Bandra Colony metro station

Last updated

Logo of Mumbai Metro Line 3.png
Bandra Colony
Bandra Colony metro station entrance B2.jpg
Bandra Colony metro station entrance B2
General information
LocationF Block Bandra Kurla Complex, Bandra East, Mumbai, Maharashtra 400051
Coordinates 19°04′12″N72°50′58″E / 19.0699627°N 72.8493601°E / 19.0699627; 72.8493601
Owned byMumbai Metro Rail Corporation Ltd (MMRC)
Operated by Delhi Metro Rail Corporation [1]
Line(s) Aqua Line 3
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground, double track
Platform levels1
Accessible Yes
Other information
StatusStaffed, operational
Station codeVIDN
History
Opened05 October 2024;9 months ago (05 October 2024)
Previous namesVidhyanagari
Services
Preceding station Mmmocl-logo-cropped.svg Mumbai Metro Following station
Bandra Kurla Complex
towards Cuffe Parade
Aqua Line 3 Santacruz
towards Aarey JVLR
Aqua Line 3
(future service)
Track layout
BSicon MFADEg.svg
BSicon utSTR.svg
BSicon MFADEg.svg
BSicon utSTR.svg
BSicon numN325.svg
BSicon utSTRg.svg
BSicon utSTRf.svg
Next station: Santacruz
BSicon utdSTR.svg
2
BSicon dPLT.svg
BSicon utdSTR.svg
BSicon utPSTR(L).svg
BSicon dPLT.svg
BSicon utPSTR(R).svg
BSicon utdSTR.svg
1
BSicon dPLT.svg
BSicon utdSTR.svg
BSicon utSTRg.svg
BSicon utSTRf.svg
Next station: Bandra - Kurla Complex
BSicon MFADEf.svg
BSicon utSTR.svg
BSicon MFADEf.svg
BSicon utSTR.svg
Location
Bandra Colony metro station

Bandra Colony is an underground metro station on the North-South corridor of the Aqua Line 3 of Mumbai Metro in Mumbai, India. It was opened to public on 7 October 2024.

Contents

History

In 2024, the Mumbai Metro Rail Corporation renamed several stations along Metro Line 3 (Colaba–Bandra–SEEPZ) to better reflect the local geography and cultural context. As part of this initiative, the station initially named Vidyanagari was officially renamed to Bandra Colony. The change was approved by the Union Government ahead of the partial commencement of operations on the Aqua Line in October 2024. The renaming aimed to align station names with the surrounding localities and improve commuter clarity, especially in areas with overlapping transit infrastructure. [2]

Station layout

GGround levelExit/entrance
L1ConcourseCustomer service, shops, vending machine, ATMs
L2
Platforms
Platform 2
Eastbound
Towards → Aarey JVLR
Next station: Santacruz
Island platform | Doors will open on the right Wheelchair symbol.svg
Platform 1
Westbound
Towards ← Acharya Atrey Chowk **
Next station: Bandra - Kurla Complex
L2Note:** (further extension to Cuffe Parade in the future)

Entry/exit

See also

References

  1. "DMRC wins contract to operate Mumbai Metro's Line 3: Officials". The Economic Times . 12 April 2023. Retrieved 12 May 2025.
  2. Shaikh, Ateeq (4 October 2024). "Government renames 11 station names on Metro Line 3". Hindustan Times. Retrieved 20 June 2025.
  3. 1 2 3 4 "Bandra Colony Station Details". MMRCL. Retrieved 13 May 2025.