M-10003 to M-10006

Last updated
The M-10004 trainset at Reno, Nevada on a trial run. Cars are of the tapered cross-section type used with M-10000 to M-10002. City of San Francisco trial run 1936.JPG
The M-10004 trainset at Reno, Nevada on a trial run. Cars are of the tapered cross-section type used with M-10000 to M-10002.
One of the M-10003-6 trains (center left) along with EMD E6 locomotives and other streamlined cars. CNW Streamliners.jpg
One of the M-10003-6 trains (center left) along with EMD E6 locomotives and other streamlined cars.

The Union Pacific Railroad's M-10003, M-10004, M-10005, and M-10006 were four identical streamlined 2-car power car diesel-electric train sets delivered in May, June, and July 1936 from Pullman-Standard, with prime movers from the Winton Engine Corporation of General Motors and General Electric generators, control equipment and traction motors. One was for the City of San Francisco , two were for the City of Denver , and one was a spare set intended for both routes. In 1939, M-10004 was split and converted into additional boosters for the other sets, now renumbered CD-05, CD-06, and CD-07, all running on the City of Denver. The M-10001 power car became the other third booster. In this form, the three power sets ran until they were replaced by E8 locomotives in 1953, at which point they were scrapped.

Contents

Historical significance

The M-10003 through M-10006 represented the final development of the custom streamlined trainset on the Union Pacific. They followed the cab/booster unit concept pioneered with the M-10002 trainset. As totally separable and interchangeable cab/booster power sets, they set the path that EMC was to follow with introduction of their E series locomotive sets the following year. Union Pacific was able to maintain daily service on the Chicago-Denver run for seventeen years by dedicating three locomotive sets to that service and re-purposing power units from M-10001 and M-10004 (three total) to provide additional power and keep at least two of the locomotive sets in running condition at any given time.

Details

A Union Pacific City of Denver (M-10005 or M-10006), 1940 City of Denver 1940 Union Pacific.JPG
A Union Pacific City of Denver (M-10005 or M-10006), 1940

These power sets had stylistic elements in common with the Illinois Central's Green Diamond unit, which was completed just previous to them. Abandoning the "turret cab" styling of M-10000 through M-10002, these units adopted a new "automobile design" elevated cab, as with the Green Diamond, behind a longer nose than that of the Diamond. They shared a divided front air intake grille that dominated the nose, edged in shining stainless steel. Beneath, the pilot was edged and barred in stainless steel, very like the Diamond's. The Diamond kept the headlight at the top of the cab, while with these power sets a large headlight tipped the nose. The IC121 Diamond was a single power unit setup with a smaller articulated trainset, and in that regard had more in common with the earlier M-10001.

The copious round porthole-style windows on the power units became a "trademark" feature of Union Pacific locomotives for a number of years. The big shiny noses and portholes were imitated in the styling of UP's E2 locomotives from 1937.

Each power car had a 1,200 hp V16 Winton 201-A engine, generator, and a pair of two-axle powered trucks. The rear truck of the first power car and the lead truck of the second power car carried a span bolster to which both power cars were articulated, so they made one unified locomotive of B-B+B-B configuration and a total of 2,400 hp (1,800 kW).

M-10004 was matched with a trainset of tapered cross-section, low profile articulated cars of the type built for the earlier M-1000x trainsets. The first cars had been built in anticipation of another tapered turret cab locomotive, but Union Pacific decided instead to cancel the proposed turret cab, expand the set to nine cars, and match it with a more powerful locomotive set of the newer design. The lounge car of the M-10004 set was also built with a food preparation facility occupying its blind rear, which was revised with a new layout and porthole style rear windows between the train's City of San Francisco and City of Los Angeles service periods. The M-10005 and M-10006 trainsets were built straight-sided to increase interior space, semi-articulated, and shorter by two sleeper cars than the M-10004 set. All of the M-1000x trainsets were lower profile than standard passenger railcars.

Changes

The most significant change to the City of Denver power sets came in 1939, when they were converted from two-car, 2,400 hp sets to three three-car, 3,600 hp (2700 kW) sets using power equipment from M-10001 and M-10004. Other changes included a gyrating signal light installed below the main headlight after the Second World War, the loss of the stainless steel trim on the pilot, the addition of the Chicago and North Western Railway herald to the nose in addition to the Union Pacific one, and changed nose-side badges for the route. The original Armour Yellow and Leaf Brown livery was changed incrementally to the modern livery of Armour Yellow and Harbor Mist Gray roof and base, with red trim striping separating the main colors. That same footage shows two boosters in the power set, indicating service as City of Denver with the expanded M-10003 (CD-07) power set, and an eleven car consist, expanded from the original nine car consist with cars from either the M-10001 or M-10002 set. Slate gray was replaced with Harbor Mist Gray at some point after the mid-1940s. A publicity photo of M-10005 from 1949 shows the trainset with a Harbor Mist Gray roof and a single headlight.

Individual power set histories

The demands of long-distance high speed City train service taxed the ability of the M-1000x fleet to meet them. The original 2400 hp power sets with Winton 201A Diesel engines were underpowered for their service requirements and had a short lifespan for mechanical parts, with at best 100,000 miles between piston replacements. [1] These shortcomings led to various measures including equipment replacements, 50% redundancy in locomotives assigned to the Denver run, consolidating the motive power of locomotive sets for a 50% boost in power for the remaining sets, and using a locomotive set built for full-size trains instead of the type originally matched with the trainset.

M-10003, later CD-07

Despite the earlier number, the M-10003 was actually the last completed of the four. This was because the number M-10003 had been previously assigned to a projected sister trainset to M-10001, which was cancelled when Union Pacific sought a longer trainset with more power in order to meet demand. The number was reassigned to the fourth of the new locomotive sets.

The M-10003 was intended to be a spare power set, able to fill in on either the City of San Francisco or City of Denver if any of the other three locomotives needed maintenance. As of March 7, 1937, its booster unit was on loan to M-10002 on the Los Angeles run. In June 1937, it was decided to permanently assign it to the City of Denver and it was renumbered to CD-07. A third power car was added in 1939, the converted M-10001 power unit.

CD-07 remained in service on the City of Denver with the two other sets until March 1953, and was scrapped with them in summer that year.

M-10004, later LA-4

First completed was M-10004 in May 1936 for the City of San Francisco . The new power cars had vertical sides and higher profiles than the previous streamliners, but the rest of the train was built to the tapered-side profile of the M-10000 through M-10002 sets. It entered revenue service on June 14, 1936 but lasted only 18 months on the route before a train equipped with the new EMC E2 3-unit set SF-1, SF-2 and SF-3 took over that route. The train was then refurbished by the UP, renumbered LA-4 and placed on City of Los Angeles service in July 1938, paired with a train powered by the 3-unit E2 set of LA-1, LA-2, and LA-3 to double the service frequency on that route.

After less than a year as the City of Los Angeles, the LA-4 was replaced again, this time by a train equipped with the new EMC E3s LA-5 and LA-6 in March 1939. In June of that year, the lead power car of the train was rebuilt as a booster unit, renumbered to CD-06-C, and added to the former M-10006, now renumbered as CD-06. The trailing power car was added to the former M-10005, now CD-05, as CD-05-C. Both cars were scrapped with their respective power sets in 1953.

The car set from M-10004 became backup equipment in the City fleet, pressed into service after the wreck of the City of San Francisco in August 1939. The set was assigned to the City of Portland run, powered by the former LA-5 and LA-6 E3 locomotive set, between July 1941 and February 1947. The cars were assigned to service as a City of Denver set while the primary sets were renovated in late 1947, then stored in 1948 and scrapped in 1951.

M-10005, later CD-05

Completed in June 1936, M-10005 entered service as the first of two new streamliners, the "Denver twins", for the City of Denver service on June 18. After approximately a year of running that service, during which the train and its sister M-10006 had moved 129,000 passengers and travelled 765,000 miles (1,231,000 km) between the two, the train was renumbered CD-05.

In 1939, the former trailing power car of LA-4 (ex M-10004) was added as a third locomotive unit to the power set, giving it a total of 3,600 hp (2,700 kW), and the consist was lengthened by two cars, to nine.

In this form, CD-05 continued in service until March 1953, when it was replaced by new E8 units and scrapped a few months later.

M-10006, later CD-06

M-10006 followed a similar service life to its sister M-10005, being the second of the "Denver twins". It was renumbered to CD-06 in June 1937, and added the rebuilt first power car of LA-4 (ex M-10004) as its third power car in 1939. It was withdrawn alongside the other units during March 1953 and scrapped.

Related Research Articles

<i>City of Portland</i> (train)

The City of Portland was a named passenger train operated by the Union Pacific Railroad between Chicago, Illinois, and Portland, Oregon. It started service in June 1935, using the streamlined M-10001 trainset. With only one set of equipment the train left each of its terminals five times a month. The route used Chicago and Northwestern trackage between Chicago and Omaha, Nebraska until 1955, replaced by Milwaukee Road trackage.

<span class="mw-page-title-main">Streamliner</span> Vehicle incorporating streamlining in a shape providing reduced air resistance

A streamliner is a vehicle incorporating streamlining in a shape providing reduced air resistance. The term is applied to high-speed railway trainsets of the 1930s to 1950s, and to their successor "bullet trains". Less commonly, the term is applied to fully faired upright and recumbent bicycles. As part of the Streamline Moderne trend, the term was applied to passenger cars, trucks, and other types of light-, medium-, or heavy-duty vehicles, but now vehicle streamlining is so prevalent that it is not an outstanding characteristic. In land speed racing, it is a term applied to the long, slender, custom built, high-speed vehicles with enclosed wheels.

<i>City of Denver</i> (train) Streamlined passenger train of the Union Pacifiic Railroad

The City of Denver was a streamlined passenger train operated by the Union Pacific Railroad between Chicago, Illinois, and Denver, Colorado. It operated between 1936 and 1971. From 1936–1955 the Chicago and North Western Railway handled the train east of Omaha, Nebraska; the Chicago, Milwaukee, St. Paul and Pacific Railroad handled it thereafter. The train was the fastest long-distance train in the United States when it debuted in 1936, covering 1,048 miles (1,687 km) in 16 hours. For almost its entire career its principal competitor was the Chicago, Burlington and Quincy Railroad's Denver Zephyr. When Amtrak assumed operation of most intercity trains in the United States in 1971, it discontinued the City of Denver, preferring to use the Burlington's route between Chicago and Denver.

<i>City of Los Angeles</i> (train)

The City of Los Angeles was a streamlined passenger train between Chicago, Illinois, and Los Angeles, California via Omaha, Nebraska, and Ogden, Utah. Between Omaha and Los Angeles it ran on the Union Pacific Railroad; east of Omaha it ran on the Chicago and North Western Railway until October 1955 and on the Milwaukee Road thereafter. The train had number 103 westbound and number 104 eastbound.

<span class="mw-page-title-main">EMC E2</span>

The EMC E2 was an American passenger-train diesel locomotive which as a single unit developed 1,800 horsepower (1,300 kW), from two (2) 900 horsepower (670 kW) prime movers. These locomotives were typically operated as a unit set or ; where the three unit lashup developed 5400 horsepower. This was almost the ideal horsepower required for the tonnage of a 15 - 18 car passenger train, operated over the ruling grades of virtually all of the mileage between major American cities. The units were of the A1A-A1A wheel arrangement, and manufactured by Electro-Motive Corporation (EMC), later Electro-Motive Diesel (EMD) of La Grange, Illinois.

<span class="mw-page-title-main">M-10000</span> Streamlined petrol-electric trainset

The M-10000 was an early American streamlined passenger trainset that operated for the Union Pacific Railroad from 1934 until 1941. It was the first streamlined passenger train to be delivered in the United States, and the second to enter regular service after the Pioneer Zephyr of the Chicago, Burlington and Quincy Railroad.

<span class="mw-page-title-main">EMC TA</span>

The EMC-TA was a model of Diesel locomotive produced for the Chicago, Rock Island and Pacific Railroad by the Electro-Motive Corporation in 1937. The original six Rock Island Rocket streamliners were three- or four-car stainless-steel semi-articulated trainsets built by Budd Company, powered by six identical locomotives, #601-606. The locomotives were classified as model TA—the T indicating Twelve hundred hp (890 kW), the A indicating an A unit. The Rock Island Line was EMC's only customer for the TA locomotive model.

<span class="mw-page-title-main">EMD E-unit</span>

EMD E-units were a line of passenger train streamliner diesel locomotives built by the General Motors Electro-Motive Division (EMD) and its predecessor the Electro-Motive Corporation (EMC). Final assembly for all E-units was in La Grange, Illinois. Production ran from May 1937, to December, 1963. The name E-units refers to the model numbers given to each successive type, which all began with E. The E originally stood for eighteen hundred horsepower, the power of the earliest model, but the letter was kept for later models of higher power.

<span class="mw-page-title-main">EMC E1</span>

The EMC E1 was an early passenger-train diesel locomotive developing 1,800 hp, with an A1A-A1A wheel arrangement, and manufactured by Electro-Motive Corporation of La Grange, Illinois. They were built during 1937 and 1938 for the Atchison, Topeka and Santa Fe Railway for a new generation of diesel-powered streamlined trains. 8 cab-equipped lead A units and three cabless booster B units were built. The initial three locomotives were AB pairs built to haul the Santa Fe's Super Chief diesel streamliners, while the others were built as single A units to haul shorter trains. The locomotives were diesel-electrics with two 900 hp (670 kW) Winton 201-A engines each, with each engine driving its own generator to power the traction motors. The E1 was the second model in a long line of passenger diesels of similar design known as EMD E-units. All Winton 201A-engined Santa Fe passenger units, including the E1s, were extensively rebuilt into the 80-class E8M engines in 1952-53. These were similar to production E8 models, but derated to 2000 hp so as not to burn out the early traction (axle) motors.

<span class="mw-page-title-main">EMC 1800 hp B-B</span> Locomotive class

Electro-Motive Corporation produced five 1800 hp B-B experimental passenger train-hauling diesel locomotives in 1935; two company-owned demonstrators, #511 and #512, the Baltimore and Ohio Railroad's #50, and two units for the Atchison, Topeka and Santa Fe Railway, Diesel Locomotive #1. The twin engine power unit layout and multiple unit control systems developed with the B-B locomotives were soon adopted for other locomotives such as the Burlington Route's Zephyr locomotives built by the Budd Company in 1936 and EMC's own EMD E-units introduced in 1937. The B-B locomotives worked as proof-of-concept demonstrators for diesel power with the service loads of full size trains, breaking out of its niche powering the smaller custom Streamliners.

<span class="mw-page-title-main">M-10001</span> Streamlined diesel trainset


The Union Pacific Railroad's M-10001 was a diesel-electric streamlined train built in 1934 by Pullman-Standard with a power system developed by General Motors Electro-Motive Corporation using a Winton 201A Diesel engine and General Electric generator, control equipment and traction motors. It was the UP's second streamliner after the M-10000, their first equipped with a diesel engine and was a much longer train than its three-car predecessor. All cars were articulated—trucks were shared between each car. It was delivered on October 2, 1934, and was used for display, test and record-setting runs for the next two months before being returned to Pullman-Standard for an increase in its power and capacity, following which it was placed into service as the City of Portland train. It has been nicknamed "The Banana".

<span class="mw-page-title-main">M-10002</span> Streamlined diesel trainset

The Union Pacific Railroad's M-10002 was a diesel-electric streamliner train built in 1936 by Pullman-Standard, with prime movers from the Winton Engine division of General Motors Corporation and General Electric generator, control equipment and traction motors. It was the UP's third streamliner, and the last turret-cab streamliner.

<i>Pioneer Zephyr</i> American train

The Pioneer Zephyr is a diesel-powered trainset built by the Budd Company in 1934 for the Chicago, Burlington & Quincy Railroad (CB&Q), commonly known as the Burlington Route. The trainset was the second internal combustion powered streamliner built for mainline service in the United States, the first such train powered by a diesel engine, and the first to enter revenue service. The trainset consists of one power/storage car, one baggage/RPO/buffet/coach car, and one coach/observation car. The cars are made of stainless steel, permanently articulated together with Jacobs bogies. The construction incorporated recent advances such as shotwelding to join the stainless steel, and unibody construction and articulation to reduce weight. It was the first of nine similarly built trainsets made for Burlington and its technologies were pivotal in the subsequent dieselization of passenger rail service. Its operating economy, speed, and public appeal demonstrated the potential for diesel-electric powered trains to revitalize and restore profitability to passenger rail service that had suffered a catastrophic loss of business with the Great Depression. Originally named the Burlington Zephyr during its demonstration period, it became the Pioneer Zephyr as Burlington expanded its fleet of Zephyr trainsets.

<span class="mw-page-title-main">British Rail Class D16/1</span> Class of diesel electric locomotives

LMS No. 10000 and 10001 were the first mainline diesel locomotives built in Great Britain. They were built in association with English Electric by the London, Midland and Scottish Railway at its Derby Works, using an English Electric 1,600 hp diesel engine, generator and electrics.

<span class="mw-page-title-main">Pennsylvania Railroad class AA1</span>

The Pennsylvania Railroad's class AA1 comprised two experimental electric locomotives constructed in 1905 by the company's own Altoona Works with the assistance of Westinghouse. Intended as testbeds as the PRR began its electrification project, both locomotives remained service into the 1930s.

<span class="mw-page-title-main">SNCF Class BB 15000</span> Class of 65 French electric locomotives

The SNCF class BB 15000 is a class of 25 kV 50 Hz electric locomotives built by Alstom and MTE between 1971 and 1978. Initially 65 locomotives strong, the series was widely used on the whole French 25 kV network before losing services to TGV trains when the LGV Est went into service in 2007.

References

  1. Kettering, E.W. (29 November 1951). History and Development of the 567 Series General Motors Locomotive Engine. ASME 1951 Annual Meeting. Atlantic City, New Jersey: Electro-Motive Division, General Motors Corporation.

Further reading