The Ohio Hub was a high-speed railway project proposed in the 2000s decade by the Ohio Department of Transportation aimed at revitalizing passenger rail service in the Ohio region. [1] [2] The plan was awarded funding under the American Recovery and Reinvestment Act of 2009, but Governor John Kasich refused to use the funds for the project and the funds were reclaimed by the federal government. Passage of the 2021 Infrastructure Investment and Jobs Act raised the possibility of new funding for a similar project.

Contents

Background

Passenger service between Cincinnati, Columbus, and Cleveland ended on May 1, 1971, when the Ohio State Limited was discontinued upon the assumption of Penn Central Transportation's passenger service by Amtrak. [3]

Initial Ohio Hub plans

Upon completion, the transit system would have been composed of 860 mi (1,380 km) of track serving 32 stations. It would connect four states along with southern Ontario, consisting of 11 major metropolitan areas and 22 million people. [4] The system's goal was to "expand the capacity of the transportation system by improving the railroads for both freight and passenger trains." [5]

As of the mid-2000s, the initial startup cost was projected to be in the $500 million range. This did not include the cost of trains or the preparations needed for high-speed service. Two high-speed train systems were being explored. The first, a 79-mile-per-hour (127 km/h) system, was expected to cost $2.7 billion, or $3.5 million per mile. The second option, a 110-mile-per-hour (180 km/h) higher-speed system was estimated to cost $3.32 billion, or $4.5 million per mile. [2]

The project's hub was proposed to be based at Cleveland Hopkins International Airport (the state's largest and busiest airport) with a second Cleveland location near downtown Cleveland, and to provide service to adjacent cities in both the state of Ohio and the Ohio Region. Three proposals were made for service – a single line system from Cleveland to Cincinnati, and two networked systems with multiple corridors providing service from Cleveland to various cities around the Ohio Region. Each corridor would branch out from Cleveland, and serve from four to nine stations, as well as connections to other regional rail services. Additional lines were proposed to connect the planned corridors with each other throughout the state, as well as to add more stations between major cities. [5]

The full Ohio & Lake Erie Regional Rail proposal would provide service to four states plus Canada through four corridors originating in Cleveland. An additional network was proposed with three additional lines (seven lines total), however was still under development. The proposal featured the following four corridors:

Awarding and rejection of funding

3C+D Corridor
BSicon CONTg.svg
BSicon ABZg+l.svg
BSicon dCONTfq.svg
BSicon INT.svg
Cleveland
Cleveland RTA logo.svg
BSicon eHST.svg
Cleveland Hopkins Airport
BSicon FLUG.svg
BSicon dCONTgq.svg
BSicon xABZgr.svg
BSicon exHST.svg
Crestline
BSicon exHST.svg
Delaware
BSicon exBHF.svg
Columbus
BSicon exHST.svg
Springfield
BSicon exBHF.svg
Dayton
BSicon exHST.svg
Sharonville
BSicon dCONTgq.svg
BSicon xABZg+r.svg
BSicon HST.svg
BSicon exlINT.svg
Cincinnati
BSicon CONTf.svg

On January 28, 2010, the White House announced that Ohio would receive $400 million of its request through the American Recovery and Reinvestment Act of 2009. This allowed for passenger rail service to return specifically on the 3C corridor. [6] The 3C Corridor could provide service from Cleveland to Columbus, Dayton, and Cincinnati, a distance of 255 miles (410 km). The service was predicted to carry around 478,000 people a year, using a subsidy of $17 million from the state government. [7]

The proposed corridor, however, attracted opposition from Republican members of the state board in charge of the project, as the proposed six-hour travel time and 39 mph (63 km/h) average speed led the project to be dubbed "snail rail". Then-governor and rail proponent Ted Strickland said in April 2010 that the average speed could be increased to 46 mph (74 km/h), but Republicans were still not sold on it. [8]

On September 24, 2010, the Federal Railroad Administration authorized the state to spend $15 million of the stimulus money for the purposes of determining specifications and completing studies regarding the corridor. Also on the 24th, the state released a new schedule for the service, which would see three daily round trips being operated, taking slightly over five hours each way, an hour and a half faster than previous estimates. [7]

Following the 2010 gubernatorial elections in Ohio, the newly elected governor John Kasich (Republican) began the process of shutting down the project and returning the money to the federal government. This money would be redistributed to other applicants. In a press conference, Kasich said that "[t]hat train is dead. I said it during the campaign. It is dead. Passenger rail is not in Ohio’s future." [9] [10]

On December 9, 2010, US Transportation Secretary Ray LaHood announced that the federal government had revoked the funding for the 3C corridor, which would be redirected to high-speed rail projects in other states. [11] The $400 million was reclaimed by the White House, following repeated promises by Governor John Kasich to cancel the project. He attempted to get permission to use the funds on other transportation related projects, but this was rejected by the White House. [8] The money reclaimed was divided among several other states, including California, New York and Florida. [12]

As of 2015, funding for the Ohio Hub project remained on hold, though it has never been officially canceled.

Potential revival

Plans were restarted around 2020 as Amtrak sought to expand and create new medium-distance rail services, though not as high-speed rail. [13] In May 2021 further plans were presented to Columbus officials regarding the proposed service, which is expected to commence service by 2035. [14]

By 2020, Amtrak was proposing to substantially increase rail service through the state. [13] The 2021 Infrastructure Investment and Jobs Act raised the possibility of new funding for new and increased service in Ohio. [15] [16]

In December 2023, three Ohio routes were accepted into the Federal Railroad Administration's Corridor Identification and Development Program, a mechanism for developing new train routes under the Infrastructure Investment and Jobs Act. Each of these corridors are granted $500,000 toward engineering and feasibility studies and are prioritized for future federal funding: [17]

Lakefront Station in Cleveland would be unable to accommodate this increase in service, which is why a group by the name of All Aboard Ohio is pushing for the restoration of rail service at Cleveland Union Terminal. [18]

Related Research Articles

<span class="mw-page-title-main">Amtrak</span> American intercity passenger rail operator

The National Railroad Passenger Corporation, doing business as Amtrak, is the national passenger railroad company of the United States. It operates inter-city rail service in 46 of the 48 contiguous U.S. states and three Canadian provinces. Amtrak is a portmanteau of the words America and trak, the latter itself a sensational spelling of track.

<span class="mw-page-title-main">Northeast Corridor</span> Electrified railroad line in the Northeastern U.S.

The Northeast Corridor (NEC) is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak, it runs from Boston in the north to Washington, D.C., in the south with major stops in Providence, New Haven, Stamford, New York City, Trenton, Philadelphia, Wilmington, and Baltimore. The NEC closely parallels Interstate 95 for most of its length, and, as of 2013, is the busiest passenger rail line in the United States both by ridership and by service frequency. The NEC carries more than 2,200 trains daily.

<i>Pennsylvanian</i> (train) Amtrak service between Pittsburgh, PA and New York City, NY

The Pennsylvanian is a 444-mile (715 km) daily daytime Amtrak train running between New York City and Pittsburgh via Philadelphia. The trains travel across the Appalachian Mountains, through Pennsylvania's capital Harrisburg, the Pennsylvania Dutch Country, suburban and central Philadelphia, and New Jersey en route to New York. The entire train ride takes about 9 hours total: 1.5 hours between New York and Philadelphia, 2 hours between Philadelphia and Harrisburg, and 5.5 hours between Harrisburg and Pittsburgh.

<i>Hiawatha Service</i> Amtrak service between Chicago, IL and Milwaukee, WI

The Hiawatha Service, or simply Hiawatha, is an 86-mile (138 km) train route operated by Amtrak on the western shore of Lake Michigan between Chicago, Illinois, and Milwaukee, Wisconsin. However, the name was historically applied to several different routes that extended across the Midwest and to the Pacific Ocean. As of 2007, twelve to fourteen trains ran daily between Chicago and Milwaukee, making intermediate stops in Glenview, Illinois; Sturtevant, Wisconsin; and Milwaukee Mitchell International Airport. The line is partially supported by funds from the state governments of Wisconsin and Illinois. The line utilizes the CPKC Railway's C&M Subdivision and Metra's Milwaukee District North Line.

<span class="mw-page-title-main">Chicago Hub Network</span> Proposed rail lines in the Midwestern US

The Chicago Hub Network is a collection of proposed fast conventional and high-speed rail lines in the Midwestern United States including 3,000 miles (5,000 km) of track. Since the 1990s, there have been multiple proposals to build a network from Chicago to destinations such as Milwaukee, Madison, Minneapolis, Indianapolis, Detroit, Kansas City, St. Louis, Cleveland, Cincinnati, and Louisville. In addition, the rail lines from the Chicago hub would connect through to cities in Canada. Eastern routes from Chicago would also blend into the Ohio Hub network. In addition to providing better connections between Midwestern cities, the projects are intended to reduce or eliminate the operating subsidies that American passenger train routes currently require.

<span class="mw-page-title-main">Southeast High Speed Rail Corridor</span> Proposed passenger rail project in the United States

The Southeast Corridor (SEC) is a proposed passenger rail transportation project in the Mid-Atlantic and Southeastern United States to extend high-speed passenger rail services from the current southern terminus of the Northeast Corridor in Washington, D.C.. Routes would extend south via Richmond and Petersburg, Virginia, with a spur to Norfolk in Virginia's Hampton Roads region; the mainline would continue south to Raleigh, Durham, Greensboro, and Charlotte, North Carolina. Since the corridor was first established in 1992, the U.S. Department of Transportation (USDOT) has extended it further to Atlanta, Georgia and Macon, Georgia; Greenville, South Carolina; Columbia, South Carolina; Jacksonville, Florida; and Birmingham, Alabama.

<span class="mw-page-title-main">Springfield Union Station (Massachusetts)</span> Train station in Springfield, Massachusetts, US

Springfield Union Station is a train and bus station in the Metro Center area of Springfield, Massachusetts. Constructed in 1926, Springfield Union Station is the fifth-busiest Amtrak station in the Commonwealth, and the busiest outside of Greater Boston.

<span class="mw-page-title-main">High-speed rail in the United States</span> Overview of the high-speed rail system in the United States of America

Plans for high-speed rail in the United States date back to the High-Speed Ground Transportation Act of 1965. Various state and federal proposals have followed. Despite being one of the world's first countries to get high-speed trains, it failed to spread. Definitions of what constitutes high-speed rail vary, including a range of speeds over 110 mph (180 km/h) and dedicated rail lines. Inter-city rail with top speeds between 90 and 125 mph is sometimes referred to in the United States as higher-speed rail.

<span class="mw-page-title-main">New York high-speed rail</span> Overview of proposals for high-speed rail in the US state of New York

High-speed rail in New York has been a topic that is consistently discussed among legislators, political leaders and in particular, several past governors since the 1990s, but thus far little progress has been made. In his campaign speeches prior to his defeat by Governor George Pataki in 1994, Mario Cuomo promised to bring high speed (maglev) rail up the Hudson Valley and along the Catskill Mountains route. It was not a priority for the subsequent administration.

<span class="mw-page-title-main">Union Station (Columbus, Ohio)</span> Former railway station in Ohio, United States

Columbus Union Station was an intercity train station in Downtown Columbus, Ohio, near The Short North neighborhood. The station and its predecessors served railroad passengers in Columbus from 1851 until April 28, 1977.

<i>Wolverine</i> (Amtrak train) Amtrak service between Chicago, IL, and Pontiac, MI

The Wolverine is a higher-speed passenger train service operated by Amtrak as part of its Michigan Services. The 304-mile (489 km) line provides three daily round-trips between Chicago and Pontiac, Michigan, via Ann Arbor and Detroit. It carries a heritage train name descended from the New York Central.

<span class="mw-page-title-main">Union Station (Erie, Pennsylvania)</span> Railroad station in Erie, Pennsylvania

Union Station is an Amtrak railroad station and mixed-use commercial building in downtown Erie, Pennsylvania, United States. It is served by the Lake Shore Limited route, which provides daily passenger service between Chicago and New York City or Boston; Erie is the train's only stop in Pennsylvania. The station's ground floor has been redeveloped into commercial spaces, including The Brewerie at Union Station, a brewpub. The building itself is privately owned by the global logistics and freight management company Logistics Plus and serves as its headquarters.

<span class="mw-page-title-main">Raleigh Union Station</span> American intermodal transit station

Raleigh Union Station is an intermodal transit station in Raleigh, North Carolina, United States. Train service began the morning of July 10, 2018. Its main building serves as an Amtrak train station, while a future adjacent building will serve as the bus terminus for GoTriangle. The station is located at the Boylan Wye, a railroad junction used by CSX and Norfolk Southern, and adjacent to the Depot Historic District in downtown Raleigh.

The Northern Lights Express (NLX) is a planned higher-speed rail service that would run 155 miles (249 km) between Minneapolis and Duluth primarily in the U.S. state of Minnesota. A portion of the proposed line would run through neighboring Wisconsin to serve Duluth's "Twin Port" of Superior. Plans are to upgrade an existing BNSF Railway freight line to allow trains to travel at up to 90 miles per hour (145 km/h). The train service is said to provide an alternative to traveling Interstate 35 between Duluth and the Twin Cities or to other destinations along the line such as the casino in Hinckley.

<i>Lake Cities</i> (Amtrak train)

The Lake Cities was a daily passenger train operated by Amtrak between Chicago, Illinois and Toledo, Ohio via Detroit, Michigan. It operated from 1980 until 2004, when it was folded into the Wolverine. It replaced the St. Clair, a Chicago–Detroit train which operated in tandem with the Wolverine. The extension to Toledo gave travelers in Michigan the opportunity to connect with eastbound trains such as the Lake Shore Limited without backtracking to Chicago. Amtrak re-routed the train from Toledo to Pontiac, Michigan in 1995.

<span class="mw-page-title-main">Higher-speed rail</span> Type of railway with speeds approaching but less than that of true high speed rail

Higher-speed rail (HrSR), also known as high-performance rail, higher-performance rail, semi-high-speed rail or almost-high-speed rail, is the jargon used to describe inter-city passenger rail services that have top speeds of more than conventional rail but are not high enough to be called high-speed rail services. The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.

<span class="mw-page-title-main">NC By Train</span>

NC By Train is a brand name used by the Rail Division of the North Carolina Department of Transportation (NCDOT) for two state-supported Amtrak routes operating in the U.S. state of North Carolina–the Carolinian and the Piedmont.

<span class="mw-page-title-main">Public transit in Columbus, Ohio</span> Overview of public transportation in Columbus, Ohio

Public transit has taken numerous forms in Columbus, the largest city and capital of Ohio. Transit has variously used passenger trains, horsecars, streetcars, interurbans, trolley coaches, and buses. Current service is through the Central Ohio Transit Authority's bus system, numerous intercity bus companies, and through bikeshare, rideshare, and electric scooter services.

<span class="mw-page-title-main">East-West Passenger Rail (Massachusetts)</span> Massachusetts east-to-west rail project

East-West Rail is a proposed passenger rail project that would provide new service between Boston and Western Massachusetts, with stops including Worcester, Springfield, Pittsfield, and Albany. A infill station in Palmer is under consideration as well. The 151-mile (243 km) route between Boston and Pittsfield would use the former mainline of the Boston and Albany Railroad, which is now owned by the Massachusetts Bay Transit Authority and CSX Transportation.

References

  1. "The Ohio Hub: The Project". Ohio Department of Transportation. Retrieved 2007-04-24.
  2. 1 2 "Ohio Hub Executive Summary" (PDF). Ohio Department of Transportation. Retrieved 2007-03-29.
  3. Lynch, Peter E. (2004). Penn Central Railroad. Saint Paul, MN: MBI. p. 32. ISBN   0760317631. OCLC   53356627.
  4. "Ohio Hub Fact Sheet 2004" (PDF). Ohio Department of Transportation. Retrieved 2007-03-29.
  5. 1 2 "Ohio Hub Overview 2006" (PDF). Ohio Department of Transportation. Archived from the original (PDF) on August 31, 2006. Retrieved 2007-03-29.
  6. "Fact Sheet: High Speed Intercity Passenger Rail Program: Cleveland - Columbus - Dayton - Cincinnati". whitehouse.gov . 27 January 2010. Archived from the original on 2017-01-21. Retrieved 2010-01-28 via National Archives.
  7. 1 2 "Ohio releases faster passenger train schedule". BusinessWeek. 24 September 2010. Archived from the original on December 25, 2010. Retrieved 26 September 2010.
  8. 1 2 "Ohio may turn down federal money, scrap rail project". Trains Magazine. 5 April 2010. Archived from the original on 5 May 2019. Retrieved 5 April 2010.
  9. "Ohio Governor-elect: "That train is dead"". Trains Magazine. 5 November 2010. Retrieved 7 November 2010.
  10. "Fact Sheet: Kasich says no passenger rail for Ohio" . Retrieved 2010-11-04.
  11. "U.S. yanks high-speed rail funds for Wisconsin and Ohio". Reuters. 9 December 2010. Retrieved 10 December 2010.
  12. "Ohio rail money will go to California, Florida, New York" . Retrieved 2010-09-12.
  13. 1 2 Pitman, Michael D. (2 February 2021). "Proposed Amtrak route expansion could spur business, help environment in southwest Ohio". Dayton Daily News. Retrieved 13 February 2021.
  14. "Amtrak seeks to connect Cleveland, Columbus and Cincinnati with trek through Dayton". WHIO. 19 May 2021. Retrieved 19 May 2021.
  15. Wu, Titus. "Ohio exploring passenger rail expansion with Amtrak". The Columbus Dispatch. Retrieved 2022-07-12.
  16. Schwartzberg, Eric. "Amtrak's proposed expansion in Ohio to get another look". dayton-daily-news. Retrieved 2022-07-12.
  17. Lassen, David (5 December 2023). "North Carolina, Ohio corridors lead list of those receiving FRA grants for possible new Amtrak routes". Trains. Retrieved 6 December 2023.
  18. Glaser, Susan; clevel; .com (2021-04-15). "Rail advocacy group wants Cleveland Amtrak station back at Tower City". cleveland. Retrieved 2022-03-22.