Taoyuan Metro

Last updated
Taoyuan Metro
Taoyuan Metro logo plain.svg
Overview
Native name
Chinese name
Traditional Chinese 桃園捷運
Simplified Chinese 桃园捷运
Transcriptions
Standard Mandarin
Hanyu Pinyin Táoyuán Jiéyùn
Bopomofo ㄊㄠˊ ㄩㄢˊ ㄐㄧㄝˊ ㄩㄣˋ
Hakka
Romanization Thò-yèn Chhia̍p-yun
Southern Min
Hokkien POJ Thô-hn̂g Chia̍t-ūn
Owner Taoyuan City Government
Department of Rapid Transit Systems
Locale Taoyuan and New Taipei, Taiwan
Transit type Rapid transit
Number of lines1
Number of stations22
Annual ridership41,896,669 (2024) [1]
Website Taoyuan Metro Corp.
Operation
Began operation2 March 2017 [2]
Operator(s) Taoyuan Metro Corporation
Technical
System length51.33 km (31.89 mi)
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification 750 V DC   third rail
Planned network

Taoyuan MRT 2.0.jpg

The Taoyuan Metro (formerly Taoyuan Rail Transit and officially Taoyuan Mass Rapid Transit System) is a rapid transit system serving Taoyuan City, as well as parts of New Taipei City and Taipei City, in Taiwan. [3] The most recently proposed network includes 11 lines and extensions, of which 2 are now under construction. The Taoyuan Airport MRT (Taipei Main Station - Laojie River) is the only line currently in operation. The system opened with the opening of the first line in the system, Taoyuan Airport MRT, for trial passenger service on 2 February 2017 and revenue passenger service on 2 March 2017.

Contents

History

Network and operations

Lines

LineTermini
(District, City)
StationsLength
(km)
Depot
Taoyuan Airport MRT
[Note 1]
Taipei Main Station
(Zhongzheng, Taipei)
Laojie River
(Zhongli, Taoyuan)
2251.33Luchu, Chingpu

Infrastructure

Taoyuan Airport MRT

Services

There are two types of Airport MRT services, Commuter and Express. [4] Express trains stop at Taipei Main Station, New Taipei Industrial Park, Chang Gung Memorial Hospital, Airport Terminal 1, and Airport Terminal 2. During peak hours, some Express services continue further, stopping at Taoyuan HSR and Huanbei. Commuter trains stop at every station.

Free Wi-Fi

Free Wi-Fi is available throughout the system.

Free Wi-Fi sign on a train Free Wi-Fi sign in Taoyuan Metro Commuter Train 1409 20170728.jpg
Free Wi-Fi sign on a train

Future expansion

All Taoyuan Metro lines will use standard gauge track.

The Taoyuan portion of the TRA Western Line, which runs on 3 ft 6 in (1,067 mm) narrow-gauge tracks (along with the rest of the Taiwan Railway network), will be reconstructed as an underground railway tunnel, with infill stations added at Pingzhen, Zhongyuan, Taoyuan General Hospital, and Zhonglu. It is intended to provide more frequent, rapid transit-style local rail services (similar to TRA grade separation projects in Greater Taipei, Taichung and Kaohsiung).

LineSectionTerminiLength (km)StatusOpening Date
Taoyuan Airport MRT Zhongli Extension Laojie River Railway Station Zhongli Railway Station 2.06Under Construction2029
Taoyuan Metro Line G.svg Green Line Main LineBade Kengkou 27.8Under Construction2026-2030
Aerotropolis Branch LineShuiweiHengshanBidding Process2032
Zhongli ExtensionBade Zhongli Railway Station 7.2Bidding Process2031
Daxi ExtensionBadeDaxi4.33Feasibility StudyTBD
Taoyuan Metro Line BR.svg Brown LineMain Line Taoyuan Main Station Huilong 11.38Planning2032
Taoyuan Metro Line O.svg Orange LineZhongli-Pingzhen LineTaoyuan ArenaPingzhen21Feasibility Study2040s
Pingzhen-Longtan LinePingzhenLongtan Bus Station9Feasibility Study2040s
Map of planned network Taoyuan MRT 2.0.jpg
Map of planned network

Construction

The Green Line passed an environmental impact assessment in July 2014. [5] Construction of the Green Line started in October 2018 and is expected to open in 3 phases in 2026, 2028 and 2030 respectively. [6] Construction of the Brown Line is expected to commence in late 2025, and expected to be completed by 2032. [7]

Network map

Taoyuan Metro

See also

Notes

  1. The Airport MRT is also known as the Purple Line for the color scheme, and occasionally known as Blue Line as it was partially designated as such.

References

  1. "統計資料" . Retrieved 16 September 2025.
  2. 黃立偉, 張國樑 (25 January 2017). 春節後試營運 機捷敲定3月2日上路. PTS NEWS (in Chinese).
  3. 桃園都會區大眾捷運系統 (in Chinese). Department of Rapid Transit Systems. 2008-07-01. Archived from the original on 2011-04-05. Retrieved 2010-06-19.
  4. "乘車指南".
  5. Chiu, Chun-chin; Holzer, Wesley; Kao, Evelyn (2014-07-17). "Taoyuan MRT green line passes evaluation, could be finished by 2019". Central News Agency. Retrieved 2014-07-17.
  6. "桃捷綠線北段7站115年通車 銜接機捷、轉乘高鐵". CNA. April 13, 2025. Retrieved September 16, 2025.
  7. "桃捷棕線等候政院核定 盼年底動工". United Daily News (in Traditional Chinese). July 10, 2025. Retrieved September 16, 2025.

Commons-logo.svg Media related to Taoyuan MRT at Wikimedia Commons

w:zh:Template:Attached KML/桃園捷運
KML is from Wikidata