Kuala Lumpur Sentral station

Last updated

KL Sentral
Kuala Lumpur Sentral Station Logo.png
Transit-oriented development hub and Intermodal passenger transport station
Kuala Lumpur Methodist-1-2-Brickfields-Girl-Primary-School-03.jpg
Kuala Lumpur Sentral Station (KL Sentral).jpg
Link to kl sentral 1.jpg
KL Sentral station councorse2.jpg
Link to monorail kl.jpg
From top, left to right:
KL Sentral CBD, KL Sentral exterior, link to Muzium Negara station, KL Sentral concourse, and link to KL Monorail accessed via Nu Sentral shopping mall
General information
Location Brickfields, Kuala Lumpur
Malaysia
Coordinates 3°08′03″N101°41′11″E / 3.1343°N 101.6864°E / 3.1343; 101.6864
Owned by MRCB
Operated by
Line(s) West Coast Line
Platforms2 island platform (Seremban Line, Port Klang Line and Skypark Link)
1 island platform (KTM ETS)
2 side platforms (Kelana Jaya Line)
2 Side platforms (KLIA Ekspres)
1 island platform (KLIA Transit)
Tracks4 (Seremban Line, Port Klang Line and Skypark Link)
2 (KTM ETS)
3 (KTM Freight)
2 (Kelana Jaya Line)
2 (KLIA Ekspres)
2 (KLIA Transit)
ConnectionsConnecting station to  MR1  through NU Sentral for KL Monorail
Connecting station to  KG15  Muzium Negara for MRT Kajang Line via a 240 meter walkway
Aiga bus trans.svg Feeder buses
Construction
Structure typeMostly subsurface
Elevated (Kelana Jaya Line)
ParkingAvailable with payment
AccessibleYes
Other information
Station code KA01  KS01  KJ15  KE1  KT1 
History
Opened
Services
Preceding station KTM Komuter logo.svg Keretapi Tanah Melayu
(Komuter)
Following station
Kuala Lumpur
towards Batu Caves
Seremban Line Mid Valley
Kuala Lumpur
towards Tanjung Malim
Port Klang Line Abdullah Hukum
towards Port Klang
Terminus Skypark Link Subang Jaya
Preceding station Electrictrainservicelogo.png Keretapi Tanah Melayu (ETS)Following station
Kuala Lumpur
towards Ipoh
KL Sentral–Ipoh (Gold) Terminus
KL Sentral–Ipoh (Silver)
Kuala Lumpur
towards Padang Besar
KL Sentral–Padang Besar (Platinum)
Kuala Lumpur
towards Butterworth
KL Sentral–Butterworth (Platinum)
Butterworth–Gemas (Gold) Bandar Tasik Selatan
towards Gemas
Kuala Lumpur
towards Padang Besar
Padang Besar–Gemas (Gold)
Preceding station Rapid KL Logo.svg Following station
Pasar Seni
towards Gombak
Kelana Jaya Line Bangsar
towards Putra Heights
Preceding station ERL logo.png Express Rail Link Following station
Terminus KLIA Transit Bandar Tasik Selatan
towards klia2
KLIA Ekspres KLIA
towards klia2
KL Sentral ornate roof decoration. KL Sentral roof decoration.JPG
KL Sentral ornate roof decoration.

Kuala Lumpur Sentral Station (KL Sentral) is a transit-oriented development that houses the main railway station of Kuala Lumpur, the capital of Malaysia. Opened on 16 April 2001, KL Sentral replaced the old Kuala Lumpur railway station as the city's main intercity railway station. KL Sentral is the largest railway station in Malaysia, and the second largest in Southeast Asia, behind Krung Thep Aphiwat Central Terminal in Bangkok, Thailand.

Contents

KL Sentral is designed as an intermodal transport hub. All of Kuala Lumpur's passenger rail lines serve KL Sentral except the Ampang, Sri Petaling, Shah Alam Line and Putrajaya Lines. Many intercity trains serving Peninsular Malaysia start here. All the railway components of the scheme have been completed with the NU Sentral shopping mall located here. It was also designed to be a new business and financial hub for Kuala Lumpur.

Overview

Plaza Sentral and its surroundings located within KL Sentral in early 2013. KL - Plaza Sentral environs.JPG
Plaza Sentral and its surroundings located within KL Sentral in early 2013.

KL Sentral refers to the entire 290,000 square metres of development built on the former Keretapi Tanah Melayu marshalling yard in Brickfields. The development includes the transport hub, hotels, office towers, condominiums and shopping malls and was expected to be completed in 2015. [1]

KL Sentral has been divided into 14 land parcels, each representing a different function. Some of these lots have been fully constructed and are already in use, while others are either in the process of being built, or are still awaiting development, according to the phased programme.

KL Sentral is being developed by a consortium made up of Malaysian Resources Corporation Berhad (MRCB), Keretapi Tanah Melayu Berhad (KTMB) and Pembinaan Redzai Sdn Bhd.

History

Kuala Lumpur Sentral station stands on the site of the former Malayan Railway's marshalling yard called the Central Railroad Repair Shops. In the Second World War during the Japanese occupation of Malaya, the yard was the target of the Allies' 1945 bombing of Kuala Lumpur. The yard was targeted twice, on 19 February 1945 and 10 March 1945. The second bombing raid also damaged a nearby museum.

In 1994, with the objective of enhancing Kuala Lumpur city's public transport, the Government of Malaysia awarded a contract to a consortium to transform 72 acres (290,000 m2) at the old railway marshalling yard into a modern transit hub within a self-contained urban development. The consortium, led by Malaysian Resources Corp Bhd (MRCB), appointed architect Kisho Kurokawa and Associates, who also designed the Kuala Lumpur International Airport (KLIA), to design the master plan for the entire development.

In July 2010, a number two trains crashed into each other. One was an airport bound train and the other was a parked train. The crash injured three people. [2]

In early August 2019, KL Sentral was one of the locations affected by two online bomb threats posted on Twitter; the other being the Russian Embassy in Kuala Lumpur. These threats were posted via a hacked account by an individual calling himself "limzhengyan"; as a result the Malaysian police carried out a search on those locations and determined that the threats were hoaxes, although coincidentally on the same day an incomplete improvised explosive device was found at the Bukit Damansara area. [3] [4]

Starting from 29 May 2023, KL Sentral LRT station officially rebranded as KL Sentral–redONE. The partnership is part of a five-year station naming rights agreement between Prasarana Integrated Development and redONE, the largest mobile virtual network operator (MVNO) in ASEAN. [5]

Development zones

The KL Sentral development area is divided into several plots of land, each with a specific development purpose. All constructions were scheduled to be completed by 2015. [1]

LotDevelopment TypeNameNotes
AOffice CIMB Headquarters (Menara CIMB)Completed in mid-2012
BOfficeQ SentralAnnounced in July 2010. Originally to be developed by MRCB, Kuwait Finance House and Quill Group, but later MRCB bought all of KFH and Quill shares in the venture. Construction began in Q4 2010 and completed in 2014.
CHotel/Residential St. Regis Hotel and Residence Construction started in Q4 2010 and completed in 2014.
DResidentialSentral ResidenceMRCB together with Capitaland and the Quill Group of companies will develop a 52-story residential tower. Construction has commence and completed in 2015.
EOffice & CommercialPlatinum SentralConstructed and fully developed by MRCB. Construction completed in 2011. [6]
FCommercialUnannouncedAnnounced in 2013, constructions were expected to commence at 2014 but there weren't any developments at the site. Currently designated as an open-air carpark with a sales gallery building.
GHotel/Commercial/OfficeNU SentralA joint venture company between Aseana Investment (Ireka) Limited and MRCB has been set up to develop a hotel and an office tower. MRCB and a Pelaburan Hartanah Bumiputera Bhd subsidiary formed a joint venture develop a retail mall and office tower. Constructions for all buildings began in H2 2008 and expected to be done by 2012. Also offers integration with KL Monorail. Consist of two office towers, a 27-story and 37-story, that will be built on top of the mall. A 28-story hotel will also be built on top of the mall.
HTransportationStesen SentralCompleted in 2000, served by KTM Komuter, KTM ETS, KLIA Transit, KLIA Ekspres, Kelana Jaya Line and Skypark Link. Also acts as a RapidKL bus hub. KL Monorail and Kajang Line are within walking distance.
IHotel Hilton Kuala Lumpur & Le Méridien hotelsCompleted in 2004
JCommercial & OfficeSooka Sentral, UEM Headquarters (Mercu UEM), MIDA office, Company Commission of Malaysia Headquarters, Quill 7 and offices of Axiata Sooka Sentral opened in 2008. Office towers completed in 2009
KResidentialSuasana SentralCompleted in 2002
LResidentialSuasana Sentral LoftCompleted in 2008
MOfficePlaza SentralPhase 1 completed in 2001. Phase 2 completed in 2007.
NOffice1 Sentral TowerCompleted in 2007. Sold to Tabung Haji

Office zones

The southern end of Kuala Lumpur Sentral has seen substantial additions of several commercial and civic buildings since 2001. Kuala Lumpur Sentral skyscrapers, Kuala Lumpur.jpg
The southern end of Kuala Lumpur Sentral has seen substantial additions of several commercial and civic buildings since 2001.

Office zones in KL Sentral account for more than 50% of the total land area. The developer intends that KL Sentral will ultimately be the business and financial hub of Kuala Lumpur.

Lot A: CIMB Headquarters (Menara CIMB)

Lot A will be the new headquarters for CIMB Group which is located facing the National Museum. As of June 2011, the new headquarters' name which appears on the construction site is Menara CIMB (CIMB Tower). The company acquired the land in July 2008, and construction is expected to begin in Q4 2007 and complete in 2011. It is unknown how many floors there will be but it should have around 600,000 sq ft (56,000 m2) of office space available. [7]

Lot M: Plaza Sentral

Lot M or Plaza Sentral is a completed office complex in the west of KL Sentral. The complex was completed in two stages.

Lot J: Sooka Sentral & 4 Office Towers

Lot J is a development lot for four 35-storey office towers of identical architecture.

Lot J was sold to United Engineers (M) Bhd (UEM) in May 2005 with plans for four towers. Tower A was built by UEM for its corporate headquarters called Mercu UEM on the prime piece of land with a gross floor area of 1,300,000 sq ft (120,000 m2). Tower B will be an office tower for the Malaysian Industrial Development Authority. Tower C was built by Quill Realty Sdn Bhd and sold to Suruhanjaya Syarikat Malaysia (SSM) for its corporate headquarters. Tower D is an office building built by Quill, named Quill 7. [8]

A development on Lot J is the 180,000 sq ft (17,000 m2) six-storey lifestyle centre which houses a fitness and spa centre, business centre, food court, restaurants and alfresco dining facilities. This development, called Sooka Sentral, opened its doors in December 2007.

Lot N: 1 Sentral Tower

1 Sentral Tower is an office tower, offering a gross floor area of 453,000 sq ft (42,100 m2). Construction was completed in 2007. It houses companies such as PricewaterhouseCoopers, MRCB and General Electric.

Others

Lot B has been proposed as a financial area for KL Sentral. No construction has taken place.

Lot F is planned for a future office block. Currently, the base is used for a furniture exhibition mall and Food and Beverage (F&B) centre.

Entertainment zones

Lot E will be a hub for entertainment and convention centre. The deck of this development has been completed.

Lot G: NU Sentral

Lot G, located in the south of KL Sentral consist of 1,200,000 sq ft (110,000 m2) shopping complex, 600,000 sq ft (56,000 m2) office block, 500,000 sq ft (46,000 m2) serviced apartments, and a 546,000 sq ft (50,700 m2) three-star hotel. NU Sentral is the shopping mall in the area, and directly acts as a pathway between Stesen Sentral and the KL Sentral monorail station. Development works commenced in 2008 and was completed in 2014. The land was previously used as a parking lot and a short-cut for pedestrians from Brickfields and the KL Sentral Monorail station to KL Sentral proper.

In January 2008 MRCB set up a joint venture company with Pelaburan Hartanah Bumiputera Bhd (PHBB) named Jewel Surprises Sdn Bhd to develop the area. The new company will hold a lease on the plot of land for 99 years. [9]

Transport hub

Lot H: Stesen Sentral

KL Sentral and surroundings map. Klsentralst.gif
KL Sentral and surroundings map.

Stesen Sentral (English: Central Station) is the name of Lot H, which is designated the transport hub within its KL Sentral development project, although both the public and connected transit lines generally refer to the station itself as "KL Sentral".

Stesen Sentral, designed to house six rail networks, was completed in December 2000 and the rail, retail and food and beverage operations began in April 2001. Standing on 9.3 acres (38,000 m2), the main building has a gross floor area of half a million sq ft and the specifications were based on passenger projections up to the year 2020, which is when Malaysia aspires to be a fully developed nation.

In 2008, Stesen Sentral registered over 100,000 passengers daily, which translates into 36.5 million people a year.

The station has a parking lot for visitors and people working around the KL Sentral area.

Rail services

Interior of KL Sentral station. Inside KL Sentral (220704).jpg
Interior of KL Sentral station.
West wing of KJ15 KL Sentral - redONE LRT station entrance. KL Sentral - RedONE LRT Station west wing (230530).jpg
West wing of  KJ15  KL Sentral - redONE LRT station entrance.

KL Sentral is served by the following services:

(Note: the Kelana Jaya Line station is branded as KL Sentral - redONE due to sponsorship reasons.) [10]

Connecting rail services

The following lines have stations located within the vicinity of KL Sentral complex:

  • 8 KL Monorail :  MR1  KL Sentral at Jalan Tun Sambanthan can be accessed via NU Sentral shopping mall located adjacent to KL Sentral complex.
  • 9 MRT Kajang Line:  KG15  Muzium Negara MRT station at Jalan Damansara can be accessed via a 200-metre elevated walkway from KL Sentral complex.

Station layout

L4Car Park
L3LRT Platforms
Side platform
Platform 15 Kelana Jaya Line towards  KJ1  Gombak (Pasar Seni)
Platform 25 Kelana Jaya Line towards  KJ37  Putra Heights (Bank Rakyat-Bangsar)
Side platform
KTM Ruby LoungeWaiting lounge for ETS Business Class passengers
L2Entrance/ExitJalan Stesen Sentral (northern end), Hilton Kuala Lumpur, Le Meridien Kuala Lumpur, bus stop
L2 Transit ConcourseAccess to KTM platforms 1 & 2 for   ETS   and 10 Skypark Link (suspended), KTMB ETS ticket counter, Skypark Link ticketing counter
L1L1 Transit ConcourseAccess to 1 2 KTM Komuter, 5 Kelana Jaya Line and 7 KLIA Transit platforms.
KL City Air TerminalAccess to 6 KLIA Ekspres and 9 MRT Kajang Line (Muzium Negara station)
Entrance/ExitNU Sentral (connects to 8 KL Monorail Line), Jalan Stesen Sentral (via KL City Air Terminal)
GKTMB platforms
Platform 1  ETS   ETS trains

10 Skypark Link towards Skypark Terminal (service suspended)

Island platform
Platform 2  ETS   ETS trains

10 Skypark Link towards Skypark Terminal (service suspended)

Platform 31 KTM Komuter towards Batu Caves (Kuala Lumpur)
Island platform
Platform 42 KTM Komuter towards Tanjung Malim (Kuala Lumpur)
Platform 52 KTM Komuter towards Pelabuhan Klang (Abdullah Hukum)
Island platform
Platform 61 KTM Komuter towards Pulau Sebang/Tampin (Mid Valley)
ERL platforms
Side platform
Platform 16 KLIA Ekspres alighting platform
Platform 27 KLIA Transit towards KLIA Terminal 2 (Bandar Tasik Selatan)
Island platform
Platform 37 KLIA Transit towards KLIA Terminal 2 (Bandar Tasik Selatan)
Platform 46 KLIA Ekspres towards KLIA Terminal 2 (KLIA Terminal 1)
Side platform
Bus terminalBuses to Genting Highlands and Kuala Lumpur International Airport
Transit Concourses

There are two Transit Concourses within KL Sentral station.

  • Level 1 Transit Concourse is the main concourse of the station building. The ticketing counters and faregates of 1 2 KTM Komuter, 5 Kelana Jaya Line, and 7 KLIA Transit are accessed from this concourse. Commuters may also connect to 8 KL Monorail via NU Sentral which can be accessed via escalators at the end of the concourse.
  • Level 2 Transit Concourse is located at the northern end of the station building and is used by passengers travelling on KTM ETS intercity trains. Faregates at this concourse lead directly to the intercity platforms.
KL City Air Terminal (KL CAT)
KL City Air Terminal. KL City Air Terminal.jpg
KL City Air Terminal.

KL City Air Terminal is located at the eastern and western ends of the station building and was opened on 14 April 2002 together with 6 KLIA Ekspres. Designed as an "Airport Terminal in the City", KL CAT is an IATA-indexed station and is assigned with the IATA code XKL .

As of October 2023, passengers flying Malaysia Airlines and Batik Air can check-in their baggage at KL CAT before boarding a KLIA Ekspres train to Kuala Lumpur International Airport.

KL CAT is divided into two halls:

  • KL CAT Departure Hall is located at the western end of the station building and houses the check-in counters, ticketing counters, and faregates to access KLIA Ekspres departure platform.
  • KL CAT Arrival Hall is located at the eastern end of the station building and houses the exit faregates from KLIA Ekspres arrival platform. The linkway to connect to Muzium Negara station for 9 MRT Kajang Line is also located at this hall.

When KL CAT was built, there were plans to offer through checked baggage service from KLIA to KL CAT where checked baggage of passengers arriving at KLIA would be conveyed to KL CAT and collected by passengers at KL CAT. However, these plans have not materialised.

Connecting stations

KL Sentral Monorail station

 MR1  KL Sentral
Rapid KL Logo.svg
Monorail station
Kuala Lumpur Sentral station (Kuala Lumpur Monorail) (exterior), Kuala Lumpur.jpg
The view of the KL Sentral Monorail station before the upgrade. It was built outside from the KL Sentral transport hub and beside a shopping mall, NU Sentral.
General information
Location Jalan Tun Sambanthan, Brickfields
Kuala Lumpur
Malaysia
Owned by Prasarana Malaysia
Operated by Rapid Rail
Line(s) 8 KL Monorail
Platforms1 side platform
Tracks2
Construction
Structure typeElevated
ParkingNone
History
Opened31 August 2003;20 years ago (2003-08-31)
Services
Preceding station Rapid KL Logo.svg Following station
Terminus KL Monorail Tun Sambanthan
towards Titiwangsa

The KL Sentral monorail station stands on Jalan Tun Sambanthan in Brickfields, behind the NU Sentral shopping mall. The station acts as a terminating stop for the KL Monorail line. It is directly connected to NU Sentral which allows for uninterrupted walking between Stesen Sentral and the monorail station.

The escalators from Jalan Tun Sambanthan to the station are a popular photo spot amongst tourists, owing to their wooden style architecture KL Sentral Monorail Station escalators to Jalan Tun Sambanthan (211030).jpg
The escalators from Jalan Tun Sambanthan to the station are a popular photo spot amongst tourists, owing to their wooden style architecture

The monorail station is also equipped with new ticket vending machines, ticketing gates as well as a new Customer Service Office. Tactile paving for the visually impaired is also provided beginning from NU Sentral. The completion of the overhead bridge now enables customers to travel between KL Sentral and the monorail station safely and conveniently. [11] [12] [13] The station uses the Spanish solution, having one rail line with a platform on each side, for passengers embarking and disembarking the train separately.

Before NU Sentral was built, passengers who wanted to move from the monorail station to Stesen Sentral and vice versa had to walk through the busy Jalan Tun Sambanthan.

These connecting stations between KL Monorail and Kelana Jaya Line are not the interchange station or out of station interchange stations. The commuter will be charged 2 single-way journey fares instead of integrated fares whenever using these connecting stations.

Muzium Negara MRT station

SBK Line Muzium Negara Entrance B 3.jpg

Due to space constraints, an MRT station cannot be built in the Stesen Sentral area, therefore an MRT station had to be built in front of the nearby National Museum to allow connections to Stesen Sentral. The Muzium Negara MRT station opened on 17 July 2017, along with the footbridge that connects the MRT station to the main KL Sentral building.

KL Sentral bus hub

KL Sentral has also been made a city bus hub by Rapid KL as part of its bus network revamp. It is the bus hub for city shuttle and trunk bus routes. [ citation needed ]

Buses to Singapore, Kuala Lumpur International Airport and to the klia2 also operate from KL Sentral, while most other bus operators go near KL Sentral along Jalan Tun Sambanthan. Also, a hop-on/hop-off tourist bus stop is located between Hilton and the station. Traveling by bus to Genting Highlands is also available here.

Bus services

From KL Sentral
From Pasar Seni / Kotaraya / Lebuh Pudu

Hotels and residential zones


Lot C: St. Regis Hotel

Lot C houses the St. Regis Hotel Kuala Lumpur. The luxurious hotel consists of 208 rooms and suites started its operation in May 2016. [14]

Lot D: The Sentral Residences

Lot D consists of two 55-storey residential towers called The Sentral Residences that overlooks the Lake Gardens and the city. Jointly developed by MRCB, CapitaLand and Quill Group, construction was completed in 2015. [15]

Lot I : Hilton KL & Le Méridien Hotels

Lot I consists of two skyscraper hotels occupied by Hilton Kuala Lumpur & Le Méridien Kuala Lumpur, owned by Daito Asia Development Sdn. Bhd. and Daisho Asia Development Sdn. Bhd. respectively. The hotels opened for business in September and October 2004 respectively.

Lot K and L: Suasana Sentral and Suasana Sentral Loft

Lot K is the location of a serviced apartment, Suasana Sentral. Suasana Sentral consists of two blocks, or 400 units of apartments. It was completed in 2002 and is fully sold and occupied, with about 40% of the buyers coming from the international community.[ citation needed ]

The second phase of condominiums on Lot L, Suasana Sentral Loft was launched in early 2005 and began occupancy in early 2008. The 37 and 38-storey apartment towers have a total of 600 units. All have been sold.[ citation needed ]


See also

Notes

    Related Research Articles

    <span class="mw-page-title-main">KLIA Ekspres</span> Airport rail link in Malaysia

    The ERL KLIA Ekspres is an express airport rail link servicing the Kuala Lumpur International Airport (KLIA) in Malaysia. It runs from KL Sentral, the main railway station of Kuala Lumpur to KLIA as well as its low-cost terminal, klia2. The line is one of the two services on the Express Rail Link (ERL) system, sharing the same tracks as the KLIA Transit. The KLIA Transit stops at all stations along the line, whereas the KLIA Ekspres runs as a direct non-stop express service between KL Sentral and KLIA/klia2. The is operated by Express Rail Link Sdn. Bhd. (ERL).

    <span class="mw-page-title-main">Sepang District</span> District of Malaysia in Selangor

    The Sepang District is a district located in the southern part of the state of Selangor in Malaysia. Sepang District covers an area of around 600 square kilometres, and had a population of 190,889 in the 2010 Census.

    <span class="mw-page-title-main">KLIA Transit</span> Railway line in Malaysia

    The ERL KLIA Transit is a commuter rail service which serves as an airport rail link to the Kuala Lumpur International Airport (KLIA) in Malaysia. It runs from KL Sentral, the main railway station of Kuala Lumpur to KLIA Terminal 1 and KLIA Terminal 2. The line is one of the two services on the Express Rail Link (ERL) system, sharing the same tracks as the KLIA Ekspres. KLIA Transit stops at all stations along the line, whereas KLIA Ekspres runs an express, non-stop service between KL Sentral and the airport. The ERL is operated by Express Rail Link Sdn. Bhd. (ERL).

    <span class="mw-page-title-main">Touch 'n Go</span> Malaysian expressway smart card

    Touch 'n Go is a contactless smart card system used for electronic payments in Malaysia. The system was introduced in 1997 and is widely used for toll payments on highways, public transportation, parking, and other services. The card is equipped with a radio-frequency identification (RFID) chip that allows users to make payments by simply tapping the card on a reader device. Touch 'n Go cards can be reloaded with funds either online or at designated reload kiosks. The system has become a popular and convenient way for Malaysians to make cashless transactions.

    <span class="mw-page-title-main">Rapid KL</span> Public transportation system in Malaysia

    Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. With its coverage throughout Kuala Lumpur and Klang Valley areas, it was followed by a federal government restructuring of public transport systems in Kuala Lumpur after the bankruptcy of STAR and PUTRA Light Rapid Transit operators, the precursors to the Ampang/Sri Petaling Lines and Kelana Jaya Line respectively. In 2003, it had inherited bus services and assets formerly operated and owned by Intrakota and Cityliner after being bailed out. Four years later, the Malaysian government had bailed out KL Infrastructure Group, the owner and operation concession holder for the Kuala Lumpur monorail, and had placed it under ownership of Prasarana.

    <span class="mw-page-title-main">Express Rail Link</span>

    The Express Rail Link Sdn Bhd is a company that owns and operates the airport rail link of the same name that connects the Kuala Lumpur International Airport (KLIA) with the Kuala Lumpur Sentral transportation hub, 57 kilometres apart. The company operates two different train services:

    <span class="mw-page-title-main">Puchong</span> Town in Selangor, Malaysia

    Puchong is a major town and a parliamentary constituency in Petaling District, Selangor, Malaysia.

    <span class="mw-page-title-main">Rail transport in Malaysia</span>

    Rail transport in Malaysia consists of heavy rail, light rapid transit (LRT), mass rapid transit (MRT), monorails, airport rail links and a funicular railway line. Heavy rail is mostly used for intercity services and freight transport as well as some urban public transport, while rapid transit rails are used for intracity urban public transport in the capital city of Kuala Lumpur and the surrounding Klang Valley region. There are two airport rail link systems linking Kuala Lumpur with the Kuala Lumpur International Airport and Sultan Abdul Aziz Shah Airport. The longest monorail line in the country is also used for public transport in Kuala Lumpur, while the only funicular railway line is available in Penang.

    <span class="mw-page-title-main">Rapid Bus</span> Malaysian bus business

    Rapid Bus Sdn Bhd is the largest bus operator in Malaysia operating mainly in urban areas of Klang Valley, Penang & Kuantan. As of February 2023, Rapid KL service brands unit of Rapid Bus, has operates 113 normal routes and also 69 MRT Feeder Bus routes, along with 8 Nadiputra routes in Putrajaya.

    Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. The Klang Valley is an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.

    <span class="mw-page-title-main">Putrajaya Sentral</span> Bus hub and train station in Putrajaya, Malaysia

    <span class="mw-page-title-main">Kajang line</span> Railway line in the Klang Valley, Malaysia

    The MRT Kajang line (KGL), previously known as the Sungai Buloh–Kajang line (SBK), is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the RapidKL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

    Pulau Meranti is a village in Sepang District, Selangor, Malaysia.

    <span class="mw-page-title-main">Kwasa Damansara</span> Town in Selangor, Malaysia

    Kwasa Damansara is a new township located in the Sungai Buloh constituency of Selangor, Malaysia. Located 14 km northwest of Kuala Lumpur's central business district, it borders Kota Damansara to the south and Sungai Buloh to the north.

    <span class="mw-page-title-main">Klang Valley Integrated Transit System</span> Rail transportation network in the Klang Valley

    The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system currently consists of 12 fully operating rail lines; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport and another one to the Sultan Abdul Aziz Shah Airport.

    <span class="mw-page-title-main">Muzium Negara MRT station</span> MRT station in Kuala Lumpur, Malaysia

    The Muzium Negara station is an underground mass rapid transit (MRT) station in Kuala Lumpur, Malaysia on the Kajang Line. It is located beneath Jalan Damansara in front of the Muzium Negara, which gave the station its name.

    <span class="mw-page-title-main">Maluri station</span> LRT and MRT integrate in Kuala Lumpur, Malaysia

    The Maluri station is an integrated light rapid transit (LRT) and mass rapid transit (MRT) located on the eastern fringe of Kuala Lumpur near and named after Taman Maluri, a residential housing estate. The station is located along Federal Route 1 Jalan Cheras opposite the AEON Taman Maluri shopping centre and Sunway Velocity Mall. The Kerayong River also runs beside the station.

    <span class="mw-page-title-main">Taman Tun Dr Ismail MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

    The Taman Tun Dr Ismail station, also known as the TTDI station, is a mass rapid transit station on the Kajang Line serving the suburb of Taman Tun Dr Ismail, Kuala Lumpur and Damansara Utama, Petaling Jaya, Selangor, Malaysia.

    <span class="mw-page-title-main">Taman Putra Perdana</span> Place in Selangor, Malaysia

    Taman Putra Perdana is a township in Dengkil sub-district, Sepang District, Selangor, Malaysia. Although the township's postcode is 47100 / 47120 / 47130, which gives it Puchong postal address, it is actually in the Sepang constituency of Selangor, administered by the Sepang Municipal Council (MPSepang). The township was developed by Kenshine Corporation in 1997.

    References

    1. 1 2 Kamarul Yunus (30 April 2008). "MRCB: KL Sentral to be completed by 2015". Business Times. Kuala Lumpur. Archived from the original on 2 May 2008. Retrieved 30 April 2008.
    2. "Malaysia".
    3. Andres, Leslie (2 August 2019). "'Incomplete' explosive device found in Bukit Damansara home". New Straits Times. Kuala Lumpur.
    4. "Bom rakitan ditemukan di kompleks Damansara, Malaysia". www.aa.com.tr (in Indonesian). Retrieved 2 August 2019.
    5. "KL Sentral LRT station renamed KL Sentral redONE". The Star. Kuala Lumpur. Retrieved 30 May 2023.
    6. "Platinum Sentral | Sentral REIT" . Retrieved 17 December 2021.
    7. "CIMB-Mapletree Management to raise RM1b for second fund". The Star. Kuala Lumpur. 27 July 2007. Retrieved 11 July 2008.
    8. Sharon Kam (9 July 2008). "City & Country: KL Sentral scales new heights". The Edge. Archived from the original on 14 July 2008. Retrieved 11 July 2008.
    9. "MRCB in joint venture to develop KL Sentral land". Business Times. Kuala Lumpur.[ permanent dead link ]
    10. "KL Sentral LRT station renamed KL Sentral redONE". The Star. Kuala Lumpur. Retrieved 30 May 2023.
    11. "First Look: Nu Sentral Mall at KL Sentral, Brickfields Review - VenusBuzz.com/Malaysian Women's Lifestyle". Archived from the original on 21 February 2015. Retrieved 15 March 2015.
    12. "New Wing of Bukit Bintang Monorail Station Opens Today | MyRapid". Archived from the original on 9 January 2015. Retrieved 15 March 2015.
    13. "Jejantas monorel Stesen KL Sentral dibuka sepenuhnya hari ini". Archived from the original on 21 February 2015. Retrieved 21 February 2015.
    14. "Starwood Opens The St Regis Kuala Lumpur". Japan Today. 8 May 2016. Retrieved 1 June 2016.
    15. MRCB Annual Report 2007 (PDF). MRCB Bhd. p. 63. Archived from the original (PDF) on 3 October 2008. Retrieved 28 July 2008.