Corporation MRT station

Last updated
 JS5 
Corporation
企业
கார்ப்பரெஷன்
Corporation
Future Mass Rapid Transit (MRT) station
Corporation MRT station site 130622.jpg
Corporation MRT station site
General information
Coordinates 1°21′11″N103°42′50″E / 1.352948°N 103.713930°E / 1.352948; 103.713930 Coordinates: 1°21′11″N103°42′50″E / 1.352948°N 103.713930°E / 1.352948; 103.713930
Owned by Land Transport Authority
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeElevated
Platform levels1
Bicycle facilitiesYes
Disabled accessYes
History
Opening2027;4 years' time (2027)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Hong Kah
towards Choa Chu Kang
Jurong Region Line
Future service
Jurong West
towards Boon Lay
Location
SGMRT-LRT map.svg
Red Dot.svg
Corporation
Corporation station in Singapore

Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore. [1] [2] [3]

Contents

History

On 9 May 2018, LTA announced that Corporation station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2027. [4]

Contract J103 for the design and construction of Corporation Station and associated viaducts was awarded to Eng Lee Engineering Pte Ltd - Wai Fong Construction Pte Ltd Joint Venture (JV) at a sum of S$274.3 million. Construction will start in 2020, with completion in 2027. [5] Contract J103 also includes the design and construction of Hong Kah station, and associated viaducts. [6]

Initially expected to open in 2026, the restrictions on the construction due to the COVID-19 pandemic has led to delays in the JRL line completion, and the date was pushed to 2027. [7]

Location

The station will be straddled over the existing Jurong West Avenue 2, just east of the junction with Bulim Avenue and Corporation Road, and west of the PIE expressway exit. It is located within the Jurong West planning area between the Hong Kah and Wenya Subzones, [8] with a housing estate and the future site of Jurong Pioneer Junior College to the south, and the Bulim district of the future Jurong Innovation District to the north. [9]

Access to the station will be via 4 exits, 2 of each side of Jurong West Avenue 2. [10]

Related Research Articles

<span class="mw-page-title-main">Boon Lay MRT station</span> MRT station in Singapore

Boon Lay MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West line in Jurong West, Singapore. Located in Jurong West Central, Boon Lay station is one of the three stations that serve Jurong West New Town; the other two are Lakeside MRT station and Pioneer MRT station. Together with Boon Lay Bus Interchange and Jurong Point Shopping Mall, they form the Boon Lay Integrated Public Transport Hub.

<span class="mw-page-title-main">Jurong West MRT station</span> Future MRT station in Singapore

Jurong West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.

<span class="mw-page-title-main">Choa Chu Kang MRT/LRT station</span> MRT and LRT station in Singapore

Choa Chu Kang MRT/LRT station is an above-ground Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Choa Chu Kang, Singapore. It is an interchange between the North South line and Bukit Panjang LRT, serving as the western terminus of the latter. The station is located between Choa Chu Kang Bus Interchange and Lot One in the Choa Chu Kang town centre.

<span class="mw-page-title-main">Gek Poh MRT station</span> Future MRT station in Singapore

Gek Poh MRT station is a future elevated Mass Rapid Transit (MRT) station along the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Tukang MRT station</span> Future MRT station in Singapore

Tukang MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Boon Lay, Singapore. The name is derived from the road nearby, Jalan Tukang.

<span class="mw-page-title-main">Bahar Junction MRT station</span> Future MRT station in Singapore

Bahar Junction MRT station is a future elevated Mass Rapid Transit (MRT) station in Jurong West, Singapore. Serving the Jurong Region line (JRL), the station will be located at the junction of Jurong West Avenue 4 and Jurong West Street 75.

<span class="mw-page-title-main">Hong Kah MRT station</span> Future MRT station in Singapore

Hong Kah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah MRT station</span> Future MRT station in Singapore

Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Choa Chu Kang West MRT station</span> Future MRT station in Singapore

Choa Chu Kang West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) Phase 1 in Choa Chu Kang, Singapore. It is built along Choa Chu Kang Avenue 3, near the junction with Choa Chu Kang Avenue 1, bringing rail connectivity to schools, residential developments and community amenities in the area.

<span class="mw-page-title-main">Tengah Plantation MRT station</span> Future MRT station in Singapore

Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah Park MRT station</span> Future MRT station in Singapore

Tengah Park MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.

<span class="mw-page-title-main">Bukit Batok West MRT station</span> Future MRT station in Singapore

Bukit Batok West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line located along the boundary of Bukit Batok and Jurong East planning areas, Singapore.

<span class="mw-page-title-main">Toh Guan MRT station</span> Future MRT station in Singapore

Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.

<span class="mw-page-title-main">Jurong Town Hall MRT station</span> Future MRT station in Singapore

Jurong Town Hall MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.

<span class="mw-page-title-main">Pandan Reservoir MRT station</span> Future MRT station in Singapore

Pandan Reservoir MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong East, Singapore.

<span class="mw-page-title-main">Tawas MRT station</span> Future MRT station in Singapore

Tawas MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore.

<span class="mw-page-title-main">Nanyang Gateway MRT station</span> Future MRT station in Singapore

Nanyang Gateway MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

<span class="mw-page-title-main">Nanyang Crescent MRT station</span> Future MRT station in Singapore

Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

<span class="mw-page-title-main">Peng Kang Hill MRT station</span> Future MRT station in Singapore

Peng Kang Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore.

<span class="mw-page-title-main">Tengah Depot</span> Future MRT and bus depot in Singapore

Tengah Depot is a future integrated train and bus depot in Tengah, Singapore. At 44.5 ha, the at-grade depot will house 100 trains of the Jurong Region line (JRL) fleet and house 600 buses. The station will be located along the line between the Hong Kah and Corporation stations. Other facilities of the depot include the Operations Control Centre (OCC) for the JRL. First announced in 2018, the depot is expected to be completed in 2026 along with the first stage of the JRL.

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  2. "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  3. "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  4. "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  5. "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  6. "Tender information | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  7. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Retrieved 24 March 2021.
  8. "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
  9. "JTC | Jurong Innovation District". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  10. "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.