Medan LRT | |
---|---|
Overview | |
Owner | Kereta Api Indonesia |
Area served | Medan |
Locale | Medan, Indonesia |
Transit type | Rapid transit |
Number of lines | 3 (planned) |
Number of stations | 17 (planned) |
Operation | |
Operation will start | TBA |
Operator(s) | Indonesian Railway Company |
Number of vehicles | 20 (planned) |
Train length | 2 |
Technical | |
System length | 41.3 kilometres (25.7 miles) (planned) |
No. of tracks | 2 |
Track gauge | 1,067 mm (3 ft 6 in) [1] |
Electrification | 750 V Third rail |
Top speed | 80 km/h |
The Medan Light Rail Transit (Medan LRT) is a planned light rail transit system in Medan, Indonesia. Made due to concerns of the congested future of the city, the government deems the project, alongside the Bus Rapid Transit (BRT), necessary. The project was announced in 2017 as a public-private partnership, with many international corporations began bidding. Construction began in 2019, but was disturbed the next year due to the COVID-19 pandemic. The LRT will use one rolling stock, with more than 20 stations divided into three lines.
Medan, home to more than 2.5 million people, offers several modes of public transportation. [2] Every year, the city experiences an average of 0.3% increase in population. [3] Despite that, 98% of the population uses private transportation instead of the publics. If this continues, by 2024, Medan could be gridlocked. [2] Vice Mayor Akhyar Nasution called the need for a rail system "mandatory" and not "for fun" as many would think. [4] Other than gridlock prevention, the 2024 National Sports Week (PON) will be held in Medan, hinting the need for easy mobility. [5] Along with the Bus Rapid Transit (BRT), the Medan Light Rail Transit (Medan LRT) is part of a governmental masterplan (RPJMN) of 2020–2024, [6] and is expected to have 4,473,996 passengers per year. [7] On 5 May, 2017, the government of Medan settled an agreement with the Indonesian Ministry of Finance in regards to the facilities the light rail transit system will have. [8]
The project was given a concession period of 20 years. [7] On 6 June, 2017, detik.com revealed that the total budget required to create the LRT requires Rp 6,34 billion or US$477.4 million, [9] [EN 1] including Rp 2,2 billion for rolling stock; [10] this later changes to Rp 12,339 billion, [11] and then Rp 20,3 billion. [7] Budgeting for the project uses blended finance to not involve state budget. [12]
As a public-private partnership, the project has an availability payment of Rp 5,755 billion/year. [13] : 5 SMRT Corporation announced it will help with the project using their experiences. [14] In 2018, companies from China and South Korea have expressed interest in developing the project. [15] In June 2019, Korea Rail Network Authority was announced as the preferred partner, and that the LRT will connect the areas of Medan, Binjai, Deli Serdang and Karo, collectively named Mebidangro, which is also the LRT's nickname. [16] The International Monetary Fund (IMF) and the World Bank also expressed interest in an LRT system in Medan. [17] Coordinator of the Ministry of Maritimes Affairs and Fisheries Luhut Binsar Pandjaitan asked for the project to use 60% of "local components" and not foreign products as a redemption to the government's financial shortcomings, which they did, with the help of PT Kereta Api Indonesia (INKA), [18] with the help of the Ministry of State Owned Enterprises (BUMN). [19] On 5 April 2019, an open-to-public press conference was held; 190 people attended it. [20]
The project's online business case ended in 2019, and the final business case commenced in late 2020. [7] Throughout that year, it underwent a phase of worthiness test and "Detail Engineering Design" (DED). [5] Construction of the LRT started in 2019 and the LRT itself was expected to begin operations in 2020, [21] however it was affected by the COVID-19 pandemic. Planning and conferences, though, still continues amid the pandemic, even though progress slowed down. North Sumatra's Development Planning Board secretary Yosi Sukmono said that construction should continue in 2021. [6] Before the pandemic, it was expected to finish by 2023. [5] Planning and conferences include studying which places would mandate stations, as well as the LRT's accessibility. [22] In August 2020, construction was planned to finish in 2023 and operations to begin in early 2024. [13] : 8
The LRT will use a Bombardier B700 rolling stock similar to the Docklands Light Railway (DLR). [23] It will have a maximum speed of 80 km/h. [24] With 20 units, it cost Rp 488.016 billion. [13] : 7 One vehicle will be able to capacitate 200-300 passengers, with 20-25% seated. [1]
All stations will be infill and elevated, [25] [26] with the tracks spanning 41.3 kilometres (25.7 miles) in total. [13] : 5 The LRT was initially announced to comprise 22 stations from the southwest to northeast of Medan, forming one line. [27] Later, however, it was expanded to three: [7]
The stations were also reduced to 17. [13] : 7 A train depot will also be built at Lau Cih station. [28] The budget for the stations, tracks, depot, and other operation facilities altogether create a budget of Rp 16.9 trillion. [13] : 7
Transit-oriented development was taken into account in selecting the station locations. [3] The termini was initially planned to be Medan and Universitas Medan station, but this was later cancelled. Other stations include: RS Adam Malik, Sekolah Siti Hajar, Santo Thomas, Ring Road, Pasar II, Perumahan Setiabudi, Raz Plaza, USU Pintu IV, RS USU, Iskandar Muda, Kampung Madras, RS Malahayati, Walikota, Lapangan Merdeka, Podomoro City, Hotel Grand Angkasa, RS Pringadi, Masjid 45, Al Amin Faisal Tanjung, and Aksara station. [27] Later, Cemara, Sport Center Batang Kuis and Pancing station were also announced. Many of these stations are located next to (and named after) hospitals, universities, and shopping malls. [7] While the routes saw positive reception by many Medan citizens, those whose properties are affected by the construction were critical on the project. [29] Meanwhile, transportation analyst Deddy Herlambang advised that the government design the route in a way that would not affect the streets, to avoid cumbersome rerouting as experienced when constructing the Palembang LRT. [30]
Indonesia's transport system has been shaped over time by the economic resource base of an archipelago with thousands of islands, and the distribution of its more than 200 million people concentrated mainly on a single island, Java.
The Jakarta metropolitan area or Greater Jakarta, known locally as Jabodetabek, and sometimes extended to Jabodetabekjur, or Jabodetabekpunjur, is the most populous metropolitan area in Indonesia. It includes the national capital as well as five satellite cities and three complete regencies. The original term "Jabotabek" dated from the late 1970s and was revised to "Jabodetabek" in 1999 when "De" was inserted into the name following its formation. The term "Jabodetabekjur" or "Jabodetabekpunjur" was legalised on the Presidential Regulation Number 54 of 2008, although the name Jabodetabek is more commonly used.
The majority of Indonesia's railways are on Java, used for both passenger and freight transport. There are three noncontinuous railway networks in Sumatra while two new networks are being developed in Kalimantan and Sulawesi. Indonesia has finalized its plan for a national railway network recently. According to the plan, 3,200 km of train tracks that will criss-cross the islands of Sumatra, Java, Kalimantan, and Sulawesi, it has been touted as the most extensive railway project in Indonesia since its independence from the Dutch in 1945. Indonesia targets to extend the national railway network to 10,524 kilometres by 2030. As of September 2022, the network spans 7,032 km.
The Jakarta Monorail was a cancelled monorail network project in Jakarta, Indonesia. If completed, it would have comprised two lines, totalling up to 29 km (18 mi).
TransJakarta or Jakarta BRT is a bus rapid transit (BRT) system in Jakarta, Indonesia. The first BRT system in Southeast Asia, it commenced operations on 15 January 2004 to provide a fast public transport system to help reduce rush hour traffic. The system is considered as the first revolutionary public transit mode in the capital city of Indonesia. The buses run in dedicated lanes (busways), and ticket prices are subsidised by the regional government. TransJakarta has the world's longest BRT system, which operates about 4,300 buses. TransJakarta aims to have 50 percent of its fleet be electric buses by 2027. By 2030, the aim is for the entire TransJakarta ecosystem to use electric buses. As of November 2023, it serves an average of 1.134 million passengers daily.
The Trans-Sumatra Highway is a primary north–south road in the Indonesian island of Sumatra, 2,508.5 km in length, and connecting the northern island at Banda Aceh to Bandar Lampung in the south, running through many major cities, traversing Medan, Pekanbaru, Jambi, and Palembang along the way. Upgrade work is expected to begin in March 2013 transforming it into a full-fledged highway, including land acquisition.
PT Kereta Api Indonesia (Persero) (lit. 'Indonesian Railways (State-owned) Limited', abbreviated as PT KAI or simply KAI) is the public railway operator in Indonesia. It is state-owned and pays track access charges. Its headquarters are located in Bandung, West Java. In 2019, KAI carried 429 million passengers and 47.2 million tonnes of cargo.
The Jakarta Mass Rapid Transit or Jakarta MRT is a rapid transit system in Jakarta, the capital city of Indonesia.
The Jabodebek LRT or Greater Jakarta LRT is a light rapid transit system in Greater Jakarta, the capital city of Indonesia, as well as the adjacent areas of West Java, within the Jakarta Metropolitan area. It was implemented by the central government, and operated by Kereta Api Indonesia (KAI), the system connects the Jakarta city center with suburbs in Greater Jakarta such as Bogor, Depok and Bekasi, hence its acronym Jabodebek.
The South Sumatra Light Rail Transit, colloquially known as LRT Palembang or Palembang LRT, is an operational light rapid transit system in Palembang, South Sumatra, Indonesia which connects Sultan Mahmud Badaruddin II International Airport and Jakabaring Sport City. It is the first practical modern light rail system to operate in Indonesia.
As a metropolitan area of about 30 million people, Jakarta has a variety of transport systems. Jakarta was awarded 2021 global Sustainable Transport Award (STA) for integrated public transportation system.
The Jakarta Light Rail Transit is one of the light rail systems in Jakarta, the capital city of Indonesia. It is conceived and built by the Jakarta provincial government. The first phase of the LRT, from Velodrome to Pegangsaan Dua, began commercial operations on 1 December 2019.
Dukuh Atas TOD is a transit-oriented development area between Central Jakarta and South Jakarta, Indonesia. This is built as part of constructing several other transit oriented development across Jakarta to facilitate commuters to transfer between different mode of public transportation.
Bundaran HI Station is a rapid transit station on the North-South Line of the Jakarta MRT in Central Jakarta, Jakarta, Indonesia. Located nearby the Hotel Indonesia (HI) Roundabout, it is currently the terminus of the North-South Line, as the phase 2 construction of the line is underway.
TransJakarta Corridor 8 is the TransJakarta bus rapid transit corridor that serves from Lebak Bulus, South Jakarta to the Pasar Baru BRT station in Central Jakarta. It traverses along Pasar Jumat, Ciputat Raya, TB Simatupang, Metro Pondok Indah, Arteri Pondok Indah, Teuku Nyak Arif, Letjen Supeno, Panjang, Daan Mogot, Letjen S. Parman, Tomang Raya, Balikpapan, Suryopranoto, Ir. Hj. Djuanda, and Pos streets, and terminates at Pasar Baru. Then continues via Gedung Kesenian, Lapangan Banteng Utama, and Katedral streets towards Lebak Bulus. This corridor is integrated with KRL Commuterline at Kebayoran railway station which serves the Rangkasbitung Line via the Pasar Kebayoran Lama BRT station, Tangerang Line at Pesing railway station via Indosiar BRT station, and Bogor Line at Juanda railway station via Juanda BRT station. This corridor is also integrated with the Jakarta MRT at Lebak Bulus Grab station via Lebak Bulus BRT station.
CSW-ASEAN TOD is a public transit interchange station and transit-oriented development zone between four TransJakarta BRT stations and the ASEAN MRT station on the old Centrale Stichting Wederopbouw or CSW intersection at Kebayoran Baru, Jakarta, Indonesia. This building is a circular crossing bridge with an art-deco architecture that connects four Transjakarta BRT stations located to the west, east and south of the intersection and the ASEAN MRT station to the north of the intersection. This building began to open on December 22, 2021 as an operational trial for the integration of integrated highway bus services and integrated highway modes.
TransJakarta Corridor 13 is a bus rapid transit corridor in Greater Jakarta, Indonesia, operated by TransJakarta. It serves the route from Ciledug, Tangerang, Banten, to Tegal Mampang BRT station in Mampang Prapatan, South Jakarta. The roads traversed by corridor 13 are HOS Tjokroaminoto (Tangerang), Ciledug Raya, Kebayoran Lama, Kyai Maja, Trunojoyo, Wolter Monginsidi, and Kapten Tendean. This is the first corridor on the BRT system to operate on a separated elevated route, running via a 9 kilometre long and 8 metre wide dedicated elevated bus lane, with height ranging from 18 to 23 metres above ground level.
Kota is a TransJakarta bus rapid transit station located at the Old City of Batavia in Pinangsia, Taman Sari, West Jakarta, Jakarta, Indonesia. The station, which is the terminus of corridor 1, is the transit point for corridor 12. The name of this station comes from the name Kota Tua Jakarta and Jakarta Kota railway station, which are located adjacent to the BRT station.