JW3 Nanyang Gateway 南洋门 நன்யாங் கேட்வே | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°21′13″N103°41′12″E / 1.35369°N 103.68661°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2029 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Nanyang Gateway MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).
On 9 May 2018, the Land Transport Authority (LTA) announced that Nanyang Gateway station would be part of the proposed JRL. [1] [2] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to this station from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028. [3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029. [4]
The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 mi) of associated viaducts – Contract J113 [5] – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021. Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029. [6]
The station will serve the JRL and will be located between the Tawas and Nanyang Crescent stations. The official station code will be JW3. [7] The station will span over Nanyang Avenue and has four entrances, serving the NTU Hall of Residence and Staff Residence. [8]
Boon Lay MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West line in Jurong West, Singapore. Located in Jurong West Central, Boon Lay station is one of the three stations that serve Jurong West New Town; the other two are Lakeside MRT station and Pioneer MRT station. Together with Boon Lay Bus Interchange and Jurong Point Shopping Mall, they form the Boon Lay Integrated Public Transport Hub.
Jurong West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong West, Singapore.
The Jurong Region Line (JRL) is a future Mass Rapid Transit (MRT) line that will serve the western part of Singapore. The JRL was first announced in 2013, and is set to open in stages from 2027 to 2029. The JRL will have 24 stations, serving Choa Chu Kang in the north, Jurong Pier in the south, Peng Kang Hill in the west and Pandan Reservoir in the east. An extension to Haw Par Villa station is under consideration. The line is coloured teal/cyan on the rail map.
Gek Poh MRT station is a future elevated Mass Rapid Transit (MRT) station along the Jurong Region line in Jurong West, Singapore.
Jurong Pier MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line (JRL), located on the boundary of Boon Lay and Jurong East planning areas in Singapore. The station will be the southern terminus of the JRL mainline. Trains entering service at this station will terminate at Peng Kang Hill via Bahar Junction.
Jurong Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Boon Lay, Singapore. First announced in May 2018, the station is expected to be completed in 2029 along with Phase 3 of JRL.
Tukang MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Boon Lay, Singapore. The name is derived from the road nearby, Jalan Tukang.
Enterprise MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.
Bahar Junction MRT station is a future elevated Mass Rapid Transit (MRT) station in Jurong West, Singapore. Serving the Jurong Region line (JRL), the station will be located at the junction of Jurong West Avenue 4 and Jurong West Street 75.
Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.
Hong Kah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.
Tengah Park MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.
Bukit Batok West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line located along the boundary of Bukit Batok and Jurong East planning areas, Singapore.
Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.
Jurong Town Hall MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.
Pandan Reservoir MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong East, Singapore.
Tawas MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore.
Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).
Peng Kang Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore.