| General information | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Location | Kandivli, Mahatma Gandhi Nagar, Kandivli West, Mumbai, Maharashtra 400067 | ||||||||||
| Coordinates | 19°12′22″N72°50′05″E / 19.20624°N 72.83476°E | ||||||||||
| System | Mumbai Metro | ||||||||||
| Owned by | |||||||||||
| Operated by |
| ||||||||||
| Line | Yellow Line 2A | ||||||||||
| Platforms | 2 (2 side platforms) | ||||||||||
| Tracks | 3 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated, Double track | ||||||||||
| Platform levels | 1 | ||||||||||
| Other information | |||||||||||
| Station code | 209 | ||||||||||
| History | |||||||||||
| Opened | 2 April 2022 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Dahanukarwadi is an elevated metro station serving Dahanukarwadi neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022. [1] [2]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016. [3] The MMRDA announced that electrification of the line had been completed on 26 May 2020. [4] Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A. [5] [6]
| 2nd Floor | Platform 1A | Pocket track toward Charkop depot → |
| Side platform | ||
| Platform 1 | 2A toward Dahisar (East) → Next station: Kandivli (West) | |
| Platform 2 | ← 2A toward Andheri (West) Next station: Valnai–Meeth Chowky | |
| Side platform | ||
| 1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| G | Street level | Exit/Entrance |
Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.