You can help expand this article with text translated from the corresponding article in German. (December 2022)Click [show] for important translation instructions.
|
DBAG Classes 483 & 484 | |
---|---|
In service | 1 January 2021 –present [1] |
Manufacturer | Stadler-Siemens consortium |
Assembly | Stadler Pankow GmbH [2] |
Built at | |
Constructed | 2020–2023 |
Number built |
|
Formation |
|
Fleet numbers |
|
Capacity |
|
Operators | S-Bahn Berlin GmbH |
Depots | Grünau [3] |
Specifications | |
Car body construction | Aluminium |
Train length |
|
Width | 3.140 m (10 ft 3.6 in) |
Height | 3.600 m (11 ft 9.7 in) |
Floor height | 1.000 m (3 ft 3.4 in) |
Doors | Double-leaf sliding plug, each 1.300 m (4 ft 3.2 in) wide (3 per side per car) |
Wheel diameter | 820 mm (32 in) (new) |
Wheelbase | Bogies: 2.100 m (6 ft 10.7 in) |
Maximum speed | 100 km/h (62 mph) |
Traction motors | asynchronous 3-phase AC (6 or 12 total, 3 per car) |
Power output |
|
Tractive effort | Starting: 104 kN (23,000 lbf) |
Acceleration | Max.: 1.0 m/s2 (3.3 ft/s2) |
Electric system(s) | 750 V DC third rail |
Current collector(s) | Contact shoe |
UIC classification |
|
Safety system(s) | |
Coupling system | Scharfenberg [ citation needed ] |
Multiple working | Within class (max. 8 cars) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes/references | |
Sourced from [6] except where otherwise noted. |
Deutsche Bahn Classes 483 and 484 are related fleets of electric multiple unit (EMU) trains ordered by German railway operator Deutsche Bahn for use on the Berlin S-Bahn system. They are designed and manufactured by a consortium of Stadler Rail and Siemens Mobility. The first units entered public service on 1 January 2021.
The full fleet will comprise 21 two-car units of Class 483, referred to as "quarter trains", and 85 four-car units of Class 484, referred to as "half trains". [7] Each unit has a full driver's cab at each end. Units of both classes can work in multiple with each-other, allowing services to be run with trains of two, four, six, or eight cars in total as required. [6]
Stadler, the consortium leader, is responsible for the mechanical and structural aspects of the production process, as part of which the units' aluminium bodyshells are fabricated in Szolnok, Hungary, before being transported by road to the Stadler Pankow works in Berlin for final assembly. [8] [3] Siemens provide the bogies and the electrical subsystems, including the power supply gear, the traction and braking systems, the train control systems, and the passenger information equipment. [8] A significant part of the Siemens contribution is based on the company's work delivering the Oslo Metro MX3000 fleet between 2005 and 2012; the bogies are derived from the lightweight and low-height SF 1000 model used on vehicles for both Oslo and Nuremberg, [3] [9] and the weather-proofing –including the hermetic sealing of much of the power electronics equipment –is especially configured to guard against ice and snow ingress. [10]
The units' traction systems are designed to a high level of redundancy. Each vehicle in each unit is equipped with its own independent traction converter supplying the traction motors that are fitted to three out of the vehicle's four axles. [10] [6] This improves reliability, as on-board drive failures affect only individual vehicles while the rest of the train continues to function. [7] [10] Similarly, although each pair of vehicles shares a single auxiliary-supply converter, each converter has two independent sets of components, so that a failure of one set causes the loss of only half the supply rather than the whole. [10]
In a departure from previous S-Bahn Berlin practice, the vehicles of each unit are identified by letters rather than by individual numbers; thus the vehicles of unit 483 001 are identified as 483 001 A and 483 001 B, and so on. Vehicles of Class 484 units are identified by letters A to D in the same manner. [11]
The new units incorporate a number of new features designed to improve accessibility and comfort. Notably, they are the first trains on the Berlin S-Bahn to have air-conditioning fitted in the passenger saloons; due to height limitations imposed by the network's structure gauge, part of the system is installed under the vehicle floors. [2] [10] [12]
Wheelchair spaces are provided adjacent to each driver's cab, with folding ramps available at the relevant doors. [13] The exterior faces of all passenger doors have been painted black, to better contrast with the ochre-and-red coloured bodysides, and LED strips that illuminate green when the doors are open and red when they're closing are fitted at each door and vestibule. [13] [14] Audible indicators that sound when the doors are opening, and standing open, have been added in addition to the previously-required doors-closing alarm, which has been changed to match the European-standard warning tone used on mainline railways. [5] [note 1] CCTV is fitted throughout the trains, which can be remotely accessed by the network security centre in the event that an emergency alarm is activated. [13] Open gangways between the vehicles of each unit make it easier for passengers to move through the train, but internal doors are still provided should it be necessary to lock certain vehicles out of use. [10]
In addition to the front and rear destination displays carried by the previous Berlin S-Bahn fleets, the new units are fitted with side-facing displays at regular intervals along the train, and high-resolution internal screens that are capable of showing route diagrams and real-time journey updates. [13]
DB Regio subsidiary S-Bahn Berlin GmbH awarded a contract for the construction of 85 four-car and 21 two-car trains to the Stadler-Siemens consortium in December 2015. [16] A mock-up of the train was presented in October 2016, [17] and the first completed Class 484 train was rolled out on 27 June 2018. [18]
The trains were tested at Siemens' Wegberg-Wildenrath Test and Validation Centre, with the first of five units to be tested there arriving in late 2018. [3] Trial runs on the Berlin S-Bahn network started in September 2019, out of normal service hours. [19]
The first passenger services with the new trains started on 1 January 2021, on line S47 between Hermannstraße and Spindlersfeld, although these used a subfleet of 10 pre-production units and were technically still considered to be tests. [1] [3] The transition to "regular" service occurred in August 2021 after the pre-production units had satisfactorily demonstrated ongoing availability exceeding 99%. [1]
From December 2021, the new trains also began operating on line S45 to Berlin Brandenburg Airport (although this ended in December 2022). [13] The arrival of additional units allowed operations to expand to line S46 between Westend and Königs Wusterhausen from 27 July 2022, and then onto line S8 between Hohen Neuendorf and Wildau from 14 October 2022. [13]
Operation on the Ring lines S41 and S42, originally scheduled for April–October 2023, instead commenced on 11 December 2022. [13]
In September 2023, it was announced that all trains had entered service. [20]
The rolling stock on the Berlin U-Bahn are the main types of cars for the underground railway (subway). They are split into two general categories: Kleinprofil and Großprofil lines. The names refer to the size of the train's coaches. Großprofil coaches have a width of 2.65 m and a height of 3.4 m, and Kleinprofil coaches are only 2.3 m wide and 3.1 m high. Therefore, the trains have to operate on separate networks.
The Class 420 is a commuter electric multiple unit train type in service on German S-Bahn networks since 1972. Their use in Munich during the 1972 Summer Olympics earned them the colloquial name Olympiatriebwagen.
Stadler Rail AG is a Swiss manufacturer of railway rolling stock, with an original emphasis on regional train multiple units and trams, but moving also into underground, high speed, intercity and sleeper trains. It also produces niche products, such as being one of the last European manufacturers of rack railway rolling stock. Stadler Rail is headquartered at its place of origin in Bussnang, Switzerland. Stadler Rail employed 13,900 employees by 2023.
The Deutsche Bahn Class 423 EMU is a light-weight articulated electric railcar for S-Bahn commuter networks in Germany. The train has similar dimensions to its predecessor, the Class 420 EMU, but is significantly lighter and has one large passenger compartment, while that of the 420 is divided into three parts. The 423 additionally has six doors in each carriage, which is down from eight on the 420. They are numbered from 423 001 to 423 462.
Transdev Germany is the largest private operator of passenger buses and trains in Germany. It is a subsidiary of Transdev.
The Stadler GTW is an articulated railcar for local transport made by Stadler Rail of Switzerland. GTW stands for Gelenktriebwagen.
Die Länderbahn GmbH (DLB), formerly Vogtlandbahn GmbH, is a German rail transport company based in Viechtach, operating transport services originally only in the Vogtland, but now also on a regional basis. Die Länderbahn is a subsidiary of Regentalbahn AG, which is owned by Ferrovie dello Stato subsidiary Netinera. The term vogtlandbahn remains in use as a trademark of Die Länderbahn in Vogtland.
The Stadler Variobahn is a German-designed model of articulated low-floor tram and light rail vehicle. Since its introduction in 1993, the Variobahn has been manufactured variously by ABB, Adtranz, Bombardier Transportation, and since 2001 by Stadler Rail. As of 2009, 254 trams have been ordered, with an additional 110 on option. A unit costs about €2.5 million.
Stadler FLIRT is a passenger multiple unit trainset made by Stadler Rail of Switzerland. The baseline design of FLIRT is an electric multiple unit articulated trainset that can come in units of two to twelve cars with two to six motorized axles. The maximum speed is 200 km/h (125 mph). Standard floor height is 57 cm, but 78 cm high floors are also available for platform heights of 76 cm.
The Stadler Regio-Shuttle RS1 is the first widely used, new-generation, diesel railcar in Germany and Czech Republic for local railway services. Its most characteristic feature is the trapezium-shaped window frames. The Regio-Shuttle is classified by the Deutsche Bahn as Class 650, by the České Dráhy as Class 840 or Class 841, however numerous private railways have their own Regio-Shuttles.
The DBAG Class 474/874 is a three-car electric multiple unit train for the Hamburg S-Bahn. The class 474 were built to replace the nearly-60-year-old class 471 trains. Some units have a pantograph (474.3) to service the 2007 opened line to Stade on an overhead catenary track.
The DBAG Class 481/482 is an electric multiple unit train for the Berlin S-Bahn. The class 481 was designed to replace the aging rail cars after the German reunification in 1990. The first mock-up models were presented in 1993 with the first rollout on 22 January 1996.
The Stadler Citylink is a series of tram-trains manufactured by Stadler Rail at its Valencia factory since 2011. The design was introduced by Vossloh España before their takeover by Stadler Rail in 2015. They are currently used in Germany, Hungary, Mexico, Spain and the United Kingdom, with more on order in Austria. Stadler opened a new factory in the United States in 2016, which is in the process of building up to 80 Citylink vehicles for service in Salt Lake City beginning in 2028.
The MVG Class B is an electric multiple unit (EMU) train type operated by the Münchner Verkehrsgesellschaft on the Munich U-Bahn system. The prototypes were delivered in 1981, and the full-production units from 1987. A derivative of the Class B, the VAG Class DT2, is in service on the Nuremberg U-Bahn system.
The British Rail Class 777 METRO is a class of electric multiple unit passenger trains currently being delivered by the Swiss rolling stock manufacturer Stadler Rail, being used on the Merseyrail network in the Liverpool City Region and adjacent areas of Cheshire and Lancashire. The trains have the ability to operate on the third rail-powered sections of the network, with some units carrying onboard batteries to allow use on unpowered track. Ordered in 2016, construction of the units began in 2018. The first unit entered service on 23 January 2023, following delays to the deployment programme. The Class 777 will replace Merseyrail's current Class 507 and Class 508 units, which were built between 1978 and 1980. Seven units of the total 53 ordered are being configured as battery electric multiple units (BEMUs) for use on non-electrified lines, being designated subclass 777/1.
The BVG Class IK is a type of electrical multiple unit used on the Berlin U-Bahn.
The MVG Class C is an electric multiple unit (EMU) train type operated by the Münchner Verkehrsgesellschaft on the Munich U-Bahn system since 2002. It is the first type of rolling stock on the Munich U-Bahn that consists of more than two cars and features gangways between the individual cars.
The VAG Class DT3 is an electric multiple unit (EMU) train type operated by the Verkehrs-Aktiengesellschaft Nürnberg on the Nuremberg U-Bahn system. It is the first type of rolling stock on the Nuremberg U-Bahn that has gangways between the individual cars.
The British Rail Class 555 Metro is a class of electric multiple units, commissioned and built for the Tyne and Wear Passenger Transport Executive (Nexus) by the Swiss company Stadler Rail, at a total cost of £362 million, for use on the Tyne and Wear Metro. For operation on Network Rail controlled tracks between Pelaw Junction and Sunderland, they are designated on TOPS as the Class 555.
Tramlink is a family of three-, five- and seven- section low-floor trams, mostly of multi-articulated type, produced by Stadler Rail Valencia. The Tramlink was originally developed by Vossloh but has been manufactured by Stadler since they took over Vossloh's factory in Valencia in 2016.
Media related to Berlin S-Bahn train type 483/484 at Wikimedia Commons