Aarey JVLR metro station

Last updated

Logo of Mumbai Metro Line 3.png
Aarey JVLR
Aarey JVLR metro station.jpg
General information
LocationGanesh Nagar, Goregaon, Mumbai, Maharashtra 400065
Coordinates 19°07′51″N72°53′04″E / 19.130699°N 72.884309°E / 19.130699; 72.884309
Owned byMumbai Metro Rail Corporation Ltd
Operated by Delhi Metro Rail Corporation
Line(s) Aqua Line 3
Platforms2 [1]
Construction
Structure typeAt-grade
Parking(TBC)
AccessibleYes
Other information
StatusStaffed, Operational
Station codeARYJ
History
Opened5 October 2024;9 months ago (2024-10-05)
Services
Preceding station Mmmocl-logo-cropped.svg Mumbai Metro Following station
SEEPZ Aqua Line 3 Terminus
SEEPZ
towards Cuffe Parade
Aqua Line 3
(Future Service)
Location
Aarey JVLR metro station

Aarey JVLR is an At-Grade terminal metro station serving the Ganesh Nagar neighbourhood of Goregaon on the North-South corridor of the Aqua Line 3 of Mumbai Metro in Mumbai, India.

Contents

This metro station was inaugurated on October 5, 2024, by Prime Minister Narendra Modi, followed by the commencement of the metro service from October 7, 2024. [2] [3] [4] [5]

Station layout

Platforms 1, 2 and 3 are located at ground level. One platform is designated for boarding, while the others are designated for alighting.

Aarey JVLR track layout
BSicon MASKa.svg
BSicon vCONTfgaq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon MASKa.svg
BSicon vCONTfgeq.svg
P1 to SEEPZ
BSicon MASKa.svg
BSicon vCONTgfaq.svg
BSicon -STRq.svg
BSicon -STRq.svg
BSicon -STRq.svg
BSicon MASKa.svg
BSicon vCONTgfeq.svg
P2 to Train Terminates Here **
BSicon MASKa.svg
BSicon vCONTgfaq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon PLT-.svg
BSicon -STRq.svg
BSicon MASKa.svg
BSicon vCONTgfeq.svg
P3 to Train Terminates Here **
Station with three tracks, one island and one side platforms
UGSubwayUnderground subway connecting Platforms 2 and 3 to Platform 1, providing access to exit A1/B1
G
Platforms
DepotAarey Depot
Platform 3
Eastbound
Towards → Train Terminates Here
Island platform | P2 doors will open on the left | P3 doors will open on the right Wheelchair symbol.svg
Platform 2
Eastbound
Towards → Train Terminates Here
Platform 1
Westbound
Towards ← Acharya Atrey Chowk **
Next Station: SEEPZ
Side platform | Doors will open on the left Wheelchair symbol.svg
ExitsExit A1/B1

Connections

The Aarey JVLR station will provide connectivity to the under construction Metro line 6 via SEEPZ station.

Entry/Exit

See also

References

  1. 1 2 "Aarey JVLR Station Details". MMRCL. Retrieved 13 May 2025.
  2. "Mumbai Metro Line 3 Opens: Check Stations, Route, Fare, Timings And More". NDTV Profit. 7 October 2024. Retrieved 6 November 2024.
  3. "Mumbai Metro-3 Second Phase On Track: Aarey-BKC Services Begin, Link To Cuffe Parade May Be Ready by 2025". News18. Retrieved 6 November 2024.
  4. "Mumbai's first underground metro route 'line 3' opens for public today". The Times of India. 7 October 2024. ISSN   0971-8257 . Retrieved 6 November 2024.
  5. "Mumbai's first underground metro line from Aarey to BKC now open for public – Check stations, timings, fares for Mumbai Metro Line 3 here". Financialexpress. 7 October 2024. Retrieved 6 November 2024.