Lorong Chuan MRT station

Last updated

Lorong Chuan
 CC14 


罗弄泉 [1]
லோரோங் சுவான் [2]
CC14 Lorong Chuan Station ExitB.jpg
Exit B of Lorong Chuan MRT station.
General information
Location150 Serangoon Avenue 3
Singapore 554533 [3]
Coordinates 1°21′06″N103°51′51″E / 1.351636°N 103.864064°E / 1.351636; 103.864064 [3]
System Mass Rapid Transit (MRT) station
Owned by Land Transport Authority (LTA) [4]
Operated by SMRT Trains Ltd (SMRT Corporation)
Line
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, taxi [5]
Construction
Structure typeUnderground
Platform levels1
Bicycle facilitiesYes
AccessibleYes
History
Opened28 May 2009;16 years ago (2009-05-28)
Previous namesMei Hwan [6]
Passengers
June 20245,916 per day [7]
Services
Preceding station Mass Rapid Transit Following station
Serangoon Circle Line Bishan
towards HarbourFront
Location
SGMRT-LRT (zoom) map.svg
Red Dot.svg
Lorong Chuan
Lorong Chuan station in Singapore

Lorong Chuan MRT station is an underground Mass Rapid Transit (MRT) station on the Circle Line in Serangoon, Singapore. Operated by SMRT Trains, the station serves several nearby landmarks such as the Braddell Heights Community Club, as well as several schools. Through the Looking Glass by A Dose of Light and Yoma Studio, which features a "tongue-in-cheek" map of Singapore, is displayed at this station as part of the Art in Transit artwork programme.

Contents

Announced in January 2003 as part of Stage 3 of the Circle Line (CCL), construction started in the third quarter of 2003 with an expected completion date of 2008. Construction for the CCL Stage 3 stations were halted due to the Nicoll Highway collapse before resuming in August 2005. The expected completion date was delayed to 2009. After further changes to Stage 3's opening date, Lorong Chuan commenced operations along with other Stage 3 stations on 28 May 2009.

History

In October 1999, the Land Transport Authority (LTA) announced that the Outer Circle Line, a rail line connecting Paya Lebar, Serangoon, Bishan, and Buona Vista stations, was under study. It was expected for the rail line to be operational by 2006. [8] There were also plans for the Marina Line, another planned rail line, to be extended from Stadium Boulevard station to connect to the Outer Circle Line at Paya Lebar. [9] The Marina Line and the Outer Circle Line would be merged to create the 34 kilometres (21 mi) Circle line (CCL) in April 2001. [10] [11] In January 2003, it was announced that Lorong Chuan station, which would be near Serangoon Avenue 3 and Lorong Chuan, would be part of CCL Stage 3, a 5.7 kilometres (3.5 mi) stretch between Marymount and Bartley stations. The segment was expected to cost S$ 1.2 billion (2003)( US$ 688.79 million). [12] [13]

Sato Kogyo was awarded the S$ 65 million (2003)( US$ 37.31 million) contract in June 2003 to build Lorong Chuan station. [14] Construction started for Stage 3 stations in the third quarter of 2003 with expected completion by 2008. [15] [16] However, the Nicoll Highway Collapse on 20 August 2004 delayed operations for Stage 3 CCL stations to 2009. [17] The LTA halted work at 16 of the 24 CCL excavation sites so these could be reviewed. [18] [19] [20] In July 2005, the LTA announced that the Street and Buildings Name Board approved the station's name to be "Lorong Chuan". [21] [22] [23]

On 26 August 2005, construction for Stage 3 stations restarted, with the LTA believing that Stage 3 will be constructed by 2008. By then, tunneling between Lorong Chuan and Serangoon stations was finished. [24] However, the LTA also revealed that Lorong Chuan would be the hardest station to construct as it is close to several schools and high-rise buildings, with one-tenth of the station's excavation works finished by then. [24] [25] Piling and concreting works for Lorong Chuan were finished by October. In the same month, a family sued Sato Kogyo for noise pollution during construction, with one member of the family claiming that that noise "[affected] their sleep and health". [26] Sato Kogyo won the case in June 2006, with the judge finding that "the plaintiff did not have much trouble sleeping through the night". [27] By that year, it was expected for the station be completed by next December, [28] with Lorong Chuan and the other Stage 3 stations to be opened by early 2009. [29] By September 2007, the Stage 3 stations were "in advanced stages of completion" according to The Straits Times , with architectural, engineering, and mechanical works being carried out and were expected to finish by mid-2008. In January 2008, the Stage 3 stations' completion date was moved earlier from 2010 to mid-2009. [30] [31]

In June, the LTA have started conducting test runs on the Stage 3 stations, with construction expected to be completed by November, and for the section to start operations by June 2009. [32] Construction for the Stage 3 stations was more than 90% completed by October, according to Lim Yong and Desmond Wee of The Straits Times. [33] In February 2009, transport minister Raymond Lim announced that CCL Stage 3 will open on 30 May, [34] thought it was later moved to 28 May. [35] After nearby residents previously expressed concerns over a path to the station for being too "narrow" and "poorly lit", [36] the LTA increased the number of lamps near the path in May 2009. The path could not be widened as it was near a canal and private property, nor could shelters be installed as it was not wide enough, though the path was levelled by the Public Utilities Board so that pools of rainwater will not be formed when it is raining. [37] On 28 May 2009, Lorong Chuan commenced operations alongside other Stage 3 stations. [38] [39]

Details

Lorong Chuan station serves the CCL and is between Bishan and Serangoon stations, with the official station code of CC14. [40] As part of the CCL, the station is operated by SMRT Trains. [41] The station operates between 5:25 am and 12:34 am daily. [42] Train frequencies vary from 3.5 to 5.0 minutes during peak hours to an average of 6 minutes for off-peak hours. [5] Lorong Chuan station is wheelchair accessible. [43] A tactile system, consisting of tiles with rounded or elongated raised studs, guides visually impaired commuters through the station, [44] with dedicated tactile routes that connect the station entrances to the platforms. [45] Wider fare gates allow easier access for wheelchair users into the station. [45] The station also has bicycle facilities and is a civil defence shelter. [46] [47] Lorong Chuan station is near the junction of Serangoon Avenue 3 and Lorong Chuan, and has two exits serving various nearby landmarks such as Braddell Heights Community Club and Bethesda Church and Centre. It also serves several nearby schools such as Nanyang Junior College and St. Gabriel's Primary school. [43] [48]

External Media
Searchtool.svg A map of Lorong Chuan's location Source: Land Transport Authority (LTA)
Searchtool.svg Visual model of Lorong Chuan station Source: LTA
Searchtool.svg Images of Through the Looking Glass Source: Bloomberg Connects

Artwork

As part of the Art in Transit Programme, a showcase of public artworks on the MRT, Through the Looking Glass by A Dose of Light and Yoma Studio is displayed at Lorong Chuan. [49] Located above the ticketing machines, the artwork is a "tongue-in-cheek" map of Singapore, according to writer Justin Zhuang. [50] The map portrays landmarks such as Changi Airport and the Singapore Flyer; historical events like the arrival of Sang Nila Utama and Stamford Raffles; myths like the Merlion; and major events of 2007 such as the Pedra Branca dispute and Indonesia sand export to Singapore ban. Animals like lions, dugongs, and birds are also depicted. [51] According to Yong Ding Li, one of the artists, the group wanted to create an artwork that commuters could relate with in a short time. [50] The group also intended the artwork to document Singapore in 2007, with artist Zhao Renhui stating that artworks in stations prior to CCL Stage 3 "[don't] say anything after a while". [52]

Through the Looking Glass was submitted to an art competition organised by the LTA for CCL Stage 3 stations. Long was tasked by the group to draw a map of Singapore. Long first drew a world atlas depicting the Earth's geography and biology. [50] When drawing the map of Singapore, Long started by sketching the Central Business District before drawing residential and industrial estates, transport infrastructure, recreational hotspots, and other landmarks. Long spent most of his time drawing Singapore's biology, which was "easy" for him as he liked nature and was a bird watcher, with his bird-watching hobby helping him to draw remote locations. [53] Through the Looking Glass was originally sketched on three A4-size sheets using a ballpoint pen. The others artists in the group spent "considerable time" scanning, enlarging, and enhancing the piece's linework digitally as Long's drawings were small; they also spent time colouring in the artwork before printing it. [52]

References

  1. "System Map" (PDF). LTA (in Chinese). Archived (PDF) from the original on 10 December 2024.
  2. "System Map" (PDF). LTA (in Tamil). Archived (PDF) from the original on 13 December 2024. Retrieved 20 December 2024.
  3. 1 2 "MARYMOUNT MRT STATION". Onemap. SLA. Archived from the original on 4 November 2025. Retrieved 24 October 2025.
  4. "New Rail Financing Framework". Land Transport Authority. 1 January 2022. Retrieved 29 March 2025.
  5. 1 2 "LTA | Transport Tools | MRT/LRT". Land Transport Authority . Archived from the original on 1 November 2019. Retrieved 11 May 2020.
  6. "Annex A FINALISED NAMES FOR CIRCLE LINE (CCL) STAGES 1-3 STATIONS". www.lta.gov.sg. Archived from the original on 18 December 2006.
  7. "Land Transport DataMall" . Datamall. Land Transport Authority. Archived from the original on 14 August 2024. Retrieved 14 August 2024.
  8. Kaur, Karamijit (28 October 1999). "LTA studying Paya Lebar-Buona Vista rail line". The Straits Times . p. 1. Retrieved 19 June 2025 via NewspaperSG.
  9. Yeo, Geraldine (25 November 1999). "6 stations for Marina line's first phase". The Straits Times . p. 3. Retrieved 24 October 2025 via NewspaperSG.
  10. Kaur, Karamjit (29 April 2001). "Land to be acquired for rail line and expressway". The Straits Times . p. 31. Retrieved 24 October 2025 via Newslink.
  11. Kaur, Karamjit (6 March 2002). "Work on Circle Line starts". The Straits Times . p. 3 via Newslink.
  12. "Circle Line Stage 3". Land Transport Authority (LTA). Archived from the original on 4 June 2003. Retrieved 19 June 2025.
  13. Kaur, Karamjit (22 January 2003). "Transfers from Circle to other lines at 6 stations". The Straits Times . p. H2 via Newslink.
  14. "$100m Circle line contracts awarded". The Straits Times . 28 June 2003. p. H14 via Newslink.
  15. "Circle Line – Stage 3 of Circle Line". Land Transport Authority . 22 February 2004. Archived from the original on 22 February 2004. Retrieved 19 June 2025.
  16. Goh, Chin Lian (13 December 2003). "Line comes full Circle with 13 stops". The Straits Times . p. H3 via Newslink. Next to open should be the 5.7km section from Bartley Road to Marymount Road, with five stations. It is due to be completed in 2008.
  17. Cheong 2012, p. 46.
  18. Cheong 2012, p. 82.
  19. "Main Contractor Told to Stop All Excavation Work". The Straits Times . 24 April 2004. p. H3.
  20. "Work on Singapore MRT Line Put on Hold". The Star. 27 April 2004. Archived from the original on 24 October 2021. Retrieved 23 August 2023.
  21. "Names for 12 Circle Line MRT stations unveiled". Today . 7 July 2005. p. 6. Retrieved 24 October 2025 via NewspaperSG.
  22. "Circle Line Station Names LTA Announces Finalised Names For Circle Line Stages 1-3 Stations And Seeks Views On Names For Circle Line Stages 4 And 5 Stations". Ministry of Transport . 7 July 2005. Archived from the original (PDF) on 29 January 2019. Retrieved 29 January 2019.
  23. "Circle Line Station Names (Annexe A)". Land Transport Authority . 9 July 2011. Archived from the original on 9 July 2011. Retrieved 9 July 2011.
  24. 1 2 Tan, Christopher (26 August 2005). "Circle Line Stage 3 to be back on schedule soon". The Straits Times . p. H7 via Newslink.
  25. Loh, Chee Kong (26 August 2005). "Circle Line's Lorong Chuan challenge". Today . p. 6. Retrieved 30 October 2025.
  26. Goh, Chin Lian (17 October 2005). "Family sues Circle line contractor over loud noise". The Straits Times . p. H1 via Newslink.
  27. Chong, Elena (7 June 2006). "Woman who sued over Circle Line noise loses case". The Straits Times . p. H2 via Newslink.
  28. Singh, Khushwant (9 February 2006). "Family sues Circle Line contractor over loud noise". The Straits Times . p. H2 via Newslink.
  29. U-wen, Lee (18 July 2006). "From Bishan to Paya Lebar station in 17 min". Today . p. 6. Retrieved 24 August 2025 via NewspaperSG.
  30. Almenoar, Maria (26 January 2008). "More trains, shorter waits". The Straits Times . p. H10 via Newslink.
  31. "We're getting super connected". The New Paper . 26 January 2008. pp. 16–17 via Newslink.
  32. Tan, Christopher (23 April 2008). "Stage 3 of Circle Line set for Nov completion". The Straits Times . p. H3 via Newslink.
  33. Yong, Lim; Wee, Desmond (27 October 2008). "Set to roll". The Straits Times . Front page via Newslink.
  34. Yeo, Ghim Lay (13 February 2009). "Five stations on Circle Line to open in May". The Straits Times . p. A1 via Newlink. Circle Line Stage 3, which has five stations, will open on May 30 instead of June, Transport Minister Raymond Lim announced in Parliament during yesterday's debate on his ministry's budget.
  35. Leong, Wee Keet (17 April 2009). "Faster and cheaper". Today . p. 3. Retrieved 24 October 2025 via NewspaperSG.
  36. Yeo, Ghim Lay (1 April 2009). "Route to new MRT station 'poorly lit'". The Straits Times . p. B3 via Newslink.
  37. Yeo, Ghim Lay (16 May 2009). "Path to Lor Chuan MRT station now safer". The Straits Times . pp. B7 via Newslink.
  38. Lim, Cheryl (28 May 2009). "Part of Circle Line opens today". Channel News Asia . Archived from the original on 28 May 2009. Retrieved 28 May 2009.
  39. "Early Opening for Circle Line from Bartley to Marymount" (PDF). Land Transport Authority . Archived from the original (PDF) on 21 February 2013. Retrieved 16 April 2009.
  40. "System Map" (PDF). Land Transport Authority. Archived (PDF) from the original on 25 June 2024. Retrieved 23 June 2024.
  41. "Getting Around – Public Transport – Rail Network". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 27 April 2021.
  42. "Lorong Chuan – First & Last Train". SMRT Journeys. 25 October 2025. Archived from the original on 31 October 2025. Retrieved 18 June 2025.
  43. 1 2 "Lorong Chuan – Map". SMRT Journeys. 17 June 2025. Archived from the original on 31 October 2025. Retrieved 17 June 2025.
  44. "Tactile Guiding System: Studs and Strips to Guide Your Way". Land Transport Authority. 30 July 2021. Archived from the original on 11 September 2021. Retrieved 11 September 2021.
  45. 1 2 Cheong 2012, p. 149.
  46. "Lorong Chuan – Amenities". SMRT Journeys. 4 November 2025. Archived from the original on 4 November 2025. Retrieved 4 November 2025.
  47. "List of Civil Defence Public Shelter (As of Jan 2025)" (PDF). Singapore Civil Defence Force . 7 November 2025. p. 6. Archived (PDF) from the original on 21 July 2025. Retrieved 7 November 2025.
  48. "Lorong Chuan – Exits". SMRT Journeys. 17 June 2025. Archived from the original on 31 October 2025. Retrieved 17 June 2025.
  49. "Art in Transit". Land Transport Authority. Archived from the original on 23 June 2024. Retrieved 23 June 2024.
  50. 1 2 3 Zhuang, Mead & Koh 2013, p. 90.
  51. Zhuang, Mead & Koh 2013, p. 94–95.
  52. 1 2 Zhuang, Mead & Koh 2013, p. 95.
  53. Zhuang, Mead & Koh 2013, p. 94.

Bibliography