Siemens Charger | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Data refers to the following except where noted: [4] [5] |
The Siemens Charger is a family of diesel-electric/dual-mode passenger locomotives designed and manufactured by Siemens Mobility for the North American market.
There are five variants of the Charger, tailored for different operators and types of service: ALC-42 for Amtrak long-distance service, ALC-42E dual mode for Amtrak inter-city and long-distance routes that serve the Northeast Corridor, SC-44 for Amtrak state-supported inter-city service or commuter rail operators, SCB-40 for Brightline inter-city service and SCV-42 for VIA Rail inter-city service in Canada.
The first production Charger, a SC-44, was unveiled on March 26, 2016, and entered revenue service on August 24, 2017. It was followed by the SCB-40, which inaugurated Brightline service on January 13, 2018. The first ALC-42 was delivered to Amtrak on June 17, 2021, and entered revenue service on February 8, 2022, on the Empire Builder .
The Charger is often paired with Venture passenger cars, also built by Siemens, as part of a trainset.
The Charger is powered by a Cummins 16-cylinder QSK95 4-stroke high speed diesel engine, which meets United States Environmental Protection Agency's more stringent Tier 4 emissions standards that took effect in 2015. [6] Power output varies by model: the SCB-40 produces 4,000 hp (3,000 kW ), [7] [8] the SC-44 produces 4,400 hp (3,300 kW), and both the SCV-42 and ALC-42 produce 4,200 hp (3,100 kW). [9] [10] The maximum speed in service is 125 mph (201 km/h). [11]
The locomotive shares much of its overall design with the Siemens Vectron diesel and electric locomotives used in Europe and the Siemens ACS-64 electric locomotive built for Amtrak.
Four Insulated-gate bipolar transistor (IGBT) power inverters carry electric current to each of the four AC traction motors. A static inverter off of the main prime mover supplies head-end power (HEP). The locomotive also features dynamic braking with regenerative capability, allowing the locomotive to divert power generated by dynamic braking away from the resistor grids to HEP and onboard locomotive auxiliary power demands. [4]
In response to a 2013 Request for Information from Metro-North Railroad, Siemens said they would be capable of producing a dual-mode variant of the Charger with onboard energy storage for use by Metro-North and the Long Island Rail Road, as well as intercity service on Amtrak's Empire Corridor. [12]
California's SC-44s have aerodynamic "spoilers" on the rear of their roofs that match the height of bi-level California and Surfliner cars. [13]
The Charger series competes with other Tier 4 compliant locomotives, such as the EMD F125 and the MPI MPXpress MP54AC. However, unlike the Charger series, both the F125 and MP54AC have struggled to find customers, selling fewer than 50 units each.
The first production SC-44 unit was unveiled on March 26, 2016. [14] The first two Charger locomotives to leave Siemens' factory in Florin, California were transported to the Transportation Technology Center (TTC) in Pueblo, Colorado in June 2016 and underwent testing of performance metrics such as acceleration and braking. [15] [16] The first Brightline SCB-40 locomotives were delivered in December 2016 to undergo testing in Florida. [17]
In February 2017, Amtrak and the Washington State Department of Transportation began testing one of the Midwest-bound SC-44 locomotives along the Cascades corridor in the Pacific Northwest for federal certification. [18] [19] Additional test runs were conducted on the Midwest and Northern California routes in April and May. [20] Testing at up to 135 miles per hour (217 km/h) was conducted at TTC and on the Northeast Corridor in September 2016 which resulted in federal certification for 125-mile-per-hour (201 km/h) operations. [21]
Revenue testing on the Capitol Corridor and San Joaquins routes in Northern California began on May 25, 2017. [22] During these tests, the trains operated with a second locomotive in case of failure. [23] The Northern California units were formally accepted and approved for solo service on October 23, 2017. [24] The SC-44 entered revenue testing on the Midwest routes in July 2017, with solo revenue service beginning on a Hiawatha Service train on August 24, 2017. [21] [25] Revenue service on the Cascades route began in November 2017. [26]
Brightline began revenue operations with its SCB-40 locomotives on January 13, 2018. [27] The first Chargers for MARC began testing that month, and revenue service began on April 5, 2018. [28] [29] Pre-revenue testing began on the Pacific Surfliner in October 2018; revenue service began later that year. [30] [31]
The first ALC-42 for Amtrak's long distance trains was put into service on the westbound Empire Builder on February 8, 2022, after extensive testing in the Midwest and on the Empire Builder route. Of the 2 units on the inaugural service, one was Amtrak's "Day One" heritage unit #301. [32]
Owner | Model | Qty. | Notes |
---|---|---|---|
Altamont Corridor Express | SC-44 | 4 | |
Amtrak | ALC-42 | 125 | |
ALC-42E | 75 [33] | ||
Amtrak Midwest | SC-44 | 33 | |
Brightline | SCB-40 | 21 | |
California Department of Transportation | SC-44 | 24 | |
Coaster | SC-44 | 9 | |
Connecticut Department of Transportation | SC-42DM | 6 | |
Exo | EC42 | 10 | |
MARC | SC-44 | 8 | |
Metro-North Railroad | SC-42DM | 27 | |
Ontario Northland | TBD | 3 | |
Trinity Railway Express | SC-44 | 5 | |
Via Rail | SCV-42 | 32 | |
Washington State Department of Transportation | SC-44 | 10 | Two on order to be delivered by 2026. |
Total | 392 |
California regional commuter line Altamont Corridor Express ordered four SC-44 locomotives in April 2018, with deliveries beginning in December 2019. [34] They entered revenue service in 2020. [35]
On December 21, 2018, Amtrak ordered 75 ALC-42 locomotives with options for an additional 100. The first locomotive entered service in February 2022, with the last expected by 2024. [36]
Compared with the SC-44, changes were made to the ALC-42 to make it more suitable for long-distance service: additional positive train control systems for nationwide service, a larger 2,200-U.S.-gallon (8,300 L) diesel fuel tank (instead of 1,800 U.S. gal [6,800 L]), a larger diesel exhaust fluid tank, a larger sandbox, a more powerful 1,000-kilowatt head-end power generator (instead of 600 kW), an extended nose section for easier repair in the event of minor front-end collision, and a prime mover de-rated to 4,200 horsepower (3,100 kW) to lengthen maintenance intervals. [37] [38]
Assembly of the first ALC-42 began in March 2020. [39] On August 5, 2020, Amtrak announced that one of the first six locomotives will be painted in a replica of the "Day 1" livery to commemorate 50 years of Amtrak service, while the other five will feature a preliminary "Phase VI" paint scheme. [40] The remainder of the fleet will introduce a new "Phase VII" livery. By February 2021, 12 units had begun production, with the first locomotive, AMTK 300, delivered to Amtrak on June 17. [41] The first ALC-42 locomotives entered revenue service on the Empire Builder on February 8, 2022. On the same day, Amtrak announced that they had ordered an additional 50 ALC-42s, bringing the total number of locomotives ordered to 125. [42]
Amtrak plans to purchase at least 75 intercity trainsets with dual-mode ALC-42E locomotives from Siemens. The trainsets will be used primarily on routes that operate over both electrified and non-electrified track, which currently require costly and lengthy locomotive swaps when transitioning between electrified and non-electrified territory. [43] [44]
In diesel mode, the ALC-42E will work like a typical diesel–electric locomotive, using its diesel engine to generate electricity for its motors. Each ALC-42E will be paired with a special trailer car that will have equipment to support electric mode on the end closest to the locomotive, and a passenger seating area on the other. There are two types of trailer cars:
By February 2024, two of the ALC-42E locomotives were under construction. [45]
The Illinois Department of Transportation (IDOT), in conjunction with its counterparts in California, Michigan, Missouri and Washington, purchased 32 SC-44 locomotives for state-supported corridor services, operated by Amtrak under contract.
The $225 million order placed in March 2014 included options for an additional 75 corridor-configured locomotives [46] [47] In 2015, IDOT ordered 12 additional units for use on the upgraded Lincoln Service corridor. [48] California ordered 14 additional units in November 2015 for use on the Pacific Surfliner beginning in 2018, plus two more units in 2016 for the Northern California services. [13] [30] Washington state ordered an additional unit to replace locomotive 1402, which was lost in the 2017 Washington train derailment and two more in connection with its purchase of new Siemens trainsets. [49] [50]
A total of 66 locomotives (32 base and 34 options) were ordered for Amtrak state corridors in this contract: 22 for California, 11 for Washington state, and 33 for the Midwest states. [51] [52] Another 8 options were exercised by MARC, bringing total contract orders to 74. [53]
In September 2014, Brightline purchased ten SCB-40 locomotives with options for an additional eleven. [54] [55] The locomotives are used in pairs, bookending four passenger cars (expandable to seven) on Brightline's Miami–West Palm Beach service. The SCB-40s have a streamlined front end that conceals the front coupler behind a removable nose cone and produce a maximum of 4,000 hp (3,000 kW) instead of the 4,400 hp (3,300 kW) on the SC-44. [56] [8] Brightline later ordered five additional trainsets and one extra locomotive (eleven locomotives total) for use on the extension to Orlando, with delivery between September 2021 and 2023. [57] These locomotives have been able to reach speeds of up to 130 mph. [58] As of February 19, 2023, all trainsets and the spare locomotive have been delivered to Brightline. [59]
In June 2018, the North County Transit District Board of Directors approved the purchase of five SC-44s for its San Diego-area Coaster commuter rail service, replacing five older F40PH locomotives. [60] Deliveries began in August 2020 and are expected to conclude in the spring of 2021. [61] Two additional units were approved in June 2019, and another two in September. These additional locomotives will replace two existing F59PHI locomotives and allow increased service levels. [61] [62] The first five locomotives entered revenue service on February 8, 2021. [63] Two more units were approved in 2020, and the last four entered service in 2023.
In January 2022, Montreal's Exo ordered 10 Siemens Chargers to update the fleet. They are planned to replace the aging F59PH locomotives. [64]
MARC announced in August 2015 that it was seeking $58 million to purchase eight locomotives to replace their aging electric-powered AEM-7 units, with deliveries planned for late 2017. [65] The purchase was approved by the Maryland Board of Public Works on September 16, 2015. [66] The MARC order uses part of the Amtrak state-corridor options. [53] The first MARC Charger was shipped from the Siemens factory in early December 2017, and began testing in mid-January 2018. [67]
In December 2020, New York's Metropolitan Transportation Authority (MTA) approved a Federal Transit Administration-funded contract for 19 dual-mode locomotives based on the Charger design. The locomotives will replace the 31 existing GE Genesis locomotives used on the Metro-North Railroad's Hudson Line, Harlem Line, and Danbury Branch; they will use third rail electric power whenever available, instead of only in Manhattan. The contract had options for 144 additional locomotives: 40 for Metro-North, 66 for the Long Island Rail Road, 20 for the New York State Department of Transportation (for Amtrak Empire Service trains), and 25 for the Connecticut Department of Transportation (CTDOT). [68] [69]
Immediately after awarding the contract, Metro-North ordered an additional eight locomotives from its options, and CTDOT ordered six from its options, [70] bringing the total order to 33. The additional units will allow for the complete replacement of the P32AC-DM locomotives in the Metro-North equipment pool and allow for service increases on the Danbury and Waterbury branches. Delivery of the 33 locomotives is expected to be completed in 2027. [71]
After the orders, as of March 2024, the contract still has options for 32 locomotives for Metro-North, 66 for LIRR, 26 for NYSDOT and 19 for CTDOT.
In December 2022, the Government of Ontario and Ontario Northland announced a CA$139.5 million investment to reinstate the Northlander passenger service between Timmins and Toronto. The government news release mentioned that the three new trainsets (each with three Siemens Venture passenger cars) will be built by Siemens Mobility and paired with Charger locomotives that will meet the latest EPA Tier 4 diesel emission standards. [72] [73]
In February 2024, five locomotives were purchased for use on the Trinity Railway Express (TRE) commuter rail service operating in the Dallas/Fort Worth area. Delivery of the first locomotives is expected around summer 2026. The five locomotives are intended to replace the oldest units in the existing TRE fleet. TRE has the option to purchase up to six additional locomotives under the contract. [74] [75]
In December 2018, Via Rail ordered 32 bi-directional trainsets each powered by one SC-44 locomotive for use on the Québec City–Windsor Corridor. [76] As with several other orders, the trainsets will use Siemens Venture passenger cars.
The first of VIA Rail's trainsets were delivered on September 29, 2021, to VIA Rail in Montreal, crossing into Canada via Sarnia, Ontario. [77] When the locomotives' final paint scheme was unveiled by VIA Rail in May 2021, the locomotive was designated as an SC-44, [78] but when delivered the locomotives' designation had been changed to SCV-42. [77] The trainsets entered service in 2022.
The Maple Leaf is an international passenger train service operated by Amtrak and Via Rail between New York Penn Station in New York City and Union Station in Toronto via Amtrak's Empire Corridor, and the south western part of Via Rail's Quebec City–Windsor Corridor. Daily service is offered in both directions; the 544-mile (875 km) trip takes approximately 12 hours, including two hours for U.S. or Canadian customs and immigration inspection at either Niagara Falls, New York, or Niagara Falls, Ontario. Although the train uses Amtrak rolling stock exclusively, the train is operated by Via Rail crews while in Canada and by Amtrak crews in the United States. Service began in 1981.
The Northeast Regional is an intercity rail service operated by Amtrak in the Northeastern and Mid-Atlantic United States. In the past it has been known as the NortheastDirect, Acela Regional, or Regional. It is Amtrak's busiest route, carrying 9,163,082 passengers in fiscal year (FY) 2023. The Northeast Regional service received more than $787.7 million in gross ticket revenue in FY 2023.
The Pacific Surfliner is a 350-mile (560 km) passenger train service serving the communities on the coast of Southern California between San Diego and San Luis Obispo.
The EMD AEM-7 is a twin-cab four-axle 7,000 hp (5.2 MW) B-B electric locomotive built by Electro-Motive Division (EMD) and ASEA between 1978 and 1988. The locomotive is a derivative of the Swedish SJ Rc4 designed for passenger service in the United States. The primary customer was Amtrak, which bought 54 for use on the Northeast Corridor and Keystone Corridor. Two commuter operators, MARC and SEPTA, also purchased locomotives, for a total of 65.
The Pennsylvanian is a 444-mile (715 km) daily daytime Amtrak train running between New York City and Pittsburgh via Philadelphia. The trains travel across the Appalachian Mountains, through Pennsylvania's capital Harrisburg, the Pennsylvania Dutch Country, suburban and central Philadelphia, and New Jersey en route to New York. The entire train ride takes about 9 hours total: 1.5 hours between New York and Philadelphia, 2 hours between Philadelphia and Harrisburg, and 5.5 hours between Harrisburg and Pittsburgh.
The San Joaquins is a passenger train service operated by Amtrak in California's San Joaquin Valley. Seven daily round trips run between its southern terminus at Bakersfield and Stockton, with onward service to Sacramento and Oakland. For Fiscal year 2025, two additional trips to Sacramento will be added.
The GE Genesis is a series of passenger diesel locomotives built by GE Transportation for Amtrak, Metro-North, and Via Rail between 1992 and 2001. A total of 321 units were produced.
The Amtrak Cascades is a passenger train route in the Pacific Northwest, operated by Amtrak in partnership with the U.S. states of Washington and Oregon. It is named after the Cascade mountain range that the route parallels. The 467-mile (752 km) corridor runs from Vancouver, British Columbia, through Seattle, Washington, and Portland, Oregon, to Eugene, Oregon.
The Palmetto is a passenger train operated by Amtrak on a 829-mile (1,334 km) route between New York City and Savannah, Georgia, via the Northeast Corridor, Washington, D.C., Richmond, Virginia, Fayetteville, North Carolina, and Charleston, South Carolina. The Palmetto is a shorter version of the Silver Meteor, which continues south to Miami, Florida. From 1996 to 2002 this service was called the Silver Palm. Although currently a day train, the Palmetto is considered a long-distance train by Amtrak and previously provided overnight sleeper service to Florida.
The Vermonter is a passenger train operated by Amtrak between St. Albans, Vermont, and Washington, D.C., via New York City. It replaced the overnight Montrealer, which terminated in Montreal until 1995. Amtrak receives funding from the states of Connecticut, Massachusetts, and Vermont for Vermonter operations north of New Haven.
Amtrak California is a brand name used by the California Department of Transportation (Caltrans) Division of Rail for three state-supported Amtrak regional rail routes in California – the Capitol Corridor, the Pacific Surfliner, and the San Joaquins – and their associated connecting network of Amtrak Thruway transportation services.
The Bombardier–Alstom HHP-8 is a twin-cab electric locomotive built for Amtrak and MARC by a consortium of Bombardier and Alstom. Its electrical system was based on Alstom's BB 36000 locomotive.
Amtrak has used a variety of paint schemes (liveries) on its rolling stock since taking over intercity passenger rail service in the United States in 1971. A series of seven schemes termed Phases, first introduced in 1972, have seen the widest use. Phases primarily use geometric arrangements of red, white, and blue—the national colors of the United States—part of Amtrak's patriotic visual identity.
The Wolverine is a higher-speed passenger train service operated by Amtrak as part of its Michigan Services. The 304-mile (489 km) line provides three daily round-trips between Chicago and Pontiac, Michigan, via Ann Arbor and Detroit. It carries a heritage train name descended from the New York Central Railroad.
The Carolinian is a daily Amtrak passenger train that runs between New York City and Charlotte, North Carolina, with major stops in Philadelphia, Baltimore, Washington, Richmond, Raleigh, Cary, Durham, and Greensboro. The 704-mile (1,133 km) service is the longest state-supported route in the Amtrak system. Northbound trains leave Charlotte at breakfast time and arrive in New York in the early evening, while southbound trains leave New York during the morning rush and arrive in Charlotte in the evening.
Brightline is an intercity rail route in the United States that runs between Miami and Orlando, Florida. Part of the route runs on track owned and shared by the Florida East Coast Railway.
Siemens Viaggio Comfort is a brand of locomotive-hauled railroad passenger cars built by Siemens Mobility. The car was designed in the early 2000s and was based on the earlier Siemens Viaggio Classic railcars. The railcars were first used in 2008 on Railjet, a high-speed rail service in Europe operated by the Austrian Federal Railways (ÖBB) and Czech Railways (ČD).
Siemens Venture is a type of locomotive-hauled passenger railroad car built by Siemens Mobility for the North American market. The cars are derived from the Siemens Viaggio Comfort cars used in Europe, with adaptations for North American operations. The cars entered service with Brightline in 2018 and with Amtrak Midwest in 2022. They have also been ordered by Amtrak for national and other state-supported routes, Via Rail, and Ontario Northland. The Venture cars will also be used on Amtrak’s Airo trainsets.