Nanyang Crescent MRT station

Last updated

 JW4 
Nanyang Crescent
南洋弯
நன்யாங் க்ரெஸ்ஸன்
Future Mass Rapid Transit (MRT) station
Nanyang Crescent MRT station site 040622.jpg
Nanyang Crescent MRT station site
General information
Coordinates 1°20′54″N103°40′51″E / 1.34836°N 103.68085°E / 1.34836; 103.68085
Owned by Land Transport Authority
Line(s)
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
Platform levels1
ParkingYes
Bicycle facilitiesYes
AccessibleYes
History
Opening2029;6 years' time (2029)
ElectrifiedYes
Services
Preceding station Mass Rapid Transit Following station
Nanyang Gateway
towards Choa Chu Kang
Jurong Region Line
Future service
Peng Kang Hill
Terminus
Location
SGMRT-LRT map.svg
Red Dot.svg
Nanyang Crescent
Nanyang Crescent station in Singapore

Nanyang Crescent MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

Contents

History

On 9 May 2018, the Land Transport Authority (LTA) announced that Nanyang Crescent station would be part of the proposed JRL. [1] [2] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to this station from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028. [3] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029. [4]

The contract for the design and construction of the Nanyang Gateway and Nanyang Crescent stations and 1.4 km (0.87 mi) of associated viaducts – Contract J113 [5] – was awarded to Hwa Seng Builder Pte Ltd at S$263 million (US$192.8 million) on 6 April 2021. [6] Construction is scheduled to start in the second quarter of 2021, with expected completion in 2029. [7]

Starting on 31 July 2022, a section of Nanyang Drive had to be temporarily diverted for the station's construction, with two bus stops along the road shifted accordingly. The overhead bridge connecting the Nanyang Technological University (NTU) North Spine and the National Institute of Education (NIE) was demolished on 11 September that year. [8]

Details

Nanyang Crescent station will serve the JRL and will be located between the Nanyang Gateway and Peng Kang Hill stations. The official station code will be JW4. [9] The station will be located in the Nanyang Technological University (NTU), along Nanyang Drive near the junction with Nanyang Walk. [10] [11]

Related Research Articles

<span class="mw-page-title-main">Jurong Region MRT line</span> Future Mass Rapid Transit line in Singapore

The Jurong Region Line (JRL) is a future Mass Rapid Transit (MRT) line that will serve the western part of Singapore. The JRL was first announced in 2013, and is set to open in stages from 2027 to 2029. The JRL will have 24 stations, serving Choa Chu Kang in the north, Jurong Pier in the south, Peng Kang Hill in the west and Pandan Reservoir in the east. An extension to Haw Par Villa station is under consideration. The line is coloured teal on the rail map.

<span class="mw-page-title-main">Choa Chu Kang MRT/LRT station</span> Mass Rapid Transit and light rail station in Singapore

Choa Chu Kang MRT/LRT station is an above-ground Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Choa Chu Kang, Singapore. It is an interchange between the North South line and Bukit Panjang LRT, serving as the western terminus of the latter. The station is located between Choa Chu Kang Bus Interchange and Lot One in the Choa Chu Kang town centre.

<span class="mw-page-title-main">Gek Poh MRT station</span> Future Mass Rapid Transit station in Singapore

Gek Poh MRT station is a future elevated Mass Rapid Transit (MRT) station along the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Jurong Pier MRT station</span> Future Mass Rapid Transit station in Singapore

Jurong Pier MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line (JRL), located on the boundary of Boon Lay and Jurong East planning areas in Singapore. The station will be the southern terminus of the JRL mainline. Trains entering service at this station will terminate at Peng Kang Hill via Bahar Junction.

<span class="mw-page-title-main">Jurong Hill MRT station</span> Future Mass Rapid Transit station in Singapore

Jurong Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Boon Lay, Singapore. First announced in May 2018, the station is expected to be completed in 2029 along with Phase 3 of JRL.

<span class="mw-page-title-main">Tukang MRT station</span> Future Mass Rapid Transit station in Singapore

Tukang MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Boon Lay, Singapore. The name is derived from the road nearby, Jalan Tukang.

<span class="mw-page-title-main">Enterprise MRT station</span> Future Mass Rapid Transit station in Singapore

Enterprise MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Bahar Junction MRT station</span> Future Mass Rapid Transit station in Singapore

Bahar Junction MRT station is a future elevated Mass Rapid Transit (MRT) station in Jurong West, Singapore. Serving the Jurong Region line (JRL), the station will be located at the junction of Jurong West Avenue 4 and Jurong West Street 75.

<span class="mw-page-title-main">Corporation MRT station</span> Future Mass Rapid Transit station in Singapore

Corporation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong West, Singapore.

<span class="mw-page-title-main">Hong Kah MRT station</span> Future Mass Rapid Transit station in Singapore

Hong Kah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah MRT station</span> Future Mass Rapid Transit station in Singapore

Tengah MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah Plantation MRT station</span> Future Mass Rapid Transit station in Singapore

Tengah Plantation MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Tengah, Singapore.

<span class="mw-page-title-main">Tengah Park MRT station</span> Future Mass Rapid Transit station in Singapore

Tengah Park MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line located along the boundary of Tengah and Bukit Batok planning areas, Singapore.

<span class="mw-page-title-main">Bukit Batok West MRT station</span> Future Mass Rapid Transit station in Singapore

Bukit Batok West MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line located along the boundary of Bukit Batok and Jurong East planning areas, Singapore.

<span class="mw-page-title-main">Toh Guan MRT station</span> Future Mass Rapid Transit station in Singapore

Toh Guan MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line (JRL) in Jurong East, Singapore. Announced on 9 May 2018, it will be constructed as part of Phase 2 of the JRL.

<span class="mw-page-title-main">Jurong Town Hall MRT station</span> Future Mass Rapid Transit station in Singapore

Jurong Town Hall MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Jurong East, Singapore.

<span class="mw-page-title-main">Pandan Reservoir MRT station</span> Future Mass Rapid Transit station in Singapore

Pandan Reservoir MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Jurong East, Singapore.

<span class="mw-page-title-main">Tawas MRT station</span> Future Mass Rapid Transit station in Singapore

Tawas MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region Line in Western Water Catchment, Singapore.

<span class="mw-page-title-main">Nanyang Gateway MRT station</span> Future Mass Rapid Transit station in Singapore

Nanyang Gateway MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore. The station will be located within the Nanyang Technological University (NTU).

<span class="mw-page-title-main">Peng Kang Hill MRT station</span> Future Mass Rapid Transit station in Singapore

Peng Kang Hill MRT station is a future elevated Mass Rapid Transit (MRT) station on the Jurong Region line in Western Water Catchment, Singapore.

References

  1. "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate". CNA. 21 September 2019. Archived from the original on 21 September 2019. Retrieved 21 September 2019.
  2. Lim, Adrian (9 May 2018). "New Jurong Region Line to boost access for NTU students". The Straits Times. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
  3. "News Room – News Releases – Joint News Release by the Land Transport Authority (LTA) & SLA – Jurong Region Line: Enhancing Connectivity in the West". Land Transport Authority. 9 April 2021. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
  4. "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 9 April 2021. Retrieved 24 March 2021.
  5. "Contract J113" (PDF). Land Transport Authority. Archived (PDF) from the original on 9 April 2021. Retrieved 9 April 2021.
  6. "J113 – Design and Construction of Nanyang Gateway Station, Nanyang Crescent Station and Viaduct for Jurong Region Line". Hwa Seng Builder Pte Ltd. Retrieved 24 August 2022.
  7. "Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded". Land Transport Authority. 6 April 2021. Archived from the original on 6 April 2021. Retrieved 8 April 2021.
  8. "Latest Updates". NTU. 26 January 2022. Retrieved 24 August 2022.
  9. "Future system map" (PDF). Land Transport Authority. Archived from the original (PDF) on 5 April 2021. Retrieved 9 April 2021.
  10. "JW4 Nanyang Crescent MRT station". Land Transport Authority. Archived from the original on 20 April 2021. Retrieved 20 April 2021.
  11. "MRT Stations & Work Sites at NTU". NTU. 23 January 2022. Retrieved 24 August 2022.