Avelia Liberty

Last updated

Avelia Liberty
Avelia Liberty.jpg
Avelia Liberty testing in Claymont, Delaware
Manufacturer Alstom
Built at Hornell, New York
Family nameAvelia TGV
Constructed2017–present
Number under construction28 trainsets
Predecessor Acela Express
Formation11 cars (2 power cars, 9 passenger cars)
Fleet numbers2100–2155 (power cars)
Capacity386
Operators Amtrak
DepotsIvy City, Washington, D.C.
Sunnyside Yard, New York City
Southampton Street Yard, Boston
Specifications
Train length698.5 ft (212.9 m)
Maximum speed160 mph (260 km/h) (service)
187.5 mph (300 km/h) (max. w/ tilting)
220 mph (350 km/h) (max. w/o tilting)
Axle load 17 tons
Traction system IGBTVVVF inverter control
Traction motors 3-phase AC induction motors
Power output7,000 kW (9,400 hp) (total)
TransmissionAC-DC-AC
Electric system(s) Overhead line;
Current collector(s) Pantograph, 1 per power car, 1 in use per train
Braking system(s) Dynamic and regenerative (power cars)
Electro-pneumatic disk and tread (trainset)
Safety system(s) Advanced Civil Speed Enforcement System
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Notes/references
Specifications: [1]

Avelia Liberty is a tilting high-speed passenger train built for the North American market by French manufacturer Alstom and assembled in the United States. Amtrak has ordered 28 train sets for use on its flagship Acela service along the Northeast Corridor between Boston, New York, and Washington, promising higher frequency and capacity than the first-generation Acela.

Contents

Part of Alstom's Avelia family of high-speed trains, the Liberty is similar to the SNCF TGV M but adapted for Federal Railroad Administration Tier III crashworthiness standards and other North American requirements.

As of October 2023, the trains were undergoing testing and were expected to enter passenger service in the second half of 2024, [2] but a firm start date has not yet been announced.

History

In 2000, Amtrak introduced the Acela service along the Northeast Corridor between Boston and Washington, D.C., via New York City and Philadelphia. The service uses a dedicated Acela Express trainset that was built by a consortium of Alstom and Bombardier between 1998 and 2001. [3]

In August 2016, Amtrak announced a $2.4 billion loan from the United States Department of Transportation for the purchase of new high-speed train sets for the Acela service from Alstom. Alstom will also provide long-term technical support and supply spare components and parts. [4] These next generation train sets would replace the 20 existing trainsets that were nearing the end of their useful service life. [5] [6] [7] The 28 train sets ordered would allow for more frequent service on the Northeast Corridor, including half-hourly peak service between New York City and Washington, D.C. [8]

Construction and testing

Trainset #2 on the Sawtooth Bridges in Kearny, New Jersey during testing in 2020 Avelia Liberty Kearny Junction.jpg
Trainset #2 on the Sawtooth Bridges in Kearny, New Jersey during testing in 2020

U.S. assembly of the train sets is taking place at Alstom's plants in Hornell and Rochester, New York. [9] Initial construction of car bodies and major components began at Hornell in October 2017. [10] The first prototype set was sent to the Transportation Technology Center (TTC) in Pueblo, Colorado in February 2020 for testing on the high-speed test track. [11] During the nine months of expected trials, the train sets were tested at speeds up to 165 mph (266 km/h). [12] A second prototype was delivered in March 2020 to Amtrak for testing along the service tracks in the Northeast which began in May 2020. [13] The first test run up to Boston South Station occurred on September 28, 2020. [14]

By 2020, the first train set was expected to enter revenue service in early 2022, with all train sets in service by late 2022, at which point Amtrak would retire the previous Acela fleet. [15] [16] [17] By February 2022, full high-speed testing was not expected to begin until later that year. [18] In May 2022, 15 of the 28 trainsets were in "some phase of production". [19]

Testing at up to 165 miles per hour (266 km/h) took place in 2022. As of May 2023, the first trainsets were expected to enter revenue service in 2024, three years behind schedule. Testing has revealed incompatibility issues due to the lack of tracks built to accommodate high-speed trains—Acela shares tracks with commuter lines and freight lines—and the age of infrastructure in the Northeast, some of which dates back almost two centuries. [20] [21]

In October 2023, a report from the Amtrak Office of Inspector General disclosed that the Avelia Liberty would likely go into service in the second half of 2024. [2]

On January 13, 2024, Amtrak announced that after thirteen previous failures, the Avelia Liberty had passed a series of computer simulations of running the trains over the Northeast Corridor tracks. Having passed the simulation, the trainsets were approved by the Federal Railroad Administration for on-track testing between Washington and Boston. [22]

Features and production

Although Amtrak initially favored a New Pendolino derivative, the train set trailers are based on the AGV and the power car design is based on that of the Avelia Horizon, designed for the French high-speed rail network (TGV), [23] but adapted to conform with North American railroad standards, including the U.S. Federal Railroad Administration (FRA)'s Tier III crashworthiness standards.

Besides containing more train sets than the prior generation, the new fleet will have train sets that each have 378 seats and 8 wheelchair locations for a total capacity of 386 passengers, allowing for 25% greater passenger capacity per train set. [6] [9] They will be equipped with an active tilt system, dubbed Tiltronix by Alstom and based on Pendolinos, that will allow higher speeds on curved portions of the corridor track at a maximum tilt angle of 6.3°. [9] [24]

Each Avelia Liberty train set has power cars at each end of the train, and (initially) nine articulated passenger cars. An additional three passenger cars can be added if demand grows. The power cars include a Crash Energy Management system to help meet the FRA's Tier-III standards while allowing a 30 percent reduction in train weight. [25] [26] These trains will also have USB ports, power sockets, Wi-Fi, accessibility features, touchless bathroom facilities, trip information displays, a café car, improved HVAC, and other conveniences. [27] [28]

The new train sets, along with track and signaling improvements, will allow for an initial improvement in maximum regular service speed to 160 mph (260 km/h) on some portions of the route. [29] Many infrastructure upgrades are underway or completed, allowing for more frequent service and faster speeds. [6] [30] [31] [32]

See also

Related Research Articles

<span class="mw-page-title-main">TGV</span> State-owned intercity high-speed rail service of France

The TGV is France's intercity high-speed rail service. With commercial operating speeds of up to 320 km/h (200 mph) on the newer lines, the TGV was conceived at the same period as other technological projects such as the Ariane 1 rocket and Concorde supersonic airliner; sponsored by the Government of France, those funding programmes were known as champion national policies. In 2023 the TGV network in France carried 122 million passengers.

<span class="mw-page-title-main">Alstom</span> French rolling stock manufacturer

Alstom SA is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional and urban trains along with trams.

<i>Acela</i> Intercity rail service operated by Amtrak in the northeastern United States

The Acela is Amtrak's flagship passenger train service along the Northeast Corridor (NEC) in the Northeastern United States between Washington, D.C. and Boston via 13 intermediate stops, including Baltimore, New York City and Philadelphia. Acela trains are the fastest in the Americas, reaching 150 miles per hour (240 km/h), but only over 49.9 miles (80.3 km) of the 457-mile (735 km) route.

<span class="mw-page-title-main">Northeast Corridor</span> Electrified railroad line in the Northeastern U.S.

The Northeast Corridor (NEC) is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak, it runs from Boston in the north to Washington, D.C., in the south, with major stops in Providence, New Haven, Stamford, New York City, Newark, Trenton, Philadelphia, Wilmington, and Baltimore. The NEC is roughly paralleled by Interstate 95 for most of its length. Carrying more than 2,200 trains a day, it is the busiest passenger rail line in the United States by ridership and service frequency.

<i>Pacific Surfliner</i> Inter-city rail service in Southern California

The Pacific Surfliner is a 350-mile (560 km) passenger train service serving the communities on the coast of Southern California between San Diego and San Luis Obispo.

<i>Metroliner</i> (train) Former express train between Washington, D.C., and New York City

The Metroliners were extra-fare high-speed trains between Washington, D.C., and New York City which operated from 1969 to 2006. They were briefly first operated by Penn Central Transportation, then by Amtrak for 35 years.

<span class="mw-page-title-main">Amtrak California</span> Caltrans passenger rail services

Amtrak California is a brand name used by the California Department of Transportation (Caltrans) Division of Rail for three state-supported Amtrak regional rail routes in California – the Capitol Corridor, the Pacific Surfliner, and the San Joaquins – and their associated connecting network of Amtrak Thruway transportation services.

<span class="mw-page-title-main">Bombardier–Alstom HHP-8</span> American electric locomotive

The Bombardier–Alstom HHP-8 is a twin-cab electric locomotive built for Amtrak and MARC by a consortium of Bombardier and Alstom. Its electrical system was based on Alstom's BB 36000 locomotive.

<span class="mw-page-title-main">Amtrak paint schemes</span> History of paint schemes applied to Amtrak locomotives and rail cars

Amtrak has used a variety of paint schemes (liveries) on its rolling stock since taking over intercity passenger rail service in the United States in 1971. A series of seven schemes termed Phases, first introduced in 1972, have seen the widest use. Phases primarily use geometric arrangements of red, white, and blue—the national colors of the United States—part of Amtrak's patriotic visual identity.

<span class="mw-page-title-main">New Pendolino</span> Italian high-speed tilting train

The New Pendolino is a class of high-speed tilting trains built by Alstom Ferroviaria for Trenitalia and Cisalpino.

<span class="mw-page-title-main">AGV (train)</span> High speed train model

The AGV is a standard gauge, high-speed, electric multiple-unit train designed and built by Alstom.

<span class="mw-page-title-main">High-speed rail in the United States</span>

Plans for high-speed rail in the United States date back to the High-Speed Ground Transportation Act of 1965. Various state and federal proposals have followed. Despite being one of the world's first countries to get high-speed trains, it failed to spread. Definitions of what constitutes high-speed rail vary, including a range of speeds over 110 mph (180 km/h) and dedicated rail lines. Inter-city rail with top speeds between 90 and 125 mph is sometimes referred to in the United States as higher-speed rail.

High-speed rail service commenced in Poland on 14 December 2014, with the introduction of 20 non-tilting New Pendolino trainsets operating on 4 designated lines radiating out from Warsaw. Polish State Railways started passenger service using Pendolino trains operating at a maximum speed of 200 km/h on 80 km line Olszamowice-Zawiercie. From December 2017 there are two 200 km/h sections, 136 km long in total. All high-speed services operated by PKP in Poland are branded as Express Intercity Premium (EIP).

<span class="mw-page-title-main">Zefiro (train)</span> Canadian high-speed train

Zefiro is a family of high-speed passenger trains designed by Bombardier Transportation whose variants have top operating speeds of between 250 km/h (155 mph); 380 km/h (240 mph) and 400 km/h (250 mph).

<span class="mw-page-title-main">Euroduplex</span> French high-speed train

Avelia Euroduplex, more commonly known simply as Euroduplex or TGV 2N2 in France, is a high-speed double-decker train manufactured by Alstom. It is primarily operated by the French national railway company SNCF, and also in operation with the Moroccan national railway company ONCF. It is the 3rd generation of the TGV Duplex.

<span class="mw-page-title-main">Siemens Charger</span> North American diesel-electric passenger locomotive

The Siemens Charger is a family of diesel-electric/dual-mode passenger locomotives designed and manufactured by Siemens Mobility for the North American market.

<span class="mw-page-title-main">Avelia Horizon</span> High-speed train type made by Alstom

The Avelia Horizon, called TGV M by its main customer SNCF, is a high-speed passenger train designed and produced by Alstom. It has a broadly similar design to the TGV Duplex sets, with bi-level carriages and a push–pull configuration with a power car on either end. However, it is more energy efficient and provides lower operating costs.

<span class="mw-page-title-main">Siemens Venture</span> Single-level passenger railcar model

Siemens Venture is a type of locomotive-hauled passenger railroad car built by Siemens Mobility for the North American market. The cars are derived from the Siemens Viaggio Comfort cars used in Europe, with adaptations for North American operations. The cars entered service with Brightline in 2018 and with Amtrak Midwest in 2022. They have also been ordered by Amtrak for national and other state-supported routes, Via Rail, and Ontario Northland. The Venture cars will also be used on Amtrak’s Airo trainsets.

<span class="mw-page-title-main">Acela Express (trainset)</span> Trainset used on the Acela, Amtraks high-speed Northeast Corridor service

The first-generation Acela Express trainset is a unique set of vehicles used on the Acela, Amtrak's flagship high-speed service along the Northeast Corridor (NEC) in the Northeastern United States. When they debuted in 2000, the sets were the fastest in the Americas, reaching 150 mph (240 km/h) on 33.9 mi (54.6 km) of the route. They were built between 1998 and 2001 by a consortium of Alstom and Bombardier. Each set has two power cars derived from units that Alstom built for the TGV, and six passenger cars derived from the LRC that Bombardier built for Via Rail.

References

  1. "Avelia Liberty press kit". Alstom Transport. July 26, 2016. Archived from the original on July 26, 2020. Retrieved July 6, 2020.
  2. 1 2 Fitzgerald, Thomas (October 4, 2023). "Amtrak's inspector general says first of new $2 billion Acelas don't meet federal standards". Philadelphia Inquirer. Retrieved October 5, 2023.
  3. "Happy 15th Anniversary, Acela Express! — Amtrak: History of America's Railroad". history.amtrak.com. December 11, 2015. Retrieved May 31, 2023.
  4. Vantuono, William C. (August 27, 2016). "Alstom lands Amtrak next-gen NEC trainset contract". Railway Age. Simmons-Boardman Publishing Inc. Retrieved August 29, 2016.
  5. Chase, Randall. "Biden announces new funding for Amtrak Northeast Corridor". Business Insider. Archived from the original on March 10, 2021. Retrieved January 27, 2020.
  6. 1 2 3 "Amtrak Invests $2.4 Billion for Next-Gen High-Speed Trainsets and Infrastructure Upgrades" (Press release). Amtrak. August 26, 2016. Retrieved April 8, 2018.
  7. "Alstom to provide Amtrak with its new generation of high-speed trains" (Press release). Alstom. August 26, 2016.
  8. "Next-Generation High Speed Trains". Amtrak. Retrieved June 30, 2020.
  9. 1 2 3 Sneider, Julie (December 2016). "Amtrak's 'Liberty' will be the latest of Alstom's high-speed Avelia trains". Progressive Railroading. Retrieved April 8, 2018.
  10. "Production of next-generation Acela Express fleet underway". Railway Gazette International. October 11, 2017. Archived from the original on November 12, 2020. Retrieved October 20, 2017.
  11. Briginshaw, David (February 18, 2020). "Next-Gen Acela Enroute to TTCI". Railway Age. Retrieved June 30, 2020.
  12. Corselli, Andrew (May 22, 2020). "Amtrak Continues Testing on New Acela Fleet". Railway Age. Retrieved June 30, 2020.
  13. "Amtrak Procurement and Program Updates" (PDF). Next Generation Equipment Committee – 2019 Annual Meeting. American Association of State Highway and Transportation Officials. February 22, 2019. Archived from the original (PDF) on March 4, 2021. Retrieved March 15, 2019.
  14. Gaffin, Adam (September 28, 2020). "Acela replacement makes first trip to Boston". Universal Hub. Retrieved December 8, 2020.
  15. "First Amtrak Avelia emerges" . Railway Gazette International. Retrieved January 27, 2020.
  16. "New Acela Fleet fact sheet" (PDF) (Press release). Amtrak. Retrieved January 27, 2020.
  17. Jagodzinski, Chris (March 18, 2021). An Inside Look at the Next Generation Acela (Speech). Massachusetts Bay Railroad Enthusiasts Third Thursday.
  18. Ruppert, Daniel P. (February 25, 2022). "Update on Acquisitions And Capital Programs". PRIIA Section 305 Next Generation Corridor Equipment Pool Committee (NGEC). p. 6. Archived from the original on March 2, 2022.
  19. Cupper, Dan (May 24, 2022). "Amtrak invites press to inspect new-generation Acela". Trains. Retrieved February 5, 2023. Fifteen of the 28 sets are in "some phase of production," he said.
  20. Lazo, Luz (May 27, 2023). "Testing 'difficulties' delay launch of faster Acela trains, Amtrak says". The Washington Post. Archived from the original on May 27, 2023. Retrieved May 27, 2023.
  21. Mann, Ted (May 30, 2023). "Amtrak's New $2 Billion High-Speed Acela Fleet Slowed by Century-Old Tracks". Wall Street Journal. Retrieved May 30, 2023.
  22. Walker, Mark (January 13, 2024). "After Years of Delays, Amtrak Moves Toward Faster Trains in the Northeast". The New York Times. ISSN   0362-4331 . Retrieved January 14, 2024.
  23. "Production of next-generation Acela Express fleet underway". Railway Gazette International. October 11, 2017. Retrieved June 27, 2022.
  24. "More than providing tracks" (PDF). unlv.edu. Retrieved November 27, 2023.
  25. "Amtrak awards Northeast Corridor high speed train contract". Railway Gazette International . DVV Media UK Ltd. August 26, 2016. Archived from the original on September 19, 2020. Retrieved August 29, 2016.
  26. Luczak, Marybeth (April 1, 2022). "Acela Trainsets: Amtrak Reveals Interiors, New Revenue Service Date (UPDATED)". Railway Age.
  27. Barrow, Keith (August 8, 2018). "A look inside Alstom's Avelia Liberty". Railway Age. Retrieved March 26, 2021.
  28. Lazo, Luz (April 13, 2022). "Amtrak's faster, higher-tech Acela trains are delayed again". Transportation. The Washington Post. Archived from the original on April 13, 2022. Retrieved January 26, 2023.
  29. Alstom (2016). "Case Study: Amtrak Avelia Liberty" (PDF). Archived from the original (PDF) on October 11, 2016.
  30. "New Jersey High-Speed Rail Improvement Program". Amtrak. Retrieved December 2, 2020.
  31. Jacobs, Jennifer; Sink, Justin (January 30, 2023). "Amtrak Bottleneck Turns Biden's Focus to His Favorite Rail Route". Bloomberg. Archived from the original on January 31, 2023. Retrieved February 4, 2023.
  32. Kanno-Youngs, Zolan; McGeehan, Patrick (January 31, 2023). "Biden Offers Millions for New York Rail Tunnel, Courtesy of His Infrastructure Bill". New York Times. Archived from the original on January 31, 2023. Retrieved February 4, 2023.
External media
Video
Nuvola apps kaboodle.svg 'Avelia Liberty' on alstom.com
3D Models
Cube NoEdges RGBfaces 64px.png Avelia Liberty 3D model on alstom.com

Commons-logo.svg Media related to Avelia Liberty at Wikimedia Commons