KTM Komuter is a commuter rail system in Malaysia operated by Keretapi Tanah Melayu (KTM). It was introduced in 1995 to provide local rail services in Kuala Lumpur and the surrounding Klang Valley suburban areas. Services were later expanded to other parts of Malaysia with the introduction of the Northern and Southern sectors.
The service uses air-conditioned electric multiple units in 3 and 6 car formations.
KTM Komuter contributed RM146.2 million to group revenue in 2017, carrying a total of 37.235 million passengers. [1] The total number of passengers travelling with KTM Komuter in 2017 shows a decrease of 10.2%. This can be attributed to reduced service frequency due to the ongoing Klang Valley Double Tracking (KVDT) rehabilitation project.
Line | First operated | Stations | Length | Terminal | |
---|---|---|---|---|---|
Central Sector 1 Batu Caves-Pulau Sebang Line | 14 August 1995 | 32 | 135 km | Batu Caves | Pulau Sebang/Tampin |
Central Sector 2 Tanjung Malim-Port Klang Line | 14 August 1995 | 27 | 126 km | Tanjung Malim | Port Klang |
Central Sector 10 KL Sentral-Terminal Skypark Line | 1 May 2018 | 3 | 26 km | KL Sentral | Terminal Skypark |
Northern Sector 1 Ipoh-Butterworth Line | 11 September 2015 | 8 | 104 km | Ipoh | Butterworth |
Northern Sector 2 Padang Besar-Butterworth Line | 1 January 2016 | 13 | 169.8 km | Padang Besar | Butterworth |
TOTAL | 79 [Note 2] | 560.8 km |
KTM Komuter's 287 km (179 mi) network in the Central Sector mainly covers the Klang Valley. It has 53 stations. It consists of two cross-city routes, namely the KTM Tanjung Malim-Port Klang Line and the KTM Batu Caves-Pulau Sebang Line.
Transfers between the two main lines can be made at any of the four stations on the central core: KL Sentral, Kuala Lumpur, Bank Negara and Putra. Same-platform or cross-platform interchange is available at Kuala Lumpur.
The KTM KL Sentral-Terminal Skypark Line is a limited express service for passengers headed towards Subang Airport. To save time, it only stops at Subang Jaya station. The link is the second of its kind in Malaysia. However, it is temporarily suspended due to low ridership.
The routes have been modified over the years. Previously, Batu Caves-Pulau Sebang line (formerly, Seremban Line) trains would head towards Tanjung Malim while the Tanjung Malim-Port Klang line (formerly, Port Klang Line) trains would head to Batu Caves. Following a successful trial, the routes were swapped. Trains from Seremban began heading towards Batu Caves, while trains from Port Klang headed towards Tanjung Malim. The train service from Seremban was extended permanently to Pulau Sebang/Tampin, hence the current name of the line.
The service is subject to overcrowding during rush hours. Several steps were taken to alleviate this. Firstly, the operator introduced a new queuing system, in which the lines are painted on the floor with three colour codes representing each of the train set. Trains were also run in 3+3 formations, although this has been discontinued with the introduction of six-car sets. An express service from Seremban to KL Sentral is available during rush hour.
The KTM Komuter Northern Sector (Malay : KTM Komuter Utara) service initially operated between Gurun in Kedah, Butterworth in Penang and Kamunting in Perak. This followed the completion of electrification works on that stretch.
The route has been modified multiple times since. Today, there are two lines, namely the Padang Besar-Butterworth Line and the Ipoh-Butterworth Line. Butterworth, Bukit Tengah and Bukit Mertajam are interchange stations between the two lines.
The KTM Komuter Southern Sector (Malay: KTM Komuter Sektor Selatan) operated from Seremban to Gemas following the completion of electrification works on that stretch. This was the second KTM Komuter service outside the Klang Valley after the northern counterpart. The Gemas and Batang Melaka stops were removed starting 20 June 2016 with the train running between Seremban and Pulau Sebang/Tampin. Subsequently, the shuttle service was terminated on 11 July 2016 when it was absorbed into the Batu Caves-Pulau Sebang Line.
On 14 March 2024, It was announced that the Southern Sector line will be re-introduced as a commuter service from Gemas to Paloh, and Paloh to JB Sentral, once the electrification and double tracking project [2] is completed. [3]
The double-tracking project, which cost cost RM 1.5 billion, [4] began in 1990. The project covers over a 150 km route stretching as far as Rawang, Port Klang and Seremban. However, the completion was delayed as of January 1995, causing the service to not launch on time. [5] The first phase of the service originally planned to begin in July 1995. [6] [4]
As part of KTM's efforts to get the public to "think commuter", KTM offered free rides of the service from 2 to 11 August 1995. [4]
The service started on 12 August 1995 from Kuala Lumpur to Rawang, on what was the original Seremban Line. The commercial run of the service began two days later. The double-tracking project with 18 EMU trains and additional 62 trains purchased at RM 180 million. Each train carries about 240 passengers and would run at the speed of 100 kmh. [6]
The line was extended to Salak Selatan on 29 September 1995. Operations between Sentul and Shah Alam began on 28 August 1995, on what was the original Port Klang Line. This line was extended to Klang on 29 September 1995. The Seremban Line was extended to Kajang on 20 November 1995 and to Seremban itself on 18 December 1995. This would form the Komuter network for more than a decade.
In the early 2000s, more stations were added along the existing route. KL Sentral was added on 16 April 2001 and served as the new transport hub of Kuala Lumpur. Mid Valley station was added on 23 August 2004, serving the surrounding Mid Valley Megamall. Kepong Sentral was added on 1 July 2006.
The Seremban-KL Sentral express service was introduced on 9 December 2004 The service was discontinued later before being reintroduced again on 25 July 2018. These services run only during the rush hour.
The route was expanded for the first time since 1995 when train services on the Seremban Line were extended to Rasa in 2007. Initially, KTM Komuter services to the new stations north of Rawang was run as a shuttle service. The route was extended to Kuala Kubu Bharu in January 2008, and finally to Tanjung Malim on 1 June 2009. The Rawang-Tanjung Malim shuttle service was absorbed into the main Port Klang Line on 11 July 2016.
Women-only coaches were introduced on 28 April 2010.
The Port Klang Line was extended to Batu Caves on 29 July 2010. Four intermediate new stations, Batu Kentonmen, Kampung Batu and Taman Wahyu were opened with this extension.
The Seremban Line was extended from Seremban to Sungai Gadut on 14 May 2011 with an intermediate station at Senawang, and to Rembau in 2013.
Northern Sector services were introduced on 11 September 2015 between Gurun in Kedah, Butterworth in Penang and Kamunting in Perak. This followed the completion of the Ipoh-Padang Besar Electrification and Double-Tracking Project in December 2014. On 1 January 2016, a second line was introduced between Butterworth and Padang Besar in Perlis, while on 17 January 2016, the Gurun-Butterworth-Kamunting route was replaced with two separate routes: Butterworth-Gurun and Butterworth-Kamunting. The three-line service operated until 1 July 2016 when the Butterworth-Gurun route was dropped, and subsequently on 1 September 2016, the route took on its current form.
Southern Sector services were introduced on 10 October 2015 following the completion of the Seremban-Gemas Electrified Double Tracking Project on 30 October 2013. This service is the second KTM Komuter service outside the Klang Valley after its northern counterpart. The Gemas and Batang Melaka stops were removed starting 20 June 2016 with the train running between Seremban and Pulau Sebang/Tampin. Subsequently, the shuttle service was terminated on 11 July 2016 when it was absorbed into the Seremban Line.
From 15 December 2015, the routes of Seremban Line and Port Klang Line were switched as part of a six-month trial. Trains from Seremban began heading towards Batu Caves, while trains from Port Klang headed towards Rawang, and vice versa. Transfers could be done at the four shared stations. This change was made permanent, and the name of the lines we changed; from Seremban Line and Port Klang Line to Batu Caves-Pulau Sebang Line and Tanjung Malim-Port Klang Line respectively.
The KL Sentral-Terminal Skypark Line to Subang Airport was introduced on 1 May 2018.
Beginning 10 September 2018, all service abolished the cash ticketing system, cashless ticketing method was then compulsory. [7]
The Komuter service was largely built from existing lines, with minor alterations (i.e. removal or abandonment of lines and replacement of wooden sleepers with concrete ones). Relevant station platforms were added and heightened to allow easier access to Komuter trains travelling in both directions.
Major pre-independence stations including Kuala Lumpur station, Klang station, Port Klang station and Seremban station were retained and upgraded to support Komuter services. Smaller, wood-based stations and halts along the line that were built at around the same time were either demolished and replaced by modern brick-and-concrete counterparts, or simply abandoned. The only exception to the rule is the old Sentul station, which has remained in service years since KTM Komuter's launch, albeit with a replacement platform.
The layouts and sizes of the new station buildings, as of the launch of the service in 1995, vary by location but are generally divided into two classes:
Some stations also have parking facilities.
The platforms of the 1995 stations are virtually standardised, down to the design of the passenger semicircle-crossed shelters, the use of similarly-styled foot crossings to link all platforms, and the diamonds-based brickwork of the platforms.
Depending on the number of patrons through the years, each station has undergone upgrades or expansions that consist of either increasing the number of ticket counters or opening new facilities for use by passengers or railway staff. Taller, wider canopies were erected on the platforms of most stations to replace narrower, original versions in 2006 and 2007. The pace of the upgrades varies by location.
During the 2000s, new stations such as the Mid Valley station appeared in more modern designs, consisting primarily of high, curved canopies above the entire platforms. Certain new stations along dual-lane lines are also included with facilities typically reserved for medium-sized stations, such as the Rasa station. The Kuala Lumpur Sentral station, however, is housed under the concrete base of the transport hub, and is stark and utilitarian in design.
The original Komuter rolling stock consists of three versions of three-car EMUs added over the course of three years, beginning in 1994. The EMUs were the first in KTM's history. All Komuter EMUs operate in multiple-unit formation, running from overhead single-phase 25 kV AC 50 Hz catenary supply, with two driving cars and 1 trailer car in between. The EMUs were state-of-the-art, with remote-controlled pneumatic doors, Automatic Train Protection (ATP), train data recorder, wheel-slip control, GTO/IGBT traction electronics and regenerative braking. Up to the point of their introduction, no other KTM motive power used these modern train control systems.
Designated by KTM as "Class 8x"s, the EMUs wear a yellow, blue and grey livery, a departure from the predominantly grey livery that KTM adopted on other locomotives and passenger coaches at the time. A handful of EMUs include full advertisements on the sides of their cars.
The original Komuter fleet consisted of the following models:
Class | Image | In service | Cars per Set | On order | Manufacturer | Remarks |
---|---|---|---|---|---|---|
Class 81 EMUs | 4 | 3 | N/A | - Jenbacher Transport in (1994/1995) | Designations EMU 01 to EMU 18. The trains were taken out of service in 2012, but four have returned to service after many years of refurbishment. | |
Class 82 EMUs | 0 | 3 | N/A | Union Carriage & Wagon in (1996/1997) | Designations EMU 41 to EMU 62. All of the trainset are retired from service due to lack of spare parts and closure of the company's international division. | |
Class 83 EMUs | 14 | 3 | N/A | Hyundai Precision (now Hyundai Rotem) in (1996/1997) | Designations EMU 19 to EMU 40. 14 sets remain in service, most of them currently service the KTM Komuter Northern Sector. Several sets were repainted with new livery for the formerly named Skypark Link. |
The Class 8x suffered from more mechanical problems as they aged, especially the Class 81 and Class 82, which had poor reliability. The manufacturers of both classes had gone bankrupt since the trains were built, hence spare parts became unavailable. On paper, the number of serviceable units in 2010 stood at 53 out of the original 62, although there are reports of far fewer trains. [8] Ultimately, four Class 81 sets were refurbished, albeit with new motors from Hyundai instead of Jenbacher. All Class 82s were taken out of service.
In 2012, six-car Class 92s were introduced, replacing most of the Class 8x in the central sector. A handful of them remain, usually on the Kl Sentral-Terminal Skypark Line or Sentul-Batu Caves shuttle, but many have been reallocated to the northern sector.
Class | Image | In service | Cars per Set | On order | Manufacturer | Remarks |
---|---|---|---|---|---|---|
Class 92 EMUs | 36 | 6 | N/A | Zhuzhou Electric Locomotives Co Ltd [8] |
Passengers travelling on KTM Komuter may use the following ticketing options:
Ridership statistics published by the Ministry of Transport are for all KTM Komuter services. No separate statistics for the individual lines or operational regions are published. Statistics before 1999 are also not available.
KTM Komuter Ridership [1] [10] [11] | |||
---|---|---|---|
Year | Ridership | Remarks | |
2019 | 30,405,000 | ||
2018 | 32,078,000 | ||
2017 | 37,235,000 | ||
2016 | 41,469,000 | ||
2015 | 49,690,000 | ||
2014 | 46,957,000 | ||
2013 | 43,942,000 | ||
2012 | 34,847,000 | ||
2011 | 35,510,000 | ||
2010 | 34,995,000 | ||
2009 | 34,683,000 | ||
2008 | 36,557,000 | ||
2007 | 36,959,000 | ||
2006 | 34,975,000 | ||
2005 | 30,935,000 | ||
2004 | 27,380,000 | ||
2003 | 24,645,000 | ||
2002 | 22,084,000 | ||
2001 | 20,929,000 | ||
2000 | 19,154,000 | ||
1999 | 17,168,000 | ||
Keretapi Tanah Melayu Berhad (KTMB) or Malayan Railway Limited, colloquially referred to simply as KTM, is the main rail operator in Peninsular Malaysia. The railway system dates back to the British colonial era, when it was first built to transport tin. Previously known as the Federated Malay States Railways (FMSR) the Malayan Railway Administration (MRA), and the Malayan Railway, Keretapi Tanah Melayu acquired its current name in 1962. The organisation was corporatised in 1992, but remains wholly owned by the Malaysian government.
The Gombak District is an administrative district located in the state of Selangor, Malaysia. The district was created on February 1, 1974, the same day when Kuala Lumpur was declared a Federal Territory. Until 1997, Rawang was the district capital; the capital has been moved to Bandar Baru Selayang. Gombak borders Kuala Lumpur to the southeast and the Genting Highlands to the east. Both Gombak and Kuala Lumpur, along with some other districts in Selangor, are situated within the Klang Valley. Other localities in Gombak district include Batu Arang, Kuang, Rawang, Kundang, Gombak Town, Selayang, Batu Caves and Hulu Kelang.
Rail transport in Malaysia has evolved significantly since its inception in the late 19th century, reflecting the country's economic growth and modernization.
The KTM Tanjung Malim–Port Klang Line, formerly known as the Port Klang Line is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu. The electric trains run between Tanjung Malim and Port Klang. Prior to 15 December 2015, the northern terminus of this line was Batu Caves.
Bandar Tasik Selatan station (BTS) is a major Malaysian interchange station located next to and named after Bandar Tasik Selatan, in Kuala Lumpur. The station serves as both a stop and an interchange for the KTM Komuter's Seremban Line, KTM ETS, the LRT Sri Petaling Line, and the Express Rail Link's KLIA Transit trains. BTS is integrated with the Terminal Bersepadu Selatan bus hub (TBS). BTS and TBS are developed as an intermodal transportation hub.
Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. Greater Kuala Lumpur is conterminous with the Klang Valley, an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.
The Rawang railway station is a railway station in Rawang, Gombak District, Selangor, Malaysia that is served by the KTM Komuter and the KTM ETS train services.
The Seremban railway station is a Malaysian railway station located in the heart of Seremban, the capital of the state of Negeri Sembilan. The station is named after the city.
The Sungai Buloh station is an integrated railway station serving the suburb of Sungai Buloh in Selangor, Malaysia, which is located to the northwest of Kuala Lumpur.
The Tanjung Malim railway station is a Malaysian train station stationed at the north eastern side of and named after the town of Tanjung Malim, Perak. The station provides both Komuter and ETS services.
The KTM West Coast railway line runs from Padang Besar close to the Malaysia–Thailand border in Perlis to the Woodlands Train Checkpoint in Singapore. It is called the West Coast railway line because it serves the West Coast states of Peninsular Malaysia. The line is owned and used entirely by Keretapi Tanah Melayu (KTM).
The Kampung Batu station is a Malaysian commuter and Rapid transit train station located in the west side of and named after the village of Kampung Batu in northern Kuala Lumpur, Malaysia. It was built on the location of the disused colonial-era Batu Village railway station. The station is served by the KTM Komuter Seremban Line and the Putrajaya Line.
Gemas railway station is a Malaysian railway station located at the eastern side of and named after the town of Gemas, Tampin District, Negeri Sembilan. Built in 1922, the station is the meeting point of and the railway junction connecting the West Coast Line with the East Coast Line (Tumpat–Gemas).
Railway electrification in Malaysia is a relatively recent development of rail transport in Malaysia. While the first railway in the country dates back to 1885, it was not until 3 August 1995 that the first electrified railway service, KTM Komuter, began operations.
The KTM ETS, commercially known as ETS, is an inter-city higher-speed rail service in Malaysia operated by Keretapi Tanah Melayu (KTM). The KTM ETS is the second electric train service to be operated by the Malaysian railway company after KTM Komuter, and the second inter-city rail service after KTM Intercity.
The Class 92 is a type of electric multiple unit operated by Keretapi Tanah Melayu on its KTM Komuter services. A total of 38 sets were built by CSR Zhuzhou of China, in 6-car formations.
The KTM Batu Caves–Pulau Sebang Line, formerly known as the Seremban Line is one of the three KTM Komuter Central Sector lines provided by Keretapi Tanah Melayu. Its electric trains run between Batu Caves and Pulau Sebang/Tampin. Prior to 15 December 2015, the northern terminus of this line was Rawang.
The KTM Komuter Northern Sector is one of the five KTM Komuter services run by Malaysian rail operator Keretapi Tanah Melayu (KTM). The service was introduced on 11 September 2015 following the completion of the Ipoh-Padang Besar Electrification and Double-Tracking Project in December 2014, which also saw the extension of ETS services to Padang Besar from Ipoh.
The KTM KL Sentral–Terminal Skypark Line is a currently suspended limited express train service in Kuala Lumpur, Malaysia between Kuala Lumpur Sentral and Sultan Abdul Aziz Shah Airport. It is Malaysia's second airport rail link service, after the Express Rail Link system.
{{cite web}}
: Missing or empty |title=
(help){{cite web}}
: Missing or empty |title=
(help){{cite web}}
: CS1 maint: numeric names: authors list (link)