Location | |
---|---|
Location | 11 Kim Chuan Road, Singapore 537065 |
Coordinates | 1°20′27.97″N103°53′14.15″E / 1.3411028°N 103.8872639°E |
Characteristics | |
Owner | Land Transport Authority |
Operator | SMRT Trains Ltd (SMRT Corporation) |
Type | Underground |
Roads | Kim Chuan Road, Upper Paya Lebar Road |
Rolling stock | Alstom Metropolis C830 Alstom Metropolis C830C Alstom Metropolis C851E (Future) |
Routes served | CCL Circle line |
History | |
Opened | 4 March 2009 |
Kim Chuan Depot is a train depot for the Mass Rapid Transit system in Singapore. The depot is constructed fully underground and provides maintenance, stabling and operational facilities for the Circle line. It is located in Hougang, along Upper Paya Lebar Road, and is accessible via Kim Chuan Road.
It used to be the first depot in Singapore to serve two independently operated MRT lines, until the adjacent Tai Seng Facility Building, became operational with the revenue operation of the Downtown line Stage 3 on 21 October 2017. [1]
To facilitate the construction of the depot, part of the Kim Chuan Village was acquired in September 2000 for the construction of the depot and the road viaduct. The Kim Chuan Road was permanently closed from Hougang Avenue 3 to Kim Chuan Drive on 27 June 2002. On 25 October 2002, part of the Hougang Avenue 3 was realigned and on 25 November 2002, part of the Kim Chuan Road was closed.
The project cost S$297 million to construct and 2.1 million cubic metres of soil had to be excavated for its construction. Touted as the world's biggest underground depot, it officially opened on 4 March 2009, employing 300 staff members. [2]
The depot was used for the temporary storage and light maintenance of rolling stock for the Downtown line, before the completion of the Tai Seng Facility Building. It also provided a route in which Downtown line trains can be towed from the depot to its operational line via the Circle line tracks. Once the main depot, Gali Batu Depot was completed with stage 2 of the Downtown line, Kim Chuan Depot simply provides a route for newly delivered Downtown line trains to be transferred in to the Tai Seng Facility Building.
The depot has a capacity to stable 70 trains and covers an area of more than 100,000 square metres (1,076,391 sq ft), reaching a depth of up to 24 metres (78 ft 9 in) at some points. Specifically, the main depot floor is 800 metres (2,624 ft 8 in) in length, 160 metres (524 ft 11 in) in width, and 23 metres (75 ft 6 in) in height. [3] The facility contains the main operation control centre for the Circle line, maintenance facility, stabling areas, and ancillary facilities such as the train wash and workshops. It also houses an automatic storage and retrieval system, a warehouse that stores spare parts for the rolling stocks and other equipments. The depot is connected to the adjacent Tai Seng Facility Building on the east side of the facility and is operated in tandem with the Tai Seng Maintenance Facility. [4]
The depot is accessible via an administration building along Kim Chuan Road, containing offices, a warehouse, a canteen and a 66 kilovolt substation is located above the depot. The remaining 3 hectares (7.4 acres) of land left empty will be used for light industrial use with buildings on it up to 9 storeys high.
The depot is located between Tai Seng station and Bartley station on the Circle line and has 4 reception tracks: 2 tracks clockwise-bound towards Tai Seng station and 2 tracks anticlockwise-bound towards Bartley station.
On 29 October 2015, LTA announced the extension of Kim Chuan depot in tandem with the Circle line stage 6 extension. The extension called for the depot to be expanded underground to almost double its land area and stabling capacity from 70 to 133 trains. The integrated depot will also house 550 buses on the plot of land above the underground train depot. [5] [6]
The Contract 821A for the construction of Kim Chuan Depot extension and its associated facilities was awarded to Woh Hup (Private) Limited at a sum of S$1.21 billion in September 2017. Construction began in 2018, with completion in 2025. [7] [8]
The extension will be located along the northern perimeter of the Bartley Road East viaduct, north of the existing depot which is along the southern perimeter of the Bartley Road East viaduct.
The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.4 million in 2019.
The North East Line (NEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by SBS Transit, the 20-kilometre (12 mi) line is the MRT's shortest. It runs from HarbourFront station in southern Singapore to Punggol station in the northeast, serving 16 stations via Chinatown, Little India, Serangoon and Hougang. Coloured purple on official maps, it is Singapore's third MRT line and the world's first fully-automated underground driverless heavy rail line.
The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. The 57.2 kilometres (35.5 mi) line is the longest on the MRT network, with 35 stations, 8 of which are underground. The line is coloured green on the rail map.
The Circle Line (CCL) is a medium-capacity Mass Rapid Transit line in Singapore operated by SMRT Corporation. It runs in a currently incomplete loop from Dhoby Ghaut station in the city area of Singapore to HarbourFront station in the south via Bishan station in Central Singapore. It also has a branch to Marina Bay station from Promenade station, which will be extended to Harbourfront station from 2026 to form a complete loop. Coloured orange on the rail map, the fully-underground line is 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour.
Hougang, or Aokang, is a planning area and mature residential town located in the North-East Region of Singapore. The town is the most populous in the region, being home to 247,528 residents as of 2018. Hougang planning area is bordered by Sengkang to the north, Geylang and Serangoon to the south, Bedok to the southeast, Toa Payoh to the southwest, Paya Lebar to the east, Ang Mo Kio to the west and Bishan to the southwest.
MacPherson MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown line and Circle line in Geylang planning area, Singapore, located underneath Paya Lebar Road at the junction with Circuit Link and Ubi Avenue 2.
Promenade MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown (DTL) and Circle (CCL) lines in Downtown Core, Singapore. Located underneath Temasek Avenue and adjacent to Millenia Tower, the station serves several key attractions and locations such as Suntec City and the Marina Promenade, which the station is named after. The station is at the junction of the Dhoby Ghaut and Marina Bay branches of the CCL.
Tai Seng MRT station is an underground Mass Rapid Transit (MRT) station on the Circle line, situated along the boundary of Hougang and Toa Payoh planning areas, Singapore.
Bartley MRT station is an underground Mass Rapid Transit (MRT) station on the Stage 3 of the Circle line, located on the boundary of Serangoon and Toa Payoh planning areas, Singapore.
Sengkang Depot is a train depot in Sengkang, Singapore operated by SBS Transit. It is the first co-location of facilities for both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT). It maintains the trains for the North East line, Sengkang LRT line, and Punggol LRT line, and houses the control centre of the three lines.
The Jurong Region Line (JRL) is a future Mass Rapid Transit (MRT) line that will serve the western part of Singapore. The JRL was first announced in 2013, and is set to open in stages from 2027 to 2029. The JRL will have 24 stations, serving Choa Chu Kang in the north, Jurong Pier in the south, Peng Kang Hill in the west and Pandan Reservoir in the east. An extension to Haw Par Villa station is under consideration. The line is coloured teal/cyan on the rail map.
The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore operated by SBS Transit. It runs from Bukit Panjang station in the north-west to Expo station in the east via the Central Area. Coloured blue on the rail map, the line serves 34 stations, all of which are underground. The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by SBS Transit, after the North East Line. The line also serves as an alternative to the East-West MRT Line running parallel from Bugis to Expo MRT Station.
Bartley Road is a major road in Singapore extending from Upper Serangoon Road to Tampines Avenue 10. The road has a distance span of 5.8km. En route, it passes through the areas of Serangoon, Bartley, Paya Lebar, Defu, Kaki Bukit and Bedok Reservoir.
The Bombardier MOVIA C951 is the first generation electric multiple unit rolling stock in operation on the Downtown Line of Singapore's Mass Rapid Transit (MRT) system. The contract was won by Bombardier Transportation and the rolling stock was built by Changchun Bombardier Railway Vehicles Initially, the authorities had ordered 73 trains, although LTA had ordered an additional 15 trains and a final 4 more trains under C951A which makes a total of 92 trainsets were manufactured under C951.
Gul Circle MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL). Located in Tuas, western Singapore, the station serves the surrounding industries of JTC Space @ Tuas and Mapletree Pioneer Logistic Hub. The station is operated by SMRT Trains.
Tai Seng Facility Building, abbreviated as TSFB or Tai Seng, is an underground train depot for the Mass Rapid Transit system in Singapore. The depot is constructed towards the east of Kim Chuan Depot and will provide maintenance, stabling and operational facilities for the Downtown line. It is located in Hougang along Bartley Road East. It is accessible via a surface building located along Bartley Road East.
Tengah Depot is a future integrated train and bus depot in Tengah, Singapore. At 44.5 ha, the at-grade depot will house 100 trains of the Jurong Region line (JRL) fleet and house 600 buses. The station will be located along the line between the Hong Kah and Corporation stations. Other facilities of the depot include the Operations Control Centre (OCC) for the JRL. First announced in 2018, the depot is expected to be completed in 2026 along with the first stage of the JRL.
Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL.
The Integrated Train Testing Centre (ITTC) is a railway testing facility under construction in Tuas, Singapore. Constructed at the former site of the Raffles Country Club, opposite the Tuas Depot, the 50 ha (120-acre) ITTC will be used to test new rolling stock and rail systems for the Singapore MRT network. The ITTC is being modelled on other similar railway testing centres in Germany, South Korea and Japan. It will incorporate several green building features in its design and operation.