The Turboliners were a family of gas turbine trainsets built for Amtrak in the 1970s. They were among the first new equipment purchased by Amtrak to update its fleet with faster, more modern trains. The first batch, known as RTG, were built by the French firm ANF and entered service on multiple routes in the Midwestern United States in 1973. The new trains led to ridership increases wherever used, but the fixed consist (set collection of rail vehicles) that made up a Turboliner train proved a detriment as demand outstripped supply. The high cost of operating the trains led to their withdrawal from the Midwest in 1981.
The second batch, known as RTL, were of a similar design but manufactured by Rohr Industries. These entered service on the Empire Corridor in the state of New York in 1976. The RTLs remained in service there through the 1990s, supplemented by several rebuilt RTGs. In the late 1990s and early 2000s, New York and Amtrak partnered to rebuild the RTLs for high-speed service; this project failed, and the last RTL trainsets left revenue service in 2003. After the settlement of legal issues, New York sold the remaining trainsets for scrap in 2012.
Amtrak assumed control of almost all private sector intercity passenger rail service in the United States on May 1, 1971, with a mandate to reverse decades of decline. Amtrak retained approximately 184 of the 440 trains which had run the day before. [1] To operate these trains, Amtrak inherited a fleet of 300 locomotives (electric and diesel) and 1,190 passenger cars, most of which dated from the 1940s–1950s. [2]
Amtrak acquired the Turboliners with multiple goals in mind. The Turboliners were expected to cost less to operate than a comparable diesel locomotive with conventional cars while having a higher operating speed, though this would be constrained by track conditions. Amtrak also hoped that introducing new equipment would generate favorable publicity. Two years into its existence, Amtrak was fighting the perception that it was making "cosmetic changes to hand-me-down equipment". New gas turbine trainsets could change that perception. [3]
The late 1960s and early 1970s saw several countries experimenting with gas turbine trains. The UAC TurboTrain had been in revenue service in the United States and Canada since 1968, with mixed results. [4] British Rail began testing the APT-E in 1972; for a variety of reasons, British Rail did not pursue gas turbine propulsion. [5]
RTG Turboliner | |
---|---|
In service | 1973–1994 |
Manufacturer | ANF |
Constructed | 1973–1975 |
Number built | 6 trainsets |
Number preserved | 0 |
Number scrapped | 6 |
Formation | Five cars |
Fleet numbers | 58–69 |
Capacity | 296 passengers |
Operators | Amtrak |
Specifications | |
Car length | 86 ft 1 in (26.24 m) |
Width | 9 ft 5+1⁄2 in (2,883 mm) [6] |
Maximum speed | 125 mph (201.2 km/h) |
Engine type | Turboshaft |
Power output |
|
AAR wheel arrangement | B-2 |
Bogies | Creusot-Loire |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
Notes/references | |
[7] |
The RTG (abbreviated from the French Rame à Turbine à Gaz, or gas turbine train) [8] model was an Americanized version of the French ANF T 2000 RTG Turbotrain (related to the prototype precursor to the very first TGV trainset, the TGV 001). The RTGs used European-style couplers (buffers and turnbuckles) between their cars, because they were built in France by ANF for SNCF. [9] Another change was the installation of top-mounted Nathan P1234A5 horns, a variation of the standard Nathan P5. [10] Amtrak obtained a permanent waiver from the Federal Railroad Administration which exempted the RTGs from the buff strength requirement of 800,000 pounds-force (3,600 kN). [11] The RTGs met a lower standard set by the International Union of Railways. [12]
Each trainset consisted of two power cars (which included seating), two coaches and a bar/grill. The trains were powered by a pair of 1,140 horsepower (850 kW) Turbomeca Turmo III turbines. [8] The cars rode on Creusot-Loire trucks. [13] The bar/grill, located at the center of the trainset, had table seating for 24. [14] The vestibules between the cars were partitioned by sliding doors: one at each end of the car, and a double set between the cars themselves. A passenger moving between cars thus had to pull open three sets of doors. The trains were not intended for use with high-level platforms, and there were no traps covering the steps down to platform level. [14] A five-car trainset could be configured with up to 44 coach seats in the end power cars, 80 coach seats in the middle coaches and to up 60 seats in the snack bar for a maximum of 308 passengers. [15]
Between 1985 and 1988, three RTG trainsets (numbered 64 to 69) were rebuilt at the Beech Grove Shops for the Empire Corridor in New York. Each trainset received an RTL-style nose and third rail capability for operation into Grand Central Terminal. A new 3,000 horsepower (2,200 kW) Turbomeca engine replaced the original. [16] The rebuilt units were designated RTG-II. [17]
Amtrak leased two RTG trainsets from ANF for 18 months in August 1973, at $85,000 per month with an option to purchase. [18] [19] These were based out of Chicago, and initially served the Chicago–St Louis corridor. Amtrak heralded the Turboliners as the "biggest travel news since the 747". David P. Morgan, editor-in-chief of Trains magazine, was aboard for the initial run from Chicago to St Louis on September 28, 1973, and came away with mixed impressions. He praised the large picture windows, comparing them favorably with the "rifle-slot-size" windows on the Budd Metroliner, but faulted the narrow aisles, difficult-to-navigate vestibules, and seat comfort. He found that the trains "[rode] reasonably well", even on rough track. [20]
Advantages over conventional diesel equipment included increased availability, higher speed through curves, and decreased weight which caused less wear on the tracks. [6] Impressed with their reliability, Amtrak purchased the trainsets outright and ordered another four trainsets, which entered service in 1975 on the Chicago–Milwaukee and Chicago–Detroit corridors. [21] [22] The purchase price for the six trainsets was $18 million. [18] Amtrak contemplated ordering an additional 14 trainsets for the partially electrified Northeast Corridor between Boston and New York City. Doing so would have required a significant rise in fares between the two cities, and the United States Department of Transportation blocked the proposal. [23]
Amtrak established a separate maintenance facility for all six trainsets in the Brighton Park neighborhood of Chicago, on the site of a former Gulf, Mobile & Ohio Railroad coach yard. [24] This facility closed in 1981 after the withdrawal of the RTGs from service; according to Amtrak, the trainsets were too expensive to operate compared to conventional equipment. The trainsets were mothballed at Amtrak's main maintenance facility in Beech Grove, Indiana. [21] [25] A contributing factor to the withdrawal was the spike in fuel prices after the Yom Kippur War. [22]
The three rebuilt RTG-II trainsets joined the RTL trainsets on the Empire Corridor in 1988. [16] Insufficient maintenance in the early 1990s reduced reliability and led to several fires in 1993–1994. Amtrak retired the RTG-IIs after one caught fire in Pennsylvania Station in New York on September 11, 1994. [26]
The two daily round-trips were branded Turboliner, replacing the individual names Abraham Lincoln and Prairie State . Amtrak repeated this experiment with the Detroit and Milwaukee corridors. Track conditions limited the new trainsets to 79 mph (127 km/h), but they were clean, comfortable, quiet and reliable. In the first year, the Chicago–St. Louis running time dropped from 5.5 to 5 hours. The Federal Railroad Administration refused a request from Amtrak to raise the speed limit to 90 mph (140 km/h), citing inadequate signalling along the route. The new trains had fallen out of favor by the end of 1974: food service was inadequate, and the five-car fixed consist could not handle demand. Amfleet coaches and new conventional diesels replaced both of the Turboliner trainsets in 1975. [27]
Turboliners arrived on the Detroit run on April 10, 1975. Additional equipment allowed Amtrak to add a round-trip in late April; the arrival of a third trainset in May made Chicago–Detroit the "first all-turbine-powered route". After one year of operation, ridership on the corridor had increased by 72 percent. The fixed capacity of 292 passengers on an RTL trainset proved an impediment; Amtrak could not add capacity when demand outstripped supply. Amtrak replaced one of the trainsets with a conventional locomotive hauling then-new Amfleet coaches in 1976; Turboliner service ended altogether by 1981 as more Amfleet equipment became available. [28]
Turboliners debuted on the Hiawatha corridor on June 1, 1975, and more trainsets began operating in 1976. As with the St. Louis and Detroit corridors, Amtrak dropped individual names in favor of the Turboliner branding in 1976, but reinstated these names in 1980. Turboliner equipment was withdrawn altogether in 1981. Their withdrawal was the end of Turboliner service in the Midwest. [29]
RTL Turboliner | |
---|---|
In service | 1976–2003 |
Manufacturer | Rohr Industries |
Constructed | 1976 |
Refurbished | 2003 |
Number built | 7 trainsets |
Number preserved | 3 (in storage - derelict condition) |
Number scrapped | 4 |
Formation | Five cars |
Fleet numbers | 2150–2163 (formerly 150–163) |
Capacity | 264 passengers |
Operators | Amtrak |
Lines served | Empire Corridor |
Specifications | |
Train length | 425 feet (130 m) |
Width | 10 ft (3.05 m) |
Maximum speed | 125 mph (201 km/h) |
Weight | 308 short tons (275 long tons; 279 t) |
Engine type | Turboshaft |
Power output | 2,280 horsepower (1,700 kW) |
Acceleration | 1 mile per hour per second (1.6 km/(h⋅s)) |
Electric system(s) | 600 V DC third rail into Grand Central Terminal or Pennsylvania Station |
Current collector(s) | Contact shoe |
AAR wheel arrangement | B-2 |
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
Notes/references | |
[30] |
Amtrak ordered another seven Turboliner trainsets, which were delivered between 1976 and 1977. [31] [32] [33] These were manufactured by Rohr Industries in Chula Vista, California, and were known as RTL Turboliners. [34] [35] They were based on the earlier RTG series, but had American-style Janney couplers throughout [9] and a different design of power car cab. [36] The standard configuration of each set was five cars: power cars at either end, a food service car, and two coaches. [30] In that configuration, each trainset could carry 264 passengers. [37] At times, Amtrak operated Turboliners with an additional coach cut into the consist. [38] These were the final gas turbine trainsets purchased by Amtrak; conventional diesel locomotive-hauled trains proved cheaper to operate. [39]
The RTL Turboliners were wider than the RTG Turboliners (10 feet or 3.05 meters versus 9 feet 5+1⁄2 inches or 2.88 meters) to accommodate more seating. The floor height was raised for use on the high-level platforms of the Northeast Corridor. Although the RTGs continued to operate under a waiver from the regulation, the RTLs were built to meet the Federal Railroad Administration's buff strength requirement of 800,000 pounds (362,873.9 kg). [6]
The RTL Turboliners were capable of third rail operation, allowing them to enter Grand Central Terminal and, later, Pennsylvania Station in New York City. [40] Under third rail operation the trains were limited to 45 miles per hour (72.4 km/h). [41] As it had with the earlier RTGs in the Midwest, Amtrak set up a separate maintenance facility in Rensselaer, New York. This facility opened on November 30, 1977, and cost $15 million. [42] As built, the RTLs carried 2,560 US gallons (9,700 L; 2,130 imp gal) of fuel, permitting an operational range of 950 miles (1,530 km). [30] The seven trainsets cost $32 million. [43]
The official inaugural run of the RTLs took place on September 18–19, 1976. Regular service on the Empire Corridor began on September 20. [43] Initially, the two trainsets were mostly confined to the New York–Albany shuttle, with a single round-trip each on Saturday and Sunday to Buffalo. [44] The New York–Montreal Adirondack received Turboliners on March 1, 1977, replacing conventional equipment. [45] By April 1977, Turboliners had displaced conventional equipment on most routes in upstate New York. Exceptions included some New York–Albany trains, as well as the long-distance Lake Shore Limited and Niagara Rainbow . [46] In 1989, after 12 years of operation, the availability of the fleet was at 90%. [41]
In 1995, Amtrak and the State of New York collaborated to rebuild a single RTL trainset at a cost of $2 million. This rebuild included a pair of new Turbomeca Makila T1 turbines, each capable of developing 1,600 horsepower (1,200 kW). [47] [48] The interiors were to be renovated, and the exterior paint scheme changed. Morrison-Knudsen rebuilt the power cars, while Amtrak overhauled the coach interiors at Beech Grove. The rebuilt trainset was designated RTL-II. In test runs on the Empire and Northeast Corridors, it reached a top speed of 125 mph (201 km/h), all the while consuming less fuel than previously. [49]
In 1998, Amtrak and the State of New York began the High Speed Rail Improvement Program, a $185 million effort to improve service over the Empire Corridor. A key component was the reconstruction of all seven RTL Turboliner trainsets to the RTL-III specification. New York selected Super Steel Schenectady to perform the work, and the first two trainsets were to enter service in 1999. Numerous delays pushed the start of service to April 2003. Of the five additional trainsets, originally scheduled to enter service in 2002, only one was completed and it never entered revenue service. [50] [51] All seven trainsets were renumbered in 2001 to prevent duplicate numbers with the new GE P42DCs and were painted in new Acela-style livery. [52] One of the rebuilt RTL-IIIs was tested on the night of February 15, 2001, reaching 125 mph (201 km/h). [53]
The first rebuilt RTL-III entered service on April 14, 2003. [37] [54] The agreement between Amtrak and New York provided that New York would take ownership of the rebuilt trainsets once Amtrak had "fully accepted" them for regular revenue service. Amtrak withdrew all RTL-IIIs from service in June after problems developed with the air-conditioning systems. In 2004, New York sued Amtrak in federal court for $477 million, both for not operating the trainsets and for failing to complete track work in the Empire Corridor to permit regular 125-mile-per-hour (201 km/h) operation. Amtrak mothballed the equipment at its maintenance facility in Bear, Delaware. Joseph H. Boardman, then-Commissioner of the New York State Department of Transportation (and a future president of Amtrak), accused Amtrak of "stealing" the trains and threatened to find a new vendor for the state's intercity rail service. [55] Conventional Amfleet equipment replaced the trainsets in revenue service.
In April 2005, New York reached a settlement with Super Steel to close the rehabilitation project for $5.5 million, requiring them to stop work on the project, cover remaining costs, and move four unfinished trains into storage at a nearby industrial park. This settlement, when added to the $64.8 million previously spent, brought total project expenses—the results of which were three rehabilitated trainsets and four others in various states of repair—to $70.3 million. [56] In 2007, Amtrak and New York settled their own lawsuit, with Amtrak paying New York $20 million. Amtrak and New York further agreed to commit $10 million each to implement track improvements in the Empire Corridor. [57] New York, which was paying $150,000 per year to store the unused trains, auctioned off its four surplus Turboliners in 2012 for $420,000, including spare parts; scrapping began in 2013. [58] [59]
The Empire Service is an inter-city rail service operated by Amtrak within the state of New York in the United States. The brand name originated with the New York Central Railroad in 1967. Trains on the line provide frequent daily service along the 460-mile (740 km) Empire Corridor between New York City and Niagara Falls via Albany, the state capital.
The Metroliners were extra-fare high-speed trains between Washington, D.C., and New York City which operated from 1969 to 2006. They were briefly first operated by Penn Central Transportation, then by Amtrak for 35 years.
The Pennsylvanian is a 444-mile (715 km) daily daytime Amtrak train running between New York City and Pittsburgh via Philadelphia. The trains travel across the Appalachian Mountains, through Pennsylvania's capital Harrisburg, the Pennsylvania Dutch Country, suburban and central Philadelphia, and New Jersey en route to New York. The entire train ride takes about 9 hours total: 1.5 hours between New York and Philadelphia, 2 hours between Philadelphia and Harrisburg, and 5.5 hours between Harrisburg and Pittsburgh.
The Adirondack is a daily intercity passenger train operated by Amtrak between New York City and Montreal. The scenic route follows the Empire Corridor through the Hudson Valley with major stops in Yonkers, Poughkeepsie, Albany–Rensselaer, and Schenectady. North of Saratoga Springs the route runs between the Adirondack Mountains and Lake Champlain until crossing the Canada–U.S. border at Rouses Point. Trains take approximately 11 hours to travel the 381-mile (613 km) route.
The Amtrak Cascades is a passenger train route in the Pacific Northwest, operated by Amtrak in partnership with the U.S. states of Washington and Oregon. It is named after the Cascade mountain range that the route parallels. The 467-mile (752 km) corridor runs from Vancouver, British Columbia, through Seattle, Washington, and Portland, Oregon, to Eugene, Oregon.
Michigan Services are three Amtrak passenger rail routes connecting Chicago, Illinois with the Michigan cities of Grand Rapids, Port Huron, and Pontiac, and stations en route. The group falls under the Amtrak Midwest brand and is a component of the Midwest Regional Rail Initiative.
The LRC is a series of lightweight diesel-powered passenger trains that were used on short- to medium-distance inter-city service in the Canadian Provinces of Ontario and Quebec.
The EMD SDP40F is a six-axle 3,000 hp (2.2 MW) C-C diesel–electric locomotive built by General Motors Electro-Motive Division (EMD) from 1973 to 1974. Based on Santa Fe's EMD FP45, EMD built 150 for Amtrak, the operator of most intercity passenger trains in the United States. Amtrak, a private company but funded by the United States government, had begun operation in 1971 with a fleet of aging diesel locomotives inherited from various private railroads. The SDP40F was the first diesel locomotive built new for Amtrak and for a brief time they formed the backbone of the company's long-distance fleet.
Amtrak has used a variety of paint schemes (liveries) on its rolling stock since taking over intercity passenger rail service in the United States in 1971. A series of seven schemes termed Phases, first introduced in 1972, have seen the widest use. Phases primarily use geometric arrangements of red, white, and blue—the national colors of the United States—part of Amtrak's patriotic visual identity.
Amfleet is a fleet of single-level intercity railroad passenger cars built by the Budd Company for American company Amtrak in the late 1970s and early 1980s. Budd based the Amfleet design on its earlier Metroliner electric multiple unit. An initial order for 57 cars in 1973 to supplement the Metroliners on the Northeast Corridor grew to two orders totaling 642 cars, sufficient to reequip all the services on the Northeast Corridor and many other routes around the United States. The first 492 cars, known as Amfleet I and completed between 1975 and 1977, were designed for short-distance service. A second order of 150 cars, known as Amfleet II and completed between 1980 and 1983, were designed for long-distance service. They were the last intercity passenger cars built by Budd.
The UAC TurboTrain was an early high-speed, gas turbine train manufactured by United Aircraft that operated in Canada between 1968 and 1982 and in the United States between 1968 and 1976. It was one of the first gas turbine-powered trains to enter service for passenger traffic, and was also one of the first tilting trains to enter service in North America.
The GE E60 is a family of six-axle 6,000 hp (4.5 MW) C-C electric locomotives made by GE Transportation Systems (GE) between 1972 and 1983. The E60s were produced in several variants for both freight and passenger use in the United States and Mexico. GE designed the locomotive for use on the Black Mesa and Lake Powell Railroad (BM&LP), a dedicated coal-hauling route in Arizona, which began operation in 1973. That same year GE adapted the design for high-speed passenger service on Amtrak's Northeast Corridor. The largest customer was Ferrocarriles Nacionales de México (NdeM), the state-owned railroad in Mexico, which bought 39 for a new electrification project in the early 1980s.
The Wolverine is a higher-speed passenger train service operated by Amtrak as part of its Michigan Services. The 304-mile (489 km) line provides three daily round-trips between Chicago and Pontiac, Michigan, via Ann Arbor and Detroit. It carries a heritage train name descended from the New York Central Railroad.
The Blue Water is a higher-speed passenger train service operated by Amtrak as part of its Michigan Services. The 319-mile (513 km) route runs from Chicago, Illinois, to Port Huron in Michigan's Blue Water Area, for which the train is named. Major stops are in Kalamazoo, Battle Creek, East Lansing, and Flint.
The Abraham Lincoln was a named passenger train operated by the Baltimore and Ohio Railroad from 1935 into the 1960s. The Abe Lincoln ran between Chicago and St. Louis on the B&O's subsidiary Alton Railroad. The train later passed to the Gulf, Mobile and Ohio Railroad, and then finally to Amtrak, which retained the name until 1978. Service between Chicago and St. Louis is now known by the umbrella term Lincoln Service. This train was the first streamlined passenger service to travel the 284 miles between Chicago and St. Louis, with Joliet, Bloomington-Normal, Springfield and Alton in between. Passengers can get a glimpse of the Mississippi River between Alton and St. Louis.
The Budd Metroliner was a class of American electric multiple unit (EMU) railcar designed for first-class, high-speed service between New York City and Washington, D.C., on the Northeast Corridor. They were designed for operation up to 150 miles per hour (240 km/h): what would have been the first high speed rail service in the Western Hemisphere. Although 164 mph (264 km/h) was reached during test runs, track conditions and electrical issues limited top speeds to 120 mph (190 km/h) in revenue service. The single-ended units were designed to be arranged in two-car sets, which were in turn coupled into four to eight-car trains.
The Horizon is a type of single-level intercity railroad passenger car used by Amtrak, the national rail passenger carrier in the United States. Amtrak ordered the cars to supplement their existing fleet of Amfleet I single-level cars used on shorter distance corridor trains. The design was based on the Comet railcar used for commuter railroads, but with modifications to make them more suitable for intercity service. Bombardier Transportation built 104 cars from 1988 to 1990 in two basic types: coaches and food service (café) cars.
The Twilight Limited was a named passenger train in the United States which initially operated between Chicago, Illinois, and Detroit, Michigan. The New York Central Railroad introduced the train in 1926, and it continued until the formation of Amtrak in 1971, although it lost its name in 1967. Amtrak renamed the train St. Clair, feeling that the name "Twilight Limited" had undesirable connotations and imagery for a company trying to save passenger rail service. Amtrak revived the name in 1976 for a new train frequency on the Chicago–Detroit corridor, and kept the name until all trains on that corridor were renamed Wolverine in 2004.
Siemens Venture is a type of locomotive-hauled passenger railroad car built by Siemens Mobility for the North American market. The cars are derived from the Siemens Viaggio Comfort cars used in Europe, with adaptations for North American operations. The cars entered service with Brightline in 2018 and with Amtrak Midwest in 2022. They have also been ordered by Amtrak for national and other state-supported routes, Via Rail, and Ontario Northland. The Venture cars will also be used on Amtrak’s Airo trainsets.