Siemens Goole | |
---|---|
Built | 6 July 2020 – |
Operated | April 2024 - |
Location | Goole, East Riding of Yorkshire |
Coordinates | 53°41′57″N0°53′37″W / 53.6993°N 0.8937°W |
Industry | Rolling stock assembly |
Employees | 700 (projected) |
Architect | ARUP and AHR [1] |
Area | 67 acres (27 ha) |
Owner(s) | Siemens Mobility |
Siemens Goole is a train factory located in Goole, East Riding of Yorkshire, England. Siemens Mobility assessed several sites in the United Kingdom before settling on Goole with an intent to build the plant if it were successful in gaining orders for new rolling stock. After a June 2018 announcement that Siemens had won the bid to build 94 London Underground New Tube for London trains for the Piccadilly line of the London Underground, Siemens confirmed it would go ahead with building the factory, though this was then subject to further delays as other rolling stock companies objected to Siemens being given the contract.
In November 2018, the High Court upheld the decision to award the contract to Siemens, but allowed the other train companies to pursue claims for damages. Groundwork on the site commenced in July 2020.
During a period of sustained new train building for the United Kingdom rail network, [2] Siemens announced in March 2018 that it would build a train factory in the UK if it was successful in acquiring new contracts for trains. [3] Siemens have already built for the UK market with their Desiro family design which includes the class 185 DMUs, and the class 350 and 450 EMUs among others. [4] The company already employs over 4,400 people in the United Kingdom in rail and other transport related roles, with eight purpose–built sites that provide rolling stock care. [5] [note 1]
After searching for a suitable site, Siemens acquired some land in Goole, in the East Riding of Yorkshire, stating that on winning orders, they would build a factory there. [7] In June 2018, Siemens were awarded a £1.5 billion contract for 94 tube trains for the Piccadilly line. [8] This triggered the plan to build the factory making Siemens the fourth train builder with an actual factory presence in the UK and the third new build factory within eight years. [9] [note 2] Previous to this, the Bombardier factory in Derby was the only UK based train builder. [8]
The plant will cost £200 million and cover a 67-acre (27 ha) area and employ 700 people in its factory. [10] 250 jobs will be created in building the factory with a further estimated 1,700 indirect jobs in the supply chain. The plant would use an existing siding in Goole that leads to a glass factory to provide access and egress for trains and will be sited on the Goole 36 industrial park adjacent to Junction 36 of the M62 motorway. [11] There will be a manufacturing and commissioning site, offices, warehouses, stabling sidings and there is space for a test track to be installed, [12] though what Siemens described as "extensive testing", would take place at their facility in Wildenrath, Germany. [13] The buildings would cover 807,293 square feet (75,000 m2) and the internal lines in the complex would total 7 miles (12 km). [14] Groundbreaking for the factory happened in late 2019, with full opening planned for 2023–2024. [15] Siemens announced in March 2024 that the plant would start building stock for the Piccadilly Line in April 2024. [16]
In the £1.5 billion deal, [17] the factory will build the trains in the Inspiro range already in use by other operators and is to replace old Tube stock from 1973. [18] The contract details 564 cars to be built (which will be marshalled into 94 trains) with an option of a further 150 trains for the Deep Tube upgrade. The initial order is expected to be complete in 2026. [19] 80% of the trains will be produced at Goole, up from the half previously planned, with some carriages being constructed in Vienna so that the order can be started before the factory at Goole is up and running. [20]
The announcement of Siemens as the winning bid led to criticism of that decision by the then MP for Sedgefield, Phil Wilson. Wilson stated that it was a "slap in the face" for the workers at the railway rolling stock factory at Newton Aycliffe run by Hitachi, as they have the skills and ability to build the trains, whereas the Siemens bid has to wait on its factory to be built. [21]
Siemens was one of four train builders invited to bid for the contract to provide rolling stock for the HS2 line. [note 3] [22] One of the stipulations of the contract was that if the new high-speed trains were not going to be built in Britain, then they should at least be assembled there. If Siemens/Alstom were successful, the trains could be assembled at Goole or at Alstom's plant at Widnes. [23]
In July 2018, the trainmakers Bombardier and Hitachi, who submitted a joint bid for the Deep Tube contract, filed papers with the High Court in London in an attempt to overturn the Siemens contract. For legal reasons, no comment was issued as to the nature of the complaint. [17] In November 2018, the High Court gave Siemens the right to build the new deep tube trains as per the contract, [24] but acknowledged that the other train companies involved were free to pursue claims for damages as he believed there was a case to answer. [25] Whilst the contract is for 94 new trains, the company may extend this to 109 trains if Transport for London extend the contract. Siemens are also an interested party in bidding for other new tube train builds for the Bakerloo, Central and Waterloo & City lines. [26] The new plant may also be used as a location to construct trains for HS2 should Siemens be successful in gaining that contract. [25]
In April 2019, Siemens submitted their plans for the factory to East Riding of Yorkshire Council. This detailed a 104-acre (42 ha) site, of which 67 acres (27 ha) is "suitable" for development. At the same time, Siemens stated that their UK rolling stock engineering and commissioning team would move to the site and its Digital Operations Centre will also re-locate there. [27] Outline planning approval was granted in July 2019, with groundwork expected in spring 2020. [28]
COVID-19 related issues delayed the start on the factory, with groundwork commencing on 6 July 2020. [29] In February 2021, a Leeds-base company (GMI), were awarded a £40 million contract for building the factory and installing the 2.8 mi (4.5 km) track connection to the main railway line near Goole. [30] In February 2021, three carriages from a redundant Class 332 set, were re-vinyled and put on static display at the site. The carriages will be used to educate schoolchildren on visits and also host some training for apprentices at the factory. [31]
The factory was officially opened on 3 October 2024 by the Secretary of State for Transport Louise Haigh and the Mayor of London Sadiq Khan. [32]
Knottingley railway station serves the town of Knottingley in West Yorkshire, England. It lies on the Pontefract Line, operated by Northern, and is 16 miles (26 km) south east of Leeds railway station.
Derby Litchurch Lane Works, formerly Derby Carriage and Wagon Works, is a railway rolling stock factory in Derby, England. It is presently owned by the multinational transportation manufacturer Alstom.
The Intercity Express Programme (IEP) was an initiative of the Department for Transport (DfT) in the United Kingdom to procure new trains to replace the InterCity 125 and InterCity 225 fleets on the East Coast Main Line and Great Western Main Line. These new trains were designed and produced by Hitachi as part of their A-train family, classified as Class 800 electro-diesel units and Class 801 electric multiple units. Hitachi categorises the units as a part of the AT300 family and has referred to them as the Hitachi Super Express Train.
Agility Trains is a consortium that presently comprised the Japanese rolling stock manufacturer Hitachi, multinational insurance and investment company Axa UK, and the infrastructure fund GLIL Infrastructure.
The British Rail Class 700 is an electric multiple unit passenger train from the Desiro City family built by Siemens Mobility. It is capable of operating on 25 kV 50 Hz AC from overhead wires or 750 V DC from third rail. 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. As of 2021, they are operated by Govia Thameslink Railway.
The British Rail Class 345 Aventra is a fleet of electric multiple unit passenger trains built by Bombardier Transportation for use on London's Elizabeth line. Part of Bombardier's Aventra family of trains, the contract for their delivery was awarded as part of the Crossrail project in February 2014. A total of 70 nine-car units – each able to carry 1,500 passengers – were constructed in Derby between 2015 and 2019, at a cost of over £1 billion. The first unit entered service on 22 June 2017.
The York Leeman Road railway depot, located in York, England, is a passenger multiple unit depot opened in May 2007 by Siemens. It services TransPennine Express Class 185s and Class 68 locomotives.
The London Underground 2024 Stock, known as the New Tube for London (NTfL) during development, is a London Underground train being built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains.
Hitachi Newton Aycliffe is a railway rolling stock assembly plant owned by Hitachi Rail Europe, situated in Newton Aycliffe, County Durham, in the North East of England.
The British Rail Class 331 Civity is a class of electric multiple unit built by CAF, owned by Eversholt Rail Group, and currently operated by Northern Trains. A total of 43 units have been built – 31 three-car units and 12 four-car units. Construction of the trains started in July 2017 and they were phased into service from 1 July 2019.
The British Rail Class 769 Flex is a class of bi-mode multiple unit (BMU) converted by Brush Traction, and running in service with Northern Trains. The train is a conversion of the existing Class 319 electric multiple unit (EMU), a conventional unit type which had become surplus to requirements during the 2010s.
Leeds Midland Road depot is a locomotive and rolling stock maintenance facility located in Leeds, West Yorkshire, England. The site is located a few miles to the south-east of Leeds station on the line between Leeds and Castleford. Owned and operated by Freightliner, it is the heavy maintenance facility for its diesel and electric locomotives and wagon fleet.
Doncaster Sheffield Airport railway station was a proposed railway station in the Doncaster Sheffield Airport (DSA) terminal area to allow an interchange of services between rail and air. The area used to have a railway station called Finningley to the north-east of the airfield, and was used by personnel from the former Royal Air Force base that the airport is sited on. However, the proposed station would have been a new-build facility on a new section of railway connecting the airport with the East Coast Main Line (ECML).
The Werrington dive-under is a replacement dual track grade separated railway junction at Werrington Junction, 3 miles (5 km) north of Peterborough railway station in Cambridgeshire, England. The junction leads to the Great Northern/Great Eastern Joint line (GN/GE) which goes through Spalding to Lincoln and beyond. Completed and opened in December 2021, the dive under allows trains on the west side of the East Coast Main Line (ECML) to access the GN/GE line without conflicting with the faster passenger services on the ECML.
The British Rail Class 69 is a class of diesel locomotives which are converted from Class 56 locomotives. The conversion work is performed by Progress Rail at their workshop in Longport.
The British Rail Class 810 Aurora is a type of bi-mode multiple unit being constructed by Hitachi Rail for East Midlands Railway. Based on the Hitachi AT300 design, 33 five-car units will replace Class 222 units on EMR's intercity routes in 2025.
CAF Newport is a rolling stock factory located at Celtic Business Park, Llanwern, Newport, Wales. The site was announced as a train-building factory in 2016 and was producing rolling stock by 2018. It is owned and operated by CAF.
Washwood Heath depot is a planned depot in Washwood Heath, Birmingham for High Speed 2 (HS2), a high-speed railway line under construction in the United Kingdom. Planning permission for the 14 road site was granted in early 2023.
The HS2 rolling stock are trains for the under-construction High Speed 2 (HS2) high-speed rail line in the United Kingdom.
The Global Centre of Rail Excellence (GCRE) is a proposed train, railway infrastructure and technology testing facility, located in Onllwyn, Wales, where the site sits on the border between Neath Port Talbot and Powys.