Bukit Kiara MRT station

Last updated
 KG12A  CC01 
Bukit Kiara Selatan
Rapid KL Logo.svg
Future rapid transit station
General information
Location Damansara Link, Bukit Kiara, Kuala Lumpur
Malaysia
Coordinates 3°8′2.35″N101°39′4.86″E / 3.1339861°N 101.6513500°E / 3.1339861; 101.6513500
Owned by MRT Corp
Line(s) 9 Kajang
13 Circle MRT
Tracks4
Construction
Structure typeElevated
ParkingNot available
Bicycle facilitiesNot available
Other information
StatusPlanning
Station code KG12A  CC01 
History
OpeningMarch 2027 (Kajang Line)
December 2028 (Circle Line)
Services
Preceding station Rapid KL Logo.svg Following station
Phileo Damansara Kajang Line Pusat Bandar Damansara
towards Kajang

The Bukit Kiara Selatan MRT station, previously known as the Bukit Kiara MRT Station, is a future mass rapid transit (MRT) station on the MRT Circle Line and Kajang Line. [1] The proposed site for the station will be located in between Phileo Damansara and Pusat Bandar Damansara stations. The station is expected to be built as an interchange for both of the lines with constructions slated to begin in 2023. It will be an elevated station under the working name of Bukit Kiara South. [2]

Contents

Location

Bukit Kiara South station is planned to be to the south of the Bukit Kiara suburban area, where it would serve nearby administration buildings, convention centers, a small residential community, sports complexes and the Royal Selangor Club. The station location is also within the reach of the Medan Damansara residential area. [3]

History

In 2006, initial plans were to construct an LRT line from Kota Damansara to Cheras, serving areas such as TTDI, Section 17, Section 16 and Bukit Damansara which are near Bukit Kiara. [4] The planned termini have since been extended to Sungai Buloh and Kajang in 2009 to provide a convenient interchange to the KTM lines and to boost development in Sungai Buloh. [5] In 2010, the line plan has been altered to be a rapid transit line which costs RM36 billion. [6] [7] [8]

After the 2011 public displays, it was announced that Bukit Kiara is to be a future station, located between Phileo Damansara and Pusat Bandar Damansara stations. [9] Construction began on the MRT line in 2012 with marks placed along the tracks for the future station site. [3] [10] The first phase of the line opened on 16 December 2016 which skips the site. [11]

The MRT Circle Line was planned with an interchange here, between Pusat Sains Negara and PPUM stations. However, it has been scrapped since May 2018 due to shortage of funds. [12] [13]

A revival was then announced in November 2020 for the MRT Circle Line project, with plans to build the Bukit Kiara MRT station along with other stations for the loop line. Constructions are expected to begin in 2023 and it will be opening in stages, starting with Phase 1 which will include Bukit Kiara. [14]

Planned services

The MRT Kajang Line is currently having a typical frequency of 7 to 9 minutes during off-peak hours, equivalent to 6 to 9 trains per hour (tph). [15] Trains run non-stop between Phileo Damansara and Pusat Bandar Damansara where it is nearer to the former. [3]

Related Research Articles

<span class="mw-page-title-main">Kota Damansara</span> Place in Selangor, Malaysia

Kota Damansara is an affluent township located in Petaling Jaya, Petaling District, Selangor, Malaysia. It is a township spread across 4,000 acres (1,600 ha).

<span class="mw-page-title-main">Segambut</span> Place in Federal Territory of Kuala Lumpur, Malaysia

Segambut is a sub-district in Kuala Lumpur, Malaysia. The federal constituency represented in the Dewan Rakyat is Segambut.

<span class="mw-page-title-main">Subang, Selangor</span> Place in Selangor, Malaysia

Subang is a township in Petaling District, Selangor, Malaysia. It is located about 17 km west of downtown Kuala Lumpur.

<span class="mw-page-title-main">Sungai Buloh station</span> MRT, KTM and ETS integrate in Kuala Lumpur, Malaysia

The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur.

<span class="mw-page-title-main">Kajang line</span> Railway line in the Klang Valley, Malaysia

The MRT Kajang line (KGL), previously known as the Sungai Buloh–Kajang line (SBK), is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

<span class="mw-page-title-main">Klang Valley Mass Rapid Transit</span>

The Klang Valley Mass Rapid Transit project is a planned three-line mass rapid transit (MRT) system in the Klang Valley, an urban conurbation in Malaysia which includes the capital city of Kuala Lumpur. The MRT lines, when completed, would be operated as components of the Klang Valley Integrated Transit System.

<span class="mw-page-title-main">Putrajaya line</span> Second Malaysian MRT line

The MRT Putrajaya Line (PYL), also known as MRT 2, is the second Mass Rapid Transit (MRT) line in Klang Valley, Malaysia, and the third fully automated and driverless rail system in the country. It was previously known as the MRT Sungai Buloh–Serdang–Putrajaya Line (SSP Line). The line stretches from Kwasa Damansara to Putrajaya and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung Baru, Jalan Tun Razak, KLCC, TRX, Kuchai Lama, Seri Kembangan and Cyberjaya.

<span class="mw-page-title-main">Klang Valley Integrated Transit System</span> Rail transportation network in the Klang Valley

The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system currently consists of 12 fully operating rail lines; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and another one to the Sultan Abdul Aziz Shah Airport.

<span class="mw-page-title-main">Kwasa Damansara MRT station</span> Railway station in Kwasa Damansara, Malaysia

The Kwasa Damansara station is a mass rapid transit (MRT) station that serves the future township of Kwasa Damansara in Selangor, Malaysia, which is currently being developed. It is the first station of both the MRT Kajang Line and MRT Putrajaya Line.

<span class="mw-page-title-main">Mutiara Damansara MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

Mutiara Damansara station is a mass rapid transit station serving the suburb of Mutiara Damansara in Petaling Jaya, Selangor, Malaysia.

<span class="mw-page-title-main">Bandar Utama MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

The Bandar Utama station is a mass rapid transit (MRT) station serving the suburb of Bandar Utama in Petaling Jaya, Selangor, Malaysia as well as parts of Taman Tun Dr Ismail, Kuala Lumpur which lie across the Damansara–Puchong Expressway from the station.

<span class="mw-page-title-main">Kwasa Sentral MRT station</span> MRT station in Shah Alam, Selangor, Malaysia

The Kwasa Sentral station is a Mass Rapid Transit (MRT) station serving the future development project known as Kwasa Damansara in Section U4 of Shah Alam, Selangor, Malaysia. It is one of the stations of the MRT Kajang Line, formerly known as MRT Sungai Buloh–Kajang Line and was opened on 16 December 2016 under Phase One operations of the line.

<span class="mw-page-title-main">Kota Damansara MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

The Kota Damansara station is a mass rapid transit (MRT) station serving the suburb of Kota Damansara in Petaling Jaya, Selangor, Malaysia. It is one of the stations of the MRT Kajang Line, formerly known as MRT Sungai Buloh-Kajang Line. The station opened on 16 December 2016 as part of phase one operations of the line.

<span class="mw-page-title-main">Surian MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

Surian station is a mass rapid transit (MRT) station serving the suburb of Kota Damansara in Petaling Jaya, Selangor, Malaysia. It is one of the stations on the MRT Kajang Line. The station is named after Persiaran Surian, the road above which the station is situated. The station was opened on 16 December 2016 under phase one operations of the MRT Kajang Line.

<span class="mw-page-title-main">Phileo Damansara MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

The Phileo Damansara station is a mass rapid transit station serving the Phileo Damansara Commercial Centre and the northern sections of Petaling Jaya, Selangor, Malaysia.

<span class="mw-page-title-main">Pusat Bandar Damansara MRT station</span> Railway station in Damansara Town Centre, Malaysia

The Pusat Bandar Damansara MRT Station, otherwise known as Pavilion Damansara Heights–Pusat Bandar Damansara MRT Station for sponsorship purposes, is a mass rapid transit (MRT) station serving the areas of Damansara Town Centre, Damansara Heights and Bangsar in Kuala Lumpur, Malaysia.

<span class="mw-page-title-main">Semantan MRT station</span> Railway station in Kuala Lumpur

The Semantan MRT Station or Manulife–Semantan for sponsorship reasons, is a mass rapid transit (MRT) station that serves the suburb of Damansara Heights, Kuala Lumpur, Malaysia. It is one of the stations on the MRT Kajang Line and was opened on 16 December 2016 when Phase One of the line became operational.

<span class="mw-page-title-main">Taman Suntex MRT station</span> MRT station in Cheras, Selangor, Malaysia

The Taman Suntex station is a Mass Rapid Transit (MRT) station that serves the suburb of Taman Suntex in Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line. The station is located at 702 Hulu Langat interchange and Batu 9 Toll Plaza (Kajang-bound) of the Cheras–Kajang Expressway Cheras–Kajang Expressway, as well as Taman Suntex.

<span class="mw-page-title-main">Sri Raya MRT station</span> MRT station in Cheras, Selangor, Malaysia

The Sri Raya MRT station is a Mass Rapid Transit (MRT) station serving the suburb of Batu 10 Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line. The station is located at 703 Telekom interchange of the Cheras–Kajang Expressway Cheras–Kajang Expressway.

<span class="mw-page-title-main">Taman Tun Dr Ismail MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

The Taman Tun Dr Ismail station, also known as the TTDI station, is a mass rapid transit station on the Kajang Line serving the suburb of Taman Tun Dr Ismail, Kuala Lumpur and Damansara Utama, Petaling Jaya, Selangor, Malaysia.

References

  1. "mrt3-proposed-line-latest-from-Pian-2147". The Edge Markets. Retrieved 15 March 2022.
  2. "MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT". Archived from the original on 2021-09-06. Retrieved 1 September 2021.
  3. 1 2 3 "Bukit Kiara MRT Station" (Map). Google Maps. Retrieved 16 November 2018. The station location are marked by the two extra curbs on both sides of the track.
  4. "Kota Damansara-Cheras Rail Line Right on Track". The Star. 15 June 2008. Archived from the original on 27 October 2018.
  5. "Additional routes for Cheras-Kota Damansara line". TheEdgeDaily. 9 April 2010. Archived from the original on 3 March 2012. Retrieved 30 October 2018.
  6. "KL to have MRT system, say sources". The Edge. 7 June 2010. Archived from the original on 3 March 2012. Retrieved 16 November 2018.
  7. "LRT, MRT, what's next? Bullet Train?". The Edge (OSK). 7 June 2010. Archived from the original on 3 April 2017. Retrieved 16 November 2018.
  8. "RM30b MRT plan". The New Straits Times. 8 June 2010. Archived from the original on 11 June 2010.
  9. transitmy. "MRT Update: MyRapidTransit launching & public viewing on 8 July 2011 at KL Convention Centre". Malaysian Transit. Archived from the original on 20 July 2012. Retrieved 11 July 2011.
  10. "MRT project moves into active construction phase". The Star. 2 August 2012.
  11. "MRT Sungai Buloh–Kajang Line Begins Operations". MyMRT. Archived from the original on 16 November 2018. Retrieved 16 November 2018.
  12. "Possible segment of MRT Circle Line at Ekspo Negaraku 2017" . Retrieved 9 February 2018.
  13. "Govt scraps MRT 3 project". The Star Online. Star Media Group Berhad. 30 May 2018. Retrieved 30 May 2018.
  14. "MASS RAPID TRANSIT LINE 3: CIRCLE LINE - DRAFT". Archived from the original on 2021-09-06. Retrieved 1 September 2021.
  15. "MRT operated by RapidKL - Train Frequency". MyRapid. Archived from the original on 16 November 2018. Retrieved 16 November 2018.