KJ11 Kampung Baru | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| LRT station | |||||||||||
General information | |||||||||||
Other names | 甘榜峇鲁 (Chinese) கம்போங் பாரு (Tamil) | ||||||||||
Location | Jalan Haji Hassan Salleh, Kampung Baru, Kuala Lumpur, Malaysia. | ||||||||||
Coordinates | 3°9′40″N101°42′23″E / 3.16111°N 101.70639°E | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 5 Kelana Jaya Line | ||||||||||
Platforms | 2 island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Parking | Not available | ||||||||||
Other information | |||||||||||
Station code | KJ11 | ||||||||||
History | |||||||||||
Opened | 1 June 1999 | ||||||||||
Services | |||||||||||
|
Kampung Baru LRT station is an underground rapid transit station, named after and serving Kampung Baru, Kuala Lumpur, in Malaysia. The station is part of the Kelana Jaya Line (formerly known as PUTRA). The station was opened on June 1, 1999, as part of the line's second and latest extension, which includes the addition of 12 stations (not including Sri Rampai station), and an underground line that the Kampung Baru station is connected to. The Kampung Baru station is currently one of only five underground stations in the Kelana Jaya Line.
Located on the southern edge of Kampung Baru, the Kampung Baru station is located directly beside the Ampang–Kuala Lumpur Elevated Highway and Klang River. The adjoining KLCC station, as is the Kuala Lumpur City Centre (KLCC) itself, is situated across the Klang River, 700 metres away, and 130 metres away from the famous Saloma Bridge that connects Kampung Baru residents to KLCC. The station is primarily intended to serve the Kampung Baru area.
The Kampung Baru station, like all other underground Kelana Jaya Line stations, is of a simplistic construction consisting of only three levels: the entrance level at street level, and the concourse and platform levels underground. All levels are linked via escalators and stairways, while elevators are additionally provided between the concourse level and the platform level. The station contains only one island platform for two tracks of opposite directions, with floor-to-ceiling platform screen doors sealing the platform from the tracks.
The station has two access points from street level, of which one is larger than the other and is the primary entrance. The secondary access point to the concourse level, just 40 m east from the main entrance, is closed to the public.
Suria KLCC is a 6-story shopping mall located at the foot of the Petronas Twin Towers. Suria KLCC is a premier shopping destination with over 300 flagship stores. The shopping mall is situated in Kuala Lumpur City Centre, Kuala Lumpur, Malaysia.
Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.
The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms part of the Klang Valley Integrated Transit System in and around Kuala Lumpur, Malaysia. Servicing 37 stations, the line has 46.4 km (28.8 mi) of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA-LRT, it is operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia. The line is named after its former terminus, the Kelana Jaya station. The line is numbered 5 and coloured ruby on official transit maps.
Kuala Lumpur City Centre (KLCC) is a multipurpose development area in Kuala Lumpur, Malaysia. KLCC refers to the area within and surrounding the KLCC Park but the term has also been widely used by buildings nearby to the vicinity.
Kampung Baru or Kampong Bharu is a Malay enclave in central Kuala Lumpur, Malaysia. One of the most valuable tracts of land in the capital, it has been estimated to be worth up to US$1.4 billion.
Jalan Ampang or Ampang Road is a major road in the Klang Valley region, Selangor and the Federal Territory of Kuala Lumpur, Malaysia. Built in the 1880s, it is one of the oldest roads in the Klang Valley. It is a main road to Ampang Jaya and is easily accessible from Jalan Tun Razak or Jalan Ulu Klang from the Hulu Kelang or Setapak direction. It is also accessible from Cheras through Jalan Shamelin, from Jalan Tun Razak through Jalan Kampung Pandan via Taman Cempaka, from Kampung Pandan through Jalan Kampung Pandan Dalam via Taman Nirwana, from the Kuala Lumpur Middle Ring Road 2 via Pandan Indah and Taman Kencana and from Hulu Langat town through the mountain pass. Wangsa Maju, Setapak, central Kuala Lumpur, Ampang Park and Salak South surround Ampang. Jalan Ampang became the backbone of the road system linking Ampang to Kuala Lumpur before being surpassed by the Ampang–Kuala Lumpur Elevated Highway (AKLEH) in 2001.
Masjid Jamek LRT station is a rapid transit station in Kuala Lumpur, Malaysia. It is the interchange station between two of Rapid KL's light rapid transit (LRT) systems, namely the LRT Ampang and Sri Petaling Lines and the LRT Kelana Jaya Line. The station is one of only two stations integrating the LRT lines, the other being Putra Heights station. The station is situated near and named after the Masjid Jamek in central Kuala Lumpur.
KLCC LRT station is an underground rapid transit station in Kuala Lumpur, Malaysia, served by the Kelana Jaya Line.
Sri Rampai LRT station is a rapid transit station in northern Kuala Lumpur, Malaysia, forming part of the Kelana Jaya line. The station, named after the nearby Taman Sri Rampai housing estate to the west, is located along the border between Taman Sri Rampai and Wangsa Maju to the east.
Dang Wangi LRT station is an underground metro station, in Kuala Lumpur, Malaysia, part of the Kelana Jaya line. The station was opened on 1 June 1999, as part of the line's second and latest extension, which includes the addition of 12 stations, and an underground line that the Dang Wangi station is connected to. The Dang Wangi station is one of only five underground stations in the Kelana Jaya Line.
Asia Jaya LRT station is an elevated rapid transit station in Petaling Jaya, Selangor, Malaysia, forming part of the Kelana Jaya Line. The station was opened on September 1, 1998, as part of the line's first segment encompassing 10 elevated stations between Kelana Jaya station and Pasar Seni station, and the line's maintenance depot in Lembah Subang.
The Pasar Seni station is an integrated rapid transit station in Kuala Lumpur that is served by the LRT Kelana Jaya Line and the MRT Kajang Line. The station is named after the nearby Central Market and is located near Petaling Street and the area known as the Chinatown of Kuala Lumpur.
Dato' Keramat LRT station is a Malaysian rapid transit station that forms part of the Kelana Jaya Line in the Klang Valley.
Abdullah Hukum station is an integrated rapid transit station in Kuala Lumpur, Malaysia, served by both the LRT Kelana Jaya Line and the KTM Komuter Port Klang Line.
Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of three light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT and LRT line currently under construction.
The Merdeka MRT station is a mass rapid transit (MRT) underground station in Kuala Lumpur, Malaysia. It is one of the stations of the Klang Valley Mass Rapid Transit (KVMRT) MRT Kajang Line, formerly known as Sungai Buloh–Kajang Line and serves as an interchange station with Plaza Rakyat LRT station for LRT Ampang and Sri Petaling lines. The station was opened on 17 July 2017 under Phase Two operations of the MRT line.
Persiaran KLCC MRT station(Working name: KLCC East) is a mass rapid transit (MRT) station in the KLCC subdistrict in Kuala Lumpur, Malaysia. It is one of the stations on the MRT Putrajaya Line.
Ampang Park MRT station is a mass rapid transit (MRT) station in Kuala Lumpur that is served by RapidKL's MRT Putrajaya Line. The MRT station is situated on the former site of Ampang Park Shopping Centre as one of the three Putrajaya Line stations around the Kuala Lumpur City Centre (KLCC). It is also located opposite Intermark Mall along the busy stretch of Jalan Tun Razak.
Ampang Park LRT station is a light rapid transit (LRT) station in Kuala Lumpur that is served by RapidKL's LRT Kelana Jaya Line. The LRT station is the last underground station on the Kelana Jaya Line along Jalan Ampang, near the Jalan Tun Razak intersection, before the line heads above ground again at Damai LRT station.
On 24 May 2021, at 20:33 local Malaysia time, a head-on collision occurred between a manually-driven empty train and an automated train carrying passengers, on the Kelana Jaya line between Kampung Baru and KLCC stations in Kuala Lumpur, Malaysia. The collision caused 213 injuries, including 166 minor injuries and 47 serious injuries.