Malad West metro station

Last updated

Mmmocl-logo.svg
Malad West

मालाड पश्चिम
Mumbai Metro station
General information
LocationMalad, Ekta Nagar, Malad West, Mumbai, Maharashtra 400064
Coordinates 19°11′08″N72°50′09″E / 19.18542°N 72.83590°E / 19.18542; 72.83590
Owned by Mumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s) Line 2A
Platforms2 (2 side platform)
Tracks2
Construction
Structure type Elevated, Double track
ParkingNo
History
Opened19 January 2023;11 months ago (2023-01-19)
Services
Preceding station MMRDA Logo.jpg Mumbai Metro Following station
Valnai
towards Dahisar East
Line 2A Lower Malad
towards Andheri West
Location
Malad West metro station

Malad West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Malad, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023. [1] [2] [3]

Contents

History

Trial runs on section of 2A from Dhanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.

Station Layout

GStreet LevelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform 2
Southbound
Towards → Andheri West next station is Lower Malad
Platform 1
Northbound
Towards ← Dahisar East next station is Valnai
Side platform | Doors will open on the left Wheelchair symbol.svg
L2

Power and Signaling System

Like all other stations and railways of Mumbai metro, Malad West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

Related Research Articles

<span class="mw-page-title-main">Mumbai Metro</span> Rapid transit system in Mumbai, India

The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.

<span class="mw-page-title-main">Kandivli</span> Suburb in Mumbai Suburban, Maharashtra, India

Kandivali formerly Khandolee is a suburb in the north of Mumbai, Maharashtra, India and has a large Gujarati, Marathi, Koli population followed by others. British records highlight a fact which is different from what is suggested in the rest of the article. The area names that ends with "vali" were the actual valleys to the small hills surrounding the area, and that's how we have Kandolee Valley to Kandivali.

<span class="mw-page-title-main">Line 2 (Mumbai Metro)</span> Metro line of the Mumbai Metro

Line 2 (Yellow Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.

<span class="mw-page-title-main">Line 7 (Mumbai Metro)</span> Mumbai Metro line

Line 7 (Red Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. When fully completed, the 30.08 km (18.69 mi) line will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations. The line is mostly elevated except for the 2.49 km (1.55 mi) underground twin tunnels at its southern terminus.

<span class="mw-page-title-main">Line 9 (Mumbai Metro)</span> Metro line in Mumbai, India

Red Line 9 (extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. Metro Line 9 is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road. This line will be unique from the other metro lines because it will run on a double-decker bridge. There will be a flyover on the first deck and the metro will run on the second deck. The flyover will start near the proposed Shivaji Chowk metro station and will end in Bhayander (West) via Mira Bhayander Road. It shall provide interconnectivity among the Western Express Highway, the Western Line, and the Mumbai Metro.

<span class="mw-page-title-main">Oshiwara metro station</span> Mumbai Metros Yellow Line 2A metro station

Oshiwara is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Andheri West, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

<span class="mw-page-title-main">Eksar metro station</span> Mumbai Metros Yellow Line 2A metro station

Eksar is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Kandarpada metro station</span> Mumbai Metros Yellow Line 2A metro station

Kandarpada is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located on CS Link Road in Dahisar, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Mandapeshwar metro station</span> Mumbai Metros Yellow Line 2A metro station

Mandapeshwar IC Colony is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located in IC Colony Road in North Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Shimpoli metro station</span> Mumbai Metros Yellow Line 2A metro station

Shimpoli is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Shimpoli, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Dahanukarwadi metro station</span> Mumbai Metros Yellow Line 2A metro station

Dahanukarwadi is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Kandivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Borivali West metro station</span> Mumbai Metros Yellow Line 2A metro station

Borivali West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Kandivli West metro station</span> Mumbai Metros Yellow Line 2A metro station

Kandivali West is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Kandivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.

<span class="mw-page-title-main">Valnai metro station</span> Mumbai Metros Yellow Line 2A metro station

Valnai – Meeth Chowky is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. The station is located in Malad, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

<span class="mw-page-title-main">Dahisar East metro station</span> Mumbai Metros Yellow Line 2A terminal metro station

Dahisar East is the elevated northern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This metro station is located on the Western Express Highway in Northern Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.

<span class="mw-page-title-main">Andheri West metro station</span> Mumbai Metros Yellow Line 2A terminal metro station

Andheri West is the elevated southern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is located in Andheri, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

<span class="mw-page-title-main">Lower Malad metro station</span> Mumbai Metros Yellow Line 2A metro station

Lower Malad is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Goregaon, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

<span class="mw-page-title-main">Lower Oshiwara metro station</span> Mumbai Metros Yellow Line 2A metro station

Lower Oshiwara is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Jogeshwari West, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.

<span class="mw-page-title-main">Anand Nagar metro station (Mumbai)</span> Mumbai Metros Yellow Line 2A metro station

Anand Nagar is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This metro station is located on New Link Road in Dahisar, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.

References

  1. "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
  3. "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.