Tengah Plantation JE1 登加种植 தெங்கா தோட்டம் | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
![]() Tengah Plantation MRT station under construction in May 2024 | |||||||||||
General information | |||||||||||
Coordinates | 1°21′26″N103°44′00″E / 1.35731°N 103.73342°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2028 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
|
Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
On 9 May 2018, the Land Transport Authority (LTA) announced that Tengah Plantation station would be part of the proposed 24-kilometre (15 mi) Jurong Region line (JRL). [1] The station would be constructed as part of Phase 2 (JRL East), a branch line consisting of 7 stations branching from Tengah to Pandan Reservoir. Phase 2 was expected to be completed in 2027. [2] [3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2028. [4]
The contract for the design and construction of Tengah Plantation station was awarded to a joint venture between John Holland Pty Ltd and McConnell Dowell South East Asia Pte Ltd for S$265.4 million (US$198.1 million) in March 2020. The contract included the design and construction of the Tengah Park and Bukit Batok West stations and associated viaducts. [5] [6] [7]
The station will be located within the future Tengah planning area in the Plantation District along Plantation Crescent. [8] [9] [10] The station is located next to Plantation Plaza and Tengah Community Hub.