KB06 KG35 Kajang | |||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Commuter rail, Inter-city rail and MRT station | |||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||
Other names | Chinese :加影 Tamil: காஜாங் | ||||||||||||||||||||||||||||||||||
Location | Jalan Bukit, Kajang, Selangor, Malaysia. | ||||||||||||||||||||||||||||||||||
Coordinates | 2°58′58″N101°47′25″E / 2.98278°N 101.79028°E | ||||||||||||||||||||||||||||||||||
Owned by | MRT Corp Keretapi Tanah Melayu | ||||||||||||||||||||||||||||||||||
Operated by | Rapid Rail Keretapi Tanah Melayu | ||||||||||||||||||||||||||||||||||
Line(s) | 1 Batu Caves-Pulau Sebang 9 Kajang 14 Putrajaya Monorail ETS KTM ETS | ||||||||||||||||||||||||||||||||||
Platforms | 1 side platform and 1 island platform (KTM) 1 island platform (MRT) | ||||||||||||||||||||||||||||||||||
Tracks | 4 (KTM) 2 (MRT) | ||||||||||||||||||||||||||||||||||
Connections | RapidKL : 450, [1] T451, [2] T461, T462, T463, T464 [3] | ||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||
Structure type | KB06 Surface KG35 Elevated | ||||||||||||||||||||||||||||||||||
Platform levels | 4 | ||||||||||||||||||||||||||||||||||
Parking | Available with payment.1460 parking bays; 600 motorcycle bays. | ||||||||||||||||||||||||||||||||||
Bicycle facilities | Available. 31 bicycle bays | ||||||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||
Station code | KB06 KG35 | ||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||
Opened | 14 August 1897 (KTM) [4] 17 July 2017 (MRT) | ||||||||||||||||||||||||||||||||||
Rebuilt | 10 November 1995 (KTM), 2017 (MRT + KTM) | ||||||||||||||||||||||||||||||||||
Electrified | 1995 (KTM) | ||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||
|
The Kajang railway station is a Malaysian railway station located near and named after the town of Kajang, Selangor. The station is situated 1 km (5⁄8 mi) south of Kajang's town centre. However, the MRT Kajang line is also named after the station as well, since it served as a terminus and the final station for the line.
Kajang station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Diagram is not to scale Source [5] |
The station is currently served by the KTM Komuter Seremban Line and KTM ETS train services. Since 17 July 2017, it is also served by the MRT Kajang Line.
The current Kajang Komuter station inherits the original station's branch lines and responsibilities to manage railway switches, railway monitoring and goods delivery. The station employs a number of railway staff. The station is also connected to sheds for railway maintenance vehicles, as well as a warehouse. The station contains three platforms: Platform 1 is a side platform with full-length track and extended shed; Platforms 2 and 3 are an island platform. The platforms are lined along with a set of four main lines; three run between the two platforms and one runs along the other side of the island platform. The line between platforms 1 and 3 is the main route. Platform 2 can be used for any service, while the platform 3 line is only used when platform 2 is occupied by another train.
The MRT platforms are elevated, along with the new KTM commuter platform replacing the ground-level station. Feeder bus services are available as well. Interchange between KTM and MRT is not possible, passengers are required to purchase separate tickets to enter the other station. [6]
The original station was opened in 1897. Intercity services were provided for the town from its early years through the 20th century, while KTM Komuter services were introduced in the mid-1990s, when a new station adjoining Jalan Bukit (Malay; English: Hill Road) was completed on the east side of the tracks to replace the older station adjoining Jalan Reko (Reko Road) on the west side of the tracks.
KTM Kajang Campus Shuttle Bus | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The KTM ground station has undergone a few remodelings throughout its service. A platform was extended to support Intercity trains that occasionally stretch longer than the station's platform. A second access area for the station was completed and opened for access at the west side of the track in 2004, but has no operational faregates and had only introduced manual ticketing services from early-2007 onwards. The installation of larger platform canopy roofs was also undertaken during the first half of 2007.
On 8 July 2011, the final alignment of the Kajang Line was announced with 31 stations; Kajang railway station being one of the interchange stations. Active construction started around August 2012; it was completed and opened to the public on 17 July 2017, along with other Phase 2 stations on the line. This station was the southernmost in the whole of the RapidKL rail network until March 16, 2023, after the Putrajaya Sentral station replaced Kajang as the southernmost station in the entire network. [7]
The MRT construction project included the rebuilding of the KTM service station, with new connecting stairwell and redesigned wayfinding sign in similar style to the MRT station. When the overhead platform for KTM commuter is finished, the KTM ticket counter, customer service and office are moved to the Level 1 of the station beside the MRT customer service counter. The on-ground station has since been demolished making Platform 1 no longer directly connected to the station as a side platform.
With the opening of the MRT Kajang Line, feeder buses also began operating linking the station with several housing areas and cities around the Kajang and Bangi areas. The feeder buses operate from the station's feeder bus hub accessed via Entrance A of the station.
Route No. | Origin | Destination | Via |
---|---|---|---|
T451 (As a pass-by) | KG34 Stadium Kajang | Universiti Kebangsaan Malaysia (UKM) | Jalan Besar, Kajang KG35 KB06 Kajang Jalan Reko Reko Sentral KB06A Kajang 2 Hentian Kajang Sungai Tangkas KB07 UKM |
T461 [8] | KG35 KB06 Kajang | Taman Kajang Utama | Jalan Reko Kajang Dispersal Link Expressway Kajang SILK Highway Kajang Utama |
T462 [9] | KG35 KB06 Kajang | Bandar Baru Bangi Seksyen 8 | Jalan Reko Reko Sentral Bangi Seksyen 4 Tambahan Bangi Seksyen 7 Sungai Ramal Kompleks PKNS Bangi Bangi Seksyen 8 & 9 (Bandar Baru Bangi) |
T463 [10] | KG35 KB06 Kajang | Bandar Baru Bangi Seksyen 4 | Jalan Reko Reko Sentral Bangi Seksyen 4 Tambahan Petronas UNIKEB 2 |
T464 [11] (As a pass-by) | Bandar Baru Bangi Seksyen 16 | KG35 KB06 Kajang | Persiaran Kemajuan Bangi Gateway Teras Jernang Universiti Kebangsaan Malaysia (UKM) KB07 UKM Sungai Tangkas Hentian Kajang KB06A Kajang 2 Reko Sentral Jalan Reko Bandar Kajang Jalan Besar, Kajang |
The MRT Kajang station also provides accessibility for some other bus services.
Route No. | Operator | Origin | Destination | Via | Remarks |
---|---|---|---|---|---|
450 [12] | Rapid KL | Mydin Sinar Kota, Kuala Lumpur (Hub Lebuh Pudu) AG7 SP7 KJ13 Masjid Jamek | Hentian Kajang | Jalan Pudu Jalan Pasar Jalan Cheras KG22 AG13 ‹See TfM› Maluri Taman Pertama KG24 Taman Midah KG25 Taman Mutiara / Leisure Mall Taman Suntex Cheras–Kajang Expressway Cheras-Kajang Highway KG31 Bukit Dukung Simpang Balak Sungai Sekamat KG33 Sungai Jernih / KPJ Kajang Bandar Kajang KG35 KB06 Kajang Reko Sentral KB06A Kajang 2 | Some buses may not enter the station bus stop (for Kajang bound only). For KL bound, passengers have to cross along Jalan Reko to access to the station. |
451 (Trial run 1 July 2023 to 30 March 2025) | KG35 Kajang | KT3 PY41 Putrajaya Sentral | Hentian Kajang Kompleks PKNS Bangi SK Kampung Abu Bakar Baginda Presint 15 Putrajaya Kompleks F Putra Square, Putrajaya Presint 2,3,4 Putrajaya | Only available on weekdays, for Putrajaya bound only: 6.30 am For other times, passengers must interchange at Tun Razak Exchange (MRT method) or Bandar Tasik Selatan (KTM and KLIA Transit method) |
Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.
The Mid Valley Komuter station is a KTM Komuter train station located in Lembah Pantai, Kuala Lumpur. The halt is on the KTM Komuter's Seremban Line.
The Pasar Seni station is an integrated rapid transit station in Kuala Lumpur that is served by the LRT Kelana Jaya Line and the MRT Kajang Line. The station is named after the nearby Central Market and is located near Petaling Street and the area known as the Chinatown of Kuala Lumpur.
Salak Selatan LRT station is a Malaysian low-rise light rapid transit (LRT) station situated near and named after the Kuala Lumpur township of Salak South. The station is part of the LRT Sri Petaling Line.
The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur.
Mutiara Damansara station is a mass rapid transit station serving the suburb of Mutiara Damansara in Petaling Jaya, Selangor, Malaysia.
Surian station is a mass rapid transit (MRT) station serving the suburb of Kota Damansara in Petaling Jaya, Selangor, Malaysia. It is one of the stations on the MRT Kajang Line. The station is named after Persiaran Surian, the road above which the station is situated. The station was opened on 16 December 2016 under phase one operations of the MRT Kajang Line.
The Semantan MRT Station is a mass rapid transit (MRT) station that serves the suburb of Damansara Heights, Kuala Lumpur, Malaysia. It is one of the stations on the MRT Kajang Line and was opened on 16 December 2016 when Phase One of the line became operational.
The Maluri station is an integrated light rapid transit (LRT) and mass rapid transit (MRT) located on the eastern fringe of Kuala Lumpur near and named after Taman Maluri, a residential housing estate. The station is located along Federal Route 1 Jalan Cheras opposite the AEON Taman Maluri shopping centre and Sunway Velocity Mall. The Kerayong River also runs beside the station.
Taman Pertama MRT station is a mass rapid transit (MRT) station on the MRT Kajang Line in Cheras, Kuala Lumpur, Malaysia. It is located along Federal Route 1 Jalan Cheras, which is just right next to where it branches to Jalan Loke Yew, Jalan Yaacob Latif and Jalan Cheras. It was opened on 17 July 2017, along with 18 adjoining stations as part of Phase Two of the MRT SBK line.
The Taman Midah MRT station is a mass rapid transit (MRT) station on the MRT Kajang Line, serving the neighbourhood of Taman Midah and the surrounding residential areas in the suburb of Cheras, Kuala Lumpur, Malaysia. It was opened on 17 July 2017.
The Taman Mutiara MRT station is an elevated rapid transit station in Cheras in south-eastern Kuala Lumpur, Malaysia. It is located above the Federal Route 1 Jalan Cheras, next to the Cheras Leisure Mall as well as EkoCheras Mall. And therefore, the station was thus provisionally named Leisure Mall station during construction.
The Taman Connaught MRT station is an elevated rapid transit station on the MRT Kajang Line, located in Taman Connaught, Bandar Tun Razak constituency in southeastern Kuala Lumpur, Malaysia. Its exact location is next to the Cheras Sentral shopping mall, which is at Federal Route 1 Jalan Cheras near the northern end of the Cheras-Kajang Expressway, close to the Federal Territory Kuala Lumpur-Selangor border.
The Taman Suntex station is a Mass Rapid Transit (MRT) station that serves the suburb of Taman Suntex in Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line. The station is located at 702 Hulu Langat interchange and Batu 9 Toll Plaza (Kajang-bound) of the Cheras–Kajang Expressway Cheras–Kajang Expressway, as well as Taman Suntex.
The Sri Raya MRT station is a Mass Rapid Transit (MRT) station serving the suburb of Batu 10 Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang line. The station is located at 703 Telekom interchange of the Cheras–Kajang Expressway Cheras–Kajang Expressway.
The Bandar Tun Hussein Onn MRT station is a Mass Rapid Transit (MRT) station in Bandar Tun Hussein Onn, located in Cheras Selatan commune, Hulu Langat region, Selangor, Malaysia. It serves as one of the stations on the Klang Valley Mass Rapid Transit (KVMRT) Kajang line. It was opened on 17 July 2017, together with the Phase 2 opening of the MRT line, along the Muzium Negara-‹See TfM›Kajang stretch.
The Bukit Dukung station is a mass rapid transit (MRT) station serving the suburbs of Bukit Dukung, Kampung Selamat and Sungai Balak in Kajang, Selangor, Malaysia. It is as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line.
The Batu 11 Cheras station is a Mass Rapid Transit (MRT) station serving the suburb of Batu 11 Cheras, Balakong and Bandar Sungai Long in Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang line. The station is located at Balakong interchange of the Cheras–Kajang Expressway.
Sungai Jernih MRT station is an elevated rapid transit station on the MRT Kajang Line, located in the northern precincts of downtown Kajang, Selangor, Malaysia. It was opened on 17 July 2017, along with 19 adjoining stations as part of Phase 2 of the system.
The Stadium Kajang MRT station is an elevated mass rapid transit (MRT) station on the Kajang Line, located in downtown Kajang, Selangor, Malaysia. It was opened on 17 July 2017, along with 19 adjoining stations as part of Phase 2 of the system. It is the second-to-last station towards Kajang on the SBK line.