Alstom Metropolis C851E

Last updated

Alstom Metropolis C851E
C851E NEL trains at Sengkang Depot.jpg
Two C851E trains for the North East Line.
C851E NEL interior.jpg
The interior of the NEL C851E. Apart from a few cosmetic differences, it is virtually identical to the preceding C751C. Although the map has more of a creme background than white.
In service
  • 28 July 2023;9 months ago (2023-07-28) – Present (NEL)
  • 2026 (CCL)
Manufacturer Alstom
Built at Barcelona, Spain
Family name Metropolis
Entered service
  • 28 July 2023;9 months ago (2023-07-28) (NEL) [1]
  • 2026 (CCL)
Number under construction63 Vehicles (21 Trainsets) (CCL)
Number built
  • 36 Vehicles (6 Sets) (NEL)
  • 6 Vehicles (2 Sets) (CCL)
Number in service
  • 36 Vehicles (6 Sets) (NEL)
  • 0 Vehicles (0 Sets) (CCL)
Formation6 per NEL trainset, 3 per CCL trainset
  • DT–Mp–Mi+Mi–Mp–DT (NEL)
  • Mc1–T–Mc2 (CCL)
Fleet numbers
  • 7087/7088 – 7097/7098 (NEL)
  • 865 – 887 (CCL)
Operators
Depots
Lines served
Specifications
Car body constructionWelded aluminium
Train length
  • 138.5 m (454 ft 4+34 in) (NEL)
  • 70.1 m (229 ft 11+78 in) (CCL)
Car length
  • 23.65 m (77 ft 7+18 in) (DT/Mc)
  • 22.8 m (74 ft 9+58 in) (Mp/Mi/T)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 8 per car, 4 per side
Maximum speed
  • 100 km/h (62 mph) (NEL design)
  • 90 km/h (56 mph) (NEL service, CCL design)
  • 78 km/h (48 mph) (CCL service)
Traction systemAlstom OPTONIX IGBTVVVF [2]
Acceleration 1.1 m/s2 (3.6 ft/s2)
Deceleration 1.3 m/s2 (4.3 ft/s2) (Emergency)
Electric system(s)
Current collector(s)
UIC classification
  • 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ (NEL)
  • Bo′Bo′+2′2′+Bo′Bo′ (CCL)
Braking system(s) Regenerative and pneumatic
Safety system(s) Alstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI [3] [4]
Coupling system Scharfenberg
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge

The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL. [5] The contract, valued at S$249,854,305.00, [6] was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot. [7] Alstom is the sole bidder for this contract. [6] An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards. [8]

Contents

Tender

The tender for trains under the contract C851E was closed on 2 October 2017 with Alstom being the sole bidder for this contract. [6] The LTA has shortlisted and the tender results was published.

S/NName of tendererAmount ($S) Offer 1 [9] Amount ($S) Offer 2 [9] Remarks
1 Alstom Transport S.A. / Alstom Transport (S) Pte Ltd Consortium279,782,872.00293,489,289.00Offer 1 in mixed currencies; S$410,100,934.00 (Alternative in mixed currencies)

The contract 851E was awarded to the sole bidder Alstom at a cost of $250 million on 30 April 2018. [6] [7]

Overview

North East Line

The 6 trains supplements the existing C751A and C751C trains on the North East Line for the 1.7-kilometre (1.1 mi) long extension from Punggol to Punggol Coast which will open in 2024. The first train set arrived in Singapore on 4 April 2021. [10] On 6 June 2023, a C851E (Set 7091/7092) was spotted testing at Potong Pasir MRT station for the first time. [11] The first of these trains entered passenger service on 28 July 2023 (set 7089/7090), and the last set (7095/7096) entered service on 28 August 2023, increasing the NEL fleet from 43 to 49 trains in a span of just one month. [1]

The trains draw 1,500 V DC power from an overhead catenary. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 6-car train (Formation: DT–Mp–Mi–Mi–Mp–DT) comprises two Driving Trailer (DT) cars at each end, and four Motor Cars (Mp and Mi). The second and fifth cars of each train (Mp) are equipped with a pantograph.

Train formation

The coupling configuration of an SBS Transit C851E in revenue service is DT–Mp–Mi+Mi–Mp–DT.

Cars of SBS Transit C851E
Car Type Driver Cab Motor Pantograph Car LengthWheelchair Bay
mft in
DM23.6577 ft 7.1 in
Mp22.874 ft 9.6 in
Mi22.874 ft 9.6 in

The car numbers of the trains range from 7x087 to 7x098, where x depends on the carriage type. Individual cars are assigned a five-digit serial number by the rail operator SBS Transit. A complete six-car trainset consists of an identical twin set of one driving trailer (DT) and two motor cars (Mi & Mp) permanently coupled together, e.g. set 7087/7088 consists of carriages 71087, 72087, 73087, 73088, 72088 and 71088.

  • The first digit is always a 7.
  • The second digit identifies the car number, where the first car has a 1, the second has a 2 & the third has a 3.
  • The third digit is always a 0.
  • The fourth digit and fifth digit are the train identification numbers. A full length train of 6 cars have 2 different identification numbers e.g. 7087/7088 (normal coupling) or 7087/7098 (cross coupling).
  • Alstom built sets 7087/7088 – 7097/7098.

Circle Line

The 23 new trains will supplement the existing C830 and C830C trains on the Circle Line when the 4.3km long extension from HarbourFront to Marina Bay opens in 2026. The first train set arrived in Singapore on 11 March 2022. [12]

The trains draw 750 V DC power from a bottom-contact third rail. They are fully automated (ATO GoA 4) and do not require an attendant on board. Each 3-car train (Formation: Mc1–Tc–Mc2) comprises two Motor Cars (Mc1 and Mc2) at each end, and an unpowered Trailer Car (Tc) in the middle.

Train formation

The coupling configuration of an SMRT C851E in revenue service is Mc1–T–Mc2.

Cars of SMRT C851E
Car TypeQuantity Driver Cab Motor Collector Shoe Car LengthWheelchair Bay
mft in
Mc223.6577 ft 7.1 in
T122.874 ft 9.6 in

The car numbers of the trains range from 865x to 887x, where x depends on the carriage type. Individual cars are assigned a 4 digit serial number by the rail operator SMRT Trains. A complete three-car trainset consists of one trailer (T) and two driving motor (Mc) cars permanently coupled together, e.g. set 865 consists of carriages 8651, 8652, 8653.

  • The first digit is always an 8.
  • The second and third digits identify the set number.
  • The fourth digit identifies the car number, where the first car has a 1, the second has a 2 and the third has a 3.
  • Alstom built sets 865 – 887.

Features

To enable a more robust maintenance regime, all the new trains are equipped with condition monitoring systems to gather data from equipment on the trains. This enables continuous monitoring of the health of the equipment and allows the operator to carry out predictive maintenance for the trains. Contact shoe sensors on the new Circle Line trains enables the operator to react promptly and take necessary measures if any dislodgement is detected.

In addition, two of the new Circle Line three-car trains are each fitted with an Automatic Track Inspection (ATI) System, which enables monitoring of the running rails, track equipment and sleepers while the trains are in operation. The ATI System supplements existing track inspection activities for timely and more effective identification of rail and trackside components which require maintenance. [5]

Related Research Articles

<span class="mw-page-title-main">Mass Rapid Transit (Singapore)</span> Principal metro system serving Singapore

The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.4 million in 2019.

<span class="mw-page-title-main">East–West MRT line</span> Mass Rapid Transit line in Singapore

The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. Coloured green on the rail map, the line serves 35 stations, 8 of which are underground. At 57.2 kilometres (35.5 mi), the line is the longest on the MRT network.

<span class="mw-page-title-main">Circle MRT line</span> Mass Rapid Transit line in Singapore

The Circle Line (CCL) is a medium-capacity Mass Rapid Transit line in Singapore. It runs in a loop from Dhoby Ghaut station in the city-centre to HarbourFront station in the south via Bishan station in the centre of the country. It also has a branch to Marina Bay station from Promenade station, which will be extended to HarbourFront station from 2026 to form a complete loop. Coloured orange on the rail map, the fully-underground line is approximately 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour.

<span class="mw-page-title-main">Bukit Panjang LRT line</span> Light rail transit line in Singapore

The Bukit Panjang LRT is a 8-kilometre (5.0 mi) automated guideway transit line in Bukit Panjang, Singapore. The BPLRT is currently the only LRT line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of Bukit Panjang and parts of Choa Chu Kang in the north-west of the country. The line was the first LRT line constructed in Singapore, having opened on 6 November 1999 by Deputy Prime Minister Tony Tan.

<span class="mw-page-title-main">Kawasaki Heavy Industries & Nippon Sharyo C751B</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & Nippon Sharyo C751B is the third generation electric multiple unit rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system since early 2000, manufactured by Kawasaki Heavy Industries & Nippon Sharyo (KNS) under Contract 751B. 21 trainsets of 6 cars each were purchased at S$231 million, and it is the first rolling stock to feature VVVF insulated-gate bipolar transistor traction control system. Kawasaki manufactured 66 cars and Nippon Sharyo manufactured 60 cars respectively with no comparable differences, having been built to agreed specifications. These trains are the third generation of rolling stock to be used on the two lines.

<span class="mw-page-title-main">Siemens C651</span> Class of electric multiple units in Singapore

The Siemens C651 is the second generation electric multiple unit rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Siemens Mobility (SIE) and SGP Verkehrstechnik in Vienna, Austria under Contract 651. A total of 114 cars consisting of 19 train-sets were purchased in 1992 and introduced into service from 1995 onwards.

<span class="mw-page-title-main">Kawasaki Heavy Industries C151</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries C151 is the first generation electric multiple unit (EMU) rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium led by Kawasaki Heavy Industries (KHI) under Contract 151. They were first introduced in 1987 and are the oldest trains in operation on the network.

<span class="mw-page-title-main">Thomson–East Coast MRT line</span> Mass Rapid Transit line in Singapore

The Thomson–East Coast Line (TEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Coloured brown on the rail map, it is fully underground. When fully completed, the sixth line on the country's MRT network will serve 32 stations around 43 kilometres (27 mi) in length, becoming one of the world's longest driverless rapid transit lines. It runs along a combined north–south and east–west corridor, starting in the north at Woodlands town, passing through Upper Thomson and the towns of Ang Mo Kio and Bishan, heading south to the city-centre at Orchard Road and Marina Bay, subsequently heading eastwards along the eastern coast of the country through Kallang, Marine Parade and southern Bedok before ending at Upper East Coast.

<span class="mw-page-title-main">Alstom Metropolis C830</span> Class of electric multiple units in Singapore

The Alstom Metropolis C830 is the first generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the Circle line of Singapore's Mass Rapid Transit (MRT) system since 2009. Alstom was contracted in 2000 by the Land Transport Authority (LTA) in Singapore to supply the trains for the Circle line.

<span class="mw-page-title-main">Alstom Metropolis C751A</span> Class of electric multiple units in Singapore

The Alstom Metropolis C751A is the first generation of communications-based train control (CBTC) electric multiple unit rolling stock in operation on the North East line of Singapore's Mass Rapid Transit (MRT) system since 2003. 25 trainsets were purchased for the line.

<span class="mw-page-title-main">Bombardier Movia C951/C951A</span> Class of electric multiple units in Singapore

The Bombardier MOVIA C951 is the first generation electric multiple unit rolling stock in operation on the Downtown Line of Singapore's Mass Rapid Transit (MRT) system. The contract was won by Bombardier Transportation and the rolling stock was built by Changchun Bombardier Railway Vehicles. Initially, the authorities had ordered 73 trains, although LTA had ordered an additional 15 trains and a final 4 more trains under C951A which makes a total of 92 trainsets were manufactured under C951.

<span class="mw-page-title-main">Kawasaki Heavy Industries & CSR Qingdao Sifang C151A</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CSR Qingdao Sifang C151A is the fourth generation electric multiple unit rolling stock in operation with majority operating on the North-South Line, with a few operating on the East-West Line of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract 151A. Their introduction to the network has increased the capacity of both lines by 15%.

<span class="mw-page-title-main">Alstom Metropolis C830C</span> Class of electric multiple units in Singapore

The Alstom Metropolis C830C is the second generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the Circle line of Singapore's Mass Rapid Transit (MRT) system. 24 trainsets of 3 cars were manufactured by Shanghai Alstom Transport Co Ltd, with deliveries from end June 2014.

<span class="mw-page-title-main">Alstom Metropolis C751C</span> Class of electric multiple units in Singapore

The Alstom Metropolis C751C is the second generation of communication-based train control (CBTC) electric multiple unit rolling stock in operation on the North East line of Singapore's Mass Rapid Transit (MRT) system. 18 trainsets of 6 cars were manufactured by Shanghai Alstom Transport Co Ltd, Deliveries began in July 2014. All 18 trainsets were delivered by 2015.

<span class="mw-page-title-main">Kawasaki Heavy Industries & CSR Qingdao Sifang C151B</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CSR Qingdao Sifang C151B is the fifth generation electric multiple unit rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Kawasaki Heavy Industries (KHI) & CRRC Qingdao Sifang under Contract 151B. 45 trains were purchased and all of them have been delivered to Singapore as of 12 April 2017. SMRT took delivery of the first 2 train cars on 21 May 2015. These trains increased frequency for the two MRT lines, North–South and East–West lines.

<span class="mw-page-title-main">Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C is the sixth generation electric multiple unit rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract 151C.

<span class="mw-page-title-main">Kawasaki Heavy Industries & CRRC Qingdao Sifang T251</span> Class of electric multiple units in Singapore

The Kawasaki Heavy Industries & CRRC Qingdao Sifang T251 is the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract T251.

<span class="mw-page-title-main">Alstom Movia R151</span> Class of electric multiple units in Singapore

The Alstom Movia R151 is the seventh generation electric multiple unit (EMU) rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system. It is manufactured by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun under Contract R151 as part of their Movia family of trains.

The CRRC Qingdao Sifang CR151 is a type of electric multiple unit to be built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Co and Singapore CRRC Sifang Railway Vehicles Service, and as of June 2023 the Land Transport Authority (LTA) has purchased 44 six-car trains. They will be delivered from 2027, before the opening of the line's first phase in 2030.

References

  1. 1 2 "New Trains for North East Line to be Rolled Out for Passenger Service from 28 July 2023". LTA. 27 June 2023. Archived from the original on 27 July 2023. Retrieved 27 June 2023.
  2. "Alstom to supply 34 Metropolis trains and signalling upgrade to Singapore metro". French Chamber Singapore. Archived from the original on 24 September 2015. Retrieved 9 August 2015.
  3. "Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world" (PDF). pp. 4 to 8. Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  4. "URBALIS Evolution: Controlling the Performance" (PDF). p. 4. Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  5. 1 2 "Alstom to Supply 17 New Trains for North East Line Extension and Circle Line 6". Land Transport Authority. 30 April 2018. Archived from the original on 10 July 2021. Retrieved 23 November 2019.
  6. 1 2 3 4 "Tender information | Land Transport Authority". www.lta.gov.sg. Archived from the original on 26 July 2018. Retrieved 2 May 2018.
  7. 1 2 hermesauto (30 April 2018). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Archived from the original on 16 November 2021. Retrieved 30 April 2018.
  8. "Joint News Release by the Land Transport Authority (LTA) & SMRT - Upgrading the Circle Line in Preparation for Circle Line 6". Land Transport Authority. 25 July 2019. Archived from the original on 31 October 2020. Retrieved 23 November 2019.
  9. 1 2 "851E Schedule" (PDF). www.lta.gov.sg. Archived (PDF) from the original on 15 September 2018. Retrieved 15 September 2018.
  10. "First of six new trains for North-East Line arrived in Singapore". Unscrambled.sg. 12 April 2021. Archived from the original on 5 July 2022. Retrieved 16 March 2022.
  11. "[Exclusive: Main Line Testing]SBS Transit C851E Set 7091/7092 at Potong Pasir". Archived from the original on 9 June 2023. Retrieved 9 June 2023.
  12. "New train for Circle Line MRT arrives in Singapore; first of 23 to be shipped here". The Straits Times. 11 March 2022. Archived from the original on 14 March 2022. Retrieved 16 March 2022.