This article needs additional citations for verification .(June 2023) |
Namo Bharat [1] | |
---|---|
![]() | |
![]() | |
Overview | |
Service type | Elevated rapid rail |
Status | Partially operational |
First service | 20 October 2023 |
Current operator(s) | Deutsche Bahn |
Website | ncrtc |
Route | |
Line(s) used | 8 (planned) 1 (partially commissioned) |
On-board services | |
Class(es) | Economy class Business class Women's class |
Seating arrangements |
|
Observation facilities | Large windows for panoramic view |
Entertainment facilities | |
Baggage facilities | Overhead racks |
Other facilities |
|
Technical | |
Rolling stock | Namo Bharat trainset |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 25 kV 50 Hz AC Overhead line |
Operating speed | 160–180 km/h (100–110 mph) |
Average length | 384 metres (1,260 ft) (16 coaches) 192 metres (630 ft) (8 coaches) |
Rake maintenance | Duhai Depot, Duhai, Uttar Pradesh |
Namo Bharat [2] [3] [4] , formerly RapidX, is a rapid rail [5] [6] [7] [8] [9] system operated by the National Capital Region Transport Corporation (NCRTC) in India's National Capital Region (NCR). It is India's first regional rapid transit system and it has been envisioned to replace the conventional non-air-conditioned MEMU-operated local train network with a rapid rail system. [10] [11] [12] The Namo Bharat semi-high-speed trainsets have an average speed of 100 km/h (62 mph). [13]
Germany's Deutsche Bahn won the contract to operate and maintain the entire Delhi–Meerut rapid rail transit corridor for 12 years, with a bid valued at approximately ₹1,500 crores (roughly US$178 million). [14]
The proposal for a regional rapid transit service to connect Delhi with nearby towns was floated in the late 1990s by the Indian Railways. In 2006, with the ongoing expansion of the Delhi Metro, the plan was under consideration as part of Delhi Metro's expansion to towns in the vicinity. [15] In 2013, the Government of India established the National Capital Region Transport Corporation to implement eight planned Regional Rapid Transit Systems (RRTS) aimed at decongesting Delhi and its surrounding areas within a 100–200 km (62–124 mi) radius. [11] [16] [17]
The project originally had the working name RapidX. When passenger services were launched in October 2023, NCRTC branded both the RRTS services [18] and the trainsets as "Namo Bharat" (Hindi : नमो भारत). [19] The name means "bow to India" in Sanskrit, but critics have noted that "Namo" is also an abbreviation of Indian prime minister Narendra Modi, who inaugurated the service. [20]
To ensure a convenient and seamless travel experience for commuters, the three Phase-1 Namo Bharat corridors—Delhi-Meerut, Delhi-Panipat, and Delhi-Alwar—will converge at Delhi's Sarai Kale Khan station. These corridors will be interoperable, allowing trains to move freely between them. This interoperability will enable commuters to travel between stations on different corridors without changing trains, encouraging a shift from private vehicles to the Namo Bharat network. [21] [22]
Namo Bharat stations are integrated with other modes of public transport wherever feasible, including airports, railway stations of the Indian Railway network, inter-state bus terminals, and Delhi Metro stations. This integration aims to ensure seamless commuter transfers between different modes of transportation, encouraging greater reliance on public transit systems. While Namo Bharat will serve as the backbone of regional transportation across the National Capital Region, Delhi Metro lines will complement it by functioning as feeder lines. The Sarai Kale Khan RapidX station will serve as a mega-terminal where all three Phase-I RapidX corridors converge, further enhancing connectivity. [21] [22]
Namo Bharat stations | Integration |
---|---|
Ghaziabad | ![]() |
New Ashok Nagar | ![]() |
Anand Vihar | ![]() |
Sarai Kale Khan | ![]() |
INA | ![]() |
Aerocity | ![]() |
Udyog Vihar | ![]() |
Kherki Dhaula toll | ![]() |
Panchgao | ![]() |
Bawal | ![]() |
The Namo Bharat trainsets have six coaches which can accommodate 450 passengers. [25]
Business class: Each RapidX train will have a separate business coach.
Premium lounge: Premium lounges have been built at every station of the network. These lounges will be reserved for business class passengers commuting via the RRTS. [26]
Comfortable travel: The air-conditioned Namo Bharat coaches will have transverse seating arrangements with overhead luggage space and Wi-Fi connectivity, among other modern amenities.
Women's coach: Each Namo Bharat train will have a separate coach for women travellers, just like the Delhi Metro. [27]
Universal accessibility: The entire infrastructure of Namo Bharat, including stations and trains, has been designed with universal accessibility in mind.
The train is equipped with safety features such as CCTV cameras, emergency door-opening mechanism and a communication button to communicate with the train operator. [28] Every RRTS station has platform screen doors integrated with the RRTS train doors and signalling system. [29] [30]
Nokia partnered with Alstom to implement the 4.9G/LTE private wireless network to support the ETCS L2 signalling for the RRTS. This is a "world-first application" of an LTE network integrated with ETCS Level 2 signaling, enabling high-speed and highly reliable commuter services. Additionally, the ETCS Level 2 system allows trains to provide real-time updates of their precise location. [31]
To optimize the utilization of the Namo Bharat system, the routes are also be used for transporting cargo during non-peak hours, with a focus on goods like perishables that can benefit significantly from the service. This initiative is expected to reduce pollution by decongesting roads between cities and decreasing the number of trucks in transit. Additionally, the system's trainset depots will be equipped with warehouses and other facilities to handle cargo efficiently. [32]
![]() | This section contains promotional content .(September 2025) |
The NCRTC is developing a cutting-edge rail-based rapid transit system in the National Capital Region, designed for a maximum speed of 180 km/h (110 mph). Achieving this speed requires grade-separated tracks and advanced signaling and control systems to ensure high capacity and safe operations. The rolling stock will feature air-conditioned train cars with rapid acceleration and deceleration capabilities. Traction power will be supplied through a specially designed system: a 25 kV flexible overhead catenary system for elevated sections and a rigid overhead catenary system for tunnels.[ citation needed ]
The trains for the service were specifically designed for fast and comfortable regional commutes. The lightweight stainless steel body of the Namo Bharat trainsets, combined with their aerodynamic nose design, minimizes air drag at high speeds of up to 180 km/h (110 mph). The trainsets were engineered at Alstom's design center in Hyderabad and manufactured by Bombardier Transportation in Savli. [33]
The Slab Track Austria system, known for delivering exceptional riding comfort even at high speeds of 180 km/h (110 mph), is being used in India for the first time. These tracks are favoured for their durability, reduced maintenance needs, and ease of replacement. [34]
The ETCS Level-2 signaling system, widely used globally for high-speed railway transit, is being implemented in India for the first time. This advanced system features modern signaling with virtual blocks and Automatic Train Operation (ATO) functionality over an LTE backbone. A standout feature of the RRTS is the interoperability across all corridors, enabled by ETCS Level-2. The system monitors train speed and direction while providing operational directives via a radio block center. The use of virtual blocks eliminates the possibility of train collisions, ensuring enhanced safety and efficiency. [35]
SPEED is NCRTC's in-house, advanced, and user-friendly platform designed for monitoring and managing the reporting of activities during the pre-construction and construction phases of the RRTS. This robust and reliable system is built on modern technological frameworks, including JavaScript and PHP.[ citation needed ]
A Common Data Environment (CDE) has been implemented to serve as a centralized repository for all construction and pre-construction drawings and technical documents. It facilitates real-time collaboration and sharing of updated information, ensuring a single source of truth across the organization. The CDE enables efficient management of design processes, defines and implements workflows, and monitors progress and actions throughout the organization. [36] [37]
Building Information Modeling (BIM) is an intelligent 3D model-based process that provides architecture, engineering, and construction professionals with the insights and tools needed to efficiently plan, design, construct, and manage buildings, infrastructure, and other structures. Project components, such as walls and doors, are modeled in 3D using BIM software, offering a realistic representation of how the final structure will appear. All RRTS stations are currently being designed and developed using the BIM platform. [38]
The NCRTC is installing a Continuously Operating Reference Station (CORS) network system, including a control station, to enhance geolocation accuracy for civil construction surveys. This system delivers real-time, highly precise coordinates with an accuracy of 5–10 mm, compared to the 10–15 meters typically provided by standard GPS. By eliminating cumulative errors in geolocation, the CORS network ensures better alignment during construction and serves as a comprehensive life cycle management solution for the project.[ citation needed ]
Operational
Under construction
Proposed
Route | Locale | Length | Construction began | Opening | Notes | Map |
---|---|---|---|---|---|---|
Delhi–Meerut | Delhi and Uttar Pradesh | 82 km (51 mi) | January 2019 | 20 October 2023 | Fully operational by mid-2025. [39] | ![]() |
Delhi–Alwar | Delhi, Haryana and Rajasthan | 164 km (102 mi) | TBD 2024 | TBD | Pre-construction works are underway. [40] | |
Ghaziabad-Jewar | Delhi and Uttar Pradesh | 72 km (45 mi) | TBD | 2028 | Detailed Project Report awaiting approval. [41] | |
Delhi–Panipat | Delhi and Haryana | 103 km (64 mi) | TBD | TBD | Detailed Project Report awaiting approval. [42] |
RapidX is the country's first regional rapid transit system, which enables commuters to reach Delhi from Meerut in an hour.
Trains of the Regional Rapid Transit System (RRTS), to be inaugurated by Prime Minister Narendra Modi on Friday, will be known as 'NaMo Bharat', Union Minister Hardeep Singh Puri announced on Thursday.
The report further stated that this air-conditioned six coach train will be able to accommodate 450 passengers.
Regional Rail, christened RAPIDX, will have an operational speed of 160 km per hour and several features including a women's coach and a premium coach.
CCTV cameras, an emergency door-opening mechanism and a button to communicate with a train operator are among the safety features of this train.
Every RRTS station is equipped with platform screen doors which are integrated with RRTS train doors and the signalling system.
The futuristic train, which will be flagged off by Prime Minister Narendra Modi on October 20 from the Sahibabad station in Ghaziabad, will have CCTV cameras, Platform Seen Doors, a state-of-the-art communication system and WiFi.