Changi Airport Skytrain | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Changi Airport Group | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 7 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Automated guideway transit/people mover | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Changi Airport Group | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Terminal 1 (Public) & Terminal 3 (Airside) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Mitsubishi Crystal Mover (2006–present) Adtranz C-100 (1990–2006) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 22 November 1990 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 10.3 km (6.4 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Fully elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,850 mm (6 ft 27⁄32 in) Guide rail span: 3.2 m (10 ft 6 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 750 V DC third rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 50 km/h (31 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Signalling | Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Changi Airport Skytrain is an automated people mover (APM) that connects Terminals 1, 2 and 3 at Singapore Changi Airport. Opened in 1990, it was the first driverless and automated system of its kind in South East Asia. [2] The Changi Airport Skytrain operates from 05:00 to 02:30 daily. [3] Traveling on the Skytrain is free and an inter-terminal journey takes approximately four minutes.
Since 2006, the trains operating on all Skytrain lines are Crystal Movers manufactured by Mitsubishi Heavy Industries. All stations are equipped with platform screen doors, are air-conditioned and have plasma displays indicating the arrival time of the next train.
With the opening of Changi Airport MRT station on 8 February 2002, the Skytrain is able to connect passengers at Terminal 1 to the MRT station entrances located at Terminals 2 and 3. [3]
In November 1990, alongside the opening of Changi Airport's second passenger terminal, the Skytrain began operations to connect the brand new Terminal 2 to the existing Terminal 1. It operated using the Adtranz C-100 [4] and the ride lasted approximately 60 seconds. [5]
On 17 March 2006, the rolling stock was replaced with the current Mitsubishi Crystal Mover System. Services were extended to the newly opened Terminal 3 and the South section opened in November 2007 with 5 new stations. [6]
On 24 February 2015, services between Station B and E (Terminal 2 to 3 and vice versa) were suspended to make way for the construction of Jewel Changi Airport. The service was reopened to transit passengers on 12 April 2019, upon the opening of Jewel Changi Airport using a three-car service. It was then fully reopened for the public and transit passengers in July 2019. [7]
In April 2020, due to the COVID-19 pandemic drastically reducing passenger volumes, services from Station B to E (T2 to T3) and Station A to F (T2 to T3) were suspended for all passengers, as well as Station B to C (T3 to T1) and Station D to E (T1 to T2) services for transit passengers. All Skytrain services were then fully suspended on 1 May 2020.
On 27 July 2020, services from Station B to C (T3 to T1) were resumed for public passengers only.
On 17 November 2022, services from Station B to E (T3 to T2) were resumed for public passengers only.
The Skytrain system consists of two independent systems: an airside-only PMS[ jargon ]/South, which provides services between Terminals 2 and 3 and between Terminal 3 main building and South Pier, and a PMS[ jargon ]/North that provides services between Terminals 1, 2 and 3 on both the landside and airside. The system use a bypass shuttle for services between Terminals 2 and 3 and single-lane shuttles for the rest of the system, with both the landside and airside having their own lanes. [4]
The system consists of seven stations (A-South, A, B, C, D, E and F), each giving the name of the nearest boarding gate for easy recognition for passengers. [4]
The Main Operation Control Center is located inside the maintenance office near A-South Station and the Standby Satellite Control Center is located in the center of the Terminal 3 building. Either of the control centers can be used to control the entire system. [4]
Initially, the Skytrain rolling stock consisted of Adtranz C-100s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). Although stations were designed to accommodate two-car trains, the C-100 trains operated in single units, without a second carriage per train, and the two innermost platform screen doors of each station were for emergency purposes (the trains stopped at the outer half of each station, with two doors on each half).
Mitsubishi Heavy Industries Crystal Mover | |
---|---|
In service | 17 March 2006 – present |
Manufacturer | Mitsubishi Heavy Industries |
Built at | Mihara, Hiroshima |
Family name | Crystal Mover |
Replaced | Adtranz C-100 |
Constructed |
|
Entered service | 2006 |
Number built | 22 vehicles |
Number in service | 22 vehicles |
Formation | Single vehicles that can be coupled to form 2- or 3-car trains |
Fleet numbers | 01 – 22 |
Capacity | 8 seated, 107 standing |
Operators | Changi Airport Group |
Depots | Terminal 1 & Terminal 3 (Airside trains only) |
Lines served | All Skytrain services |
Specifications | |
Car body construction | Welded aluminium |
Car length | 12.55 m (41 ft 2 in) |
Width | 2.69 m (8 ft 10 in) |
Height | 3,725 mm (12 ft 2.7 in) |
Doors | 4 per car |
Maximum speed |
|
Weight | 15 t (15 long tons; 17 short tons) per car |
Traction system | Mitsubishi IGBT–VVVF inverter vector control |
Traction motors | 2 × 80 kW (110 hp) 3-phase AC induction motor |
Power output | 160 kW (210 hp) |
Acceleration | 1 m/s2 (3.3 ft/s2) |
Deceleration |
|
Electric system(s) | 750 V DC third rail |
Current collector(s) | Collector shoe |
UIC classification | AA |
Braking system(s) | Electric command pneumatic brake with regenerative brake with stand-by brake and parking brake (with variable load control and wheel slide prevention control) |
Safety system(s) | Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1] |
Coupling system | Dellner |
Track gauge | 1,850 mm (6 ft 27⁄32 in) Guide rail span: 3.2 m (10 ft 6 in) |
Notes/references | |
[4] |
In 2002, work began on a new S$135 million Mitsubishi Crystal Mover-based system to accommodate the planned opening of Changi Airport Terminal 3 and the projected increase in demand as the airport expanded. [8] During the upgrade, the existing C-100 system continued operations on one of the tracks while the other was upgraded from December 2004 to 16 March 2006, after which the latter resumed operations while the former was closed for upgrading. [4] Full operations finally began in November 2007 when the lines serving Terminal 3 opened. [7]
Mitsubishi delivered 16 Crystal Mover vehicles to Singapore Changi Airport, ten of which are allocated to PMS[ jargon ]/North and six to PMS[ jargon ]/South. Five different designs with innovative external face images derived from the original Crystal Mover design were proposed to Changi Airport, with the final vehicle design being awarded the Good Design Award in 2006. [4]
The Crystal Mover was also designed for flexible response to a variety of operations, from a one car operation to multiple coupled-car operations, depending upon the system requirements; this is seen in the use of dual-car operations for PMS[ jargon ]/North landside and PMS[ jargon ]/South, single-car operations for PMS[ jargon ]/North airside and triple-car operations for T2-T3 services on PMS[ jargon ]/North. [4]
Exterior-wise, the Crystal Mover vehicles are painted in a base livery of silver and grey, blending in with the color scheme of the airport terminal buildings. However, many units are decorated with colorful promotional liveries. Trains come in two interior color schemes: blue for PMS[ jargon ]/North trains, and orange for PMS[ jargon ]/South trains. [7]
All Crystal Mover vehicles have four wide-opening doors, two on each side. The interior features longitudinal seating at both ends of the car for a total of 8 seats, with a spacious standing area in the middle of the car for baggage and trolleys. At the ends of every car, an equipment housing offers a flat platform for additional seating. Trains were also fitted with two LED text displays located near the ceiling which display travel information, and two media screens displaying Airport promotional material. [7]
The configuration of a Crystal Mover in revenue service is just the one car. With both the motors and the third rail current collectors, the train cars can be coupled up to two or three cars during service.
In the Changi Airport Skytrain, the signaling system and the automatic operation system utilise a train detection system based on the check-in/check-out principle, an ATC and an overrun protection system (ORP) by on-board ATP. When a train enters the ORP signal aspect section, the on-board ATP device creates the ORP control pattern in a manner which protects the fixed-point stop control pattern by the on-board ATO. If the train speed overshoots the ORP control pattern, the emergency brake is activated, safely bringing the train to an emergency stop. [4]
The system also uses a by-pass operation between Terminals 2 and 3, where trains are placed under synchronous control so that they depart and arrive at each corresponding station at the same time. Specifically, the station departing times are synchronized by the count of the station dwell time which is automatically adjusted based on the stoppage state at the station. Also, the train speed is adjusted by ATO which recognizes signals which are sent from the way-side control devices to the on-board control device at the time of departure from a station so that the crossing times in the bypass section are optimized and their arrival times are synchronized. [4]
In 2015, one portion of the Changi Airport Skytrain system connecting Station B and E was suspended due to construction works for Jewel Changi Airport. Passengers in the public area had to use the mezzanine level bridge along Changi Airport MRT station, and the Skytrain operating between Station A and F in the airside. [6] Landside operations for services between stations A and F only resumed in July 2019.
To increase the system capacity of the Skytrain, six new train cars have been purchased which subsequently entered service in 2019. The existing shuttle between Terminals 2 and 3 was upgraded to a three-car system, whereas the shuttle between Terminal 3 and 3 South was upgraded to a two-car system. [9]
Terminal 4, opened in 2017, is not served by the Skytrain. However, the future Terminal 5 will also have an underground automated people mover system. [10]
Tampa International Airport is an international airport six miles (9.7 km) west of Downtown Tampa, in Hillsborough County, Florida, United States. The airport is publicly owned by Hillsborough County Aviation Authority (HCAA). The airport serves 100 non-stop destinations throughout North America, Central America, the Caribbean and Europe across multiple carriers.
Rail transport in Singapore mainly consists of a passenger urban rail transit system spanning the entire city-state: a rapid transit system collectively known as the Mass Rapid Transit (MRT) system operated by the two biggest public transport operators SMRT Trains and SBS Transit, as well as several Light Rail Transit (LRT) rubber-tyred automated guideway transit lines also operated by both companies. In addition, local specialised light rail lines are in operation in places such as the Singapore Changi Airport and Sentosa.
The Innovia APM 100 is an automated people mover (APM) rolling stock first developed by Westinghouse, intended mainly for airport connections and light rail in towns. They are operated by Automatic Train Control (ATC), making it fully automatic and driverless.
The Crystal Mover is a rubber-tired automated people mover (APM) system for airport and urban rail transit applications manufactured at Mitsubishi Heavy Industries (MHI) Mihara Machinery Works in Mihara, Hiroshima Prefecture, Japan. The Crystal Mover, initially based on the Japanese APM standard, is used in automated guideway transit (AGT) systems in China, Japan, Singapore, South Korea, the United Arab Emirates and the United States.
The Hong Kong International Airport APM is a driverless people mover located within Hong Kong International Airport. It operates in two segments within Terminal 1 and the Midfield Concourse, and between Terminals 1, and also connects to the Skypier. It used to also serve Terminal 2 prior to 2019. However, as of May 2024, Terminal 2 is not in service due to redevelopment works and services between Skypier and Terminal 1 pass through Terminal 2 without stopping.
Skylink is an automated people mover (APM) system operating at Dallas Fort Worth International Airport (DFW). It is an application of the Innovia APM 200 system and is maintained and operated by Alstom. When it opened in 2005, it was the world's longest airside airport train system.
The Aerotrain is an automated people mover system located within the Kuala Lumpur International Airport in Malaysia.
The Plane Train is an automated people mover system located at Hartsfield–Jackson Atlanta International Airport connecting all of its terminals and concourses. Built by Westinghouse Electric Corporation, the system is the world's most heavily traveled airport people mover. The system is currently operated and maintained by Alstom, which acquired the system's previous operator, Bombardier Transportation, in 2021.
The Pittsburgh International Airport People Mover is a fully automated people mover system at the Pittsburgh International Airport serving Pittsburgh, Pennsylvania.
AeroTrain is a 3.78-mile (6.08 km) underground automated people mover system at Washington Dulles International Airport, in Dulles, Virginia, United States.
The MIA Mover is an automated people mover (APM) system which opened at the Miami International Airport (MIA) in metropolitan Miami, Florida, United States on September 9, 2011. The MIA Mover is designed to quickly transport landside passengers between Miami International Airport's Main Terminal and the Miami Intermodal Center (MIC). The MIA Mover is one of three separate automated people movers operating at the airport. The others are the Skytrain, which operates within Concourse D, and the MIA e Train people mover connecting Concourse E's satellite building.
The Skytrain is an automated people mover (APM) at Miami International Airport (MIA) in Miami-Dade County, Florida, United States. One of three APMs at MIA, it operates within Concourse D and connects four stations over a distance of 0.70 miles (1.12 km). It uses Crystal Mover vehicles, which are fully-automated and travel along the roof of the terminal. The system has transported up to 40,000 passengers daily.
Changi Airport is Singapore's primary international airport and a major aviation hub in the Asia-Pacific region. It is one of the commercial airports in Singapore, the other being Seletar Airport. Since the rankings for the World's Best Airport by Skytrax began in 1999, the airport was classified as the world's best twelve times, including for eight consecutive years from 2013 to 2021.
Soekarno–Hatta International Airport Terminal 3 is a terminal of Soekarno–Hatta International Airport serving Greater Jakarta, Indonesia. It is located on northeast side of the airport. Terminal 3 has a different style to other terminals of the airport. Terminal 1 and 2 were built with incorporation of the local Javanese architecture into the design, but Terminal 3 is built in contemporary modern design with a degree of environmental friendly and traditional sense. The terminal was first named as Terminal 3 Ultimate before it was renamed simply as Terminal 3.
The Orlando International Airport People Movers are a set of five automated people mover (APM) systems operating within Orlando International Airport. Four of the systems, dubbed Gate Links, connect the airport's main terminal to four satellite airside concourses. The fifth, dubbed the Terminal Link, connects the main terminal to the Intermodal Terminal.
The Tampa International Airport People Movers are a set of automated people mover systems operating within Tampa International Airport. The primary set of people movers are automated guideway transit (AGT) systems that connect the airport's main terminal to four satellite airside concourses. Opened in 1971, the landside/airside shuttles were the first people movers used to transport passengers within an airport terminal. A fifth people mover line known as SkyConnect, which began operating in 2018, connects the main terminal with the airport's economy parking garage and rental car center. In addition, a monorail once connected the main terminal and the long-term parking garage from 1991 until its closure in 2020.
The Soekarno–Hatta Airport Skytrain is a semi-driverless 3.05 kilometre Automated People Mover System (APMS) which connects Soekarno-Hatta Airport Terminals 1, 2, 3 and SHIA railway station, free of charge. Trains are spaced 5 minutes apart, with 7 minutes needed to get from Terminal 1 to Terminal 3. The trains are only available on the landside.
The MIA e Train is one of three automated people mover systems operating at Miami International Airport. The MIA e Train connects the satellite building of Concourse E with the rest of Concourse E which is connected to the main terminal. The system opened in 2016 replacing an earlier system and was built at a cost of $87 million.
The Heathrow Terminal 5 Transit is an automated people mover system (APM) at London Heathrow Airport in the United Kingdom. It operates in the Heathrow Terminal 5 complex and conveys air passengers between the main airport terminal and its satellite buildings, Terminals 5B and 5C.
Shanghai Pudong Airport APM is an automated people mover in the Pudong International Airport. In the initial phase, there are two lines, each connecting a terminal building and a satellite hall. The two lines are planned to be connected after the completion of Terminal 3 in the future. The system uses Class A stocks, currently in a 4-car configuration, with conditions reserved for a 5-car configuration across the fleet.