DT6 CR15 King Albert Park 阿尔柏王园 கிங் ஆல்பர்ட் பார்க் | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mass Rapid Transit (MRT) station | ||||||||||||||||
General information | ||||||||||||||||
Location | 2 Blackmore Drive Singapore 599987 [1] | |||||||||||||||
Coordinates | 01°20′09″N103°47′01″E / 1.33583°N 103.78361°E | |||||||||||||||
Operated by | SBS Transit DTL Pte Ltd (ComfortDelGro Corporation) (Downtown line) | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 2 (1 island platform) + 2 (1 island platform) (U/C) | |||||||||||||||
Tracks | 2 + 2 (U/C) | |||||||||||||||
Connections | Bus, taxi | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Platform levels | 1 | |||||||||||||||
Bicycle facilities | Yes | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 27 December 2015 (Downtown line) | |||||||||||||||
Opening | 2032 | (Cross Island line)|||||||||||||||
Electrified | Yes | |||||||||||||||
Previous names | Blackmore, Bukit Timah [2] [3] [4] | |||||||||||||||
Passengers | ||||||||||||||||
June 2024 | 5,658 per day [5] | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
King Albert Park MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown line (DTL) in Bukit Timah, Singapore. Located at the western end of Bukit Timah Road at the junction of Blackmore Drive, this station serves the private residential estates along the Bukit Timah corridor. Sites surrounding the station include Methodist Girls' School, Ngee Ann Polytechnic, and the preserved Bukit Timah Railway Station.
First announced as Blackmore MRT station in July 2008, the station was constructed as part of DTL Stage 2 (DTL2). Construction was briefly delayed due to residents' concerns of the tunnel launch shaft near their estate, and the sudden dissolution of Alpine Bau contracted to construct the station. Initially forecast to open in mid-2016, the station opened earlier on 27 December 2015 along with the other DTL2 stations. In September 2022, the station was announced to interchange with the future Cross Island line (CRL). The station features an Art-in-Transit artwork The Natural History of Singapore's Mythical Botanic Creatures by the Artists Caravan.
The station was first announced as "Blackmore" station when the stations on Downtown Line Stage 2 (DTL2) were revealed in July 2008. [6] The station name was finalised as "King Albert Park" through a public poll in July 2009. [7] Contract 917 for the design and construction of the station and the adjacent tunnels was awarded to Alpine Bau GmbH (Singapore Branch) in September 2009. The S$ 350 million ( US$ 240.7 million) contract included the construction of the adjacent Sixth Avenue station. Construction was targeted to begin in 2010. [8]
Construction works had to be suspended for two months over Maplewood residents' concerns about the tunnel boring machine (TBM) launch shaft located right outside the condominium. [9] [10] The construction space required pedestrians to take an alternative route which residents considered "dangerous" and "inconvenient" especially for Methodist Girls' School (MGS) students due to the movement of construction vehicles. Motorists exiting the condominium had to watch out and give way to fast-moving traffic along Bukit Timah Road. The new construction site also limited access for service and emergency vehicles to the condominium. Unhappy that they were not consulted, the residents launched a petition to prime minister Lee Hsien Loong while some appealed to the local Member of Parliament (MP) Christopher de Souza to change the construction plans. [10] [11]
Residents had suggested relocating the TBM launch shaft to Sixth Avenue station. However, the Land Transport Authority (LTA) explained that would require demolishing the shophouses. Another suggestion to drill the tunnels from Tan Kah Kee station would delay construction by another four years. [12] Souza and the LTA, through engagements with the Maplewood residents, offered to rebuild a new direct pathway between the condominium and MGS and reconfigure the traffic to and from the condominium. [13] [14]
Eventually, road markings and traffic lights were implemented along Bukit Timah Road so traffic on the road would have to slow down near the condo. Noise barriers were erected to minimise construction noise and the construction site was regularly washed to minimise dust accumulation. [12] The traffic scheme was revised so construction vehicles do not have to pass by the condominium. [15] Construction resumed in the middle of July 2011. [12]
A 14 m (46 ft) precast segment of the Bukit Timah canal wall near the junction of Bukit Timah Road and Clementi Road was dislodged, which prompted a halt in construction works and the closure of the rightmost two lanes on Bukit Timah Road on 17 January 2012. Cement had to be injected to stabilise the ground. [16]
On 19 June 2013, the main contractor for the station Alpine Bau went bankrupt. [17] [18] [19] The sudden insolvency caught the LTA by surprise, as the construction was going well by then. [18] [19] [20] An "unprecedented situation", [19] the LTA immediately took action. A security firm was employed to protect the sites and the incomplete structures, while the LTA worked with experts to preserve the tunnel boring machines and recharge wells. As the LTA sought a new contractor, McConnell Dowell South East Asia, the contractor for Beauty World station, was temporarily appointed as the caretaker contractor to carry on tunnelling works. Through engagement with the Ministry of Manpower, the 400 affected workers were reassigned or sent home. [20] [21]
On 29 August 2013, the LTA announced the appointment of two new contractors for King Albert Park and the two other stations. The contract for the completion of the King Albert Park and Sixth Avenue stations and associated tunnels was awarded to McConnell Dowell at a contract sum of $254 million (US$203 million). [22] [23] The contractors were appointed just eight weeks after the insolvency, whereas usually, a tender needed at least six months for evaluation and processing. The quick appointment was to reduce the delay in the completion of DTL2. [24]
To speed up the construction as much as possible, manpower for the construction of these stations increased by 25%, with workers taking up additional graveyard shifts so that work could continue throughout the day and night. To reduce inconvenience to residents, rather than using conventional breakers, quieter wire saws were utilised to break up the concrete struts. [20] [25]
On 28 June 2015, Transport Minister Lui Tuck Yew announced that the DTL2 would be opened earlier, [26] with the works 95% complete. [25] The LTA managed to bring forward the completion as the staff worked through many weekends and "sleepless nights". The engineers were reported to be "equally proud and relieved" of the achievement and they were credited for their cooperation and hard work. [25] In August that year, Lui announced that the DTL2 segment would open on 27 December. [27] [28] [29] Prior to the station's opening, passengers were offered a preview of the station during the DTL open house on 5 December. [30]
The station was first announced to interchange with the Cross Island line (CRL) on 20 September 2022 by Transport Minister S Iswaran. The CRL platforms will be constructed as part of CRL Phase 2, a 15 km (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station. [31] [32]
The contract for the construction of CRL King Albert Park station was awarded to China Communications Construction Company Limited (Singapore Branch) for S$447 million (US$333.58 million) in October 2023. Construction of the new station was scheduled to begin in 2024 and be completed in 2032. [33] [34]
King Albert Park station serves the Downtown line (DTL) and is situated between the Beauty World and Sixth Avenue stations. The official station code is DT6. [35] Being part of the DTL, the station is operated by SBS Transit. [36] The station is located along Bukit Timah Road at the junction with Blackmore Drive. [1] Surrounding landmarks of the station include: Bukit Timah Railway Bridge, the preserved Bukit Timah Railway Station, [37] [38] Covenant Community Methodist Church, Methodist Girls' School, Ngee Ann Polytechnic, and Sime Darby Centre. [39]
The designs of King Albert Park station and the adjoining stations, Tan Kah Kee and Sixth Avenue, are intended to represent the natural elements. [40] The blue and turquoise panels in the station, arranged in ripple patterns, is intended to reflect the water surfaces. [41]
The station is wheelchair-accessible. A tactile system, consisting of tiles with rounded or elongated raised studs, [42] guides visually impaired commuters through the station, with dedicated routes that connect the station entrances to the platforms or between the lines. Wider fare gates allow easier access for wheelchair users into the station. [43]
King Albert Park station is a designated Civil Defence (CD) shelter. [44] To be activated in times of national emergency, the station features the reinforced steel blast doors and decontamination chambers to protect against chemical attacks. [45]
King Albert Park station features The Natural History of Singapore's Mythical Botanic Creatures by Chan Mei Hsien, Long Ying Han and Soh Pei Ling Joey of the Artists Caravan. [46] The work was commissioned as part of the MRT network's Art-in-Transit (AiT) Programme, a public art showcase which integrates artworks into the MRT network. [47] The artwork depicts bronze statues of fantasy creatures placed at corners of the station, along with a "Nature Notebook" by MGS students printed on glass panes along the station's pedestrian bridge. [46] Referencing the wildlife that resides in the nearby Bukit Timah Nature Reserve, [47] the artwork is intended as a "whimsical narrative", depicting contrasts between natural and manmade environmental features through the revelation of the "secret lives" of these mystical creatures. [48] [49] [50]
Chinatown MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North East (NEL) and Downtown (DTL) lines in Outram, Singapore. It serves the ethnic enclave of Chinatown. Situated at the junction of Eu Tong Sen Street, New Bridge Road and Upper Cross Street, the station is near several landmarks, including the Buddha Tooth Relic Temple, Masjid Jamae (Chulia), Chinatown Point and People's Park Complex.
Little India MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North East (NEL) and Downtown (DTL) lines. The station is located at the junction of Bukit Timah Road and Race Course Road, and serves the ethnic neighbourhood of Little India. Several landmarks surrounding the station include KK Women's and Children's Hospital, Tekka Market, and the Land Transport Authority headquarters.
Newton MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North South (NSL) and Downtown (DTL) lines. It is located in Newton, Singapore, at the junction of Scotts Road and Bukit Timah Road near Newton Circus. The station serves the offices and condominiums around Newton Circus including Goldbell Towers and Scotts Highpark, and it is within walking distance to the Newton Food Centre.
Botanic Gardens MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Circle line (CCL) and the Downtown line (DTL). Situated in Tanglin, Singapore, the station is located northwest of the Singapore Botanic Gardens at the junction of Bukit Timah Road and Cluny Park Road. Other nearby developments of the station include Crown Centre, Serene Centre, Cluny Court, Adam Road Food Centre and the National University of Singapore Faculty of Law.
Bugis MRT station is an underground Mass Rapid Transit (MRT) interchange station on the East–West (EWL) and Downtown (DTL) lines. Situated in Bugis, Singapore, the station is underneath the junction of Rochor Road and Victoria Street. Various developments surrounding the station include Bugis Junction, Raffles Hospital and the National Library. The station is also close to Kampung Glam.
The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs from Bukit Panjang station in the north-west of the country towards Expo station in the east via a loop around the city-centre. Coloured blue on the rail map, the line serves 34 stations, all of which are underground. The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by SBS Transit after the North East Line. It also serves as an alternative to the East–West Line where it runs roughly geographically parallel from Bugis to Expo station.
Rochor MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown Line (DTL) in Rochor, Singapore. Located between Sungei Road and Rochor Canal Road, the station serves landmarks such as Sim Lim Square, The Verge, the LASALLE College of the Arts and Tekka Centre. The station is operated by SBS Transit.
Stevens MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown (DTL) and Thomson–East Coast (TEL) lines. Situated at the junction of Stevens Road and Bukit Timah Road, it serves the nearby Singapore Chinese Girls' School and St. Joseph's Institution, as well as the Raffles Town Club and the surrounding private estates.
Tan Kah Kee MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown Line (DTL) in Bukit Timah, Singapore. Located directly underneath the campus of Hwa Chong Institution (HCI), this station was named after the founder of the institution Tan Kah Kee. In addition to HCI, other educational institutions within the vicinity of this station include Nanyang Girls' High School, Raffles Girls' Primary School and National Junior College.
Beauty World MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown Line (DTL) in Bukit Timah, Singapore. Located along Upper Bukit Timah Road, this station took its name from the historic Beauty World Market, a former amusement park and market that once stood in the vicinity. Beauty World station primarily serves the residential estates along Jalan Jurong Kechil and Toh Yi Drive, as well as Beauty World Centre, Beauty World Plaza, and Bukit Timah Shopping Centre. It is also within walking distances to Ngee Ann Polytechnic, Pei Hwa Presbyterian Primary School, Bukit Timah Market & Food Centre, Bukit Timah Community Club, Bukit Timah Tua Pek Kong Temple, and Bee Low See Temple.
Hillview MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown Line, situated on the boundaries of Hillview and Nature Reserve planning subzones of Bukit Batok and Bukit Panjang respectively, Singapore.
Cashew MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown line in Singapore, located between Upper Bukit Timah Road and Cashew Road. It is the nearest MRT station to the headquarters of the Ministry of Defence as well as the upcoming National Service (NS) Hub.
Bukit Panjang MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station on the Downtown line (DTL) and the Bukit Panjang LRT line (BPLRT) in Singapore. Located in the namesake estate of Bukit Panjang, the station is at the junction of Upper Bukit Timah Road and Petir Road. The station serves the commercial buildings of Bukit Panjang Plaza, Hillion Mall, and Junction 10. It forms a part of the Bukit Panjang Integrated Transport Hub (BPITH), which also contains a bus interchange.
Bencoolen MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown Line (DTL) in Singapore. Located under Bencoolen Street, the station serves primarily the Nanyang Academy of Fine Arts (NAFA), Singapore Management University and surrounding developments. At 43 metres (141 ft) below street level, Bencoolen is the deepest station in Singapore.
Kaki Bukit MRT station is an underground Mass Rapid Transit (MRT) station on the Downtown line (DTL). Situated in Kaki Bukit, Singapore, it is located along Kaki Bukit Avenue 1. The station serves the vicinity's residential and industrial developments, including Kaki Bukit Techpark and TechView.
Bedok North MRT station is an underground Mass Rapid Transit station on the Downtown line in the northern part of Bedok, Singapore, located along Bedok North Road, near the Pan Island Expressway flyover and the Bedok Town Park. It serves nearby HDB estates, the nearby Damai Primary School and will serve a future integrated hospital in the area.
The Cross Island Line (CRL) is a high capacity Mass Rapid Transit (MRT) line under development in Singapore. It will run in an east–west direction from Changi to Jurong Industrial Estate via Loyang, Pasir Ris, Hougang, Serangoon North, Ang Mo Kio, Sin Ming, Bukit Timah, Clementi and West Coast. From Pasir Ris, the line will branch off to Punggol. The 58-kilometre (36 mi) line will replace the East–West Line as the longest line on the MRT network upon its complete opening by the 2040s, serving about 27 stations.
Hume MRT station is a future underground Mass Rapid Transit station located along the junction of Hume Avenue and Upper Bukit Timah Road in the Hillview planning sub-zone of Bukit Batok, Singapore. It is an infill station and will be located near a number of Bukit Timah heritage sites: Bukit Timah Hill, Bukit Timah Nature Reserve, Former Bukit Timah Fire Station, Fuyong Estate, and Former Ford Factory. The station will have two platforms and will be between Beauty World and Hillview stations on the Downtown line.
Turf City MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Bukit Timah, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
Maju MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Bukit Timah, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.