Alstom Metropolis C851E | |
---|---|
In service |
|
Manufacturer | Alstom |
Built at | Barcelona, Spain |
Family name | Metropolis |
Entered service |
|
Number under construction | 57 Vehicles (19 Trainsets) (CCL) |
Number built |
|
Number in service |
|
Formation | 6 per NEL trainset, 3 per CCL trainset
|
Fleet numbers |
|
Operators |
|
Depots | |
Lines served | |
Specifications | |
Car body construction | Welded aluminium |
Train length |
|
Car length |
|
Width | 3.2 m (10 ft 6 in) |
Height | 3.7 m (12 ft 1+5⁄8 in) |
Doors | 1,450 mm (57+1⁄8 in), 8 per car, 4 per side |
Maximum speed |
|
Traction system | Alstom OPTONIX IGBT–VVVF [2] |
Acceleration | 1.1 m/s2 (3.6 ft/s2) |
Deceleration | 1.3 m/s2 (4.3 ft/s2) (Emergency) |
Electric system(s) |
|
Current collector(s) |
|
UIC classification |
|
Braking system(s) | Regenerative and pneumatic |
Safety system(s) | Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI [3] [4] |
Coupling system | Scharfenberg |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL. [5] The contract, valued at S$249,854,305.00, [6] was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot. [7] Alstom is the sole bidder for this contract. [6] An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards. [8]
The tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract. [6] The LTA has shortlisted and the tender results was published.
S/N | Name of tenderer | Amount ($S) Offer 1 [9] | Amount ($S) Offer 2 [9] | Remarks |
---|---|---|---|---|
1 | Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium | 279,782,872.00 | 293,489,289.00 | Offer 1 in mixed currencies; S$410,100,934.00 (Alternative in mixed currencies) |
The contract 851E was awarded to the sole bidder Alstom at a cost of $250 million on 30 April 2018. [6] [7]
The 6 trains supplements the existing C751A and C751C trains on the North East Line for the 1.7-kilometre (1.1 mi) long extension from Punggol to Punggol Coast which opened on 10 December 2024. The first train set arrived in Singapore on 4 April 2021. [10] On 6 June 2023, a C851E (Set 7091/7092) was spotted testing at Potong Pasir MRT station for the first time. [11] The first of these trains entered passenger service on 28 July 2023 (set 7089/7090), and the last set (7095/7096) entered service on 28 August 2023, increasing the NEL fleet from 43 to 49 trains in a span of just one month. [1]
The trains draw 1,500 V DC power from an overhead catenary. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 6-car train (Formation: DT–Mp–Mi–Mi–Mp–DT) comprises two Driving Trailer (DT) cars at each end, and four Motor Cars (Mp and Mi). The second and fifth cars of each train (Mp) are equipped with a pantograph.
The coupling configuration of an SBS Transit C851E in revenue service is DT–Mp–Mi+Mi–Mp–DT.
Car Type | Driver Cab | Motor | Pantograph | Car Length | Wheelchair Bay | |
---|---|---|---|---|---|---|
m | ft in | |||||
DM | ✓ | ✗ | ✗ | 23.65 | 77 ft 7.1 in | ✗ |
Mp | ✗ | ✓ | ✓ | 22.8 | 74 ft 9.6 in | ✗ |
Mi | ✗ | ✓ | ✗ | 22.8 | 74 ft 9.6 in | ✓ |
The car numbers of the trains range from 7x087 to 7x098, where x depends on the carriage type. Individual cars are assigned a five-digit serial number by the rail operator SBS Transit. A complete six-car trainset consists of an identical twin set of one driving trailer (DT) and two motor cars (Mi & Mp) permanently coupled together, e.g. set 7087/7088 consists of carriages 71087, 72087, 73087, 73088, 72088 and 71088.
The 23 new trains will supplement the existing C830 and C830C trains on the Circle Line when the 4.3km long extension from HarbourFront to Marina Bay opens in 2026. The first train set arrived in Singapore on 11 March 2022. [12]
The trains draw 750 V DC power from a bottom-contact third rail. They are fully automated (ATO GoA 4 and do not require an attendant on board. Each 3-car train (Formation: Mc1–Tc–Mc2) comprises two Motor Cars (Mc1 and Mc2) at each end, and an unpowered Trailer Car (Tc) in the middle.
The coupling configuration of an SMRT C851E in revenue service is Mc1–T–Mc2.
Car Type | Quantity | Driver Cab | Motor | Collector Shoe | Car Length | Wheelchair Bay | |
---|---|---|---|---|---|---|---|
m | ft in | ||||||
Mc | 2 | ✓ | ✓ | ✓ | 23.65 | 77 ft 7.1 in | ✗ |
T | 1 | ✗ | ✗ | ✓ | 22.8 | 74 ft 9.6 in | ✓ |
The car numbers of the trains range from 8065x to 8087x, where x depends on the carriage type. Individual cars are assigned a 5 digit serial number by the rail operator SMRT Trains. A complete three-car trainset consists of one trailer (T) and two driving motor (Mc) cars permanently coupled together, e.g. set 865 consists of carriages 80651, 80652, 80653.
To enable a more robust maintenance regime, all the new trains are equipped with condition monitoring systems to gather data from equipment on the trains. This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains. Contact shoe sensors on the new Circle Line trains enables the operator to react promptly and take necessary measures if any dislodgement is detected.
In addition, two of the new Circle Line three-car trains are each fitted with an Automatic Track Inspection (ATI) System, which enables monitoring of the running rails, track equipment and sleepers while the trains are in operation. The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance. [5]
The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. Coloured green on the rail map, the line serves 35 stations, 8 of which are underground. At 57.2 kilometres (35.5 mi), the line is the longest on the MRT network.
The Circle Line (CCL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs in a loop from Dhoby Ghaut station in the city-centre to HarbourFront station in the south via Bishan station in the centre of the country. It also has a branch to Marina Bay station from Promenade station, which will be extended to HarbourFront station from 2026 to form a complete loop. Coloured orange on the rail map, the fully-underground line is approximately 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour.
The Bukit Panjang LRT is an 8-kilometre (5.0 mi) automated guideway transit line in Bukit Panjang, Singapore. The BPLRT is currently the only Light Rail Transit (LRT) line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and parts of Choa Chu Kang in the north-west area of the country. The line was the first LRT line constructed in Singapore, having been opened on 6 November 1999 by then-Deputy Prime Minister Tony Tan.
The Alstom Metropolis is a family of electric multiple units designed and produced by the French rolling stock manufacturer Alstom. It is designed for high capacity rapid transit or metro rail infrastructure systems. Trains can be run in various configurations, the length alone varying between two and ten cars; it is also suitable for both manned or unmanned operations.
The Kawasaki Heavy Industries & Nippon Sharyo (KNS) C751B was the third generation electric multiple unit rolling stock that operated on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system from 2000 to 2024, manufactured by Kawasaki Heavy Industries & Nippon Sharyo (KNS) under Contract 751B. 21 trainsets of 6 cars each were purchased at S$231 million, and it was the first rolling stock to feature VVVF insulated-gate bipolar transistor traction control system. Kawasaki manufactured 66 cars and Nippon Sharyo manufactured 60 cars respectively with no comparable differences, having been built to agreed specifications.
The Siemens C651 was the second generation electric multiple unit rolling stock that operated on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Siemens Mobility (SIE) and SGP Verkehrstechnik in Vienna, Austria under Contract 651. A total of 114 cars consisting of 19 trainsets were purchased in 1992 and were in service from 1995 to 2024.
The Kawasaki Heavy Industries (KHI) C151 is the first generation electric multiple unit (EMU) rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium led by Kawasaki Heavy Industries (KHI) under Contract 151. They were first introduced in 1987 and are the oldest trains in operation on the network.
SMRT Trains Limited is a rail operator in Singapore and a wholly owned subsidiary of SMRT Corporation. After the privatisation of the MRT operations in 1995, it was originally named Singapore MRT Limited. On 31 December 2001, it was renamed SMRT Trains Limited, so as to avoid confusion with the then upcoming North East MRT line which would be under SBS Transit. SMRT Trains currently manages most of the MRT services in Singapore except the North East Line and Downtown Line.
The Alstom Metropolis C830 is the first generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the Circle line of Singapore's Mass Rapid Transit (MRT) system since 2009. Alstom was contracted in 2000 by the Land Transport Authority (LTA) in Singapore to supply the trains for the Circle line.
The Alstom Metropolis C751A is the first generation of communications-based train control (CBTC) electric multiple unit rolling stock in operation on the North East line (NEL) of Singapore's Mass Rapid Transit (MRT) system since 2003. 25 trainsets were purchased for the line.
The Kawasaki Heavy Industries & CSR Qingdao Sifang C151A is the fourth generation electric multiple unit rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract 151A. Their introduction to the network has increased the capacity of both lines by 15%.
The Alstom Metropolis C830C is the second generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the Circle line of Singapore's Mass Rapid Transit (MRT) system. 24 trainsets of three cars were manufactured by Shanghai Alstom Transport Co Ltd, with deliveries from end June 2014.
The Alstom Metropolis C751C is the second generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the North East line of Singapore's Mass Rapid Transit (MRT) system. Eighteen 6-car train sets were manufactured by Shanghai Alstom Transport Co Ltd, Deliveries began in July 2014, and all trainsets were delivered by 2015.
The Kawasaki Heavy Industries & CSR Qingdao Sifang C151B is the fifth generation electric multiple unit rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) & CRRC Qingdao Sifang under Contract 151B. 45 trains were purchased and all of them have been delivered to Singapore as of 12 April 2017. SMRT took delivery of the first 2 train cars on 21 May 2015. These trains increased frequency for the two MRT lines, North–South and East–West lines.
The Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C is the sixth generation electric multiple unit rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract 151C.
The Kawasaki Heavy Industries & CRRC Qingdao Sifang T251 is the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract T251.
The Alstom Movia R151 is the seventh generation electric multiple unit (EMU) rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system. It is manufactured by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun under Contract R151 as part of their Movia family of trains.
The Hyundai Rotem J151 is the first generation electric multiple unit rolling stock to be introduced on the Jurong Region Line of Singapore's Mass Rapid Transit (MRT) system, manufactured by Hyundai Rotem under Contract J151. 62 three-car medium-capacity Hyundai Rotem trainsets will be delivered from 2024 onwards and service will commence when the line opens in 2027.
The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Company and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.