Tai Seng Facility Building

Last updated
Tai Seng Facility Building
Location
Location101 Bartley Road East, Singapore 533951
Coordinates 1°20′32.15″N103°53′43.26″E / 1.3422639°N 103.8953500°E / 1.3422639; 103.8953500
Characteristics
Operator SBS Transit Rail Pte Ltd (ComfortDelGro Corporation)
RoadsBartley Road East
Rolling stock Bombardier Movia C951
Routes served  DTL   Downtown line
History
Opened21 October 2017;6 years ago (2017-10-21)

Tai Seng Facility Building, abbreviated as TSFB or Tai Seng, is an underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance, stabling and operational facilities for the Downtown line. It is located in Hougang along Bartley Road East. [1] It is accessible via a surface building located along Bartley Road East.

The depot is approximately 52 metres wide, 295 metres long and 20 metres deep. It is connected to Kim Chuan Depot and has underground access for trains to run between both facilities, allowing Downtown line trains to be stabled in the Tai Seng Facility Building, and able to access its remote tracks. It is used in tandem with Kim Chuan Depot for the operations of the Downtown line.

History

Construction of the Tai Seng Facility Building began in November 2010 and was targeted for completion in March 2013, ahead of the commencement of service along the Downtown line Stage 1. The rolling stock for the line were stabled at the neighbouring Kim Chuan Depot, which houses the trains for the Circle line. [2]

When Stage 1 of the Downtown line opened on 22 December 2013, Kim Chuan Depot was used for maintenance and launching of rolling stock for the Downtown line, until Stage 2 was completed on 27 December 2015, providing access to Gali Batu Depot, the Downtown line's main depot. During that time, Downtown line trains had to be towed from the facility via Circle line tracks overnight to Stage 1 of the Downtown line for revenue service and light maintenance work was done at the temporary Marina Bay Maintenance Facility.

The depot is used at full capacity for the housing and maintenance of trains. This includes a direct connection between the line directly to the facility between Ubi station and Bedok North station via two reception tracks: 1 track Bukit Panjang-bound towards Ubi station and 1 track Expo-bound towards Bedok North station. [3] [4]

Related Research Articles

<span class="mw-page-title-main">Mass Rapid Transit (Singapore)</span> Principal metro system serving Singapore

The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.4 million in 2019.

<span class="mw-page-title-main">East–West MRT line</span> Mass Rapid Transit line in Singapore

The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. The 57.2 kilometres (35.5 mi) line is the longest on the MRT network, with 35 stations, 8 of which are underground. The line is coloured green on the rail map.

<span class="mw-page-title-main">Circle MRT line</span> Mass Rapid Transit line in Singapore

The Circle Line (CCL) is a medium-capacity Mass Rapid Transit line in Singapore operated by SMRT Corporation. It runs in a currently incomplete loop from Dhoby Ghaut station in the city area of Singapore to HarbourFront station in the south via Bishan station in Central Singapore. It also has a branch to Marina Bay station from Promenade station, which will be extended to HarbourFront station from 2026 to form a complete loop. Coloured orange on the rail map, the fully-underground line is 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour.

<span class="mw-page-title-main">Hougang</span> Planning Area and HDB Town in North-East Region ----, Singapore

Hougang or Aukang is a planning area and mature residential town located in the North-East Region of Singapore. The town is the most populous in the region, being home to 247,528 residents as of 2018. Hougang planning area is bordered by Sengkang to the north, Geylang and Serangoon to the south, Bedok to the southeast, Toa Payoh to the southwest, Paya Lebar to the east, Ang Mo Kio to the west and Bishan to the southwest.

<span class="mw-page-title-main">MacPherson MRT station</span> Mass Rapid Transit station in Singapore

MacPherson MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown line and Circle line in Geylang planning area, Singapore, located underneath Paya Lebar Road at the junction with Circuit Link and Ubi Avenue 2.

<span class="mw-page-title-main">Tai Seng MRT station</span> Mass Rapid Transit station in Singapore

Tai Seng MRT station is an underground Mass Rapid Transit (MRT) station on the Circle line, situated along the boundary of Hougang and Toa Payoh planning areas, Singapore.

<span class="mw-page-title-main">Bartley MRT station</span> Mass Rapid Transit station in Singapore

Bartley MRT station is an underground Mass Rapid Transit (MRT) station on the Stage 3 of the Circle line, located on the boundary of Serangoon and Toa Payoh planning areas, Singapore.

<span class="mw-page-title-main">Kim Chuan Depot</span> MRT rail depot in Singapore

Kim Chuan Depot is a train depot for the Mass Rapid Transit system in Singapore. The depot is constructed fully underground and provides maintenance, stabling and operational facilities for the Circle line. It is located in Hougang, along Upper Paya Lebar Road, and is accessible via Kim Chuan Road.

<span class="mw-page-title-main">Bishan Depot</span> Mass Rapid Transit train depot in Bishan, Singapore

Bishan Depot or is a depot located on the Mass Rapid Transit in Bishan, Singapore. It was completed in 1986 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.

<span class="mw-page-title-main">Changi Depot</span> MRT depot in Singapore

Changi Depot is located in Changi near Koh Sek Lim Road, Singapore.

<span class="mw-page-title-main">Sengkang Depot</span> Train depot in Singapore

Sengkang Depot is a train depot in Sengkang, Singapore operated by SBS Transit. It is the first co-location of facilities for both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT). It maintains the trains for the North East line, Sengkang LRT line, and Punggol LRT line, and houses the control centre of the three lines.

<span class="mw-page-title-main">Downtown MRT line</span> Mass Rapid Transit line in Singapore

The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore operated by SBS Transit. It runs from Bukit Panjang station in the north-west to Expo station in the east via the Central Area. Coloured blue on the rail map, the line serves 34 stations, all of which are underground. The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by SBS Transit, after the North East Line. The line also serves as an alternative to the East-West MRT Line running parallel from Bugis to Expo MRT Station.

Bartley Road is a major road in Singapore extending from Upper Serangoon Road to Tampines Avenue 10. The road has a distance span of 5.8km. En route, it passes through the areas of Serangoon, Bartley, Paya Lebar, Defu, Kaki Bukit and Bedok Reservoir.

<span class="mw-page-title-main">Thomson–East Coast MRT line</span> Mass Rapid Transit line in Singapore

The Thomson–East Coast Line (TEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Coloured brown on the rail map, it is fully underground. When fully completed, the sixth line on the country's MRT network will serve 32 stations over 43 kilometres (27 mi) in length, becoming one of the world's longest driverless rapid transit lines. It runs along a combined north–south and east–west corridor, starting in the north at Woodlands town, passing through Upper Thomson and the towns of Ang Mo Kio and Bishan, heading south to the city-centre at Orchard Road and Marina Bay, subsequently heading eastwards along the eastern coast of the country through Kallang, Marine Parade and southern Bedok before ending at Upper East Coast.

<span class="mw-page-title-main">Ealing Common Depot</span> London Underground railway depot on the District Line

Ealing Common Depot is a London Underground railway depot on the District line, located between Acton Town and Ealing Common stations in west London, England. It is the oldest of the main depots on the Underground, having been built in 1905, when the District Railway was upgraded for electric traction. All depot facilities were moved there from Lillie Bridge Depot, and it was known as Mill Hill Park Works. It subsequently became Ealing Common Works, and its status was reduced to that of a depot in 1922, when Acton Works was opened, and took over responsibility for all major overhauls. Most of the functions of Acton Works were devolved back to the depots, including Ealing Common, in 1985.

<span class="mw-page-title-main">Gali Batu Depot</span> MRT depot in Singapore

Gali Batu MRT Depot is a train depot located off Woodlands Road in Singapore. It provides maintenance services for the Downtown line of the Mass Rapid Transit system, with the capacity to stable up to 42 trains.

<span class="mw-page-title-main">Bombardier Movia C951/C951A</span> Class of electric multiple units in Singapore

The Bombardier MOVIA C951 is the first generation electric multiple unit rolling stock in operation on the Downtown Line of Singapore's Mass Rapid Transit (MRT) system. The contract was won by Bombardier Transportation(Now Alstom) and the rolling stock was built by Changchun Bombardier Railway Vehicles Initially, the authorities had ordered 73 trains, although LTA had ordered an additional 15 trains and a final 4 more trains under C951A which makes a total of 92 trainsets were manufactured under C951.

<span class="mw-page-title-main">Tuas Link MRT station</span> Mass Rapid Transit station in Singapore

Tuas Link MRT station is an elevated Mass Rapid Transit (MRT) station in western Singapore. Located in Tuas along Tuas West Drive, it is located close to Tuas Depot and Tuas Checkpoint. The station is the terminus of the East–West line (EWL) and the westernmost station in Singapore.

<span class="mw-page-title-main">East Coast Integrated Depot</span> MRT and bus depot in Singapore

The East Coast Integrated Depot (ECID) is a large integrated bus and train depot located in Changi that will serve three Mass Rapid Transit (MRT) lines in Singapore, the East West Line (EWL), the Downtown Line (DTL) and the Thomson-East Coast Line (TEL). As of 12 November 2023, it is currently under construction, with expected completion in 2025.

<span class="mw-page-title-main">Singapore Rail Test Centre</span> Railway testing facility in Singapore

The Singapore Rail Test Centre (SRTC) is a railway testing facility in Tuas, Singapore. Constructed on the former site of the Raffles Country Club and opposite Tuas Depot, the 50 ha (120-acre) SRTC will be used to test new rolling stock and rail systems for the Singapore MRT network. It incorporates several green building features in its design and operation.

References

  1. "Tai Seng Facility Building". cgnarchitects. Archived from the original on 9 March 2017. Retrieved 8 February 2017.
  2. "Tai Seng Facility Building". Land Transport Guru. Retrieved 8 February 2017.
  3. "Internship_report". SlideShare. 7 November 2015. Retrieved 8 February 2017.
  4. "Technical Issues and Discussions for Tunnel Mining by Earth Pressure Balance Machine, Singapore MRT C929A" (PDF). nishimatsu jp. Retrieved 8 February 2017.