Keystone Service

Last updated
Keystone Service
Amtrak Keystone at Lancaster Station.jpeg
A Keystone Service train at Lancaster, Pennsylvania in 2019
Overview
Service type Regional rail
High-speed rail (some portions)
StatusSuspended
Predecessor Penn Central corridor trains
First serviceOctober 29, 1972
Current operator(s) Amtrak
Ridership1,467,216 (FY16) [1]
Route
Start Philadelphia, Pennsylvania or New York City, New York
Stops19
End Harrisburg, Pennsylvania
Distance travelled195 miles (314 km)
Average journey time3 hours 30 mins (New York–Harrisburg), 1 hour 45 mins (Philadelphia–Harrisburg) [2]
Service frequency13 daily round trips
Train number(s)600–601, 605, 607, 609–612, 615, 618–620, 622, 637, 639–656, 658, 660–667, 669–672, 674
On-board services
Seating arrangementsUnreserved Coach Seating (Philadelphia–Harrisburg), Reserved Coach Seating (New York–Philadelphia)
Technical
Rolling stock
Electrification AC Overhead Catenary at 12 kV, 25 Hz
Operating speedUp to 125 miles per hour (201 km/h)

Amtrak's 195-mile (314 km)Keystone Service provides frequent regional passenger train service between the Harrisburg Transportation Center in Harrisburg, Pennsylvania and 30th Street Station in Philadelphia, running along the Philadelphia to Harrisburg Main Line (Keystone Corridor). Most trains continue along the Northeast Corridor (NEC) to Pennsylvania Station in New York.

Contents

Travel time between Harrisburg and New York is approximately 3 hours and 30 minutes, including 1 hour and 45 minutes to travel between Harrisburg and Philadelphia. There are also several express trains which cut both journey times by approximately 15 minutes. [2]

A few portions of the route consist of high-speed rail, where it reaches its max speed of 125 mph (201 km/h), making it one of the four high-speed rail services operated by Amtrak, and one of the five high-speed rail services in the United States.

It is Amtrak's fifth-busiest route, and the railroad's third-busiest in the NEC. [3] In fiscal year 2016, the service carried 1.47 million passengers, an increase of 7.9% over FY2015. Total revenue in FY2016 was $41,123,787, an increase of 7.5% over FY2015. [1] The route is primarily funded by the Pennsylvania Department of Transportation (PennDOT). [2]

History

Takeover from Penn Central

The Keystone Service is the successor of numerous services running along the Philadelphia to Harrisburg Main Line dating from 1857, when the Pennsylvania Railroad (PRR) bought the Philadelphia and Columbia Railroad, enabling service between Philadelphia and Harrisburg.

By the time the PRR folded into Penn Central in 1968, it operated three types of service on the Main Line: commuter service between Paoli and Suburban Station via 30th Street Station, regional service (trains numbered in the 600s) between Harrisburg and Suburban Station via 30th Street Station, and express intercity service like the Broadway Limited and Duquesne , which skipped 30th Street entirely and used North Philadelphia station as their only Philadelphia stop. [4]

When the Metroliner high-speed program had begun two years earlier, the state had attempted to capitalize on the opportunity to purchase upgraded rolling stock for the 600-series trains. On August 30, 1966, Governor William Scranton of Pennsylvania announced plans to purchase 11 Metroliners for 80 mph (130 km/h) service to replace the Silverliners then used. The cars were ordered through Philadelphia commuter agency SEPTA, as the state was not permitted to contract directly with the PRR. [5] The state, SEPTA, and PRR reached an agreement on November 3rd; the state and SEPTA would each pay $2 million, funded mostly by mass transit grants from the newly formed Department of Housing and Urban Development (HUD), and the PRR would receive a free 15-year lease of the cars. The PRR soon withdrew after complaints from competing Red Arrow Lines and Capitol Trailways, and the HUD grants were later found not to be applicable to intercity service. [5]

In June 1968, an agreement was reached where the state Transportation Assistance Authority would pay $2 million and Penn Central would pay $2.5 million for the 11 Metroliners for Harrisburg service. On July 14, a 4-car train was tested on the line, with several demonstration runs for officials on August 21. [6] On February 25, 1970, the cars intended for Harrisburg service completed their performance testing. Penn Central refused to accept the cars, citing numerous technical issues with the cars and their general unsuitability for the service. They had worse acceleration than the Silverliners already in service, tended to overheat when making numerous closely spaced stops, and had difficulty climbing the grade out of Suburban Station. Additionally, the corridor lacked high-level platforms to effectively use the cars, and 15 substations would require expensive modifications. [7] The 11 cars were unused for some time before Penn Central ultimately decided to lease the cars for use on the core New York–Washington service. They were moved back to the Budd plant for modifications in April. In July 1970, the state authorized $100,000 to upgrade existing Silverliners for the Harrisburg service instead. [7]

When Amtrak was created to take over intercity passenger rail service in 1971, there was substantial debate about whether some trains constituted intercity services (to be either taken over by Amtrak or discontinued, relieving private companies like Penn Central of the financial burden) or commuter services (to be retained by the private companies unless discontinuance was approved by the ICC). Penn Central alleged that several of its regional services – the 600-series trains, connecting Lancaster–York buses, Clockers , and New York–Chatham service – were intercity services that could be discontinued since they were not included in Amtrak's initial system.

On March 31, 1971, Penn Central filed with ICC to discontinue the 600-series trains at the conclusion of their contract with SEPTA on June 30. [8] The state filed suit against Penn Central on April 7 to stop the discontinuance. On April 23, Penn Central filed in District Court to discontinue the regional services. [8] Five days later, the state and the UTU filed an opposing suit, calling the trains a commuter service. On April 30, Judge John P. Fullam ordered Penn Central to continue operating the trains and referred the case to the ICC. [8]

When Amtrak took over intercity service on May 1, 1971, the 600-series trains continued to be operated by Penn Central, though they were listed in Amtrak schedules. [9] The city of Philadelphia and the state both preferred to have Penn Central rather than Amtrak operate the service, as Amtrak was exempt from state control. On June 21, the ICC ruled that the service was not intercity rail, as sought by the state and not by Penn Central. [8] On August 3, Fullam ordered Penn Central to continue operating the regional services. [8]

On October 29, 1972, after further negotiations with Penn Central, Amtrak took over operation of the 600-series trains as Silverliner Service, named for the Silverliner cars used to run the trains. [10] [11] Amtrak assumed formal responsibility for the Silverliner Service and Clockers around April 1974. [12] Penn Central (and later Conrail and finally SEPTA Regional Rail) continued to operate Paoli–Philadelphia commuter service. Amtrak took over ticketing for the Silverliner Service and Clockers from Penn Central on July 1, 1975. [13] On October 26, 1975, SEPTA funded an increase from 9 to 11 daily round trips. [13] Amtrak began including a listing of connecting trains to/from New York City in the November 1975 timetable. [14]

Declining service

In the late 1970s, NJDOT's new Arrow III railcars arrived several years ahead of the completion of electrification projects to allow their use in New Jersey commuter service. Amtrak by this time was desperate for electric propulsion, as the aging GG1 locomotives were reaching the end of their usefulness, replacement E60 locomotives were proving unreliable, and new EMD AEM-7 locomotives were only just beginning to arrive. In April 1978, Amtrak leased 70 of NJDOT's Arrow II cars for use on the Clockers, Keystone Service, and the new Chesapeake . [15] By January 1979, the Arrows were rotated between the Clockers and Silverliner Service. The Arrows had bathrooms and water fountains, making them more suitable for the regional service than the Silverliners. [16] In late 1980, under pressure from NJDOT, Amtrak returned all but 32 of the Arrows, which created a need to find other equipment for the Silverliner Service. Despite being pronounced unsuitable for Harrisburg service a decade before, the Metroliners were the only easily available rolling stock, as they were being slowly retired from the eponymous service. A test run with Metroliners was made on January 20, 1981, and Metroliners were used in revenue service for two weeks in February. [17] Metroliners were used on the New York - Harrisburg Valley Forge for a week in August, and a maintenance facility at Harrisburg opened on October 13, 1981. [17]

As the new AEM-7 locomotives continued to arrive, Amtrak assigned them to haul crack Metroliner trains with Amfleet consists and reassigned the less-reliable Metroliners for the secondary Philadelphia–Harrisburg service, calling them Capitoliners. [18] On October 25, 1981, the service was rebranded as Keystone Service. [19] [17] All service was then operated by the Metroliners, which lacked the quick acceleration of the Silverliners and Arrows and made them unsuitable for the service. [17] After a single Metroliner set was withdrawn from Clocker service in March 1982, the Keystone Service was the only remaining use of the Metroliners. [17] On April 24, 1983, a pair of weekday trains – the 9:54am arrival and 3:55pm departure from Suburban Station – were renamed Keystone Executive. Intended to attract riders from the western end of the corridor, the trains made intermediate stops only at Lancaster, Downingtown, and 30th Street, with a 99-minute schedule. [20]

The first westbound train of the morning made numerous local stops for commuters to Harrisburg, including some at stations not served by any other Amtrak train. This was first shown in the April 29, 1973 schedule. [21] These one-off stops were gradually dropped: Merion in 1979; 52nd Street and Berwyn in 1980; Radnor and Narberth in 1982; and Bryn Mawr, Overbrook, and Wayne in 1987.[ citation needed ] Amtrak and SEPTA opened a station in Exton on November 2, 1981 to serve fast-growing suburban areas. [17]

The Silverliner Service carried over one million passengers in 1980, but ridership was in steep decline from a variety of factors. [4] On October 30, 1983, Amtrak reduced the service from 11 to 9 weekday round trips, prompting an 8% drop in ridership. [17] [22] A decrease to 6 weekday round trips on January 12, 1986, and 5 round trips on April 27, cut ridership by an additional 45%. [17] [22] The cuts included the termination of the Keystone Executive. [23] Despite the loss of service, fares doubled from 1980 to 1987. [4] The single SEPTA round trip past Paoli to Downingtown was cut in 1983, but two round trips were restored in March 1985, with additional midday and weekend service in 1988. Service was further extended to Parkesburg in 1990, with lower fares than Amtrak. [4] By 1990, SEPTA carried 595,000 passengers west of Paoli, twice that of Amtrak's ridership on the entire Keystone Service. [22]

The Metroliner cars, worn out from nearly two decades of heavy use, began to fail frequently. In April 1985, Amtrak began studying the possibility of removing electrification west of Paoli. [17] On-time performance decreased from around 85% in 1985 to below 60% in early 1988. [4] On January 25, 1988, Amtrak began towing the Metroliner cars with AEM-7 locomotives rather than running them under their own power, although the cars had their pantographs up to power lighting and heating systems. [17] A wreck of the Night Owl four days later two took AEM-7 locomotives out of commission, exacerbating a shortage of electric power available to Amtrak. [24] On February 1, Amtrak converted all Keystone Service trains to diesel power and terminated them on the lower level of 30th Street Station, as diesel-powered trains were not allowed in the tunnels to Suburban Station. [17] The change was listed as "temporary" on timetables starting on May 15, 1988 and lasting into 1990. [25] [26] After dieselization and the lengthening of schedules, on-time performance jumped up to consistently over 90%. [4]

Through service

At its inception on May 1, 1971, Amtrak ran two through services on the line: the combined New York–Chicago Broadway Limited and New York–St. Louis Spirit of St. Louis (soon renamed National Limited ), and the Pittsburgh–New York Duquesne (soon renamed Keystone ). The former train stopped only at Lancaster and Paoli between Harrisburg and North Philadelphia; it was intended for long-distance travelers between the East Coast and the Midwest rather than local passengers. The Duquesne/Keystone had one additional stop at Coatesville and was intended for medium-distance intercity travel. [9]

Amtrak discontinued the Keystone on April 30, 1972, leaving the 600-series trains as the only local service along their route. The Broadway Limited and National Limited were split; they added local stops west of Harrisburg, but passengers from between Harrisburg and Philadelphia had to change trains at Harrisburg, Lancaster, Paoli, or Philadelphia to reach stops west of Harrisburg or north of Philadelphia. [27] :64 On October 28, 1973, Amtrak changed the weekday-only Valley Forge from a Philadelphia–New Haven local train to a Harrisburg–New York City train. It only made the same intermediate stops as the Keystone, including no direct service to 30th Street Station. [28] However, its introduction meant that through passengers no longer had to change at Philadelphia or rely on the Broadway Limited, whose on-time performance had plunged to just 6.8% in 1973. [27] :20

Additional local stops in Pennsylvania were later added. On May 19, 1974, Amtrak added weekend service on the Valley Forge: a Saturday train from Harrisburg to Boston, and a Sunday train from Boston to Harrisburg. [12] The weekend service ended on October 26, 1975. [13] On October 28, 1979, Amtrak and SEPTA began the "Ardmore Connection": the Valley Forge began stopping at Ardmore, where a close connection could be made with a SEPTA Paoli–Philadelphia local train. [16] On December 17, 1979, the westbound Valley Forge began stopping at 30th Street rather than bypassing it using the Pittsburgh Subway; however, it retained the Ardmore stop. [16] [29]

The Washington sections of the Broadway Limited and National Limited originally split at Harrisburg and reached the Northeast Corridor via the Port Road Branch. The Washington section of the Broadway Limited was rerouted through Philadelphia on October 26, 1975; the National Limited followed suit on October 29, 1978. [27] :41,62 The National Limited was discontinued entirely on October 1, 1979; the state began funding the Pittsburgh–Philadelphia Pennsylvanian as a replacement on April 27, 1980. [27] :75

At the same time, a pair of Clockers, the westbound Keystone and eastbound Big Apple, were extended to Harrisburg on weekends. [17] They ran within an hour of the Valley Forge's weekday schedule; however, they ran to 30th Street and Suburban stations rather than only serving North Philadelphia. [30] The Keystone was renamed Susquehanna on October 25, 1981. [19] The Big Apple and Susquehanna dropped the Suburban Station stop a year later, but continued to serve 30th Street. [31] On October 30, 1983, the Pennsylvanian was extended to New York City, eliminating the transfer at Philadelphia (although it continued to stop at 30th Street). [32] On January 12, 1986, the eastbound Valley Forge began serving 30th Street (as the westbound had for six years); this allowed it to effectively replace a canceled Keystone Service train (#600, the first morning eastbound) to serve commuters. [17] [23]

Amtrak began operating the Atlantic City–Philadelphia Atlantic City Express in 1989, and later extended it along several busy corridors in hopes of increasing ridership. On April 4, 1991, one daily Keystone Service round trip was extended to Atlantic City under the Atlantic City Express brand. Only a weekend round trip continued to be through-routed. The Atlantic City Express was discontinued on April 2, 1995; New Jersey Transit Atlantic City Line trains continue to serve 30th Street Station. [33]

Modern improvements

In November 1996, as part of a general cutback of Regional Rail service, SEPTA cut service back to Downingtown, leaving Parkesburg and Coatesville as Amtrak-only stations. [34] Amtrak added the stations to several existing round trips as a result. [35] Amtrak discontinued its stops at Whitford and Malvern (both served only by a single round trip) on April 5, 1998, reducing the number of suburban stations shared by SEPTA and Keystone Service trains to four. [36]

Beginning in 2000, Amtrak and PennDOT spent $166 million to rehabilitate the Philadelphia to Harrisburg Main Line. This included the restoration of fully electrified service, as well as track improvements for a top speed of 110 miles per hour (180 km/h). When the project was completed and electric service began in October 2006, travel times between Harrisburg and Philadelphia were reduced from 120 minutes to 95 minutes, with further time savings for through trains by eliminating the need for an engine change at Philadelphia. Service was also increased from 11 to 14 daily round trips. By FY 2010, ridership was up 91% since FY 2000 and 58% since FY 2006. [37]

Later improvements aimed to develop a sealed corridor without public at-grade crossings, which would allow future speed increases to 125 miles per hour (201 km/h) west of Philadelphia. [38] The last two such at-grade crossings on the line, located just east of Mount Joy, were closed on September 24, 2014. They were replaced with a bridge connecting to a nearby street. [39] Private crossings continue to be used on the line, however. [40]

On March 18, 2020 Amtrak temporarily suspended all Keystone Service trains due to declining demand because of the ongoing COVID-19 pandemic. [41] [42] Service between Philadelphia and Harrisburg will resume on June 1, 2020, with all-reserved seating. [43]

Operation

Consist

Former Metroliner cab car at Lancaster, Pennsylvania in 2017 Former Metroliner cab coach at Lancaster.jpg
Former Metroliner cab car at Lancaster, Pennsylvania in 2017

A typical Keystone consist usually contains an ACS-64 electric locomotive and five passenger cars, consisting of four Amfleet coaches and a rebuilt Metroliner cab car. As a result of the signal, track, and catenary upgrades that were completed in October 2006, Keystone trains run in a push–pull mode, one of the few Amtrak services to do so. Before the 2006 upgrades, diesel power (typically a GE Genesis locomotive) was needed between Harrisburg and Philadelphia.

The trains consist of unreserved coaches between Harrisburg and Philadelphia and reserved coaches between Philadelphia and New York. There is no business class or snack/food service. However, there is a quiet car on all trains, and free Wi-Fi service is offered. Amenities vary by train. [2]

Service

On weekdays there are thirteen Keystone trains and one Pennsylvanian train in each direction. All trains run between Harrisburg and Philadelphia, with nine Keystone trains plus the Pennsylvanian continuing on to New York. There are eight round-trip trains on both Saturdays and Sundays. All but one, including the Pennsylvanian, make the full trip between Harrisburg and New York. On the majority of the trains, the journey between Harrisburg and New York takes approximately 3 hours and 30 minutes, including 1 hour and 45 minutes to travel between Harrisburg and Philadelphia. There are also several express trains which cut both journey times by approximately 15 minutes each. [2]

Amtrak Keystone Service (interactive map) Amtrak Keystone Service.svg
Amtrak Keystone Service (interactive map)

Route

The Keystone Service operates over Amtrak-owned trackage:

The route's western terminus, Harrisburg Transportation Center, is the 22nd busiest Amtrak station in the country. Lancaster station, the route's midpoint, is the 21st busiest. Due largely to the significant number of passengers traveling to and from Philadelphia, these stations are among the busiest in the country serving metropolitan areas with fewer than two million people.

Related Research Articles

<i>Metroliner</i> (train) Former express train between Washington, D.C., and New York City

The Metroliners were extra-fare high speed trains between Washington, D.C. and New York City which operated from 1969 to 2006. They were briefly first operated by Penn Central Transportation, then by Amtrak for 35 years.

<i>Pennsylvanian</i> (train) Amtrak train service between Pittsburgh and New York

The Pennsylvanian is a 444-mile (715 km) daily daytime Amtrak train running between New York and Pittsburgh via Philadelphia. The trains travel across the Appalachian Mountains, through Pennsylvania's capital Harrisburg, the Pennsylvania Dutch Country, suburban and central Philadelphia, and New Jersey en route to New York. The entire train ride takes about 9 hours total, with 1.5 hours between New York and Philadelphia, 2 hours between Philadelphia and Harrisburg, and 5.5 hours between Harrisburg and Pittsburgh.

MARC Train Commuter rail system comprising three lines in the Baltimore–Washington metropolitan area

MARC Train Service, previously known as Maryland Rail Commuter, is a commuter rail system comprising three lines in the Baltimore–Washington metropolitan area. MARC is administered by the Maryland Transit Administration (MTA), a Maryland Department of Transportation (MDOT) agency, and is operated under contract by Bombardier Transportation Services USA Corporation (BTS) and Amtrak over tracks owned by CSX Transportation (CSXT) and Amtrak.

Northeast Corridor Line commuter rail line in New Jersey, United States

The Northeast Corridor Line is a commuter rail service operated by NJ Transit between the Trenton Transit Center and New York Penn Station on Amtrak's Northeast Corridor in the United States. The service is the successor to Pennsylvania Railroad commuter trains between Trenton and New York, and is NJ Transit's busiest commuter rail service. After arrival at New York Penn Station, some trains load passengers and return to New Jersey, while others continue east to Sunnyside Yard for storage. Most servicing is done at the Morrisville Yard, at the west end of the line. The Northeast Corridor Line is colored red on NJ Transit system maps and its symbol is the State House. The Princeton Branch is a shuttle service connecting to the line. Connecting SEPTA Trenton Line service between Philadelphia and Trenton is listed in the timetable.

SEPTA Regional Rail commuter rail service

The SEPTA Regional Rail system is a commuter rail network owned by the Southeastern Pennsylvania Transportation Authority and serving the Philadelphia Metropolitan area. The system has 13 branches and more than 150 active stations in Philadelphia, Pennsylvania, its suburbs and satellite towns and cities. It is the fifth-busiest commuter railroad in the United States, and the busiest outside of the New York and Chicago metropolitan areas. In 2016, the Regional Rail system had an average of 132,000 daily riders.

Suburban Station commuter rail station in Center City, Philadelphia

Suburban Station is an art deco office building and underground commuter rail station in Penn Center, Philadelphia. Its official SEPTA address is 16th Street and JFK Boulevard. The station is owned and operated by SEPTA and is one of the three core Center City stations on SEPTA Regional Rail. The station was built by the Pennsylvania Railroad to replace the original Broad Street Station and opened on September 28, 1930.

Keystone Corridor railway line

The Keystone Corridor is a 349-mile (562 km) railroad corridor between Philadelphia and Pittsburgh, Pennsylvania, that consists of two rail lines: Amtrak's Philadelphia-to-Harrisburg main line, which also hosts SEPTA's Paoli/Thorndale Line commuter rail service; and the Norfolk Southern Pittsburgh Line. The corridor was originally the Main Line of the Pennsylvania Railroad.

Overbrook station SEPTA Regional Rail station

Overbrook station is a SEPTA Regional Rail station on the Paoli/Thorndale Line, located near 63rd Street and City Line Avenue in the Overbrook neighborhood of Philadelphia, Pennsylvania. It serves many of the residents of Overbrook Farms and the suburban neighborhoods across City Avenue in neighboring Montgomery County, as well as Saint Joseph's University and Talmudical Yeshiva of Philadelphia.

Merion station SEPTA Regional Rail station

Merion station is a SEPTA Regional Rail station on the Paoli/Thorndale Line, located in Merion, Pennsylvania just outside of Philadelphia. The station building, constructed in 1914 by the Pennsylvania Railroad, is a designated historic building. SEPTA completed renovations of the station building's slate tile roof and the westbound canopy in late 2007.

Malvern station (SEPTA) commuter rail station located in the western suburbs of Philadelphia

Malvern station is a SEPTA Regional Rail and a former Amtrak station in Malvern, Pennsylvania. Located at West King Road and North Warren Avenue, it serves most Paoli/Thorndale Line trains. Until 1998, some Keystone Service trains stopped here as well.

Downingtown station rail station in Downingtown, Pennsylvania

Downingtown station is a commuter and intercity passenger rail station located in the western suburbs of Philadelphia at West Lancaster Avenue & Stuart Avenue in Downingtown, Pennsylvania. It is served by most Amtrak Keystone Service and SEPTA Paoli/Thorndale Line trains, and until November 7, 2011, the eastbound Amtrak Pennsylvanian on Sundays only.

Pennsylvania Station is a name applied by the Pennsylvania Railroad (PRR) to several of its grand passenger terminals. In the early 20th century different railroad companies typically used different stations, especially in major cities or towns, so the station usually took the name of the company.

Lancaster station (Pennsylvania) Amtrak rail station in Lancaster, Pennsylvania, United States

Lancaster is an Amtrak railroad station and a former Pennsylvania Railroad station in Lancaster, Lancaster County in the U.S. state of Pennsylvania. Located on the Keystone Corridor, the station is served by the Keystone Service between New York City and Harrisburg, and by the Pennsylvanian between New York and Pittsburgh. Lancaster is the second busiest Amtrak station in Pennsylvania, and the twenty-first busiest in the United States. It is one of the busiest Amtrak stations serving a metropolitan area smaller than two million people, primarily because of the large number of passengers traveling to and from Philadelphia and points east.

Middletown station (Pennsylvania) Amtrak rail station in Middletown, Pennsylvania, USA

Middletown is an Amtrak train station on the Keystone Corridor in Middletown, Dauphin County in the U.S. state of Pennsylvania. The station is served by Amtrak's Keystone Service between New York City and Harrisburg. The current station was built in 1990, but a planned relocation of the station is expected to be completed in 2021.

Philadelphia to Harrisburg Main Line railway line

The Philadelphia to Harrisburg Main Line is a rail line owned and operated by Amtrak in the U.S. state of Pennsylvania. This is the only electrified Amtrak service in the United States outside of the main line of the Northeast Corridor. The line runs from Philadelphia, where it meets the Northeast Corridor at Zoo interlocking, west to Harrisburg, where electrification ends. It is part of the longer Keystone Corridor, which continues west to Pittsburgh along the Norfolk Southern Railway's Pittsburgh Line. This section is sometimes referred to as "Keystone East" and is part of Amtrak's Keystone Service.

52nd Street station (SEPTA Regional Rail) Closed train station in Philadelphia, Pennsylvania

52nd Street is a closed train station that was located at the intersection of North 52nd Street & Landsdowne Avenue in the West Philadelphia section of Philadelphia, Pennsylvania, United States. It was built by the Pennsylvania Railroad (PRR) at the junction of its Main Line and its Schuylkill Branch. Today, these lines are the SEPTA Regional Rail Paoli/Thorndale Line and Cynwyd Line, respectively.

<i>Beacon Hill</i> (train)

The Beacon Hill was a daily 157-mile (253 km) commuter rail service operated by Amtrak between Boston, Massachusetts, and New Haven, Connecticut, from 1978 to 1981. The Beacon Hill was one of the last long-haul commuter services operated by Amtrak. Service consisted of a single rush-hour round trip, with service eastbound to Boston in the morning and westbound to New Haven in the evening.

Budd Metroliner class of American electric multiple unit cars

The Budd Metroliner was a class of American electric multiple unit (EMU) railcar designed for first-class, high-speed service between New York City and Washington, D.C. on the Northeast Corridor. They were designed for operation up to 150 mph (240 km/h): what would have been the first high speed rail service in the Western Hemisphere. Although 164 mph (264 km/h) was reached during test runs, track conditions and electrical issues limited top speeds to between 100 mph (160 km/h) and 120 mph (190 km/h) in revenue service. The single-ended units were designed to be arranged in two-car sets, which were in turn coupled into four to eight-car trains.

Paoli/Thorndale Line SEPTA Regional Rail line travelling from Philadelphia to Thorndale

The Paoli/Thorndale Line, commonly known as the Main Line, is a SEPTA Regional Rail service running from Center City Philadelphia to Thorndale in Chester County. It operates on Amtrak's Philadelphia to Harrisburg Main Line, which in turn was once the Main Line of the Pennsylvania Railroad and is now part of the Keystone Corridor, a federally-designated high-speed rail corridor.

<i>Chesapeake</i> (train) Amtrak passenger train

The Chesapeake was a daily passenger train operated by Amtrak along the Northeast Corridor between Washington, D.C. and Philadelphia, Pennsylvania from 1978 to 1983. It was one of the few commuter trains operated by Amtrak.

References

  1. 1 2 "Amtrak FY16 Ridership and Revenue Fact Sheet" (PDF). Amtrak. April 17, 2017. Retrieved January 25, 2018.
  2. 1 2 3 4 5 "Keystone Service Timetable" (PDF). Amtrak. January 8, 2018. Retrieved January 25, 2018.
  3. "AMTRAK SETS RIDERSHIP RECORD AND MOVES THE NATION'S ECONOMY FORWARD" (PDF) (Press release). Amtrak. 14 October 2013. Archived from the original (PDF) on 4 October 2014. Retrieved 28 September 2014.
  4. 1 2 3 4 5 6 Dawson, John A. "Rail Ridership, Service, and Markets in the Keystone Corridor" (PDF). Transportation Research Record. 19: 12–19.
  5. 1 2 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1966" (PDF). Pennsylvania Railroad Technical & Historical Society.
  6. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1968" (PDF). Pennsylvania Railroad Technical & Historical Society.
  7. 1 2 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1970" (PDF). Pennsylvania Railroad Technical & Historical Society.
  8. 1 2 3 4 5 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1971" (PDF). Pennsylvania Railroad Technical & Historical Society.
  9. 1 2 National Schedules of Intercity Passenger Service. National Railroad Passenger Corporation. May 1, 1971. p. 13 via Museum of Railway Timetables.
  10. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1972" (PDF). Pennsylvania Railroad Technical & Historical Society.
  11. Nationwide Schedules of Intercity Passenger Service. National Railroad Passenger Corporation. October 29, 1972. p. 43 via Museum of Railway Timetables.
  12. 1 2 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1974" (PDF). Pennsylvania Railroad Technical & Historical Society.
  13. 1 2 3 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1975" (PDF). Pennsylvania Railroad Technical & Historical Society.
  14. All-America Schedules. Amtrak. November 30, 1975. p. 30 via Museum of Railway Tmetables.
  15. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1978" (PDF). Pennsylvania Railroad Technical & Historical Society.
  16. 1 2 3 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1979" (PDF). Pennsylvania Railroad Technical & Historical Society.
  17. 1 2 3 4 5 6 7 8 9 10 11 12 13 Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1980–1989" (PDF). Pennsylvania Railroad Technical & Historical Society.
  18. Solomon, Brian (2004). Amtrak. Saint Paul, Minnesota: MBI. p. 151. ISBN   978-0-7603-1765-5.
  19. 1 2 Amtrak National Train Timetables. Amtrak. October 25, 1981. pp. 22–23 via Museum of Railway Timetables.
  20. National Train Timetables. Amtrak. April 24, 1983. p. 22 via Museum of Railway Timetables.
  21. All-America Schedules. Amtrak. April 29, 1973. p. 28 via Museum of Railway Timetables.
  22. 1 2 3 "PHILADELPHIA – HARRISBURG RAIL STUDY: Executive Summary" (PDF). Delaware Valley Regional Planning Commission. January 1992.
  23. 1 2 National Train Timetables. Amtrak. April 27, 1986. pp. 25–26 via Museum of Railway Timetables.
  24. "Collision of Amtrak Train 66, The Night Owl with On-track Maintenance- of-way Equipment" (PDF). National Transportation Safety Board. January 6, 1989.
  25. Amtrak National Train Timetables. Amtrak. May 15, 1988. p. 65 via Museum of Railway Timetables.
  26. Amtrak National Train Timetables. Amtrak. April 1, 1990. p. 69 via Museum of Railway Timetables.
  27. 1 2 3 4 Sanders, Craig (2006). Amtrak in the Heartland. Bloomington, Indiana: Indiana University Press. ISBN   978-0-253-34705-3.
  28. All-America Schedules. Amtrak. October 28, 1973. p. 27 via Museum of Railway Timetables.
  29. National Train Timetables. Amtrak. February 2, 1980. p. 25 via Museum of Railway Timetables.
  30. National Train Timetables. Amtrak. April 27, 1980. p. 24 via Museum of Railway Timetables.
  31. National Train Timetables. Amtrak. October 31, 1982. p. 22 via Museum of Railway Timetables.
  32. National Train Timetables. Amtrak. October 30, 1983. p. 34 via Museum of Railway Timetables.
  33. Waltzer, Jim (October 6, 2005). "Waltz Through Time: An Express Derailed". Atlantic City Weekly . Archived from the original on July 7, 2011.
  34. "Transit Accessibility in the Delaware Valley Region" (PDF). Delaware Valley Regional Planning Commission. June 1998. p. 11.
  35. "On the Railroad Lines…" (PDF). The Delaware Valley Rail Passenger. Delaware Valley Association of Railroad Passengers. 14 (12): 5. December 1996.
  36. "Schedule Changes" (PDF). The Delaware Valley Rail Passenger. Delaware Valley Association of Railroad Passengers. 16 (4): 10. April 1998.
  37. "Amtrak's Northeast Corridor: Facts and Background Information" (PDF). Amtrak. May 2011.
  38. "Keystone Corridor East High Speed Phase II". planthekeystone.com. Archived from the original on 21 October 2013. Retrieved 20 July 2013.
  39. Hainthaler, Joe (23 September 2014). "Two roads carrying traffic south from Route 230 in Mount Joy to close Wednesday". Lancaster Online. Retrieved 28 September 2014.
  40. "Amtrak train collides with farm tractor near Mount Joy". WHTM-TV. June 5, 2018. Retrieved July 31, 2018.
  41. Hertzler, Richard (17 March 2020). "Amtrak to suspend train service in Lancaster County Wednesday as riders avoid transportation hubs amid COVID-19 fears". Lancaster Online. Retrieved 18 March 2020.
  42. "Service Adjustments Due to Coronavirus" (Press release). Amtrak. 2020-03-24. Archived from the original on 2020-03-25. Retrieved 2020-03-25.
  43. "Amtrak announces re-opening of some Pa. service, with new safety guidelines". PennLive. May 21, 2020. Retrieved May 22, 2020.

Route map:

KML file (edithelp)
    KML is from Wikidata

    Commons-logo.svg Media related to Keystone Service at Wikimedia Commons