Kajang station

Last updated

 KB06  KG35  Kajang
Keretapi Tanah Melayu Berhad Logo.svg KTM Komuter logo.svg Electrictrainservicelogo.png Rapid KL Logo.svg
Commuter rail, Inter-city rail and MRT station
Kajang MRT Station outview 02 (cropped).jpg
View of the integrated station building.
General information
Other names Chinese :加影
Tamil: காஜாங்
LocationJalan Bukit, Kajang, Selangor, Malaysia.
Coordinates 2°58′58″N101°47′25″E / 2.98278°N 101.79028°E / 2.98278; 101.79028
Owned by MRT Corp
Keretapi Tanah Melayu
Operated by Rapid Rail
Keretapi Tanah Melayu
Line(s) 1 Batu Caves-Pulau Sebang
9 Kajang
14 Putrajaya Monorail
  ETS   KTM ETS
Platforms1 side platform and 1 island platform (KTM)
1 island platform (MRT)
Tracks4 (KTM)
2 (MRT)
ConnectionsAiga bus trans.svg RapidKL  : 450, [1] T451, [2] T461, T462, T463, T464 [3]
Construction
Structure type KB06  Surface
 KG35  Elevated
Platform levels4
ParkingAvailable with payment.1460 parking bays; 600 motorcycle bays.
Bicycle facilitiesAvailable. 31 bicycle bays
AccessibleYes
Other information
Station code KB06  KG35 
History
Opened14 August 1897 (KTM) [4]
17 July 2017 (MRT)
Rebuilt10 November 1995 (KTM), 2017 (MRT + KTM)
Electrified1995 (KTM)
Services
Preceding station KTM Komuter logo.svg Keretapi Tanah Melayu
(Komuter)
Following station
Serdang
towards Batu Caves
Batu Caves–Pulau Sebang Line Kajang 2
Preceding station Electrictrainservicelogo.png Keretapi Tanah Melayu (ETS)Following station
Bandar Tasik Selatan
towards Padang Besar
Padang Besar–Gemas (Gold) Seremban
towards Gemas
Bandar Tasik Selatan
towards Butterworth
Butterworth–Gemas (Gold)
Preceding station Rapid KL Logo.svg Following station
Stadium Kajang Kajang Line Terminus

The Kajang railway station is a Malaysian railway station located near and named after the town of Kajang, Selangor. The station is situated 1 km (58 mi) south of Kajang's town centre. However, the MRT Kajang line is also named after the station as well, since it served as a terminus and the final station for the line.

Contents

Services

Kajang station
 
Sg. Gadut Seremban
BSicon vCONTg.svg
BSicon v-SHI2gr.svg
BSicon dABZg2.svg
BSicon STRc3.svg
BSicon vSTR.svg
BSicon dSTR+c1.svg
BSicon dSTR2+4-.svg
BSicon dSHI2+r.svg
BSicon vENDEa.svg
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon exdPLT.svg
BSicon dSTR.svg
BSicon vSTR.svg
1
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dSTR.svg
23
BSicon exdPLT.svg
BSicon dSTR.svg
BSicon vSTR.svg
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon exdPLT.svg
BSicon dSTR.svg
BSicon dENDEa.svg
BSicon vSTR.svg
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon vSTR.svg
BSicon dPLT.svg
BSicon dBLa.svg
BSicon excPLT.svg
BSicon cXPLTq.svg
BSicon excPLT.svg
BSicon XPLTq.svg
BSicon vSTR.svg
BSicon XPLTq.svg
BSicon dSTR.svg
BSicon dBLe.svg
BSicon exdPLT.svg
BSicon XPLTq.svg
BSicon vSTR.svg
BSicon XPLTq.svg
BSicon vSTR.svg
BSicon cXPLTq.svg
BSicon dBLa.svg
BSicon exdPLT.svg
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dSTR+c2.svg
BSicon d-STR3+1.svg
BSicon v-SHI2r.svg
BSicon dSTR.svg
BSicon vSTR.svg
BSicon PLT.svg
East entrance
Jalan Reko
BSicon exdPLT.svg
BSicon vSTR.svg
BSicon dABZg+1.svg
BSicon STRc4.svg
BSicon vSHI2l-.svg
BSicon dSTR+c2.svg
BSicon SPLg+3.svg
West entrance
Jalan Bukit
BSicon PLT.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon v-SHI2r.svg
BSicon vABZg+1-.svg
BSicon dSTRc4.svg
BSicon PLT.svg
BSicon vSTR.svg
BSicon dSTR+c2.svg
BSicon d-STR3+1.svg
BSicon dSHI2lr.svg
BSicon d-STR2+4.svg
BSicon STRc3.svg
BSicon v-SHI2g+r.svg
BSicon dABZg+1.svg
BSicon dSTRc4.svg
BSicon STRc1.svg
BSicon SPL+4.svg
BSicon vSTR.svg
BSicon vSTR.svg
BSicon vCONTf.svg
BSicon vENDEe.svg
Rawang Kuala Lampur
 
Diagram is not to scale
Source [5]

The station is currently served by the KTM Komuter Seremban Line and KTM ETS train services. Since 17 July 2017, it is also served by the MRT Kajang Line.

The current Kajang Komuter station inherits the original station's branch lines and responsibilities to manage railway switches, railway monitoring and goods delivery. The station employs a number of railway staff. The station is also connected to sheds for railway maintenance vehicles, as well as a warehouse. The station contains three platforms: Platform 1 is a side platform with full-length track and extended shed; Platforms 2 and 3 are an island platform. The platforms are lined along with a set of four main lines; three run between the two platforms and one runs along the other side of the island platform. The line between platforms 1 and 3 is the main route. Platform 2 can be used for any service, while the platform 3 line is only used when platform 2 is occupied by another train.

The MRT platforms are elevated, along with the new KTM commuter platform replacing the ground-level station. Feeder bus services are available as well. Interchange between KTM and MRT is not possible, passengers are required to purchase separate tickets to enter the other station. [6]

History

The original station was opened in 1897. Intercity services were provided for the town from its early years through the 20th century, while KTM Komuter services were introduced in the mid-1990s, when a new station adjoining Jalan Bukit (Malay; English: Hill Road) was completed on the east side of the tracks to replace the older station adjoining Jalan Reko (Reko Road) on the west side of the tracks.

Renovations

The KTM ground station has undergone a few remodelings throughout its service. A platform was extended to support Intercity trains that occasionally stretch longer than the station's platform. A second access area for the station was completed and opened for access at the west side of the track in 2004, but has no operational faregates and had only introduced manual ticketing services from early-2007 onwards. The installation of larger platform canopy roofs was also undertaken during the first half of 2007.

Mass Rapid Transit

On 8 July 2011, the final alignment of the Kajang Line was announced with 31 stations; Kajang railway station being one of the interchange stations. Active construction started around August 2012; it was completed and opened to the public on 17 July 2017, along with other Phase 2 stations on the line. This station was the southernmost in the whole of the RapidKL rail network until March 16, 2023, after the Putrajaya Sentral station replaced Kajang as the southernmost station in the entire network. [7]

The MRT construction project included the rebuilding of the KTM service station, with new connecting stairwell and redesigned wayfinding sign in similar style to the MRT station. When the overhead platform for KTM commuter is finished, the KTM ticket counter, customer service and office are moved to the Level 1 of the station beside the MRT customer service counter. The on-ground station has since been demolished making Platform 1 no longer directly connected to the station as a side platform.

Bus Services

MRT Feeder Bus Services

With the opening of the MRT Kajang Line, feeder buses also began operating linking the station with several housing areas and cities around the Kajang and Bangi areas. The feeder buses operate from the station's feeder bus hub accessed via Entrance A of the station.

MRT Feeder Bus Services at Kajang station
Route No.OriginDestinationVia
Bus-logo-white.svg T451  

(As a pass-by)

 KG34  Stadium Kajang Universiti Kebangsaan Malaysia (UKM)Jalan Besar, Kajang
 KG35  KB06 Kajang
Jalan Reko
Reko Sentral
 KB06A  Kajang 2
Hentian Kajang
Sungai Tangkas
 KB07  UKM
Bus-logo-white.svg T461   [8]  KG35  KB06 KajangTaman Kajang UtamaJalan Reko
Malaysia expressway logo.svgMes-e18.svg Kajang Dispersal Link Expressway Kajang SILK Highway
Kajang Utama
Bus-logo-white.svg T462   [9]  KG35  KB06 Kajang Bandar Baru Bangi Seksyen 8Jalan Reko
Reko Sentral
Bangi Seksyen 4 Tambahan
Bangi Seksyen 7
Sungai Ramal
Kompleks PKNS Bangi
Bangi Seksyen 8 & 9 (Bandar Baru Bangi)
Bus-logo-white.svg T463   [10]  KG35  KB06 Kajang Bandar Baru Bangi Seksyen 4Jalan Reko
Reko Sentral
Bangi Seksyen 4 Tambahan
Petronas UNIKEB 2
Bus-logo-white.svg T464   [11]

(As a pass-by)

Bandar Baru Bangi Seksyen 16 KG35  KB06 KajangPersiaran Kemajuan
Bangi Gateway
Teras Jernang
Universiti Kebangsaan Malaysia (UKM)
 KB07  UKM
Sungai Tangkas
Hentian Kajang
 KB06A  Kajang 2
Reko Sentral
Jalan Reko
Bandar Kajang
Jalan Besar, Kajang

Other Bus Services

The MRT Kajang station also provides accessibility for some other bus services.

Other Bus Services at MRT/KTM Kajang Station
Route No.OperatorOriginDestinationViaRemarks
Bus-logo-white.svg 450   [12] Rapid KLMydin Sinar Kota, Kuala Lumpur
(Hub Lebuh Pudu)
 AG7  SP7  KJ13  Masjid Jamek
Hentian KajangJalan Pudu
Jalan Pasar
Jalan Cheras
 KG22  AG13  ‹See TfM› Maluri
Taman Pertama
 KG24  Taman Midah
 KG25  Taman Mutiara / Leisure Mall
Taman Suntex
Malaysia expressway logo.svgMes-e7.svg Cheras–Kajang Expressway Cheras-Kajang Highway
 KG31  Bukit Dukung
Simpang Balak
Sungai Sekamat
 KG33  Sungai Jernih / KPJ Kajang
Bandar Kajang
 KG35  KB06  Kajang
Reko Sentral
 KB06A  Kajang 2
Some buses may not enter the station bus stop (for Kajang bound only).

For KL bound, passengers have to cross along Jalan Reko to access to the station.

Bus-logo-white.svg 451  

(Trial run 1 July 2023 to 30 March 2025)

 KG35 Kajang KT3  PY41  Putrajaya Sentral Hentian Kajang
Kompleks PKNS Bangi
SK Kampung Abu Bakar Baginda
Presint 15 Putrajaya
Kompleks F
Putra Square, Putrajaya
Presint 2,3,4 Putrajaya
Only available on weekdays, for Putrajaya bound only: 6.30 am For other times, passengers must interchange at Tun Razak Exchange (MRT method) or Bandar Tasik Selatan (KTM and KLIA Transit method)

General

KTM station

Ground level (demolished)

Elevated

MRT station

Around the station

Nexus Kajang service apartment under construction that is located next to the station Nexus Kajang (220709) 02.jpg
Nexus Kajang service apartment under construction that is located next to the station

See also

Related Research Articles

<span class="mw-page-title-main">Rapid KL</span> Public transportation system in Malaysia

Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.

<span class="mw-page-title-main">Mid Valley Komuter station</span> KTM station in Kuala Lumpur, Malaysia

The Mid Valley Komuter station is a KTM Komuter train station located in Lembah Pantai, Kuala Lumpur. The halt is on the KTM Komuter's Seremban Line.

<span class="mw-page-title-main">Pasar Seni station</span> LRT and MRT interchange in Kuala Lumpur, Malaysia

The Pasar Seni station is an integrated rapid transit station in Kuala Lumpur that is served by the LRT Kelana Jaya Line and the MRT Kajang Line. The station is named after the nearby Central Market and is located near Petaling Street and the area known as the Chinatown of Kuala Lumpur.

Salak Selatan LRT station is a Malaysian low-rise light rapid transit (LRT) station situated near and named after the Kuala Lumpur township of Salak South. The station is part of the LRT Sri Petaling Line.

<span class="mw-page-title-main">Sungai Buloh station</span> MRT, KTM and ETS integrate in Kuala Lumpur, Malaysia

The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur.

<span class="mw-page-title-main">Mutiara Damansara MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

Mutiara Damansara station is a mass rapid transit station serving the suburb of Mutiara Damansara in Petaling Jaya, Selangor, Malaysia.

<span class="mw-page-title-main">Surian MRT station</span> MRT station in Petaling Jaya, Selangor, Malaysia

Surian station is a mass rapid transit (MRT) station serving the suburb of Kota Damansara in Petaling Jaya, Selangor, Malaysia. It is one of the stations on the MRT Kajang Line. The station is named after Persiaran Surian, the road above which the station is situated. The station was opened on 16 December 2016 under phase one operations of the MRT Kajang Line.

<span class="mw-page-title-main">Semantan MRT station</span> Railway station in Kuala Lumpur

The Semantan MRT Station is a mass rapid transit (MRT) station that serves the suburb of Damansara Heights, Kuala Lumpur, Malaysia. It is one of the stations on the MRT Kajang Line and was opened on 16 December 2016 when Phase One of the line became operational.

<span class="mw-page-title-main">Maluri station</span> LRT and MRT integrate in Kuala Lumpur, Malaysia

The Maluri station is an integrated light rapid transit (LRT) and mass rapid transit (MRT) located on the eastern fringe of Kuala Lumpur near and named after Taman Maluri, a residential housing estate. The station is located along Federal Route 1 Jalan Cheras opposite the AEON Taman Maluri shopping centre and Sunway Velocity Mall. The Kerayong River also runs beside the station.

<span class="mw-page-title-main">Taman Pertama MRT station</span> MRT station in Kuala Lumpur, Malaysia

Taman Pertama MRT station is a mass rapid transit (MRT) station on the MRT Kajang Line in Cheras, Kuala Lumpur, Malaysia. It is located along Federal Route 1 Jalan Cheras, which is just right next to where it branches to Jalan Loke Yew, Jalan Yaacob Latif and Jalan Cheras. It was opened on 17 July 2017, along with 18 adjoining stations as part of Phase Two of the MRT SBK line.

<span class="mw-page-title-main">Taman Midah MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Taman Midah MRT station is a mass rapid transit (MRT) station on the MRT Kajang Line, serving the neighbourhood of Taman Midah and the surrounding residential areas in the suburb of Cheras, Kuala Lumpur, Malaysia. It was opened on 17 July 2017.

<span class="mw-page-title-main">Taman Mutiara MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Taman Mutiara MRT station is an elevated rapid transit station in Cheras in south-eastern Kuala Lumpur, Malaysia. It is located above the Federal Route 1 Jalan Cheras, next to the Cheras Leisure Mall as well as EkoCheras Mall. And therefore, the station was thus provisionally named Leisure Mall station during construction.

<span class="mw-page-title-main">Taman Connaught MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Taman Connaught MRT station is an elevated rapid transit station on the MRT Kajang Line, located in Taman Connaught, Bandar Tun Razak constituency in southeastern Kuala Lumpur, Malaysia. Its exact location is next to the Cheras Sentral shopping mall, which is at Federal Route 1 Jalan Cheras near the northern end of the Cheras-Kajang Expressway, close to the Federal Territory Kuala Lumpur-Selangor border.

<span class="mw-page-title-main">Taman Suntex MRT station</span> MRT station in Cheras, Selangor, Malaysia

The Taman Suntex station is a Mass Rapid Transit (MRT) station that serves the suburb of Taman Suntex in Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line. The station is located at 702 Hulu Langat interchange and Batu 9 Toll Plaza (Kajang-bound) of the Cheras–Kajang Expressway Cheras–Kajang Expressway, as well as Taman Suntex.

<span class="mw-page-title-main">Sri Raya MRT station</span> MRT station in Cheras, Selangor, Malaysia

The Sri Raya MRT station is a Mass Rapid Transit (MRT) station serving the suburb of Batu 10 Cheras, Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang line. The station is located at 703 Telekom interchange of the Cheras–Kajang Expressway Cheras–Kajang Expressway.

<span class="mw-page-title-main">Bandar Tun Hussein Onn MRT station</span> MRT station in Cheras, Selangor, Malaysia

The Bandar Tun Hussein Onn MRT station is a Mass Rapid Transit (MRT) station in Bandar Tun Hussein Onn, located in Cheras Selatan commune, Hulu Langat region, Selangor, Malaysia. It serves as one of the stations on the Klang Valley Mass Rapid Transit (KVMRT) Kajang line. It was opened on 17 July 2017, together with the Phase 2 opening of the MRT line, along the Muzium Negara-‹See TfM›Kajang stretch.

<span class="mw-page-title-main">Bukit Dukung MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Bukit Dukung station is a mass rapid transit (MRT) station serving the suburbs of Bukit Dukung, Kampung Selamat and Sungai Balak in Kajang, Selangor, Malaysia. It is as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang Line.

<span class="mw-page-title-main">Batu 11 Cheras MRT station</span> MRT station in Balakong, Selangor, Malaysia

The Batu 11 Cheras station is a Mass Rapid Transit (MRT) station serving the suburb of Batu 11 Cheras, Balakong and Bandar Sungai Long in Selangor, Malaysia. It serves as one of the stations on Klang Valley Mass Rapid Transit (KVMRT) Kajang line. The station is located at Balakong interchange of the Cheras–Kajang Expressway.

Sungai Jernih MRT station is an elevated rapid transit station on the MRT Kajang Line, located in the northern precincts of downtown Kajang, Selangor, Malaysia. It was opened on 17 July 2017, along with 19 adjoining stations as part of Phase 2 of the system.

<span class="mw-page-title-main">Stadium Kajang MRT station</span> MRT station in Kuala Lumpur, Malaysia

The Stadium Kajang MRT station is an elevated mass rapid transit (MRT) station on the Kajang Line, located in downtown Kajang, Selangor, Malaysia. It was opened on 17 July 2017, along with 19 adjoining stations as part of Phase 2 of the system. It is the second-to-last station towards Kajang on the SBK line.

References

  1. "Rapid Bus Line 450". Moovit. 21 February 2016. Retrieved 15 October 2018.
  2. "MRT Feeder Bus Line T451". Moovit. 6 March 2018. Retrieved 15 October 2018.
  3. "List of RapidKL MRT Feeder Bus". myRapid. 14 December 2016. Retrieved 15 October 2018.
  4. "History of Railways in Selangor" . Retrieved 7 December 2024.
  5. File:Ktmb kajang station platform layout.svg
  6. "第一捷運7站 銜接4種公交". 東方網 - 馬來西亞東方日報. Archived from the original on 23 July 2017. Retrieved 23 July 2017.
  7. Artymiuk, Simon (16 March 2023). "Services begin on Kuala Lumpur's MRT Putrajaya Line Phase 2". IRJ. Retrieved 19 May 2023.
  8. "Kajang MRT Feeder Bus T461 | mrt.com.my". mrt.com.my. Retrieved 31 December 2020.
  9. "Kajang MRT Feeder Bus T462 | mrt.com.my". mrt.com.my. Retrieved 31 December 2020.
  10. "Kajang MRT Feeder Bus T463 | mrt.com.my". mrt.com.my. Retrieved 31 December 2020.
  11. "Kajang MRT Feeder Bus T464 | mrt.com.my". mrt.com.my. Retrieved 31 December 2020.
  12. "Line Route 450 - rapidKL Bus - Bus Schedules". Moovit. Retrieved 31 December 2020.