Siemens Velaro | |||||||||
---|---|---|---|---|---|---|---|---|---|
| |||||||||
| |||||||||
|
Siemens Velaro is a family of high-speed electric multiple unit trains built by Siemens. It is based on the ICE 3 high-speed trains initially co-manufactured by Siemens and Bombardier for German national rail operator Deutsche Bahn (DB).
In 1994, Deutsche Bahn were the first to order 50 units of the high-speed trains, branded as ICE 3, that would eventually evolve into the Velaro family. This initial batch of ICE-3 trainsets was built by a consortium with Bombardier (acquired by Alstom), and first delivered for service in 1999. A version based on this train without Bombardier patents was developed by Siemens and has been marketed as Velaro since. Velaro derivatives have been introduced in Germany, Belgium, France, the United Kingdom, the Netherlands, Spain, China, Russia, and Turkey.
In July 2006, a Siemens Velaro train-set (AVE S-103) reached 403.7 km/h (250.8 mph), which was the world record for railed and unmodified commercial service trainsets. [1]
In 2018, Siemens announced a major design iteration termed Velaro Novo. [2] Private American rail company Brightline West was the first to select the Velaro Novo for its fleet in May 2024. [3]
The Velaro E is a version of the Velaro family used by RENFE for operations in Spain. In 2001, RENFE ordered sixteen Velaros [4] designated AVE Class 103. The order was later increased to a total of 26 trains. The first units were delivered in July 2005 and completed their first test runs in January 2006. The trains serve the 621 km (386 mi) Barcelona–Madrid line at speeds up to 310 km/h (195 mph) for a travel time of 2 hours 30 minutes.
On 15 July 2006, a train achieved a top speed of 403.7 km/h (250.8 mph) between Guadalajara and Calatayud on the Madrid-Barcelona line, this is the Spanish record for railed vehicles. Until 3 December 2010 it was also a world record for unmodified commercial service trainsets, as the earlier TGV (world record of 574.8 km/h or 357.2 mph) and ICE records were achieved with specially modified and shortened trainsets, and the Shinkansen (443 km/h or 275 mph, 1996) record was for a test (non-commercial) trainset.
The Velaro CRH3C is a Chinese version of the Velaro. In November 2005, China ordered 60 trains [4] for the Beijing–Tianjin Intercity Railway. The eight-car trains are very similar to Spain's Velaro E, but 300 mm (11.81 in) wider to fit in almost 50% more seats in a 2 plus 3 layout. In the CRH3C version, a 200-metre-long Velaro train will seat 600 passengers. [5] These trains were manufactured jointly by Siemens in Germany and CNR Tangshan in China. The first Chinese-built CRH3C was unveiled on 11 April 2008. [6]
CRH3C reached a top speed of 394.3 km/h (245.0 mph) during a test on the Beijing to Tianjin high-speed railway on 24 June 2008. [7]
The Velaro RUS is part of the Velaro family built for Russia. On 19 May 2006, Siemens announced an order from Russian Railways for eight Velaro RUS high-speed trains including a 30-year service contract. [4] The contract is in total worth €600 million. The trains, connecting Moscow with Saint Petersburg, and later also Saint Petersburg and Nizhny Novgorod (the service was temporarily discontinued from 1 June 2015 till 1 March 2018 [8] ) at a speed of up to 250 km/h (155 mph), are based on the ICE3 train standard but with bodies widened by 33 cm (13 in) to 3.265 m (10 ft 8+1⁄2 in) to take advantage of Russia's wide loading gauge. [9] They are also built to the 1,520 mm (4 ft 11+27⁄32 in) Russian track gauge, unlike other Velaro EMUs, which are standard gauge.
Four of the trains are for both 3 kV DC and 25 kV 50 Hz AC operation. The total length of each ten-car train is 250 m (820 ft 3 in), carrying up to 600 passengers.
Development and construction were carried out at Erlangen and Krefeld in Germany. Single-voltage EVS1 (3 kV DC) trains entered passenger service at the end of 2009 on the Moscow–St Petersburg route, [10] and the dual-system EVS2 trains entered service on the Nizhniy Novgorod route in 2010. [11]
It set a record for the fastest train in Russia on 2 May 2009, travelling at 281 km/h (175 mph) [12] and on 7 May 2009, travelling at 290 km/h (180 mph). [13]
On 19 December 2011 an order for an additional eight sets was signed in order to facilitate an increased number of services on existing lines and the expansion of new service elsewhere in the system. [14]
The Velaro D is specifically designed for Deutsche Bahn international services from Germany. Designated DB's Class 407, it is designed to run at speeds up to 330 km/h (205 mph) [15] and comply with Technical Specifications for Interoperability and enhanced crashworthiness requirements. [16] There are fire-proof equipment rooms and fire doors between cars. Velaro D is designed to be quieter and more reliable than the ICE 3 (Class 403/406).
The train is also expected to use up to 20% less energy than previous versions of ICE. This is achieved in part by improved body styling. It does not have the ICE3's panorama lounges which allow passengers in the end coaches a view of the tracks over the driver's shoulder. The Class 407 has 460 seats: 111 in first class, 333 in second class and 16 in the bistro car. In total this is 37 more seats than the ICE 3, even though the seat pitch is unchanged. This is achieved by putting the traction equipment in compartments at either end of the train instead of hiding it behind panels the length of the train. Unlike all previous ICE versions, the passenger seating is all open-plan and there are no compartments. [17]
The eight-coach Class 407 trains can couple up and work with their Class 403 and Class 406 predecessors. Eight of the 16 bogies per train are powered, and there are four independent sets of traction equipment per train: if two of them break down, the train can still run. For full international flexibility across Europe, it can function on any of four voltages. The fleet will be based in Frankfurt. [17]
In December 2008 Deutsche Bahn signed a €500 million order for 15 trainsets. [18] [19] The train's production stages were presented to the press in Krefeld on 28 April 2010, [20] and three completed cars were displayed by Siemens on 22 September 2010 at InnoTrans. [21] In June 2011, Deutsche Bahn ordered an additional Velaro D set (increasing the total to 16) in order to replace an ICE3MF set damaged in an accident in August 2010. [22]
Velaro D was meant to go into service starting December 2011 [16] on services from Frankfurt to southern France via the new LGV Rhin-Rhône, and subsequently within Germany and on other international services to France, Belgium, Switzerland and the Netherlands. [17] Due to a series of delays in manufacturing and licensing no Velaro D trainsets were in service as of November 2012 and there was no schedule for their delivery. Only in December 2013 the first four trains delivered to DB were licensed for domestic operation as multiple units and started with passenger traffic. Four more trains were due to be delivered in spring 2014, whereas the remainder of eight trains shall be used for test runs in France and Belgium to gain type approval there. [23]
The specification of the Velaro D allows its access to the Channel Tunnel, [16] enabling DB to use it on the services it plans to operate from London to Amsterdam and Frankfurt. [24] Deutsche Bahn submitted safety documentation for the operation of Velaro D high speed trainsets through the Channel Tunnel to the Intergovernmental Commission in July 2011, [25] which in June 2013 granted a licence for passenger trains to DB. [26]
In 2012 and 2013, Siemens discussed with Deutsche Bahn the delivery of one more Velaro D set, free of charge, as compensation for the delivery and certification delays. This train was originally built for test purposes and features a different propulsion setup, utilizing permanent magnet AC synchronous motors as opposed to the traditional AC asynchronous motors. Siemens stated that this will allow a reduction in the number of propulsion units per train, while still maintaining train performance. [27] [28]
In 2019, Deutsche Bahn felt the need of further trains able to run at 300 km/h (190 mph) or faster for national and international use. Siemens offered its Velaro Novo, which was under development, and it offered an evolution of the Velaro D, designed for operation at 320 km/h (200 mph) and equipped with multi-system (MS) capability, hence labelled Velaro MS. Demanding a service-proven model, Deutsche Bahn ordered 30 Velaro MS for delivery starting in 2022. [29]
The first of these trains was completed in late 2021 and presented to the public in February 2022, marketed as ICE 3neo by Deutsche Bahn and bearing the DB class number 408. At the same time, the order was increased by 43 trainsets, with all 73 trains supposed to be in service by early 2029. [30] In May 2023, the order was increased by another 17 units, bringing the total number to 90.
The first class 408 unit entered revenue service in December 2022. International service started in June 2024, seeing the ICE 3neo replacing class 406 units on services to both Belgium and The Netherlands.
In October 2023, a new interior design for the Deutsche Bahn long-distance fleet debuted on a class 408 train with the 17th serial unit. All subsequent units will be rolled out with the redesigned furnishing. [31] [32] Like the Velaro D Class 407, the class 408 does not feature the panorama lounges behind the drivers cab as found in the early ICE 3 models class 403 and 406.
On 7 October 2010, it was reported that Eurostar had selected Siemens as preferred bidder to supply ten Velaro e320 [33] trainsets at a cost of €600 million (and a total investment of more than £700 million with the refurbishment of the existing fleet included) [34] to operate an expanded route network, including services from London to Cologne and Amsterdam. [35] These would be sixteen-car, 400-metre (1,312 ft 4 in) long trainsets built to meet current Channel Tunnel regulations, and would not be the same as the Velaro D sets which Deutsche Bahn propose to operate services between Germany and London. [35] The top speed will be 320 km/h (200 mph) and they will have 894-950 seats, unlike the current Eurostar fleet manufactured by the French Alstom, which has a top speed of 300 km/h (190 mph) and a seating capacity of 750. Total traction power will be rated at 16 MW (21,000 hp ; 22,000 PS ). [33] [36] [37] On the British system they are classified as Class 374 units.
The Velaro TR is a Velaro D derived eight-car standard gauge high-speed train for the Turkish State Railways (TCDD). The eight cars, totalling a length of 200 m (656 ft 2 in), can accommodate 519 passengers and reach a top speed of 300 km/h (190 mph). [38] [39] [40] 25 kV 50 Hz AC power the train with a total of 8 MW. [38]
In 2013, TCDD concluded four contracts with Siemens for the acquisition of 19 units in total (one unit for the first, six for the second, ten for the third and two for the last contract) [41] with a combined value of €685 million. (Excluding the last two sets.) [42] Furthermore, Siemens would provide 7 years of maintenance and cleaning for the first 7 sets, and also provide a simulator. [38] [42] For the remaining 12 sets Siemens would provide 3 years of maintenance and cleaning. [41] The Velaros are to be deployed on the Turkish high-speed railway network. The first Siemens Velaro (the only Velaro D type train of TCDD, code numbered HT80001) entered service on 23 May 2015 between Ankara-Konya. [40] [43] [44] The second Velaro of TCDD, which is the first Velaro TR type train, with the code number HT80101 (this type of train was involved an accident in Ankara) arrived in Ankara on 17 February 2016. [40] The last Velaro TR arrived to Turkey in 2021.(HT80118) [41]
Unlike the traditional white - red - dark blue color scheme used on the TCDD HT65000 high-speed trains, a white - turquoise - grey color scheme has been selected for the livery of TCDD's Velaro trains. [43]
In May 2022 it was announced that Egyptian National Railways had ordered 41 Velaro eight-car sets, amongst other railway equipment, for a 2,000 km (1,243 mi) railway development. [45] In May 2024, the first of the "Velaro EGY" high speed trainsets was undergoing dynamic testing at the Wegberg-Wildenrath circuit in Germany ahead of delivery later the year. [46]
The Velaro Novo is Siemens's concept for the next generation of high speed train, announced in June 2018. It would be lighter and more efficient than previous designs, with a top speed of 360 km/h (225 mph). [2] [47] The company claims to achieve these improvements via lightweight construction techniques and reduced aerodynamic drag by fully covered, inside bearing bogies. By 2024, no full trainset had yet been produced except for one prototype car that has been running as part of a Deutsche Bahn ICE-S test train since April 2018. [48]
Siemens has branded the Velaro Novo for the US market as the American Pioneer 220. In May 2024, Siemens announced that Brightline had selected them to produce ten seven-car trainsets for their Rancho Cucamonga–Las Vegas route (Brightline West) that is planned for completion in 2028 (before the 2028 Summer Olympics). [3] [49] [50]
Siemens has broken ground on a new facility in Horseheads, New York to produce the trainsets for Brightline West. [51]
The Velaro platform has been customized for each variant according to operational needs:
AVE Class 103 | CRH3 | Sapsan | DB Class 407 [53] | BR Class 374 | TCDD HT80000 | DB Class 408 | |
---|---|---|---|---|---|---|---|
Operator | RENFE, Spain | China Railway, China | Russian Railways, Russia | Deutsche Bahn, Germany | Eurostar, Western Europe | TCDD Taşımacılık, Turkey | Deutsche Bahn, Germany |
Date of initial order (service entry) | 2001 (2007) | 2005 (2008) | 2006 (2009) | 2008 (2013) | 2010 (2015) | 2013 (2015) | 2019 (2022) |
Length | 200 m (660 ft), 8 cars with 460 seats | 200 m (660 ft), 8 cars with 601 seats | 250 m (820 ft), 10 cars with 604 seats | 200 m (660 ft), 8 cars with 460 seats | 390 m (1,280 ft), 16 cars with more than 900 seats | 200 m (660 ft), 8 cars with 516 seats | 200 m (660 ft), 8 cars with 439 seats |
Weight | 425 t | 447 t | 667 t | 454 t | 454 t | 460 t | |
Maximum speed | 350 km/h (220 mph) | 380 km/h (240 mph) [54] | 350 km/h (220 mph) | 320 km/h (200 mph) | 320 km/h (200 mph) | 320 km/h (200 mph) | 320 km/h (200 mph) |
Power output | 8,800 kW (11,800 hp) | 8,800 kW (11,800 hp), 18,400 kW (24,700 hp) (CRH380BL) [55] | 8,000 kW (10,728 hp) | 8,000 kW (10,728 hp) | 16,000 kW (21,000 hp) | 8,000 kW (10,728 hp) | |
Tractive effort | 283 kN (64,000 lbf) | 300 kN (67,000 lbf), 515 kN (116,000 lbf) (CRH380BL) [56] | 328 kN (74,000 lbf) | 300 kN (67,000 lbf) | |||
Power systems | 25 kV 50 Hz AC | 25 kV 50 Hz AC | 3 kV DC (EVS1", single-voltage), 25 kV 50 Hz AC, 3 kV DC ("EVS2", dual-system) | 25 kV 50 Hz AC, 15 kV, 16.7 Hz AC, 3 kV, 1.5 kV DC | 25 kV 50 Hz AC, 15 kV, 16.7 Hz AC, 3 kV, 1.5 kV DC | 25 kV 50 Hz AC | 25 kV 50 Hz AC, 15 kV, 16.7 Hz AC, 3 kV, 1.5 kV DC |
Axle arrangement | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ | Bo′Bo′+2′2′+Bo′Bo′+2′2′ +2′2′+Bo′Bo′+2′2′+Bo′Bo′ |
Eurostar is an international high-speed rail service in Western Europe, connecting Belgium, France, Germany, the Netherlands and the United Kingdom.
High Speed 1 (HS1), legally the Channel Tunnel Rail Link (CTRL), is a 109.9-kilometre (68.3-mile) high-speed railway linking London with the Channel Tunnel.
Intercity Express is a high-speed rail system in Germany. It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway, Deutsche Bahn. ICE fares are fixed for station-to-station connections, on the grounds that the trains have a higher level of comfort. Travelling at speeds up to 300 km/h (190 mph) within Germany and 320 km/h (200 mph) when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights.
The Siemens Desiro is a family of diesel or electric multiple unit passenger trains developed by Siemens Mobility, a division of the German Siemens AG conglomerate. The main variants are the Desiro Classic, Desiro ML, Desiro UK and the later Desiro City, Desiro HC and Desiro RUS. The trains are mostly used for commuter and regional services, and their rapid acceleration makes them suitable for services with short distances between stations. The design is flexible, and has become common in many European countries.
The Ligne à Grande Vitesse Nord, typically shortened to LGV Nord, is a French 333-kilometre (207 mi)-long high-speed rail line, opened in 1993, that connects Paris to the Belgian border and the Channel Tunnel via Lille.
Thalys PBKA is a high-speed trainset, manufactured by the French company GEC-Alsthom, and used on the international Eurostar service. Originally built for Thalys they were intended to operate between Paris, Brussels, Köln and Amsterdam, forming the abbreviation PBKA. They were initially intended to be sole rolling stock of the service, but their extreme cost and complexity due to their quadri-current capability led the order of a simpler tri-current sister class, the Thalys PBA, a TGV Réseau derivative, with which they can work in multiple.
The HSL 2 is a Belgian high-speed rail line between Leuven and Ans and is 66.2 km (41 mi) long, all of it on dedicated high-speed tracks, which began service on 15 December 2002. As part of the Belgian railway network, it is owned, technically operated and maintained by Infrabel.
The ICE 2 is the second series of German high-speed trains and one of six in the Intercity-Express family since 1995. The ICE 2 (half-) trains are even closer to a conventional push–pull train than the ICE 1, because each train consists of only one locomotive, six passenger cars and a cab car. The maximum speed is 280 km/h (175 mph), but this is limited to 250 km/h (155 mph) when the cab car is leading the train and even further down to 160 km/h (100 mph) when two units are coupled at the powerheads due to the forces on the overhead line by their respective pantographs.
The Turkish State Railways (TCDD) started building high-speed rail lines in 2003. TCDD has branded its high-speed service as Yüksek Hızlı Tren (YHT) which currently operates on three lines: the Ankara–Istanbul high-speed railway, the Ankara–Konya high-speed railway and the Ankara-Sivas high-speed railway. YHT is the only high-speed rail service in Turkey, with two types of EMU train models operating at speeds of up to 250 km/h (155 mph) (HT65000) or 300 km/h (186 mph) (HT80000).
ICE 3, is a family of high-speed electric multiple unit trains operated by Deutsche Bahn. It includes classes 403, 406,407 and 408, which are additionally specified as ICE 3, ICE 3M, New ICE 3 and ICE 3neo respectively. Three multisystem trains, known as ICE International, are owned by Nederlandse Spoorwegen. ICE 3 trains have a maximum speed of 320 km/h (200 mph) when travelling on the high-speed rail lines, however class 403 are permitted to go up to a maximum speed of 330 km/h (210 mph) when it travels on the high-speed route between Frankfurt and Cologne.
The CRH3 Hexie is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin intercity railway line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing intercity railway. It is capable of service speed of 380 km/h (236 mph) as the very similar Velaro E used in Spain, but, similarly to the Sapsan, it is 300 mm (11.8 in) wider to take advantage of a more generous structure gauge and thus be able to fit in more seats in a 2+3 layout.
The Renfe Class 103 is a high-speed train used for the AVE service and operated in Spain by the state-run railway company RENFE. The trainset is also known as S103 or S/103.
The DBAG Class 605, commonly known as the ICE TD is a high-speed diesel multiple unit (DMU) train, formerly in service with Deutsche Bahn and DSB. It was retired from active passenger service in 2017 after years of operational issues with one trainset being kept and repurposed as a technology testbed.
The Sapsan is a Russian gauge high speed electric express train. The train is a Siemens Velaro model, which in turn is based on the ICE 3M/F high-speed trains manufactured by Siemens for the German Deutsche Bahn (DB), known as the Siemens Velaro.
France has a large network of high-speed rail lines. As of June 2021, the French high-speed rail network comprises 2,800 km (1,740 mi) of tracks, making it one of the largest in Europe and the world. As of early 2023, new lines are being constructed or planned. The first French high-speed railway, the LGV Sud-Est, linking the suburbs of Paris and Lyon, opened in 1981 and was at that time the only high-speed rail line in Europe.
High-speed rail is emerging in Russia as an increasingly popular means of transport, where it is twice as fast as the regular express trains between Moscow and Saint Petersburg.
Yüksek Hızlı Tren or YHT is a high-speed rail service in Turkey, operated by TCDD Taşımacılık, and is the railway's premier intercity train service. As of 2022, the network spans 1,385 km (860.6 mi) and services major cities like Istanbul, Ankara, Eskişehir, İzmit, Konya, and Sivas. Expansion of the system is underway and the network is expected to reach Edirne, Afyonkarahisar, Adana, and İzmir in the 2020s.
ICE 4 is a brand name for long-distance Intercity-Express high-speed trains being procured for Deutsche Bahn.
The British Rail Class 374, also referred to as the Eurostar e320, is a type of electric multiple unit passenger train used on Eurostar services through the Channel Tunnel to serve destinations beyond the core routes to Paris and Brussels. They began to run passenger services in November 2015. The trains, owned by Eurostar International Limited, are sixteen-coach versions of the Siemens Velaro. Each train is 390.2 m (1,280 ft) long. The trains are compliant with the Technical Specifications for Interoperability (TSI).
TCDD HT80000, also known as Siemens Velaro TR, is a series of high-speed electric multiple units built by Siemens for the Turkish State Railways. The EMUs are used for the Yüksek Hızlı Tren (YHT) services on the Turkish high-speed railway network and especially on the Polatlı–Konya high-speed railway, where they can reach a maximum speed of 300 km/h (186 mph).
{{cite web}}
: CS1 maint: bot: original URL status unknown (link)