| General information | |||||||||||
| Location | Kandivli, Siddhivinayak Nagar, Kandivli West, Mumbai, Maharashtra 400067 | ||||||||||
| Coordinates | 19°12′51″N72°50′14″E / 19.21413°N 72.83735°E | ||||||||||
| System | Mumbai Metro | ||||||||||
| Owned by | | ||||||||||
| Operated by | Maha Mumbai Metro Operation Corp. Ltd (MMMOCL) | ||||||||||
| Line | Yellow Line 2A | ||||||||||
| Platforms | 2 (2 side platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Parking | No | ||||||||||
| Other information | |||||||||||
| Station code | 208 | ||||||||||
| History | |||||||||||
| Opened | 2 April 2022 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Kandivali (West) is an elevated metro station serving Siddhivinayak Nagar neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022. [1] [2] [3]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016. [4] The MMRDA announced that electrification of the line had been completed on 26 May 2020. [5] Kandivli West was opened to the public on 2 April 2022, along with the first phase of Line 2A. [6]
| 2nd Floor | Side platform | |
| Platform 2 Southbound | 2A toward Andheri (West) (Dahanukarwadi) → | |
| Platform 1 Northbound | ← 2A toward Dahisar (East) (Shimpoli) | |
| Side platform | ||
| 1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| G | Street level | Exit/Entrance |
Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.