ICE 4 | |
---|---|
Manufacturer | |
Built at |
|
Replaced | |
Constructed | 2015-2024 |
Number built | 137
|
Formation |
|
Capacity |
|
Operators | DB Fernverkehr |
Specifications | |
Train length | [5] |
Car length |
|
Width | 2,642 to 2,852 mm (8 ft 8 in to 9 ft 4+1⁄4 in) (internal/external) |
Height | 4,111 mm (13 ft 5+7⁄8 in) |
Platform height | 550 to 760 mm (21.7 to 29.9 in) ARL |
Wheel diameter |
|
Maximum speed |
|
Weight |
|
Traction system | Siemens SIBAS PN IGBT–VVVF |
Power output |
|
Acceleration |
|
Electric system(s) | 15 kV 16+2⁄3 Hz AC (nominal) from overhead catenary |
Current collector(s) | Pantograph |
UIC classification |
|
Safety system(s) | ETCS, LZB, PZB |
Coupling system | Scharfenberg Type 10 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Notes/references | |
Sources: Specifications [7] except where noted |
ICE 4 is a brand name for long-distance Intercity-Express high-speed trains being procured for Deutsche Bahn.
Procurement started around 2008 for replacements for locomotive-hauled InterCity and EuroCity train services, and was later expanded to include replacements for ICE 1 and ICE 2 high-speed trainsets. In 2011 Siemens Mobility was awarded the contract for 130 seven-car intercity train replacements, and 90 ten-car ICE train replacements, plus further options – the contract for the ten-car sets was modified in 2013 to expand the trainset length to twelve vehicles. The name ICx was used for the trains during the initial stages of the procurement; in late 2015 the trains were rebranded 'ICE 4', at the unveiling of the first train set, and given the class designation 412 by Deutsche Bahn.
Two pre-production trainsets had been manufactured by 2016, and were used for testing later that year, prior to the introduction of the main series in late 2017.
Around 2008 Deutsche Bahn began the tendering process to replace locomotive/coach trainsets on its long distance subsidiary, DB Fernverkehr's, InterCity and EuroCity train services. The initial announcement suggested that the tender would be for 100 to 130 trainsets. No specific train type was specified and DB did not intend to become involved with the design process - both locomotive-hauled trains such as Railjet or variations on the ICE 3 EMU design were considered to be options. The new trains were to be branded ICX and were expected to be similar in aesthetic design to the ICE3 trains; the design speed was expected to be in the 200 to 250 km/h (125 to 155 mph) range and to improve upon the energy efficiency of the units it replaced. [8]
The scope of the procurement was later expanded to include replacements for the ICE 1 and ICE 2 trains with a top speed of up to 280 km/h (175 mph), and the size of the order increased to up to 300 trains. Bids were received from Alstom and Siemens, with the Siemens bid including Bombardier Transportation as a subcontractor. Initial bids made in 2009 were said to be too high by DB, being over €5 billion. In 2010, DB announced that Siemens had been chosen as the preferred bidder for the procurement scheme, [9] and on 9 May 2011 DB and Siemens signed a contract for 130 ICx trains, plus a further 90 trainsets to be formalised at a later date, with an option for a further 80 sets. The trains were to be delivered by 2030, with the value of the 220 train deal estimated at around €6 billion. [10] Siemens' share of the contract for the intercity sets was later reported as being worth €3.7 billion to the company, reported to be the "biggest order in the company's history". [11]
In 2011 Siemens awarded Bombardier Transportation a subcontract for its contribution to the project valued at €2.2 billion, of which €1.3 billion was for the 130 'intercity' trains. Bombardier's contract included aerodynamic optimisation of the design, and supply of the bodyshells - initially expected to come from its Görlitz plant, with driving vehicle assembly to take place at its Hennigsdorf plant, and Flexx Eco bogies manufactured at its plant in Siegen. [10] The change in the initial order from 10 to 12 car ICE replacement trains (170 additional vehicles) resulted in a €336 million increase in the value of Bombardier's order. [12]
Bodyshells are also to be supplied from Bombardier's Wrocław plant (Poland). [13] In 2015 Bombardier contracted Panattoni Europe to build an additional 18,357 m2 (197,590 sq ft) manufacturing hall for the Wrocław plant, initially to be used for the construction of the ICx trains. [14]
Faiveley was awarded (late 2011/early 2012) contracts to supply brake equipment, including magnetic track brakes, and electropneumatic brake systems; as well as doors and air conditioning systems for the 130 unit intercity order. [15] [16]
Voith was contracted to supply parts of the nose of the trainsets, including GFRP cabin, the nose module and its opening hatches, coupling systems, and snow deflector. [17] [18]
Construction of the trainsets was expected to start in 2013, with two pre-production trains delivered by 2016. [10] With Alstom taking over Bombardier’s rail business in January 2021, Bombardier’s manufacturing responsibility of remaining sets on order were transferred to Alstom.
The initial contract with Siemens, signed 2011 specified a design allowing flexible train make-up (between 5 and 14 units), [19] with 24 different variants described; each composed of motor cars, and trailer cars. Two main variants were: a seven car, 499 seat trainset with 3 motor cars (K1n) and a top speed of 230 km/h (145 mph) - these were to replace locomotive hauled trains; the second was a ten car, 724 seat variant with 5 power cars (K3s) and a top speed of 250 km/h (155 mph), to replace ICE1 and ICE2 trains - the replacements were expected to be 20 tonnes lighter than the trains they replaced, resulting in claimed energy savings of 30% [7] [10]
Each trainset was to have a restaurant/bistro car, cycle storage, and a designated 'family area'. [7] [10]
The exterior design received a Red Dot design award in 2015. [20]
The K3 trains are to be for Germany, Austria and Switzerland, 12 of the K1 trains are to be operated into the Netherlands. [21]
On 5 March 2013, DB announced that it had approved a 12 car 250 km/h (155 mph) train configuration that would raise capacity over, and replace in the base order, the existing 10 car train - seating capacity would increase from 724 seats to 830 seats. The order was altered in expectation of growing ridership for DB's long-distance services. [1] In 2020, DB announced a further order of a 13-car configuration, with increased passenger capacity and a higher top speed. The 12-part ICE4 of the K3s classification will also be upgraded to 265 km/h (165 mph).
By 2013 DB had selected a site in Nippes, Cologne for a maintenance depot for all of its ICE fleet including future ICx trains. [22]
In April 2015 DB Systemtechnik began climatic testing on the ICx cab and other components. [23] Mainline test runs by DB Systemtechnik began on 25 September 2015. [24]
One pre-series-production trainset was formally unveiled at Berlin Südkreuz on 4 December 2015. The trainsets were re-branded ICE 4 at the same time (see also Intercity-Express), and given the network classification Class 412. [25]
On 16 September 2016, Siemens announced that the ICE 4 had been approved for operation by Federal Railway Authority (Eisenbahn-Bundesamt, EBA). Trial passenger operations commenced on Hamburg - Würzburg - Munich services on 31 October 2016 with full service expected from December 2017. [26]
On 26 September 2018, the DB board approved the purchase of 18 additional seven-car trainsets and 50 individual cars to be added to trainsets then on order. [27]
On 4 April 2019 it was announced that due to problems with the carriage frames of the ICE 4 trains, [28] Deutsche Bahn would not take delivery of any further trains. Manufacturers Siemens and Bombardier Transportation were asked by DB to fix the issues.
On 17 July 2019 it was announced that Siemens, Bombardier, and Deutsche Bahn had come to an agreement in which Siemens and Bombardier would fix the trains, which were deemed safe, between 2020 and mid-2023. Further, Deutsche Bahn would begin immediately accepting more deliveries of the trains. [29]
In 2020, it was announced that up to 50 13-car configurations would be put into service from 2021, known publicly as "XXL-ICE" trains. These longer trains will be 374 meters long, and carry up to 918 passengers. Their top speed will also be higher than other models, at 265 km/h (165 mph). [30] [31] [32] [33] In April 2023 the final 13-car train was delivered.
In June 2023 the outstanding orders for the ICE 4 were fulfilled with the delivery of the 137th unit, a 7-car train. Deutsche Bahn for now has chosen to further expand its ICE fleet with the ICE 3 Neo (Class 408) and ICE L.
The seven-car sets, K1s (former classification K1n), are formed as follows. [34]
Car No. | 27/37 | 26/36 | 25/35 | 24/34 | 23/33 | 22/32 | 21/31 |
---|---|---|---|---|---|---|---|
Designation | Apmzf 6812.2 | ARmz 8812.2 | Bpmbsz 7412.2 | Bpmz 3412.2 | Bpmz 3812.2 | Bpmz 3412.7 | Bpmdzf 7812.2 |
Class and function | 1. Class Cab car | 1. Class Bordrestaurant | 2. Class Servicewagen | 2. Class | 2. Class Cab car | ||
Seating capacity | 50 | 27 in 1. Class 16 in Restaurant | 44 | 88 | 59 +2 folding seats |
The 12-car sets, K3s, are formed as follows. [35]
Car No. | 14 | 12 | 11 | 10 | 9 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Designation | Apmzf 0812.0 | Apmz 1812.0 | Apmz 1412.0 | ARmz 8812.0 | Bpmbsz 6412.0 | Bpmz 9812.0 | Bpmz 2412.0 | Bpmz 2412.3 | Bpmz 4812.0 | Bpmz 2412.5 | Bpmz 2412.8 | Bpmdzf 5812.0 |
Class and function | 1. Class Cab car | 1. Class | 1. Class Bordrestaurant | 2. Class Servicewagen | 2. Class | 2. Class Cab car | ||||||
Seating capacity | 50 | 67 | 21 in 1. Class 22 in Restaurant | 38 | 88 | 59 +2 folding seats |
The 13-car sets, K4s, are formed as follows. [36]
Car No. | 14 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 2 | 1 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Designation | Apmzf 0812.0 | Apmz 1812.0 | Apmz 1412.0 | ARmz 8812.0 | Bpmbsz 6412.0 | Bpmz 9812.0 | Bpmz 2412.0 | Bpmz 2412.3 | Bpmz 4812.0 | Bpmz 2412.7 | Bpmz 2412.5 | Bpmz 2412.8 | Bpmdzf 5812.0 |
Class and function | 1. Class Cab car | 1. Class | 1. Class Bordrestaurant | 2. Class Servicewagen | 2. Class | 2. Class Cab car | |||||||
Seating capacity | 50 | 67 | 21 in 1. Class 22 in Restaurant | 38 | 88 | 59 +2 folding seats |
Intercity Express is a high-speed rail system in Germany. It also serves destinations in Austria, France, Belgium, Switzerland and the Netherlands as part of cross-border services. It is the flagship of the German state railway, Deutsche Bahn. ICE fares are fixed for station-to-station connections, on the grounds that the trains have a higher level of comfort. Travelling at speeds up to 300 km/h (190 mph) within Germany and 320 km/h (200 mph) when in France, they are aimed at business travellers and long-distance commuters and marketed by Deutsche Bahn as an alternative to flights.
The Siemens Desiro is a family of diesel or electric multiple unit passenger trains developed by Siemens Mobility, a division of the German Siemens AG conglomerate. The main variants are the Desiro Classic, Desiro ML, Desiro UK and the later Desiro City, Desiro HC and Desiro RUS. The trains are mostly used for commuter and regional services, and their rapid acceleration makes them suitable for services with short distances between stations. The design is flexible, and has become common in many European countries.
DB Fernverkehr AG is a semi-independent division of Deutsche Bahn that operates long-distance passenger trains in Germany. It was founded in 1999 in the second stage of the privatisation of Deutsche Bahn, under the name of DB Reise&Touristik and was renamed in 2003. As of 2024, DB Fernverkehr operates approximately 800 domestic and 250 international train services per day, utilizing 500 trainsets.
Siemens Velaro is a family of high-speed electric multiple unit trains built by Siemens. It is based on the ICE 3 high-speed trains initially co-manufactured by Siemens and Bombardier for German national rail operator Deutsche Bahn (DB).
The ICE 1 is the first batch-produced German high-speed train and one of six in the Intercity Express family. Revenue service at speeds up to 250 km/h (155 mph) started in 1991. It was raised to 280 km/h (175 mph) in May 1995 and temporary reduced to 250 km/h (155 mph) again, as a result of the Eschede accident.
The ICE 2 is the second series of German high-speed trains and one of six in the Intercity-Express family since 1995. The ICE 2 (half-) trains are even closer to a conventional push–pull train than the ICE 1, because each train consists of only one locomotive, six passenger cars and a cab car. The maximum speed is 280 km/h (175 mph), but this is limited to 250 km/h (155 mph) when the cab car is leading the train and even further down to 160 km/h (100 mph) when two units are coupled at the powerheads due to the forces on the overhead line by their respective pantographs.
The Intercity Experimental, later renamed ICE V, was an experimental train developed by the Deutsche Bundesbahn for research into high-speed rail in Germany. It is the predecessor of all Intercity Express trains of the Deutsche Bahn.
Metropolitan was the brand name of a German premium passenger train service between the cities of Cologne and Hamburg. Meant as an alternative to air transport, the first-class-only trains were operated from 1 August 1999 until 11 December 2004 by the Metropolitan Express Train GmbH based in Bad Homburg, a wholly owned subsidiary of the DB Fernverkehr wholly owned subsidiary of Deutsche Bahn AG.
The Alstom Coradia is a family of diesel multiple units, electric multiple units, and unpowered rail cars for intercity and regional service manufactured by Alstom, with variants operating in Europe, North America, and Africa.
ICE 3 is a family of high-speed electric multiple unit trains operated by Deutsche Bahn. It includes classes 403, 406,407 and 408, which are additionally specified as ICE 3, ICE 3M, New ICE 3 and ICE 3neo respectively. Three multisystem trains, known as ICE International, are owned by Nederlandse Spoorwegen. ICE 3 trains have a maximum speed of 300 km/h (190 mph) in Germany, 320 km/h (200 mph) when travelling on the French high-speed rail lines, class 403 are theoretically permitted to go up to a maximum speed of 330 km/h (210 mph) when travelling on the high-speed route between Frankfurt and Cologne.
Railjet is a high-speed rail service in Europe operated by Austrian Federal Railways (ÖBB) and Czech Railways (ČD). Branded as Railjet Express (RJX) for the fastest services and as Railjet (RJ) for services with additional stops, it was introduced in 2008 and operates at speeds of up to 230 km/h (143 mph). Railjet is ÖBB's premier service and operates both domestically within Austria and on international services to adjacent major cities in the Czech Republic, Germany, Switzerland, Italy, Hungary and Slovakia.
The CRH3 Hexie is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin intercity railway line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing intercity railway. It is capable of service speed of 380 km/h (236 mph) as the very similar Velaro E used in Spain, but, similarly to the Sapsan, it is 300 mm (11.8 in) wider to take advantage of a more generous structure gauge and thus be able to fit in more seats in a 2+3 layout.
DBAG Class 411 and Class 415 are German tilting electric multiple-unit high-speed trains in service with DB Fernverkehr, commonly known as ICE T, operationally referred as ICE-T / LPF-T in the timetable documents.
The DBAG Class 605, commonly known as the ICE TD is a high-speed diesel multiple unit (DMU) train, formerly in service with Deutsche Bahn and DSB. It was retired from active passenger service in 2017 after years of operational issues with one trainset being kept and repurposed as a technology testbed.
The Sapsan, also known as Velaro RUS EVS, is a Russian gauge high speed electric express train. The train is a Siemens Velaro model, which in turn is based on the ICE 3M/F high-speed trains manufactured by Siemens for the German Deutsche Bahn (DB).
Zefiro is a family of high-speed passenger trains designed by Bombardier Transportation whose variants have top operating speeds of between 250 km/h (155 mph); 380 km/h (240 mph) and 400 km/h (250 mph).
Intercity, often shortened to IC ), is the second-highest train classification in Germany, after the Intercity Express (ICE). Intercity services are locomotive-hauled express trains, usually over long-distances. There are Intercity routes throughout Germany and routes generally operate every other hour, with multiple routes giving a more frequent service on core routes. Intercity services are operated by the DB Fernverkehr division of Deutsche Bahn, Germany’s national railway.
Intercity 2, abbreviated as IC2, refers to DB Intercity trains formed of double-deck rolling stock. Such trains were first introduced by Deutsche Bahn Fernverkehr in December 2015 to replace its aging IC coaches.
ICE L is a long-distance locomotive-hauled push-pull train which is being built by the Spanish company Talgo for the German train operator DB Fernverkehr and is scheduled to commence operation from 2025. The name of the train was changed in 2021 from its previous working title ECx, with the L standing for low-floor entry. The trains form part of the manufacturer's Talgo 230 family of trains. The Talgo Travca locomotives ordered for the service are designated DB Class 105. They will replace old Intercity (IC) trains in Germany.
The Intercity Nieuwe Generatie, or ICNG is an electric multiple unit trainset of the Dutch Railways. In addition to supplementing the existing intercity rolling stock, it will replace the Bombardier TRAXX locomotives and Intercityrijtuig coaches on the high-speed line between Amsterdam and Belgium. This will provide the connection that was originally planned to be provided by the Fyra service, which was cancelled in 2013.
Media related to DBAG Class 412 at Wikimedia Commons