Tawas MRT station

Last updated

 JW2 
Tawas
大华士
தாவாஸ்
Future Mass Rapid Transit (MRT) station
Tawas MRT station site 040622.jpg
Tawas MRT station site
General information
Coordinates 1°21′02″N103°41′31″E / 1.35056°N 103.69185°E / 1.35056; 103.69185 Coordinates: 1°21′02″N103°41′31″E / 1.35056°N 103.69185°E / 1.35056; 103.69185
Owned by Land Transport Authority
Line(s)
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2027;4 years' time (2027)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Gek Poh
towards Choa Chu Kang
Jurong Region Line
Future service
Terminus
Nanyang Gateway
Location
SGMRT-LRT map.svg
Red Dot.svg
Tawas
Tawas station in Singapore

Tawas MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. [1] [2] [3]

Contents

Derived from the namesake road nearby, Lorong Tawas, it will be the northern terminus of the West Branch of the Jurong Region Line from 2027 to 2029 before Peng Kang Hill MRT station opens. There will be two station names in the naming exercise - Tawas and Cleantech. Trains entering service at this station will terminate at Choa Chu Kang via Bahar Junction.

History

On 9 May 2018, the Land Transport Authority (LTA) announced that Tawas station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027. [4]

Contract J107 for the design and construction of Tawas Station and associated viaducts was awarded to Sembcorp Design and Construction Pte Ltd at a sum of S$ 226.6 million ( US$ 166.1 million). Construction will start in 2020, with completion in 2027. [5] Contract J107 also includes the design and construction of Gek Poh, and associated viaducts. [6]

Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027. [7]

Location

The station complex will be situated at JTC CleanTech Park. [8] It is located within the Western Water Catchment planning area, [9] to the west of the Jurong Eco-Garden. [10]

Access to the station will be via 4 exits. [11]

Related Research Articles

<span class="mw-page-title-main">Jurong East MRT station</span> Mass rapid transit station in Singapore

Jurong East MRT station is an elevated Mass Rapid Transit (MRT) interchange station on the North South (NSL) and East West (EWL) lines in Jurong East, Singapore, operated by SMRT Trains. It is located at the heart of Jurong Lake District, within the vicinity of JCube, Jem, Westgate, IMM, Ng Teng Fong General Hospital and Jurong East Bus Interchange.

<span class="mw-page-title-main">Boon Lay MRT station</span> Mass rapid transit station in Singapore

Boon Lay MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West line in Jurong West, Singapore. Located in Jurong West Central, Boon Lay station is one of the three stations that serve Jurong West New Town; the other two are Lakeside MRT station and Pioneer MRT station. Together with Boon Lay Bus Interchange and Jurong Point Shopping Mall, they form the Boon Lay Integrated Public Transport Hub.

<span class="mw-page-title-main">Jurong West MRT station</span> Future MRT station in Singapore

Jurong West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.

<span class="mw-page-title-main">Jurong Region MRT line</span> Future Mass Rapid Transit line in Singapore

The Jurong Region Line (JRL) is a future Mass Rapid Transit (MRT) line that will serve the western part of Singapore. The JRL was first announced in 2013, and is set to open in stages from 2027 to 2029. The JRL will have 24 stations, serving Choa Chu Kang in the north, Jurong Pier in the south, Peng Kang Hill in the west and Pandan Reservoir in the east. An extension to Haw Par Villa station is under consideration. The line is coloured teal on the rail map.

<span class="mw-page-title-main">Choa Chu Kang MRT/LRT station</span> Mass rapid transit and light rail station in Singapore

Choa Chu Kang MRT/LRT station is an above-ground Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Choa Chu Kang, Singapore. It is an interchange between the North South line and Bukit Panjang LRT, serving as the western terminus of the latter. The station is located between Choa Chu Kang Bus Interchange and Lot One in the Choa Chu Kang town centre.

<span class="mw-page-title-main">Gek Poh MRT station</span> Future MRT station in Singapore

Gek Poh MRT station is a future elevated Mass Rapid Transit (MRT) station along the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Tukang MRT station</span> Future MRT station in Singapore

Tukang MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Boon Lay, Singapore. The name is derived from the road nearby, Jalan Tukang.

<span class="mw-page-title-main">Bahar Junction MRT station</span> Future MRT station in Singapore

Bahar Junction MRT station is a future elevated Mass Rapid Transit (MRT) station in Jurong West, Singapore. Serving the Jurong Region line (JRL), the station will be located at the junction of Jurong West Avenue 4 and Jurong West Street 75.

<span class="mw-page-title-main">Corporation MRT station</span> Future MRT station in Singapore

Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Hong Kah MRT station</span> Future MRT station in Singapore

Hong Kah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah MRT station</span> Future MRT station in Singapore

Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Choa Chu Kang West MRT station</span> Future MRT station in Singapore

Choa Chu Kang West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) Phase 1 in Choa Chu Kang, Singapore. It is built along Choa Chu Kang Avenue 3, near the junction with Choa Chu Kang Avenue 1, bringing rail connectivity to schools, residential developments and community amenities in the area.

<span class="mw-page-title-main">Tengah Plantation MRT station</span> Future MRT station in Singapore

Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Toh Guan MRT station</span> Future MRT station in Singapore

Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.

<span class="mw-page-title-main">Jurong Town Hall MRT station</span> Future MRT station in Singapore

Jurong Town Hall MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.

<span class="mw-page-title-main">Pandan Reservoir MRT station</span> Future MRT station in Singapore

Pandan Reservoir MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong East, Singapore.

<span class="mw-page-title-main">Nanyang Gateway MRT station</span> Future MRT station in Singapore

Nanyang Gateway MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

<span class="mw-page-title-main">Nanyang Crescent MRT station</span> Future MRT station in Singapore

Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

<span class="mw-page-title-main">Peng Kang Hill MRT station</span> Future MRT station in Singapore

Peng Kang Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore.

<span class="mw-page-title-main">Tengah Depot</span> Future MRT and bus depot in Singapore

Tengah Depot is a future integrated train and bus depot in Tengah, Singapore. At 44.5 ha, the at-grade depot will house 100 trains of the Jurong Region line (JRL) fleet and house 600 buses. The station will be located along the line between the Hong Kah and Corporation stations. Other facilities of the depot include the Operations Control Centre (OCC) for the JRL. First announced in 2018, the depot is expected to be completed in 2026 along with the first stage of the JRL.

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  2. "Residents and students welcome Jurong Region Line but find it confusing". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  3. "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  4. "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  5. "LTA | News Room | news-releases | LTA Awards Three Civil Contracts to Construct Four Stations for the Jurong Region Line". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  6. "3 civil contracts worth $596m awarded to design, construct future Jurong Region Line stations, Transport News & Top Stories - The Straits Times". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 13 February 2020.
  7. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Retrieved 24 March 2021.
  8. "JTC | CleanTech Park". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  9. "Singapore's Western Water Catchment Planning Area". Key Location. Retrieved 21 September 2019.
  10. "JTC | Jurong Eco-Garden". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  11. "Jurong Region Line". 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.