Clementi MRT station

Last updated

 EW23  CR17 
Clementi
金文泰
கிளிமெண்டி
Mass Rapid Transit (MRT) station
EW23 Clementi MRT Exterior 20211207 120431.jpg
Exterior of the station
General information
Location3150 Commonwealth Avenue West
Singapore 129580
Coordinates 1°18′55.09″N103°45′54.88″E / 1.3153028°N 103.7652444°E / 1.3153028; 103.7652444
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
Connections Clementi Bus Interchange
Construction
Structure typeElevated (EWL)
Underground (CRL)
Platform levels1
ParkingYes (Clementi Mall)
AccessibleYes
History
Opened12 March 1988 (1988-03-12) (East West line)
Opening2032 (2032) (Cross Island line)
Services
Preceding station Mass Rapid Transit Following station
Dover
towards Pasir Ris
East–West Line Jurong East
towards Tuas Link
Maju
towards Aviation Park
Cross Island Line
Future service
West Coast
Location
SGMRT-LRT map.svg
Red Dot.svg
Clementi
Clementi station in Singapore

Clementi MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West Line (EWL). Located in Clementi, Singapore, the station is located along Commonwealth Avenue West and serves landmarks such as The Clementi Mall, Clementi Bus Interchange and Clementi Fire Station.

Contents

Built as part of Phase IA of the MRT system, the EWL station opened on 12 March 1988. An oil spill on the tracks led to two trains colliding at the station on 5 August 1993. The station saw further upgrades such as new half-height platform doors and fans above the platforms to improve ventilation, as well as new linkways which opened in 2018. In September 2022, it was announced that the station would become an interchange station with the Cross Island Line (CRL) as part of Phase 2 of the line.

History

East West line

Faregates pictured in 2015 Clementi MRT Station-NewExit (Faregates).jpg
Faregates pictured in 2015
A C151 train at the EWL platform ClementiMRT.JPG
A C151 train at the EWL platform

Clementi station was first constructed as part of Phase IA of the MRT system, a 8.5-kilometre (5.3 mi) segment which spans from Tiong Bahru to this station. [1] Initially planned to be built as part of Phase II, this segment was targeted to be completed in 1988 right after the completion of MRT Phase I to increase Phase I's catchment area. [2] The contract for the construction of Clementi station and 2 kilometres (1.2 mi) of viaducts was awarded to a joint venture between Lim Kah Ngam Construction and Aoki Corporation for S$48.7 million (US$ 66 million in 2022) in April 1985. [3] [4]

The station opened for a public preview on 27 and 28 February 1988, [5] before operations commenced on 12 March that year. [6] [7] On the opening day, Clementi station was the most visited station among the Phase IA stations with 80,000 recorded trips and 125,618 passengers. [8] [9]

In 2012, half-height platform screen doors was installed at this station as part of the Land Transport Authority's (LTA) programme to improve safety in MRT stations. [10] [11] [12] High-volume low-speed fans were installed above the platforms of the station between 2012 and 2013 as part of a national programme to improve ventaliation at station platforms. [13] [14]

Two new link bridges, along with new fare gates and escalators, [15] were built and opened in 2018 to improve connectivity to new flats near the station. [16] [17] Noise barriers were installed along the viaduct stretch from Clementi Road to Clementi Station as part of a S$17 million (US$12.7 million) contract awarded to CKT Thomas Pte Ltd in January 2015. [18] [19] Another set of noise barriers from Clementi Avenue 4 to Lempeng Drive were installed from 2018 to 2020. [20] [21]

Clementi rail incident

On the morning of 5 August 1993, two trains collided at the station after one became stalled at the station due to a technical fault. The crash left 156 people injured, eight of them seriously. The trains were taken out of service while engineers conducted checks on signalling equipment at the Clementi, Buona Vista and Commonwealth stations. [22] [23] MRT operations resumed the next day. [22] [24] For further engineering checks between the Buona Vista and Clementi stations, trains at Buona Vista were not allowed to depart until the train at Clementi left; this restriction was lifted on 8 August. [25]

An independent inquiry panel concluded that a damaged maintenance locomotive spilled oil on the tracks the morning of the crash. While workers were aware of the spill, the cleaning crew were delayed from accessing the tracks. Ten trains had experienced braking issues leading up to the crash. The stalled train used its emergency brakes to stop at Clementi station and needed to recharge its brake systems before moving off. The automatic braking system of the subsequent train failed to prevent the collision. As MRT staff had followed procedures, none faced discipline as a result of the crash. The inquiry recommended increased inspections of locomotives and for the station master to look out for oil spills on tracks. [26]

Cross Island line

The station was first announced to interchange with the Cross Island line (CRL) on 20 September 2022 by Transport Minister S Iswaran. The CRL platforms will be constructed as part of CRL Phase 2, a 15-kilometre (9.3 mi) segment spanning six stations from Turf City station to Jurong Lake District station. [27] [28] The station is expected to be completed in 2032. [29]

The contract for the construction of CRL Clementi station was awarded to a joint venture between China Communications Construction Company Limited (Singapore Branch) and Sinohydro Corporation Limited (Singapore Branch) for S$514 million (US$383.58 million) in October 2023. Construction of the new station was scheduled to begin in 2024 and be completed in 2032. [30] To facilitate the construction of the new CRL station, the Clementi police headquarters and the neighbourhood police centre were relocated to Lempeng Drive. [31] [32]

Station details

Clementi station serves the EWL and is between the Jurong East and Dover stations. The official station code is EW23. [33] Being part of the EWL, the station is operated by SMRT Trains. [34] The station will be a future interchange station with the CRL. [35] The station is located along Commonwealth Avenue West and has four entrances. [36] Surrounding landmarks of the station include The Clementi Mall, Clementi Bus Interchange, Clementi Fire Station, Clementi Polyclinic, Masjid Darussalam and Clementi Primary School. [37]

Related Research Articles

<span class="mw-page-title-main">Mass Rapid Transit (Singapore)</span> Principal metro system serving Singapore

The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.4 million in 2019.

<span class="mw-page-title-main">North–South MRT line</span> Mass Rapid Transit line in Singapore

The North–South Line (NSL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore, operated by SMRT Corporation. Coloured red on the Singapore rail map, the line is 45 kilometres (28 mi) long and serves 27 stations, 11 of which, between the Bishan and Marina South Pier stations, are underground. It runs from Jurong East station, located in Western Singapore, to Marina South Pier station in the Central Area, via Woodlands station in northern Singapore. The line operates for almost 20 hours a day, with headways of up to 1 to 2 minutes during peak hours and 5 to 8 minutes during off-peak hours. All the trains on the North–South Line run with a six-car formation.

<span class="mw-page-title-main">East–West MRT line</span> Mass Rapid Transit line in Singapore

The East–West Line (EWL) is a high-capacity Mass Rapid Transit (MRT) line operated by SMRT in Singapore, running from Pasir Ris station in the east to Tuas Link station in the west, with an additional branch between Changi Airport and Tanah Merah stations. It is the second Mass Rapid Transit line to be built in Singapore. Coloured green on the rail map, the line serves 35 stations, 8 of which are underground. At 57.2 kilometres (35.5 mi), the line is the longest on the MRT network.

<span class="mw-page-title-main">City Hall MRT station</span> Mass Rapid Transit station in Singapore

City Hall MRT station is an underground Singapore Mass Rapid Transit (MRT) interchange station on the North–South line (NSL) and East–West line (EWL). Situated in the Downtown Core district, it is underneath Stamford Road near the road junctions with North Bridge Road and St Andrew's Road. The station is near landmarks such as the former City Hall, Raffles City, the Padang, St Andrew's Cathedral and the Cenotaph.

<span class="mw-page-title-main">Jurong East MRT station</span> Mass Rapid Transit station in Singapore

Jurong East MRT station is an elevated Mass Rapid Transit (MRT) interchange station on the North South (NSL) and East West (EWL) lines in Jurong East, Singapore, operated by SMRT Trains. It is located at the heart of Jurong Lake District, within the vicinity of Jem, Westgate, IMM, Ng Teng Fong General Hospital, Jurong East Bus Interchange and the upcoming residential development J'Den, formerly JCube.

<span class="mw-page-title-main">Outram Park MRT station</span> Mass Rapid Transit station in Singapore

Outram Park MRT station is an underground Mass Rapid Transit (MRT) interchange station in Singapore. The station is on the East–West, North East and Thomson–East Coast lines, and is located near the junction of Outram Road, Eu Tong Sen Street and New Bridge Road on the boundary of Bukit Merah and Outram planning areas. It is the closest MRT station to Singapore General Hospital, the Police Cantonment Complex, Outram Community Hospital and the Health Promotion Board. The station was included in the early plans of the MRT network in 1982; it was constructed as part of the Phase I MRT segment from Novena, and was completed in December 1987.

<span class="mw-page-title-main">Paya Lebar MRT station</span> Mass Rapid Transit station in Singapore

Paya Lebar MRT station is a Mass Rapid Transit (MRT) interchange station on the East West line (EWL) and Circle line (CCL) in Geylang, Singapore. Despite the name, this station is not located in Paya Lebar but rather along Paya Lebar Road, near the junction with Sims Avenue. It is located among the developments of the Paya Lebar Central commercial hub and near the Geylang Serai district.

<span class="mw-page-title-main">Changi Airport MRT station</span> Mass rapid transit station in Singapore

Changi Airport MRT station is an underground Mass Rapid Transit (MRT) station serving Changi Airport and its supplementary structure Jewel in Changi, Singapore. The station is the terminus of the Changi Airport branch of the East West line (EWL); it is operated by SMRT Trains and is built in an east–west direction. The ends of the station directly connect to Terminals 2 and 3 of Changi Airport.

<span class="mw-page-title-main">Boon Lay MRT station</span> Mass Rapid Transit station in Singapore

Boon Lay MRT station is an above-ground Mass Rapid Transit (MRT) station on the East West line in Jurong West, Singapore. Located in Jurong West Central, Boon Lay station is one of the three stations that serve Jurong West New Town; the other two are Lakeside MRT station and Pioneer MRT station. Together with Boon Lay Bus Interchange and Jurong Point Shopping Mall, they form the Boon Lay Integrated Public Transport Hub.

<span class="mw-page-title-main">Pasir Ris MRT station</span> Mass rapid transit station in Singapore

Pasir Ris MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL) in Pasir Ris, Singapore. Situated along Pasir Ris Central adjacent to Pasir Ris Bus Interchange and the White Sands Shopping Mall, it is the eastern terminus of the EWL and, as of June 2021, the only MRT station within Pasir Ris. The station exterior has the characteristic dome-shaped segmented roof also seen on other elevated EWL stations.

<span class="mw-page-title-main">Marina Bay MRT station</span> Mass Rapid Transit station in Singapore

Marina Bay MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North South (NSL), Circle (CCL) and Thomson–East Coast (TEL) lines in Singapore. Located in the Downtown Core district near Marina Bay, the station serves the Marina One Residences, Marina Bay Suites and the Marina Bay Financial Centre.

<span class="mw-page-title-main">Ang Mo Kio MRT station</span> Mass Rapid Transit station in Singapore

Ang Mo Kio MRT station is an above-ground Mass Rapid Transit (MRT) station on the North South Line in Ang Mo Kio, Singapore.

<span class="mw-page-title-main">Orchard MRT station</span> Mass Rapid Transit station in Singapore

Orchard MRT station is an underground Mass Rapid Transit (MRT) interchange station in Singapore, on the North South (NSL) and Thomson–East Coast (TEL) lines. Situated along Orchard Boulevard and underneath ION Orchard, the station serves various commercial and retail developments of the Orchard Road shopping district, including Liat Towers, Ngee Ann City, Wheelock Place, Wisma Atria and Shaw House, among others.

<span class="mw-page-title-main">Tanah Merah MRT station</span> Mass Rapid Transit station in Singapore

Tanah Merah MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL). Located in Bedok, Singapore, the station is along New Upper Changi Road and serves various residential developments, including Casa Merah. It is the terminus of the EWL branch to Changi Airport station.

<span class="mw-page-title-main">Toa Payoh MRT station</span> Mass Rapid Transit station in Singapore

Toa Payoh MRT station is an underground Mass Rapid Transit (MRT) station on the North South line (NSL) in Toa Payoh, Singapore. Located in the town centre of Toa Payoh, it is integrated with the Toa Payoh Bus Interchange and the HDB Hub, headquarters of the Housing and Development Board. The station is underneath the intersection of three roads: Lorong 1 Toa Payoh, Lorong 2 Toa Payoh and Lorong 6 Toa Payoh.

<span class="mw-page-title-main">Bugis MRT station</span> Mass Rapid Transit station in Singapore

Bugis MRT station is an underground Mass Rapid Transit (MRT) interchange station on the East–West (EWL) and Downtown (DTL) lines. Situated in Bugis, Singapore, the station is underneath the junction of Rochor Road and Victoria Street. Various developments surrounding the station include Bugis Junction, Raffles Hospital and the National Library. The station is also close to Kampung Glam.

<span class="mw-page-title-main">SMRT Trains</span> Singapore train operator

SMRT Trains Limited is a rail operator in Singapore and a wholly owned subsidiary of SMRT Corporation. After the privatisation of the MRT operations in 1995, it was originally named Singapore MRT Limited. On 31 December 2001, it was renamed to SMRT Trains Limited, so as not to confuse with another MRT line - North East MRT Line that is under Singapore Bus Services and the bus operations merged from Trans-Island Bus Services. At the same time, Singapore Bus Services was renamed to SBS Transit to be multi-modal. SMRT Trains currently manages most of the MRT services in Singapore except the North East Line and Downtown Line.

<span class="mw-page-title-main">Gul Circle MRT station</span> Mass Rapid Transit station in Singapore

Gul Circle MRT station is an elevated Mass Rapid Transit (MRT) station on the East West line (EWL). Located in Tuas, western Singapore, the station serves the surrounding industries of JTC Space @ Tuas and Mapletree Pioneer Logistic Hub. The station is operated by SMRT Trains.

<span class="mw-page-title-main">Tuas Link MRT station</span> Mass Rapid Transit station in Singapore

Tuas Link MRT station is an elevated Mass Rapid Transit (MRT) station in western Singapore. Located in Tuas along Tuas West Drive, it is located close to Tuas Depot and Tuas Checkpoint. The station is the terminus of the East–West line (EWL) and the westernmost station in Singapore.

<span class="mw-page-title-main">Cross Island MRT line</span> Future Mass Rapid Transit line in Singapore

The Cross Island Line (CRL) is a high capacity Mass Rapid Transit (MRT) line under development in Singapore. It will run in an east–west direction from Changi to Jurong Industrial Estate via Loyang, Pasir Ris, Hougang, Serangoon North, Ang Mo Kio, Sin Ming, Bukit Timah, Clementi and West Coast. From Pasir Ris, the line will branch off to Punggol. The 58-kilometre (36 mi) line will replace the East West Line as the longest line on the MRT network upon its complete opening by the 2040s, serving about 27 stations.

References

  1. Dhaliwal, Rav (10 June 1983). "Now First Phase Takes a Step Up". The Straits Times . Singapore Press Holdings. p. 1 via NewspaperSG.
  2. Wee, Agnes (10 June 1983). "Phase I of MRT Modified to Cover a Wider Area". Business Times . Singapore Press Holdings. p. 1 via NewspaperSG.
  3. Lim, Soon Neo (23 April 1985). "LKN-Aoki venture clinches $48.7m MRT contract". Business Times . Singapore Press Holdings. p. 16 via NewspaperSG.
  4. Dhaliwal, Rav (23 April 1985). "It's All Go Now for First Phase of MRT". The Straits Times . Singapore Press Holdings. p. 12. Retrieved 3 October 2023 via NewspaperSG.
  5. "Six East-West Line MRT Stations to Hold Open Days". The Straits Times . Singapore Press Holdings. 6 February 1988. p. 25 via NewspaperSG.
  6. "Riding the MRT train to Clementi". Business Times . Singapore Press Holdings. 12 March 1988. p. 1. Retrieved 17 October 2017 via NewspaperSG.
  7. Dhaliwal, Rav (12 March 1988). "PM to Open the MRT System Today". The Straits Times . Singapore Press Holdings. p. 1. Retrieved 3 October 2023 via NewspaperSG.
  8. Simon, Sharon (14 March 1988). "Clementi Packs Them In at Opening of New Line". The Straits Times . Singapore Press Holdings. p. 12 via NewspaperSG.
  9. "Clementi Extension a Hit with MRT Commuters". The Straits Times . 24 March 1988. p. 18 via NewspaperSG.
  10. "Platform screen doors for all above-ground MRT stations by 2012". The Straits Times. 25 January 2008. Archived from the original on 28 January 2008.
  11. "Speech by Mr Raymond Lim, Minister for Transport, at the Visit to Kim Chuan Depot, 25 January 2008, 9.00am" (Press release). Ministry of Transport. 25 January 2008. Archived from the original on 12 January 2015. Retrieved 11 January 2015.
  12. "LTA completes installing elevated MRT station screen doors early". Channel NewsAsia . Mediacorp. Archived from the original on 24 September 2017. Retrieved 23 September 2017.
  13. "Enhancing Connectivity and Comfort for Commuters". Land Transport Authority. 13 October 2011. Archived from the original on 25 December 2012. Retrieved 6 July 2012.
  14. "Connect – April 2012" (PDF). Land Transport Authority. Archived from the original (PDF) on 5 February 2018. Retrieved 8 December 2020.
  15. Fang, Joy (1 August 2014). "Direct lift access from HDB blocks to three MRT stations". Today. Retrieved 11 October 2023.
  16. Tan, Christopher (25 August 2015). "LTA studying possible extension of planned Jurong Region Line to connect to Circle Line". The Straits Times. Archived from the original on 14 July 2019. Retrieved 29 July 2022.
  17. Yeo, Marissa (25 August 2015). "Jurong line may be extended to link with Circle Line". TODAY. Retrieved 6 October 2023.
  18. "Railway Noise Barriers on Track" (PDF). Land Transport Authority. 15 January 2015. Archived from the original on 20 March 2022. Retrieved 22 November 2017.
  19. "Annex A: Phase 1 of Railway Noise Barrier Installation Plans" (PDF). Land Transport Authority. Archived from the original (PDF) on 20 March 2022. Retrieved 3 October 2023.
  20. "Railway Noise Barriers at 16 More Locations". Land Transport Authority. 14 December 2018. Retrieved 3 October 2023.
  21. "Annex A: Phase 2 of the Installations of Railway Noise Barriers" (PDF). Land Transport Authority . Retrieved 3 October 2023.
  22. 1 2 Pereira, Brendan (6 August 1993). "MRT trains collide at Clementi: 132 hurt". The Straits Times . Singapore Press Holdings. p. 1. Retrieved 2 October 2023 via NewspaperSG.
  23. "Spilled Oil May Be Cause of MRT Train Collision". The Straits Times . Singapore Press Holdings. 7 August 1993. p. 1 via NewspaperSG.
  24. "Queenstown-Jurong E Service Resumes, Cause of Crash Still Unknown". Business Times . Singapore Press Holdings. 7 August 1993. p. 2 via NewspaperSG.
  25. "Safety restriction imposed after MRT accident lifted". The Straits Times . Singapore Press Holdings. 9 August 1993. p. 21. Retrieved 11 October 2023 via NewspaperSG.
  26. "Oil spillage led to MRT train collision: Panel". The Straits Times . Singapore Press Holdings. 20 October 1993. p. 1. Retrieved 11 October 2023 via NewspaperSG.
  27. Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  28. Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  29. "Cross Island Line Phase 2". LTA. 20 September 2022. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  30. "LTA Awards Two Civil Contracts for Cross Island Line Phase 2". LTA. 2 October 2023. Retrieved 2 October 2023.
  31. "Clementi police headquarters to relocate to make way for Cross Island Line station". CNA. 17 October 2023. Retrieved 17 October 2023.
  32. "金文泰警署和邻里警局本月底搬迁 方便地铁跨岛线建筑工程". 8world (in Chinese). 17 October 2023. Retrieved 17 October 2023.
  33. "MRT System Map" (PDF). Land Transport Authority. Archived (PDF) from the original on 21 August 2020.
  34. "Getting Around – Public Transport – Rail Network". Land Transport Authority. Archived from the original on 1 November 2019. Retrieved 27 April 2021.
  35. "Cross Island Line". Land Transport Authority. 28 September 2023. Retrieved 11 October 2023.
  36. "Clementi – Map". SMRT Journeys. SMRT Corporation. Archived from the original on 22 December 2021. Retrieved 11 October 2023.
  37. "Clementi – Exits". SMRT Journeys. SMRT Corporation. Archived from the original on 15 November 2021. Retrieved 11 October 2023.