Mitsubishi Heavy Industries Crystal Mover C810D

Last updated
Mitsubishi Heavy Industries Crystal Mover C810D
In serviceQ3 2025 (Projected)
Manufacturer Mitsubishi Heavy Industries
Built at Mihara, Hiroshima, Japan
Family name Crystal Mover
Replaced Mitsubishi Heavy Industries Crystal Mover C810
Constructed2024 – 2027
Entered serviceQ3 2025
Number under construction50 vehicles (25 sets)
Number built50 vehicles (25 sets)
Formation2 per trainset
M1–M2
Fleet numbers58 – 82
Capacity36 seated; 174 standing
Operators SBS Transit Ltd (ComfortDelGro Corporation)
Depots Sengkang
Lines served
Specifications
Car body construction Aluminum-alloy weighed
Train length23.5 m (77 ft 1+14 in)
Car length11.75 m (38 ft 6+58 in)
Width2.69 m (8 ft 9+78 in)
Height3,615 mm (11 ft 10+38 in)
Doors2 × 2 per car
Maximum speed
  • 80 km/h (50 mph) (design)
  • 70 km/h (43 mph) (service)
Weight14.9 t (14.7 long tons; 16.4 short tons) per car
Traction system Mitsubishi IGBTVVVF inverter vector control
Traction motors 4 × 80 kW (110 hp) 3-phase AC induction motor
Power output320 kW (430 hp)
Acceleration 1 m/s2 (3.3 ft/s2)
Deceleration
  • 1 m/s2 (3.3 ft/s2) (service)
  • 1.3 m/s2 (4.3 ft/s2) (emergency)
Electric system(s) 750 V DC   third rail
Current collector(s) Collector shoe
UIC classification AA+AA
Braking system(s) Electric command pneumatic brake with regenerative brake with stand-by brake, parking brake (with variable load control and wheel slide prevention control)
Safety system(s)Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [1]
Coupling system Shibata
Track gauge 1,850 mm (6 ft 2732 in)
Guideway span: 3.2 m (10 ft 6 in)

The Mitsubishi Heavy Industries Crystal Mover C810D is an automated people mover vehicle which serves the Sengkang LRT line and Punggol LRT line as the third generation train after their previous counterparts Mitsubishi Heavy Industries Crystal Mover C810 and Mitsubishi Heavy Industries Crystal Mover C810A.

Contents

Overview

On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Sengkang and Punggol LRT systems. The new trains will be delivered progressively from 2024 to 2027. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha (27.4 acres) from the existing 3.5 ha (8.6 acres) to ensure that it has capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed. [2] In May 2023, the LTA ordered an additional 8 C810D trains, bringing the total number of C810D trains to 25 C810D trains. These 8 two-car trains will replace half of the existing fleet of 16 two-car trains, while the earlier order of 17 two-car trains will replace 25 one-car trains, bringing the total to 33 two-car trains. [3]

On 23 November 2024, the first batch of 25 new C810D trains has arrived in Singapore and will undergo testing and commissioning works at the Sengkang LRT depot before entering passenger service in the third quarter of 2025.

Train formation

The configuration of a C810D in revenue service is M1–M2 with both the motors and the third rail current collectors.

The car numbers of the trains range from 58 to 82. Individual cars are assigned a two-digit serial number by the rail operator SBS Transit. A complete two-car trainset consists of two motor cars (M1–M2).

Related Research Articles

<span class="mw-page-title-main">People mover</span> Fully automated transit systems, generally serving relatively small areas

A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks.

<span class="mw-page-title-main">North East MRT line</span> Mass Rapid Transit line in Singapore

The North East Line (NEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by ComfortDelGro's SBS Transit, the 20-kilometre (12-mile) line is the MRT's shortest. It runs from HarbourFront station in southern Singapore to Punggol station in the northeast, serving 16 stations via Chinatown, Little India, Serangoon and Hougang. Coloured purple on official maps, it is Singapore's third MRT line and the world's first fully-automated underground driverless heavy rail line.

SBS Transit Ltd is a multi-modal public transport operator in Singapore operating bus and rail services. With a majority of its shares owned by Singaporean multinational transport conglomerate ComfortDelGro Corporation at 75%, it was formerly known as Singapore Bus Services before rebranding to SBS Transit on 1 November 2001.

<span class="mw-page-title-main">Punggol LRT line</span> Light rail line in Singapore

The Punggol LRT is an automated guideway transit line in Singapore. The line, which initially opened on 29 January 2005, connects the residential districts and suburbs of Punggol to Punggol Digital District and Punggol Town Centre, which consist of Singapore Institute of Technology (SIT)’s campus and JTC’s Business Park, and where the town centre connects with the North East MRT line, Punggol Bus Interchange, and Waterway Point.

<span class="mw-page-title-main">Sengkang LRT line</span> Light rail line in Singapore

The Sengkang LRT is a 10.7-kilometre (6.6 mi) automated guideway transit line in Singapore. The line, which initially opened on 18 January 2003, connects the residential districts and suburbs of Sengkang to Sengkang Town Centre, where it connects with the North East MRT line, Sengkang Bus Interchange, Compass One and Compassvale Bus Interchange. It is the second line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains. It is the first LRT line to be operated by SBS Transit.

<span class="mw-page-title-main">Light Rail Transit (Singapore)</span> Automated guideway transit systems in Singapore

The Light Rail Transit system, locally known by the initialism LRT, are a series of localised automated guideway transit (AGT) systems in Singapore which acts as feeder services to the heavy rail Mass Rapid Transit (MRT), and together forms the core of the country's rail transport services. The first LRT line was opened in 1999 and the system has since expanded to two lines, each serving three new towns, namely Bukit Panjang, Sengkang and Punggol, with a total system length of approximately 30 km (19 mi). Trains on these lines have at least one station interchange link to the MRT.

<span class="mw-page-title-main">Rail transport in Singapore</span>

Rail transport in Singapore mainly consists of a passenger urban rail transit system spanning the entire city-state: a rapid transit system collectively known as the Mass Rapid Transit (MRT) system operated by the two biggest public transport operators SMRT Trains and SBS Transit, as well as several Light Rail Transit (LRT) rubber-tyred automated guideway transit lines also operated by both companies. In addition, local specialised light rail lines are in operation in places such as the Singapore Changi Airport and Sentosa.

<span class="mw-page-title-main">Kawasaki Heavy Industries & Nippon Sharyo C751B</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & Nippon Sharyo (KNS) C751B was the third generation electric multiple unit rolling stock that operated on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system from 2000 to 2024, manufactured by Kawasaki Heavy Industries & Nippon Sharyo (KNS) under Contract 751B. 21 trainsets of 6 cars each were purchased at S$231 million, and it was the first rolling stock to feature VVVF insulated-gate bipolar transistor traction control system. Kawasaki manufactured 66 cars and Nippon Sharyo manufactured 60 cars respectively with no comparable differences, having been built to agreed specifications.

<span class="mw-page-title-main">Innovia APM 100</span> Automated people mover manufactured by Bombardier

The Innovia APM 100 is an automated people mover (APM) rolling stock first developed by Westinghouse, intended mainly for airport connections and light rail in towns. They are operated by Automatic Train Control (ATC), making it fully automatic and driverless.

<span class="mw-page-title-main">Crystal Mover</span> Rubber-tired automated people mover system manufactured by Mitsubishi Heavy Industries

The Crystal Mover is a rubber-tired automated people mover (APM) system for airport and urban rail transit applications manufactured at Mitsubishi Heavy Industries (MHI) Mihara Machinery Works in Mihara, Hiroshima Prefecture, Japan. The Crystal Mover, initially based on the Japanese APM standard, is used in automated guideway transit (AGT) systems in China, Japan, Singapore, South Korea, the United Arab Emirates and the United States.

<span class="mw-page-title-main">Sengkang Depot</span> Train depot in Singapore

Sengkang Depot is a train depot in Sengkang, Singapore operated by SBS Transit. It is the first co-location of facilities for both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT). It maintains the trains for the North East line, Sengkang LRT line, and Punggol LRT line, and houses the control centre of the three lines.

<span class="mw-page-title-main">Sengkang</span> Planning Area and HDB Town in North-East Region ----, Singapore

Sengkang is a planning area and residential town located in the North-East Region of Singapore. The town is the second most populous in the region, being home to 249,370 residents in 2020. Sengkang shares boundaries with Seletar and Punggol in the north, Pasir Ris and Paya Lebar in the east, Hougang and Serangoon to the south, as well as Yishun and Ang Mo Kio to the west.

<span class="mw-page-title-main">Riviera MRT/LRT station</span> Light rail station in Singapore

Riviera LRT station is an elevated Light Rail Transit (LRT) station in Punggol, Singapore. Serving the east loop of the Punggol LRT line (PGLRT), the station is along Punggol East between the junctions of Punggol Central and Punggol Field. Surrounding landmarks include Punggol Joint Temple and Punggol Promenade Riverside Park.

<span class="mw-page-title-main">Macau Light Rapid Transit</span> Mass transit system in Macau

The Macau Light Rapid Transit is a mass transit system in Macau and the first railway system of the city. The first phase of the project's construction began in February 2012, and the first section of the Taipa line was opened to the public on 10 December 2019. Barra extension of the line and two new branches of Seac Pai Van and Hengqin opened in 2023 and 2024.

<span class="mw-page-title-main">Green Mover Max</span> Japanese low-floor light-rail vehicle

The Green Mover Max was the first 100% low-floor articulated Light Rail Vehicle (LRV) to be built entirely in Japan. It was developed jointly by Kinki Sharyo, Mitsubishi Heavy Industries, and Toyo Denki, and introduced first in Hiroshima by the Hiroshima Electric Railway Company (Hiroden). It replaced Hiroden's ailing fleet of Siemens Combinos in 2005.

<span class="mw-page-title-main">Punggol MRT/LRT station</span> Mass Rapid Transit and light rail station in Singapore

Punggol MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Punggol, Singapore. It is an interchange station between the North East Line (NEL) and Punggol LRT (PGLRT), and the only MRT station located within Punggol planning area. Stretching across Punggol Central, the station is situated next to Punggol Temporary Bus Interchange and the retail development of Waterway Point.

<span class="mw-page-title-main">Sengkang MRT/LRT station</span> Mass Rapid Transit and light rail station in Singapore

Sengkang MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Sengkang, Singapore. It is an interchange between the North East line (NEL) and Sengkang LRT (SKLRT). Along with Buangkok station, it is located within the Sengkang planning area.

In Singapore, the main lines on the Mass Rapid Transit system using the 1,435 mm standard gauge.

<span class="mw-page-title-main">Mitsubishi Heavy Industries Crystal Mover C810/C810A</span> Class of electric multiple units in Singapore

The Mitsubishi Heavy Industries Crystal Mover C810/C810A is an automated people mover train that serves the Sengkang LRT line and Punggol LRT line in Singapore. The C810 has been operating since 18 January 2003, with its first service on the Sengkang East Loop. The C810A commenced revenue service on 5 April 2016.

<span class="mw-page-title-main">LRTA 2000 class</span> LRTA Rolling Stock operating at Manila Line 2

The LRTA 2000 class is a class of electric multiple units in operation on the LRT Line 2, manufactured by Rotem and Toshiba.

References

  1. "Kyosan Corporate Report 2018". p. 19 to 20. Archived from the original on 16 June 2020. Retrieved 16 June 2020.
  2. "Sengkang-Punggol LRT to get 17 new two-car trains to boost capacity". CNA. 5 February 2021. Archived from the original on 15 May 2021. Retrieved 6 February 2021.
  3. "8 new two-carriage trains to be added to Sengkang-Punggol LRT line". The Straits Times. 10 May 2023. Retrieved 29 November 2023.