General information | |||||||||||
Location | Kandivli, Siddhivinayak Nagar, Kandivli West, Mumbai, Maharashtra 400067 | ||||||||||
Coordinates | 19°12′51″N72°50′14″E / 19.21413°N 72.83735°E | ||||||||||
System | Mumbai Metro | ||||||||||
Owned by | ![]() | ||||||||||
Operated by | Maha Mumbai Metro Operation Corp. Ltd (MMMOCL) | ||||||||||
Line | Yellow Line 2A | ||||||||||
Platforms | 2 (2 side platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Parking | No | ||||||||||
Other information | |||||||||||
Station code | 208 | ||||||||||
History | |||||||||||
Opened | 2 April 2022 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Kandivali (West) is an elevated metro station serving Siddhivinayak Nagar neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022. [1] [2] [3]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016. [4] The MMRDA announced that electrification of the line had been completed on 26 May 2020. [5] Kandivli West was opened to the public on 2 April 2022, along with the first phase of Line 2A. [6]
2nd Floor | Side platform ![]() | |
Platform 2 Southbound | 2A toward Andheri (West) (Dahanukarwadi) → | |
Platform 1 Northbound | ← 2A toward Dahisar (East) (Shimpoli) | |
Side platform ![]() | ||
1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.