Bandar Tasik Selatan station

Last updated

 KB05  SP15  KT2  Bandar Tasik Selatan
Intermodal Transport Hub
Keretapi Tanah Melayu Berhad Logo.svg KTM Komuter logo.svg Electrictrainservicelogo.png Rapid KL Logo.svg ERL logo.png
Commuter rail, Inter-city rail, LRT and Airport rail link station
Bandar Tasik Selatan station (Rawang-Seremban Line) (eastern entrance), Klang Valley.jpg
The southeastern entrance into the station.
General information
Other names Chinese :南湖鎮站
Location Kuala Lumpur Middle Ring Road 2, Bandar Tasik Selatan, Kuala Lumpur, Malaysia.
Coordinates 3°4′34″N101°42′38″E / 3.07611°N 101.71056°E / 3.07611; 101.71056
Owned by Keretapi Tanah Melayu
Prasarana Malaysia
Operated by Rapid Rail
Express Rail Link
Line(s) West Coast Line
Platforms2 side platform (KTM)
1 island platform (LRT)
2 island platforms (ERL)
Tracks2 (KTM)
2 (LRT)
4 (ERL)
ConnectionsAiga bus trans.svg Terminal Bersepadu Selatan bus hub
Construction
Structure typeSurface
ParkingAvailable with payment.
AccessibleAvailable
Other information
Station code KB04  SP15  KT2 
History
Opened10 November 1995 (KTM)
11 July 1998 (LRT)
20 June 2002 (ERL)
Services
Preceding station KTM Komuter logo.svg Keretapi Tanah Melayu
(Komuter)
Following station
Salak Selatan
towards Batu Caves
Batu Caves–Pulau Sebang Line Serdang
Preceding station Electrictrainservicelogo.png Keretapi Tanah Melayu (ETS)Following station
Kuala Lumpur Sentral
towards Padang Besar
Padang Besar–Gemas (Gold) Kajang
towards Gemas
Kuala Lumpur Sentral
towards Butterworth
Butterworth–Gemas (Gold)
Preceding station Rapid KL Logo.svg Following station
Bandar Tun Razak
towards Sentul Timur
Sri Petaling Line Sungai Besi
towards Putra Heights
Preceding station ERL logo.png Express Rail Link Following station
Kuala Lumpur Sentral
Terminus
KLIA Transit Putrajaya & Cyberjaya
towards KLIA T2

Bandar Tasik Selatan station (BTS) is a major Malaysian interchange station located next to and named after Bandar Tasik Selatan, in Kuala Lumpur. The station serves as both a stop and an interchange for the KTM Komuter's Seremban Line, KTM ETS, the LRT Sri Petaling Line, and the Express Rail Link's KLIA Transit trains. [1] BTS is integrated with the Terminal Bersepadu Selatan bus hub (TBS). [2] BTS and TBS are developed as an intermodal transportation hub.

Contents

Facilities for the reloading of Touch 'n Go cards are also provided in the interchange, at the Sri Petaling Line concourse. [3]

Location

BTS is located approximately 10 km (6.2 mi) south of the Kuala Lumpur city centre, towards the Kuala Lumpur International Airport. The location of BTS and TBS provides easy access to Malaysia's motorway network, avoiding city centre road congestion.

Lines

The interchange is made out of three different lines. [1] They were laid side by side and added over the course of seven years. Overhead bridges connect all three lines. Each line has separate, independent service features and ticketing areas. The paid areas of each line are distinct from each other, therefore there is no paid-area integration between the three lines, and passengers have to purchase new tickets (or tokens in the case of the LRT and KTM stations) when exiting one line to change to the other.

All three lines in the interchange accommodate for disabled passengers.

Seremban Line (KTM Komuter) and KTM ETS

The Bandar Tasik Selatan station was formed with the completion of a KTM Komuter regional rail halt, as part of the second phase of the electrified Rawang-Seremban Line (between Kuala Lumpur and Kajang) opening on 10 November 1995. The station was the first in the stop to be accessible from Kuala Lumpur Middle Ring Road 2 (MRR2), but its facilities were rudimentary, consisting of only two raised side platforms lined along a curved double track, a footbridge, and an elevated ticket area that initially provided only ticket vending machines. The platform shelters were only sufficient for a limited space, and the halt often suffered from bottlenecking at the ticket area. The various levels of the halt were also initially linked primarily via staircases or escalators, rendering the halt unfriendly to disabled users.

In 2006 and 2007, renovation works were made to expand the ticket area of the halt, and add a larger concourse area with a manual ticket counter. In addition, existing shelters along the platforms were replaced by large canopies during the middle of 2007, in conjunction with 2006 and 2007 canopy upgrades at most Komuter stations built or upgraded circa 1995.

On 4 August 2016, an additional morning train (Mondays to Fridays except on public holidays) was introduced between Bandar Tasik Selatan, KL Sentral and Tanjung Malim. The train starts at Bandar Tasik Selatan at 5:35am, running non-stop express to KL Sentral, arriving at 5:49am. The train then leaves KL Sentral at 6:15am and runs as a normal Port Klang Line train to Tanjung Malim, stopping at every station before terminating at Tanjung Malim at 7:44am. [4] This has since been replaced with modifications to the KTM Komuter timetable.

The station provides both KTM Komuter and the KTM ETS services.

LRT Sri Petaling Line

The second addition to the stop is a subsurface light rapid transit station for the Sri Petaling-Sentul Timur branch of the Ampang Line, then known as STAR LRT. The station was opened on 11 July 1998, as part of the second phase of the STAR system's opening, including 7 new stations along the Chan Sow Lin-Sri Petaling route, and was situated directly southeast from the Komuter halt and closer to MRR2. At that time, BTS station was named as "Tasik Selatan" station. [5] Because of the layout, the Komuter halt was initially accessible solely via the main entrance of the then Ampang Line station, which currently serves as the southeastern access point into the interchange station.

In comparison to the Komuter halt during its time of opening, the STAR station was considerably more capable of handling larger numbers of passengers, with several ticket counters and ticket vending machines prepared in its ticket concourse when the station was unveiled to commuters. The station also features an island platform for its two adjoining tracks, instead of side platforms. Both segments of the station are linked by a footbridge, which, like the initial KTM halt, did not accommodate disabled passengers as the footbridge is only accessible via staircases. This has since changed when lifts were added to both the KTM and LRT stations.

The principal styling of the station is similar to most other stations along the Ampang and Sri Petaling lines, featuring multi-tiered roofs supported by latticed frames, and white plastered walls and pillars. Signboards in the station formerly referred to itself simply as "Tasek Selatan".

KLIA Transit (Express Rail Link)

An exterior view of the Bandar Tasik Selatan KLIA Transit station southbound, as seen from the footbridge leading to the station, showing a passing KLIA Ekspres train. Bandar Tasik Selatan station (KLIA Transit), Klang Valley.jpg
An exterior view of the Bandar Tasik Selatan KLIA Transit station southbound, as seen from the footbridge leading to the station, showing a passing KLIA Ekspres train.

The Bandar Tasik Selatan Express Rail Link station is the latest stop added to the Bandar Tasik Selatan interchange, beginning its operation on 20 June 2002 as part of the 5-station KLIA Transit airport rail link between the Kuala Lumpur International Airport station and Kuala Lumpur Sentral.

Rather than sharing a common access point with the KTM station and the Sri Petaling Line station, the KLIA Transit station was constructed as an entirely dedicated structure towards the northwest from the KTM station, with its own access point towards the northwest via Kampung Malaysia Tambahan to Jalan Sungai Besi (a branch road from the Sungai Besi Expressway). The only direct linkage between the KLIA Transit station and the other two stations is a 95-metre (312 ft) footbridge over the ERL tracks and the KTM tracks into the ticket area of the KTM station, thus serving as a second access point to both the KTM station and the Sri Petaling Line station.

The station was built in a unique design that incorporated large semicircular roofs as shelters for platforms with multi-tiered roofs for the rest of the building, similar to the adjoining Sri Petaling Line station. Unlike the initial structures of the KTM and LRT stations, however, the station was planned and built to support disabled passengers, with elevators and inclinations up and down uneven walkways, alongside stairways and escalators in all relevant areas of the station. The station also features two island platforms along four tracks, and basic ticket counters.

Terminal Bersepadu Selatan

TBS station view from BTS LRT station Terminal Bersepadu Selatan outview (211106).jpg
TBS station view from BTS LRT station
Terminal Bersepadu Selatan at dusk Terminal Bersepadu Selatan 2.jpg
Terminal Bersepadu Selatan at dusk

Terminal Bersepadu Selatan (TBS, English: Southern Integrated Terminal) is the main long-distance bus terminal in Kuala Lumpur, Malaysia. It is integrated with the adjacent Bandar Tasik Selatan station (BTS) via a footbridge, forming the TBS-BTS integrated transportation hub. [6]

TBS is one of the three planned Integrated Transport Terminals (ITT) of Kuala Lumpur, and the only one currently in operation. Originally intended to be the bus terminal serving southbound buses, TBS gradually took over bus operations for East Coast-bound and northbound buses from older city bus terminals. The other two ITTs, located at Gombak and Sungai Buloh, are in planning stages and will eventually become the main bus terminals for East Coast-bound and northbound buses respectively. [7]

History

Former Hentian Putra, 2024 Hentian Putra, Kuala Lumpur 20240212 134311.jpg
Former Hentian Putra, 2024

TBS was built to relieve the heavily congested Pudu Sentral bus station (formerly and still commonly known as Puduraya) located in the city centre. Initially planned to be the bus station serving southbound express buses, the long-term plan was TBS eventually taking over the remaining express buses at Pudu Sentral, as well as East Coast-bound buses at Hentian Putra and Pekeliling bus stations. It was expected that Pudu Sentral would remain as a city bus station only. [8]

TBS opened for service on 1 January 2011, taking over southbound long-distance bus operations from Pudu Sentral. [9] The ceremonial official opening by the Prime Minister Najib Tun Razak was on 14 April 2013.

Hentian Putra ceased operations on 1 December 2014, with its East Coast-bound bus services moved to TBS. [10]

On 1 November 2015, 545 of the 635 northbound bus operations at Pudu Sentral were moved to TBS, completing the replacement of Pudu Sentral by TBS as the city's main express bus terminal. Pudu Sentral remains in use as a terminal for short-distance buses and stage buses. [11] [12]

Location and facilities

Inside the terminal Terminal Bersepadu Selatan 5.jpg
Inside the terminal

TBS is located approximately 10 km (6.2 mi) south of Kuala Lumpur city centre relieving and bypassing road congestion in the city centre. The proximity of TBS to the Middle Ring Road 2 and Besraya Expressway gives easy access to Malaysia's expressway network. [13]

The terminal has 60 bus platforms, 150 taxi bays and 1,000 parking bays. [13] The terminal is fully accessible and equipped with amenities such as ATMs, baby care rooms, luggage trolleys and luggage storage. [14] Shopping and dining options are available. [15]

The terminal ticketing facilities feature:-

The system is set up to deter touting. [16]

The departure hall is divided into three sections. Only ticket holders are allowed into the departure hall. They are required to go through an auxiliary police security checkpoint. [16] [17]

Designed to handle 5,000 bus trips a day at maximum capacity, TBS handled about 1,300 bus trips daily as of October 2015, prior to the shift of northbound bus operations from Pudu Sentral. [12] As of December 2015, the terminal serves 52,000 travellers per day. [16]

Management

The current operator of TBS is Maju Terminal Management Services Sdn Bhd (Maju TMAS). Maju TMAS is a member company of Maju Holdings Berhad. [18]

See also

Related Research Articles

<span class="mw-page-title-main">Kuala Lumpur Sentral station</span> Railway station in Kuala Lumpur, Malaysia

Kuala Lumpur Sentral Station is a transit-oriented development that houses the main railway station of Kuala Lumpur, the capital of Malaysia. Opened on 16 April 2001, KL Sentral replaced the old Kuala Lumpur railway station as the city's main inter-city railway station. KL Sentral is the largest railway station in Malaysia, and also in Southeast Asia from 2001 to 2021, before Krung Thep Aphiwat Central Terminal in Bangkok, Thailand was completed.

<span class="mw-page-title-main">KLIA Transit</span> Railway line in Malaysia

The ERL KLIA Transit is a commuter rail service which serves as an airport rail link to the Kuala Lumpur International Airport (KLIA) in Malaysia. It runs from KL Sentral, the main railway station of Kuala Lumpur to KLIA's Terminal 1 and Terminal 2. The line is one of the two services on the Express Rail Link (ERL) system, sharing the same tracks as the KLIA Ekspres. KLIA Transit stops at all stations along the line, whereas KLIA Ekspres runs an express, non-stop service between KL Sentral and the airport. The line is operated by Express Rail Link Sdn. Bhd. (ERL).

<span class="mw-page-title-main">Rapid KL</span> Public transportation system in Malaysia

Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.

<span class="mw-page-title-main">Express Rail Link</span>

The Express Rail Link Sdn Bhd is a company that owns and operates the airport rail link of the same name that connects the Kuala Lumpur International Airport (KLIA) with the Kuala Lumpur Sentral transportation hub, 57 kilometres apart. The company operates two different train services:

Malaysian National Projects are major national and giant projects which are important in the development of Malaysia.

<span class="mw-page-title-main">Bandar Tasik Selatan</span>

Bandar Tasik Selatan is a township in Sungai Besi, Kuala Lumpur, Malaysia. It was established in 1991.

<span class="mw-page-title-main">Rail transport in Malaysia</span>

Rail transport in Malaysia has evolved significantly since its inception in the late 19th century, reflecting the country's economic growth and modernization.

Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. Greater Kuala Lumpur is conterminous with the Klang Valley, an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.

<span class="mw-page-title-main">Subang Jaya station</span> Railway station in Malaysia

The Subang Jaya station is a railway station located in SS16, Subang Jaya. It is served by the KTM Komuter Port Klang Line and Skypark Link, as well as the LRT Kelana Jaya Line.

<span class="mw-page-title-main">Putra Komuter station</span> Malaysian commuter train halt

Putra Komuter station is a Malaysian commuter train halt in Kuala Lumpur. It is named in part after Putra World Trade Centre located nearby, which is now known as the World Trade Centre Kuala Lumpur. World Trade Centre Kuala Lumpur is one of the convention and exhibition centres located in Kuala Lumpur.

Salak Selatan LRT station is a Malaysian low-rise light rapid transit (LRT) station situated near and named after the Kuala Lumpur township of Salak South. The station is part of the LRT Sri Petaling Line.

<span class="mw-page-title-main">Nilai Komuter station</span> Railway station in Nilai, Malaysia

Nilai Komuter station is a KTM Komuter train station, situated close to and named after the old town of Nilai, Negeri Sembilan. The station strictly serves as a two-platform train halt for the Seremban Line KTM Komuter train service. This used to be a stop for the KTM ETS service when the line was extended to Gemas in 2015.

<span class="mw-page-title-main">Bandar Sri Permaisuri</span> Township in Federal Territory of Kuala Lumpur, Malaysia

Sri Permaisuri is a township in Cheras, Kuala Lumpur, Malaysia. It is located near Bandar Tun Razak and Salak South. It was opened for residential housing in 2000. The major types of housing there are apartments and condominiums.

<span class="mw-page-title-main">Pudu Sentral</span> Bus station in Kuala Lumpur, Malaysia

The Pudu Sentral(formerly Puduraya Terminal ) is the main local service bus terminus in Kuala Lumpur, Malaysia. It was opened in 1976.

<span class="mw-page-title-main">Batu Caves–Pulau Sebang Line</span> Railway line in Malaysia

The KTM Batu Caves–Pulau Sebang Line, formerly known as the Seremban Line is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu. Its electric trains run between Batu Caves and Pulau Sebang/Tampin. Prior to 15 December 2015, the northern terminus of this line was Rawang.

<span class="mw-page-title-main">Klang Valley Integrated Transit System</span> Rail transportation network in the Klang Valley

The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system commenced operations in August 1995 with the introduction of commuter rail service on the existing rail between Kuala Lumpur and Rawang. The system have since expanded and currently consists of 11 fully operating rail lines in a radial formation; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and one temperarily suspended airport rail link to the Sultan Abdul Aziz Shah Airport. The system encompasses 528.4 kilometres (328.3 mi) of grade-separated railway with 197 operational stations.

<span class="mw-page-title-main">KL Sentral–Terminal Skypark Line</span> Railway line in Malaysia

The KTM KL Sentral–Terminal Skypark Line is a currently suspended limited express train service in Kuala Lumpur, Malaysia between Kuala Lumpur Sentral and Sultan Abdul Aziz Shah Airport. It is Malaysia's second airport rail link service, after the Express Rail Link system.

<span class="mw-page-title-main">Taman Midah</span> Township in Kuala Lumpur, Malaysia

Taman Midah is a 262-acre township in Cheras, Kuala Lumpur, Malaysia. The township probably takes its name from the Midah River which flows into a small lake to the east.

Sultan Street railway station was a railway station located at the intersection of Jalan Sultan, Jalan Pudu and Jalan Tun Tan Cheng Lock, in Kuala Lumpur, Malaysia.

References

  1. 1 2 "KL Transit map, Jan 2015". Archived from the original on 8 July 2017. Retrieved 29 March 2016.
  2. TBS BTS; website
  3. "Locations". Archived from the original on 9 December 2020. Retrieved 8 September 2019.
  4. "Additional Service For Early Birds" (PDF). Archived from the original (PDF) on 27 December 2016. Retrieved 27 December 2016.
  5. Chia Mui Wee (1998). Persepsi pengguna terhadap penggunaan perkhidmatan pengangkutan Sistem Transit Aliran Ringan Sdn. Bhd (in Malay). Universiti Malaya: Bahagian Pentadbiran Perniagaan,Fakulti Ekonomi dan Pentadbiran, Universiti Malaya. p. 87.
  6. TBSBTS; Official website; accessed March 2019
  7. "Integrated Transport Terminal (ITT) Gombak". Land Public Transport Commission of Malaysia. Archived from the original on 10 May 2017. Retrieved 6 October 2016.
  8. Lee Yuk Peng (21 May 2009). "Steps to improve KL transport service". The Star.
  9. BERNAMA - Bandar Tasik Selatan Integrated Transport Terminal To Open in 1 January (Retrieved on 27 April 2011)
  10. "Relocation of Express Bus Services from Hentian Bas Putra to Terminal Bersepadu Selatan Effective 1st December 2014". Land Public Transport Commission of Malaysia. 21 November 2014. Archived from the original on 9 April 2016. Retrieved 27 March 2016.
  11. "Northbound buses to operate from Bandar Tasik Selatan terminal effective Nov 1". The Sun Daily (Malaysia). 20 October 2015. Retrieved 27 March 2016.
  12. 1 2 "Express buses leaving Puduraya". The Star (Malaysia). 21 October 2015. Retrieved 27 March 2016.
  13. 1 2 Chok Suat Ling (13 July 2008). "Cut the highways, look into buses, LRT". The New Straits Times. Archived from the original on 13 July 2008. Retrieved 13 July 2008.
  14. "Facilities". Terminal Bersepadu Selatan official website. Retrieved 27 March 2016.
  15. "Dine & Shop". Terminal Bersepadu Selatan official website. Retrieved 27 March 2016.
  16. 1 2 3 Nair, Vijenthi (10 December 2015). "No ordinary bus terminal". The Star (Malaysia). Retrieved 27 March 2016.
  17. "Departure Lounge". Terminal Bersepadu Selatan official website. Retrieved 27 March 2016.
  18. Bandar Tasik Selatan integrated transport terminal to open Archived 19 September 2012 at the Wayback Machine (Retrieved on 27 April 2011)