Bishan MRT tunnel flooding | |
---|---|
Details | |
Date | 7 October 2017 |
Location | Between Bishan MRT station and Braddell MRT station |
Coordinates | 1°20′55″N103°50′51″E / 1.348542°N 103.8475287°E |
Country | Singapore |
Line | North South MRT line |
Operator | SMRT Trains Ltd (SMRT Corporation) |
Incident type | Flooding of MRT tunnel. |
Cause | Human error, malfunction in the water pumping system, which has since been repaired. |
Statistics | |
Deaths | 0 |
Injured | 0 |
Damage | S$2 million |
The Bishan MRT tunnel flooding was a major incident on the North South MRT line (NSL) of the Singapore MRT which occurred at 5.33 pm on 7 October 2017. The flooding of the tunnels between the Bishan and Braddell MRT stations was caused by heavy rain and a faulty maintenance pump. The flooding completely blocked the tunnel, and bus services had to be deployed while the Singapore Civil Defence Force and maintenance staff removed the water from the tunnel. The incident caused more than S$2 million in damages and lost revenue for the operator SMRT and led to the firing of eight maintenance employees.
The section of flooded tunnels between Bishan and Braddell was part of the first section of the system to open. At the time of the incident, the system was going through a turbulent period plagued with multiple disruptions and delays which caused public displeasure, and this incident further aggravated the situation. Earlier in the day, there was a lunchtime delay on the North East line, [1] and in the previous month, service on the Bukit Panjang LRT line was disrupted. [2] [3]
At 5:33 p.m. on 7 October 2017, heavy rain flooded the tunnels between the Bishan and Braddell MRT stations. In addition, a small trackside fire, whose cause is still unknown, was spotted by a train driver between Raffles Place MRT station and Marina Bay MRT station. This prompted the train's operator, SMRT, to suspend all service from Ang Mo Kio to Marina South Pier. SMRT provided free bridging buses along the affected stretch of stations. [4]
At 7:07 p.m., the Singapore Civil Defence Force (SCDF) received a call from SMRT about a flooding situation in the tunnels between the two affected stations. SMRT then officially reported the flooding on social media at 7.30 p.m. Train service between the Newton MRT station and Marina South Pier was restored, but service between Newton and Ang Mo Kio remained down. SMRT also mentioned that its engineers were working with SCDF personnel to pump water out of the affected stretch of tunnels. [5] [6] At 1:50 p.m. the next day, SMRT said that the water had been cleared and that service would resume, and test trains were deployed to ensure passenger safety. This resulted in almost 20 hours of disruption. [6]
Following the incident, SMRT and the Land Transport Authority (LTA) launched a joint investigation into the incident. The initial report delivered by the LTA listed three possible causes or combination of causes that could have resulted in the failure - The accumulation of silt and debris could have prevented the lowest float switch from activating or the alarm switch from triggering, or that the pumps were not set back to automatic mode after the last round of maintenance was completed. [7] The investigation led to the uncovering of falsified maintenance records and lack of maintenance of the water pumps. [8]
As a result of the incident, SMRT suffered S$2 million in damages to trackside equipment and trains. [9] The incident prompted a check of other similar pumps around the system, two of which, at Lavender and Kembangan, were also found to be faulty. [10] SMRT also fired eight employees from their maintenance crew — including a senior executive, two managers, and five members of the technical staff — as a result of the incident. [8] To prevent such an incident from occurring again, the train operator introduced flood-prevention measures at four other tunnel portals along the East West line in 2018. These measures included installing more float switches and relocating pump control panels (used for manually activating the water pumps) to areas accessible to maintenance staff. [11]
On 20 July 2018, SMRT was fined S$1.9 million by the LTA for this incident and another incident at Pasir Ris MRT station, which led to the deaths of two SMRT employees. [12]
The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.45 million in 2023.
The North–South Line (NSL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore, operated by SMRT Corporation. Coloured red on the Singapore rail map, the line is 45 kilometres (28 mi) long and serves 27 stations, 11 of which, between the Bishan and Marina South Pier stations, are underground. It runs from Jurong East station, located in Western Singapore, to Marina South Pier station in the Central Area, via Woodlands station in northern Singapore. The line operates for almost 20 hours a day, with headways of up to 1 to 2 minutes during peak hours and 5 to 8 minutes during off-peak hours. All the trains on the North–South Line run with a six-car formation.
The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. Coloured green on the rail map, the line serves 35 stations, 8 of which are underground. At 57.2 kilometres (35.5 mi), the line is the longest on the MRT network.
The Circle Line (CCL) is a medium-capacity Mass Rapid Transit line in Singapore. It runs in a loop from Dhoby Ghaut station in the city-centre to HarbourFront station in the south via Bishan station in the centre of the country. It also has a branch to Marina Bay station from Promenade station, which will be extended to HarbourFront station from 2026 to form a complete loop. Coloured orange on the rail map, the fully-underground line is approximately 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour.
The Bukit Panjang LRT is a 8-kilometre (5.0 mi) automated guideway transit line in Bukit Panjang, Singapore. The BPLRT is currently the only LRT line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and parts of Choa Chu Kang in the north-west of the country. The line was the first LRT line constructed in Singapore, having opened on 6 November 1999 by Deputy Prime Minister Tony Tan.
Bishan MRT station is a Mass Rapid Transit (MRT) interchange station on the North–South (NSL) and Circle (CCL) lines in Bishan, Singapore. The station is located along Bishan Road within the town centre; it is integrated with Junction 8 shopping centre and is close to Bishan Bus Interchange. Nearby schools include Raffles Institution, Catholic High School, and Kuo Chuan Presbyterian Primary and Secondary Schools.
Pasir Ris MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL) in Pasir Ris, Singapore. Situated along Pasir Ris Central adjacent to Pasir Ris Bus Interchange, Pasir Ris Mall and the White Sands Shopping Mall, it is the eastern terminus of the EWL. The station exterior has the characteristic dome-shaped segmented roof also seen on other elevated EWL stations.
Bukit Panjang is a planning area and residential town located in the West Region of Singapore. A portion of this town is situated on a low-lying elongated hill. The planning area is bounded by Bukit Batok to the west, Choa Chu Kang to the northwest, Sungei Kadut to the north, the Central Water Catchment to the east, and Bukit Timah to the south. Bukit Panjang New Town is located at the northern portion of the planning area. Bukit Panjang has an average elevation of 36m/118 ft.
The Light Rail Transit system, locally known by the initialism LRT, are a series of localised automated guideway transit (AGT) systems in Singapore which acts as feeder services to the heavy rail Mass Rapid Transit (MRT), and together forms the core of the country's rail transport services. The first LRT line was opened in 1999 and the system has since expanded to three lines, each serving three new towns, namely Bukit Panjang, Sengkang and Punggol, with a total system length of approximately 30 km (19 mi). Trains on these lines have at least one station interchange link to the MRT.
Newton MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North South (NSL) and Downtown (DTL) lines. It is located in Newton, Singapore, at the junction of Scotts Road and Bukit Timah Road near Newton Circus. The station serves the offices and condominiums around Newton Circus including Goldbell Towers and Scotts Highpark, and it is within walking distance to the Newton Food Centre.
Toa Payoh MRT station is an underground Mass Rapid Transit (MRT) station on the North South line (NSL) in Toa Payoh, Singapore. Located in the town centre of Toa Payoh, it is integrated with the Toa Payoh Bus Interchange and the HDB Hub, headquarters of the Housing and Development Board. The station is underneath the intersection of three roads: Lorong 1 Toa Payoh, Lorong 2 Toa Payoh and Lorong 6 Toa Payoh.
Braddell MRT station is an underground Mass Rapid Transit (MRT) station located on the North South line (NSL) in Toa Payoh, Singapore. Unlike the other stations on the NSL, the station has side platforms due to engineering constraints. Located underneath the traffic junction of Lorong 1 Toa Payoh and Lorong 2 Toa Payoh, Braddell station primarily serves the estates in the northern part of Toa Payoh New Town.
Bishan Depot or is a depot located on the Mass Rapid Transit in Bishan, Singapore. It was completed in 1986 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.
The safety of the Mass Rapid Transit (MRT) system in Singapore was questioned by the public after several accidents on the system during the 1980s and 1990s. Most problems have been addressed, and many safety measures are visible to users of the system.
In the Mass Rapid Transit system in Singapore, security issues related to crime and terrorism were not high on the agenda of the system's planners since its inception, but since the occurrence of several high-profile terrorism incidents elsewhere, CCTVs have been upgraded and installed across all stations, and security officers patrol inside the trains and within train stations 24/7.
SMRT Trains Limited is a rail operator in Singapore and a wholly owned subsidiary of SMRT Corporation. After the privatisation of the MRT operations in 1995, it was originally named Singapore MRT Limited. On 31 December 2001, it was renamed SMRT Trains Limited, so as to avoid confusion with the then upcoming North East MRT line which would be under SBS Transit. SMRT Trains currently manages most of the MRT services in Singapore except the North East Line and Downtown Line.
Bukit Panjang MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station on the Downtown line (DTL) and the Bukit Panjang LRT line (BPLRT) in Singapore. Located in the namesake estate of Bukit Panjang, the station is at the junction of Upper Bukit Timah Road and Petir Road. The station serves the commercial buildings of Bukit Panjang Plaza, Hillion Mall, and Junction 10. It forms a part of the Bukit Panjang Integrated Transport Hub (BPITH), which also contains a bus interchange.
Choa Chu Kang MRT/LRT station is an elevated Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Choa Chu Kang, Singapore. Serving the North South line (NSL) and the Bukit Panjang LRT line (BPLRT), the station is located near the Choa Chu Kang Bus Interchange and Lot One shopping centre. Other surrounding landmarks include Keat Hong Community Club and Choa Chu Kang Park.
The Pasir Ris rail accident occurred on 22 March 2016 at the track switch near Pasir Ris station in Pasir Ris, Singapore on the East–West Line (EWL). A train ran over and killed two SMRT Trains track workers, Nasrulhudin Majumudin and Muhammad Asyraf Ahmad Buhari, who were trainees and part of a team of 15 investigating a track point fault machine near the station.
The Joo Koon rail accident, sometimes referred to as the Joo Koon train collision, was a crash which happened on 15 November 2017, when a C151A train travelling at 16 kilometres per hour (9.9 mph) rear-ended a stationary C151A train at Joo Koon station on the East–West MRT line, resulting in 38 injuries. The stationary train was in the process of being detrained due to a train fault. Both trains were operating under the recently installed Thales SelTrac CBTC signalling system at the time of incident, and the Minister of Transport Khaw Boon Wan expressed that he was "disturbed" by an initial finding that "critical safety software" was inadvertently removed from the stationary train, possibly due to a malfunctioning signalling circuit, which led to the crash. This incident is the second train collision in Singapore MRT's history, after the Clementi rail accident.