Location | |
---|---|
Location | Tengah, Singapore |
Characteristics | |
Owner | Land Transport Authority |
Operator | Singapore One Rail (SBS Transit and RATP Dev Asia Pacific) |
Type | At-Grade |
Roads | KJE, PIE |
Rolling stock | Hyundai Rotem J151 |
Routes served | JRL Jurong Region Line |
History | |
Opened | 2027 |
Tengah Depot is a future integrated train and bus depot in Tengah, Singapore. At 44.5 ha (110 acres), the at-grade depot will house 100 trains of the Jurong Region line (JRL) fleet and house 600 buses. [1] The station will be located along the line between the Hong Kah and Corporation stations. Other facilities of the depot include the Operations Control Centre (OCC) for the JRL. First announced in 2018, the depot is expected to be completed in 2026 along with the first stage of the JRL.
On 9 May 2018, the Land Transport Authority (LTA) announced that a joint rail and bus depot in the Tengah area will serve the proposed Jurong Region line (JRL). The depot was expected to be completed in 2026 along with Phase 1 of the JRL. [1] [2] However, the restrictions on construction due to the COVID-19 pandemic in Singapore has led to delays, with the completion date pushed by one year to 2027. [3]
Contract J101 for the construction of Tengah Depot and its associated facilities was awarded to China Railway 11 Bureau Group Corporation (Singapore Branch) at S$739.5 million in November 2019. Construction will begin in 2020, with an expected completion in 2027. [4] [5]
The depot includes a rail administration building, stabling yards, test track, storage warehouses and maintenance workshops. The administrative building will house the Operation Control Centre (OCC) and Depot Control Centre (DCC) for the Jurong Region line. The stabling yards have a capacity for 100 four-car trains, and stabling capacity supplemented by an additional stabling facility located off Peng Kang Hill Station. [4]
The multi-storey bus depot will be co-located with the facility and will provide parking and maintenance facilities for about 600 buses. It will also house a Bus Operations Control Centre. Within the site will be a four-storey transport workers' dormitory which can accommodate 450 bus captains. [4] [6]
Boon Lay MRT station is a Mass Rapid Transit (MRT) station on the East West line (EWL) in Jurong West, Singapore. Situated along Boon Lay Way, the station is integrated with the Boon Lay Bus Interchange and Jurong Point as part of the Boon Lay Integrated Transport Hub. Other landmarks surrounding the station include the SAFRA Clubhouse and Jurong West Public Library.
Jurong West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.
The Jurong Region Line (JRL) is a Mass Rapid Transit (MRT) line under development in Singapore. It is planned to serve the western parts of the country, particularly the new town of Tengah and its surrounding areas. First envisioned as a Light Rail Transit (LRT) line in 2001, the project was put on hold throughout the 2000s before its current iteration as a MRT line was confirmed in 2013. The line is set to open in stages from 2027 to 2029. It will be the first MRT line to be fully elevated, and the fifth MRT line to be completely automated and driverless.
Choa Chu Kang MRT/LRT station is an elevated Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Choa Chu Kang, Singapore. Serving the North South line (NSL) and the Bukit Panjang LRT line (BPLRT), the station is located near the Choa Chu Kang Bus Interchange and Lot One shopping centre. Other surrounding landmarks include Keat Hong Community Club and Choa Chu Kang Park.
Mandai Depot is an integrated train and bus depot located in Mandai, Singapore. The train depot serves as the maintenance and control centre of the Thomson-East Coast line while the bus depot is used for the Sembawang-Yishun Bus Package.
Gek Poh MRT station is a future elevated Mass Rapid Transit (MRT) station along the Jurong Region line in Jurong West, Singapore.
Bahar Junction MRT station is a future elevated Mass Rapid Transit (MRT) station in Jurong West, Singapore. Serving the Jurong Region line (JRL), the station will be located at the junction of Jurong West Avenue 4 and Jurong West Street 75.
Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.
Hong Kah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
Choa Chu Kang West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) Phase 1 in Choa Chu Kang, Singapore. It is built along Choa Chu Kang Avenue 3, near the junction with Choa Chu Kang Avenue 1, bringing rail connectivity to schools, residential developments and community amenities in the area.
Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
Tengah Park MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.
Bukit Batok West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line located along the boundary of Bukit Batok and Jurong East planning areas, Singapore.
Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.
Jurong Town Hall MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.
Pandan Reservoir MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong East, Singapore.
Tawas MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore.
Peng Kang Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore.
Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL.