Several plans have been proposed for high-speed rail in Canada, the only G7 country that does not have any high-speed rail. [1] In the press and popular discussion, there have been two routes frequently proposed as suitable for a high-speed rail corridor: Edmonton to Calgary via Red Deer and Windsor to Quebec City via London, Kitchener-Waterloo, Toronto, Ottawa and Montreal.

Contents

Other proposed routes include international high-speed rail link between Montreal and Boston or New York City discussed by regional leaders, though little progress has been made; [2] [3] [4] On April 10, 2008, an advocacy group, High Speed Rail Canada, [5] was formed to promote and educate Canadians on the benefits of high-speed rail in Canada. [6]

Early high-speed rail in Canada

CN Rail created some early hopes with the UAC TurboTrain, in its Toronto–Montreal route during the 1960s. The TurboTrain was a true HST, achieving speeds as high as 201 km/h (125 mph) in regular service. The Turbo went 225 km/h (140 mph) in a speed run April 26, 1976 [7] and may have attained even higher speeds in test runs in 1968–69. [8]

CN's, and later Via Rail's, TurboTrain service was marred with lengthy interruptions to address design problems and having to cope with poor track quality (accounted for by dual passenger-freight use). As such, the trains were operated at 161 km/h (100 mph). The TurboTrain featured the latest technology advances such as passive coach tilting, Talgo attachment for rigid coach articulation and gas turbine power.[ citation needed ] The units were plagued by technical and reliability issues and were ultimately retired by 1982.

Beginning in the 1970s, a consortium of several companies started to study Bombardier Transportation's LRC, which was a more conventional approach to high-speed rail, in having separate cars and locomotives, rather than being an articulated train. Pulled by heavy conventional-technology diesel-electric locomotives designed for 201 km/h (125 mph) normal operating speed and inspired by the British InterCity 125, it entered full-scale service in 1981 for Via Rail, linking cities in the Quebec City–Windsor Corridor, but at speeds never exceeding the 161 km/h (100 mph) limit mandated by line signalling. It was the world's first active tilting train in commercial service.[ citation needed ]

Calgary–Edmonton

Map of Alberta showing the linear concentration of cities between Calgary and Edmonton. Alberta's Cities.png
Map of Alberta showing the linear concentration of cities between Calgary and Edmonton.

The Calgary–Edmonton corridor is about 300 km (190 mi) long and takes about three hours to traverse by car via the Queen Elizabeth II Highway.

2004 Van Horne Institute study

A 2011 update to a 2004 study by the Van Horne Institute [9] concluded that "high-speed rail would bring significant benefits to the Calgary–Edmonton corridor and Alberta as a whole". The report also stated that the project would "generate between $3.7 and $6.1 billion in quantifiable benefits". The study considered three options:

  1. Upgrade of an existing Canadian Pacific freight route to allow trains up to 240 km/h (150 mph) using Bombardier's JetTrain, costing approximately $2.5 billion.
  2. A new dedicated passenger route, known as the "Green Field" route, also using the JetTrain, and costing approximately $3.7 billion.
  3. An electrified version of the Green Field route, using TGV-style trains running at 300 km/h (190 mph), costing approximately $5 billion.

The report also found that there was little incremental benefit in running at 300 km/h (190 mph) rather than 240 km/h (150 mph), and therefore recommended the first option.

On September 22, 2006, the government of Alberta announced that it was deploying video cameras along a stretch of the Queen Elizabeth Highway to measure the number of cars that travel between the two cities. [10]

The Calgary Herald announced on April 18, 2007, that the provincial government had purchased land in downtown Calgary for a possible station or terminal. [11] On April 7, 2011, Premier Ed Stelmach said that the land being purchased for the new location of the Royal Alberta Museum could be used as the Edmonton terminal. [12]

Government plans

In 2011, Alberta Premier Alison Redford said that the high-speed rail was a priority for her, saying "such an initiative could unite the province and send a message to Canada and the world about Alberta's progress." [13] However, during the 2012 Alberta provincial election campaign, none of the four main party leaders said that they deny the need for one, but said that it was a "maybe". [14]

The Standing Committee on Alberta's economic future studied the feasibility of high-speed rail between Calgary and Edmonton in 2014. The committee also held hearings on the subject in early 2014 in Calgary, Red Deer and Edmonton. The report released in May 2014 stated that although Alberta was not ready for high-speed rail, the government should start planning for it by acquiring land along a transportation corridor. [15]

In 2015, the provincial New Democratic Party (NDP) government stated it was reviving the possibility of a bullet train operating between Edmonton and Calgary. The Minister of Infrastructure, Brian Mason, said the government had issued a request for a proposal to undertake the planning and implementation of a study "to determine the future needs for the QE II highway" due to high traffic volumes. "The high-speed train between Edmonton and Calgary is something that we're beginning to ask about," said Mason. The line would cost between $2.6 and $7 billion depending on the type of technology used. Annual operating costs of a high-speed rail line were estimated to be anywhere from $88 million to $129 million. [16] [17] Via Rail stated that such projects 'pay for themselves.' and that the government should invest more in the Canadian rail industry. The Liberal government of Canada also endorsed and prioritized investing heavily in national and provincial infrastructure projects. [18]

EllisDon announced on July 8, 2021, that it had formed a partnership with AECOM to plan a high-speed rail line between Calgary and Edmonton, running through Red Deer. The group formed by the partnership is named Prairie Link. EllisDon estimated the project would cost $9 billion. [19] The project was to be entirely financed by the private sector. [20] The memorandum of understanding (MOU) that was signed with Alberta had no financial commitment from the government. The director of Prairie Link, Jeffrey Hansen-Carlson, said that "The MOU essentially sets the stage for a cooperative relationship between Prairie Link and the government to support project development." Prairie Link also emphasized that regulatory issues would also be discussed with the government since there is little regulation for high-speed rail in Alberta. [20]

As of 2021, the project was in the planning and development phase. Construction was projected to begin in 2023 and last 7–9 years. The trains would have been capable of reaching speeds of 350–400 km/h (220–250 mph), [21] well over the 250 km/h (160 mph) threshold needed for newly built lines to qualify as high-speed under the general definition of the term. [22]

Quebec City–Windsor

2011 Windsor-Quebec City High-Speed Rail Map - EcoTrans 2011 Windsor Quebec City High Speed Rail Map - EcoTrans.jpg
2011 Windsor–Quebec City High-Speed Rail Map  EcoTrans

The Quebec City–Windsor corridor is the most densely populated and heavily industrialized region of Canada. With over 18 million people, it contains approximately half of Canada's population, the national capital, and three of the four largest metropolitan areas in Canada (Toronto, Montreal and Ottawa). It is already the focus of most Via Rail service. As of 2023, 26 studies have been completed on the idea of high-speed rail in the Ontario-Quebec Corridor and none have been implemented. [23]

1995 study

This study was initiated in 1992. The scope included "medium-fast" (200–250 km/h) and very fast (more than 300 km/h) technologies. It produced three reports: Quebec-Ontario High Speed Rail Project, Preliminary Routing Assessment and Costing Study, Final Report and Québec-Ontario High Speed Rail Project, Final Report. [24] [25]

Lynx consortium

In 1998, the Lynx consortium, including Bombardier and SNC-Lavalin proposed a 320 km/h (200 mph) high-speed train from Toronto to Quebec City via Kingston, Ottawa and Montreal based on the TGV and the French Turbo-Train technology. [26]

Bombardier JetTrain

In 2000, Bombardier developed the JetTrain. The high-speed train prototype generates its power to turn the wheels with a 5,000-horsepower (3.7 MW) Pratt and Whitney turbine. The Jet Train visited Calgary and Toronto in March 2003. The prototype then visited Miami on 7 October 2003 and Orlando on the 11th. After these promotional stops in the United States and Canada, no government purchased the Jet Train. The prototype is stored serviceable at the AAR/FRA Transportation Technology Center, at Pueblo, Colorado, United States.[ citation needed ]

2008 study

On January 10, 2008, Dalton McGuinty (Premier of Ontario), and Jean Charest (Premier of Quebec) announced their two provinces would conduct a joint $2 million feasibility study into the development of high-speed rail in the Quebec City–Windsor Corridor. The federal government agreed to participate in the study. [27] [28] In February 2009, The EcoTrain Consortium, consisting of firms Dessau, MMM Group, KPMG, Wilbur Smith & Associates and Deutsche Bahn International, were awarded a contract to update the feasibility studies for high-speed rail (HSR) in the Quebec City–Windsor corridor. The study was expected to take a year, [29] [30] but was delayed. [31] Michael Ignatieff, then-leader of the Liberal Party said in 2011 that he would agree to fund the Quebec corridor and described it as a means to unite the country, similar to early railway projects in Canada. [32] His NDP counterpart, Jack Layton, also pledged to fund the route. [33]

When the results of the study were released October 17, 2011, by the citizens group High Speed Rail Canada, [34] it revealed results for two technology alternatives: diesel traction and electric traction. Diesel traction would provide speeds of 200 km/h and would cost $18.9 billion for an entire Windsor–Quebec City system; a Montreal–Ottawa–Toronto system would cost $9.1 billion. Electric traction would provide speeds of 300 km/h and would cost $21.3 billion for an entire Windsor–Quebec City system; a Montreal–Ottawa–Toronto system would cost $11 billion. [35] The study further revealed that a Montreal–Ottawa–Toronto system is the most economically viable section and could generate a positive net economic benefit using either diesel or electric traction. [36]

After the report had been released, politicians and Chamber in Windsor area argued that having the less-expensive "higher speed rail" connection between Detroit, Michigan; and Windsor must be part of the consideration. Detroit is already part of higher speed rail initiative in the United States to connect to Chicago, Illinois, and to St. Louis, Missouri. They suggested that a study to include cross-border connection would account for greater economic impact. [37] [38]

Developments after 2014

In an interview with CBC Radio on April 15, 2014, ahead of the 2014 Ontario general election, Ontario Minister of Transportation Glen Murray announced that high-speed rail will be constructed between London, Kitchener, and Toronto within 10 years. [39] Further details were released by Murray in a speech April 30, 2014, in London. [40] Select results from a study prepared by a London, England–based consultancy, First Class Partnerships, was released to the public. The FCP study considered a range of options including continuing the existing service with LRC trains, incremental upgrading of the existing line with faster and more diesels, and construction of new sections of line. [41] However the full FCP study was not publicly released.

In an interview with 'International Rail Journal' on May 2, 2014, FCP disclosed a few further details. [42] Unlike the earlier EcoTrain study, which proposed to build a completely separate line for HSR, FCP proposed to share the existing rail corridor from Toronto to Georgetown which is being upgraded with 4 to 6 tracks and will be electrified for use by GO regional trains and Toronto's Union Pearson Express. In addition the FCP noted substantial traffic potential for a HSR line between Kitchener/Waterloo and Toronto. This contrasts with EcoTrain, which dismissed that corridor as being too short a trip to be attractive for HSR. FCP also noted the route from Kitchener to London would be across "open countryside" and reduce land acquisition issues. Murray said that next step was to prepare an environmental impact statement, and that the line might be implemented within 8 years. The project faced significant technical and political challenges. HSR trains will need to share tracks with GO regional, freight, and airport express trains. Between Bramalea and Georgetown, HSR trains will share the corridor with the Canadian National Railways main line.

In October 2014, High Speed Rail Canada announced that it would release to the public a number of feasibility studies done on the corridor. One was the FCP study of a line between London and Toronto [43] and the other was a study was done by the SNCF and funded by cities along the Quebec–Windsor Corridor for a HSR line between Windsor and Quebec City. [34]

High-speed rail within Ontario

On December 5, 2014, the Ontario Ministry of Transportation approved starting an environmental assessment on the best route for a high speed rail connecting Toronto, Kitchener–Waterloo, London and Windsor for 2015. [44] On October 30, 2015 the Government of Ontario announced that David Collenette would be the special advisor for high-speed rail. [45] Collenette delivered the Special Advisor's Final Report to the provincial government on December 2, 2016, [46]

On May 19, 2017, Ontario Premier Kathleen Wynne and Transport Minister Steven Del Duca announced the first steps in having a high-speed rail route in place by 2025 from Toronto to London, extending to Windsor by 2031, based on the recommendations on Collenette's report. The environmental assessment for this would reportedly be coordinated with the Metrolinx project to enable two-way, all-day GO Transit trains to Kitchener and will be sharing that corridor. Premier Wynne also said that design and planning would commence "immediately" along with the assessment. The announcement was criticized as a re-election tactic in anticipation for the 2018 Ontario general election, as the Liberal Party had announced similar plans for high speed rail in 2014, also ahead of a general election that same year. [47] However, with the election of a majority government for the Progressive Conservative Party of Ontario, the future of the high-speed rail proposal inherited from the Liberal Party became uncertain. [48] [49] In late 2018, it was reported that the new Ford government, while not outright cancelling the high-speed rail proposal, was expanding its scope to include alternatives such as increased Via Rail service, more bus capacity or improved highway infrastructure. [50] The 2019 provincial budget paused all funding for the high-speed rail proposal. [51]

High Frequency Rail

On July 6, 2021, procurement for the Via Rail's High Frequency Rail was announced. The service is planned to operate between Toronto and Quebec City partly along newly constructed tracks that would run pass through Peterborough, Ottawa, Montreal, Laval, and Trois-Rivières, and partly along existing right of way. The government's initial announcement envisioned trains operating at a maximum speed 200 km/h (124 mph), but the government has challenged its partners to come up with a design that can reach speeds up to 300 km/h (186 mph). [52] [53] [54] By segregating Via's passenger rail services from freight lines, travel times in some routes are expected to be reduced by up to 90 minutes, and service reliability is expected to increase from an average of 67% to 95%. [55]

There is no single definition for high speed rail but it is generally accepted that newly built lines capable of travelling at 250 km/h (155 mph) and upgraded lines capable of travelling 200 km/h (124 mph) qualify. [56]

Other proposed routes

Chilliwack–Whistler

In October 2020, a group known as the Mountain Valley Express Collective Society formed to propose the creation of a high-speed rail network for the Fraser Valley. The rail network was proposed as an alternative to supplement the growing capacity demands along the British Columbia Highway 99 corridor. The proposal was for an end-to-end transit system running from Whistler to Chilliwack, with stops in major municipalities like Surrey, Vancouver, and Squamish. [57] The BC provincial government did not formally approach the project.

Vancouver–Seattle

The Pacific Northwest Corridor is one of ten high-speed rail corridors proposed by the US federal government. If the 750 km (466 mi) corridor were completed as proposed, 180 km/h (110 mph) passenger trains would travel from Eugene, Oregon, to Seattle, Washington, in 2 hours 30 minutes, and from Seattle to Surrey, British Columbia, in 2 hours 50 minutes. A dedicated line parallel to existing tracks would decrease this time into 1 hour, with 400 km/h (250 mph) speed. The proposal is still being worked on.

The terminus on the Canadian side is proposed to be located at King George station in Surrey. This would leave passengers at the end of a public transit SkyTrain line to downtown Vancouver, a 40-minute addition to the trip. Surrey is east of Vancouver.

A second option is to run the line to Bridgeport in Richmond, BC. That is a 20-minute ride on SkyTrain to downtown Vancouver.

The State of Washington completed in December 2020 an ultra-high-speed study titled, "Cascadia High Speed Ground Transportation". The Cascadia ultra-high-speed ground transportation (UHSGT) system would connect people and communities increase economic competitiveness, and improve quality of life across the Cascadia megaregion. This fast, safe predictable way to travel would connect the metro areas of Vancouver, Seattle, and Portland. [58]

Montreal–Boston/New York

In 2000, the United States Federal Railroad Administration proposed an accelerated line running at speeds of 200 km/h (124 mph) between Boston and Montreal in order to link with the Acela Express and Northeast Regional service from Washington, D.C., to Boston and to serve northern New England communities along the route. The first phase of the study, which included public hearings, was conducted in 2002 with the participation of the states of Massachusetts, New Hampshire, and Vermont. The second phase of the study was cancelled after New Hampshire withdrew its support.

In the 1970s, the Mayor of Montreal, Jean Drapeau, announced his project to build a TGV (high-speed line) to New York in order to replace the slow and unreliable Adirondack service operated by Amtrak. In 2001, Mayor Pierre Bourque tried to revive the TGV to New York project. [59] The topic has also been discussed between the governor of New York and the premier of Quebec, but no progress was made after a pre-feasibility study in 2003. [60] [61] [62] [63] The line is problematic because most of the investment would need to be made through the sparsely populated Adirondack Mountains north of Albany. Between Albany and New York, relatively fast and frequent rail service is already available.

See also

Related Research Articles

<span class="mw-page-title-main">Trans-Canada Highway</span> Transcontinental highway system in Canada

The Trans-Canada Highway is a transcontinental federal–provincial highway system that travels through all ten provinces of Canada, from the Pacific Ocean on the west coast to the Atlantic Ocean on the east coast. The main route spans 7,476 km (4,645 mi) across the country, one of the longest routes of its type in the world. The highway system is recognizable by its distinctive white-on-green maple leaf route markers, although there are small variations in the markers in some provinces.

<span class="mw-page-title-main">Via Rail</span> Inter-city passenger rail operator in Canada

Via Rail Canada Inc., operating as Via Rail or Via, is a Canadian Crown corporation that is mandated to operate intercity passenger rail service in Canada.

<span class="mw-page-title-main">Canadian Junior Football League</span> Canadian football league

The Canadian Junior Football League (CJFL) is a national Major Junior Canadian football league consisting of 19 teams playing in five provinces across Canada. The teams compete annually for the Canadian Bowl. Many CJFL players move on to professional football careers in the Canadian Football League (CFL) and elsewhere.

<span class="mw-page-title-main">Quebec City–Windsor Corridor</span> Region in Canada

The Quebec City–Windsor Corridor is the most densely populated and heavily industrialized region of Canada. As its name suggests, the region extends between Quebec City in the northeast and Windsor, Ontario, in the southwest, spanning 1,150 kilometres (710 mi). With more than 18 million people, it contains about half of the country's population, three of Canada's four largest metropolitan areas and seven of Canada's twelve largest metropolitan areas, all based on the 2016 census. Its relative importance to Canada's economic and political infrastructure renders it akin to the Northeast megalopolis in the United States. The name was first popularized by Via Rail, which runs frequent passenger rail service in the region in its service area known as "The Corridor".

<span class="mw-page-title-main">LRC (train)</span> Class of Canadian passenger rolling stock

The LRC is a series of lightweight diesel-powered passenger trains that were used on short- to medium-distance inter-city service in the Canadian Provinces of Ontario and Quebec.

<span class="mw-page-title-main">Calgary–Edmonton Corridor</span> Geographic region in Alberta, Canada

The Calgary–Edmonton Corridor is a geographical region of the Canadian province of Alberta. It is the most urbanized area in Alberta and is one of Canada's four most populated urban regions. It consists of Statistics Canada Alberta census divisions No. 11, No. 8, and No. 6. Measured from north to south, the region covers a distance of approximately 400 km (250 mi). As of the designations in the Canada 2021 Census of census metropolitan areas (CMAs) and census agglomerations (CAs) in Alberta, the corridor includes three of the province's four CMAs and two CAs, in addition to four other CAs already included in the Calgary and Edmonton CMAs.

<span class="mw-page-title-main">JetTrain</span> Experimental high-speed passenger trainset

The JetTrain was an experimental high-speed passenger train concept created by Bombardier Transportation in an attempt to make European-style high-speed service more financially appealing to passenger railways throughout North America. It was designed to use the same LRC-derived tilting carriages as the Acela Express trains that Bombardier built for Amtrak in the 1990s, which used all-electric locomotives. Unlike the Acela, powered electrically by overhead lines, the JetTrain would have used a combination of a 4,000-horsepower (3.0 MW) gas-turbine engine, a low-power diesel engine, a reduction gearbox, and two alternators to power electric traction motors. This would have allowed it to run at high speeds on non-electrified lines.

The Rocky Mountain Rail Society (RMRS) is a registered nonprofit organization of volunteers dedicated to the preservation of Canadian National Railway steam locomotive 6060, The Spirit of Alberta. Their goal is to ensure that The Spirit of Alberta remains in full and complete operating condition for the enjoyment of steam rail fans.

<span class="mw-page-title-main">New York high-speed rail</span> Overview of proposals for high-speed rail in the US state of New York

High-speed rail in New York has been a topic that is consistently discussed among legislators, political leaders and in particular, several past governors since the 1990s, but thus far little progress has been made. In his campaign speeches prior to his defeat by Governor George Pataki in 1994, Mario Cuomo promised to bring high speed (maglev) rail up the Hudson Valley and along the Catskill Mountains route. It was not a priority for the subsequent administration.

This is a list of planned, or proposed, high-speed rail projects by country. Although a number of countries have conducted preliminary feasibility studies, many lines are eventually shelved or postponed due to high costs; only a few nations are building high-speed rail lines. Planned lines are separated here from lines under construction, and some countries have both. High-speed rail is public transport by rail at speeds over 200 km/h.

<span class="mw-page-title-main">High-speed rail in China</span>

The high-speed rail (HSR) network in the People's Republic of China (PRC) is the world's longest and most extensively used – with a total length of 45,000 kilometres (28,000 mi) by the end of 2023. The HSR network encompasses newly built rail lines with a design speed of 200–380 km/h (120–240 mph). China's HSR accounts for two-thirds of the world's total high-speed railway networks. Almost all HSR trains, track and service are owned and operated by the China Railway Corporation under the brand China Railway High-speed (CRH).

<span class="mw-page-title-main">Quebec City–Windsor Corridor (Via Rail)</span> Via Rail passenger train service area in the Canadian provinces of Quebec and Ontario

The Quebec City–Windsor Corridor, also known as simply the Corridor, is a Via Rail passenger train service in the Canadian provinces of Quebec and Ontario. The Corridor service area has the heaviest passenger train frequency in Canada and contributes 67% of Via's revenue.

The Ohio Hub was a high-speed railway project proposed in the 2000s decade by the Ohio Department of Transportation aimed at revitalizing passenger rail service in the Ohio region. The plan was awarded funding under the American Recovery and Reinvestment Act of 2009, but Governor John Kasich refused to use the funds for the project and the funds were reclaimed by the federal government. Passage of the 2021 Infrastructure Investment and Jobs Act raised the possibility of new funding for a similar project.

<span class="mw-page-title-main">Great Lakes megalopolis</span> Cities around the Great Lakes of North America

The Great Lakes megalopolis consists of a bi-national group of metropolitan areas in North America largely in the Great Lakes region. It extends from the Midwestern United States in the south and west to western Pennsylvania and Western New York in the east and northward through Southern Ontario into southwestern Quebec in Canada. It is the most populated and largest megalopolis in North America.

<span class="mw-page-title-main">ViaFast</span>

ViaFast was an abandoned passenger rail plan that would have cut Via Rail's trip times throughout the Quebec City–Windsor Corridor. ViaFast did not propose true high-speed service throughout the service area, but a series of smaller upgrades to avoid known bottlenecks and provide improved performance at a fraction of the price of entirely new lines. It aimed to reduce the Toronto–Montreal time by about one hour, to 3.5 hours; halving the Montreal–Quebec City time to 2 hours; and reducing Toronto–Windsor time by an hour, to 3.5 hours.

<span class="mw-page-title-main">Zip Rail</span> Proposed passenger rail line in Minnesota, US

Zip Rail is a proposed passenger train that would link the Minneapolis–Saint Paul, Minnesota metropolitan area with the city of Rochester, also in the U.S. state of Minnesota. The project was previously branded as Rochester Rail Link.

<span class="mw-page-title-main">Higher-speed rail</span> Type of railway with speeds approaching but less than that of true high speed rail

Higher-speed rail (HrSR), also known as high-performance rail, higher-performance rail, semi-high-speed rail or almost-high-speed rail, is the jargon used to describe inter-city passenger rail services that have top speeds of more than conventional rail but are not high enough to be called high-speed rail services. The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.

TransPod Inc. is a Canadian company designing ultra-high-speed transportation technology and vehicles.

The Chennai-Mysuru high speed rail corridor is India's third high-speed rail project after the Mumbai Ahmedabad High Speed Rail Corridor and Delhi Varanasi High Speed Rail Corridor. The 435 km HSR corridor will connect Chennai to Mysuru through 9 stations.

References

  1. "Off the Rails – How Canada fell from leader to laggard in high-speed rail, and why that needs to change". The Walrus Foundation. June 2009. Retrieved 2015-04-07.
  2. "Boston to Montreal High-Speed Rail Planning and Feasibility Study Phase I" (PDF). Vermont Agency of Transportation. April 2003. Archived (PDF) from the original on June 5, 2020. Retrieved June 6, 2020.
  3. "United States Federal Railroad Administration High-Speed Rail". United States Federal Railroad Administration. Archived from the original on May 24, 2009. Retrieved June 6, 2020.
  4. "High Speed Rail Pre-Feasibility Study: New York City to Montreal" (PDF). New York State Department of Transportation. February 2004. Archived (PDF) from the original on June 5, 2020. Retrieved June 6, 2020.
  5. "High Speed Rail Canada Homepage". Highspeedrail.ca. Retrieved 2015-04-07.
  6. "High Speed Rail Canada Citizens Advocacy Group and Website Forms". Marketwire.com. 2008-04-10. Retrieved 2015-04-07.
  7. Langan, High Speed Rail Canada Paul. "TURBO TRAIN – Still Canada's Fastest High Speed Train" . Retrieved 2018-12-28.
  8. Langan, High Speed Rail Canada Paul. "Did the CN TurboTrain Reach Speeds of 273 km/h in Test Runs?" . Retrieved 2018-12-28.
  9. "Cost Update for Calgary/Edmonton High Speed Rail: An Integrated Economic Region | Van Horne Institute". Vanhorne.info. Archived from the original on 2016-01-17. Retrieved 2015-04-07.
  10. "High-speed rail topic of survey". Calgary Sun. 2006-09-22. Archived from the original on June 23, 2007.{{cite news}}: CS1 maint: unfit URL (link)
  11. "Land bought for rail terminal". Calgary Herald. Archived from the original on 2007-12-18.
  12. "Downtown Edmonton site of new RAM". Edmonton Journal. April 7, 2011. Archived from the original on April 10, 2011. Retrieved April 7, 2011.
  13. Gerein, Keith. "High-speed rail on premier's agenda". Edmonton Post. Archived from the original on February 10, 2012. Retrieved February 19, 2016.
  14. Audette, Trish (April 12, 2012). "Alberta's political leaders say 'maybe' to high-speed train between Calgary and Edmonton". Calgary Herald . Retrieved 2012-05-05.
  15. Langan, Paul (2014-05-24). "Train à grande vitesse au Canada : HIGH SPEED RAIL CANADA posts 2014 Alberta High Speed Rail Feasibility Study". High Speed Rail Canada. Retrieved 2015-04-07.
  16. "Alberta NDP looking into speed train possibilities | Edmonton Sun". 2015-10-28. Retrieved 2020-07-17.
  17. Edwardson, Lucie (October 28, 2015). "Transportation minister hints at Calgary to Edmonton high-speed rail". Metro. Archived from the original on March 7, 2016.
  18. "High-speed rail belongs in Liberals' infrastructure discussion" . Retrieved 2020-07-17.
  19. Burroughs, David (2021-07-13). "EllisDon, AECOM Propose C$9B Edmonton-Calgary High Speed Line". Railway Age. Retrieved 2021-08-16.
  20. 1 2 "Canadian construction company aims to see high-speed rail connect Edmonton and Calgary". CBC News . July 8, 2021. Retrieved August 16, 2021.
  21. "Province on board with building high-speed Calgary-Edmonton rail link: developer". calgaryherald. Retrieved 2021-10-22.
  22. railways, UIC-International union of (2021-10-22). "Intercity and High-Speed". UIC - International union of railways. Retrieved 2021-10-22.
  23. https://www.highspeedrailcanada.com/p/all-canadian-hsr-studies.html [ bare URL ]
  24. "Quebec-Ontario High Speed Rail Project, Preliminary Routing Assessment and Costing Study, Final Report" (PDF). March 1995. Archived (PDF) from the original on May 19, 2017. Retrieved June 6, 2020.
  25. "Québec-Ontario High Speed Rail Project, Final Report" (PDF). August 1995. Archived (PDF) from the original on June 6, 2020. Retrieved June 6, 2020.
  26. "Committee Report No. 4 - TRAN (36-1) - House of Commons of Canada". www.ourcommons.ca. Retrieved 2021-08-16.
  27. "Via Rail says snowfall behind spike in ridership | CTV News". Ctv.ca. 2008-01-10. Archived from the original on 2009-06-08. Retrieved 2015-04-07.
  28. "Governments revive plans for high-speed trains between Quebec, Ontario". CBC News. January 10, 2008.
  29. "Ontario Ministry of Transportation | Québec City-Windsor high-speed rail study". Newswire.ca. 2009-02-23. Retrieved 2015-04-07.
  30. "It's time, finally, for Windsor-Quebec City high-speed rail rink". Dailycommercialnews.com. 2009-03-05. Retrieved 2015-04-07.
  31. Langan, Paul (2010-04-13). "High Speed Rail Canada – Train à grande vitesse au Canada : April 2010". Highspeedrailcanada.blogspot.com. Retrieved 2015-04-07.
  32. Martin Oulette (14 March 2011). "Ignatieff says his Libs would consider financial funding for Quebec City arena". Winnipeg Free Press.
  33. "Layton touts NDP as federalist option in Quebec". Ctv.ca. Archived from the original on 2012-07-30. Retrieved 2015-04-07.
  34. 1 2 "High Speed Rail Canada Releases the 2010 SNCF International Socio economic study of High Speed Rail Implementation on the Quebec – Windsor Corridor :: Wire Service Media". Wireservice.ca. 2010-05-30. Retrieved 2015-04-07.
  35. "High Speed Rail Feasibility Study". Ontario Ministry of Transportation. February 14, 2011. Archived from the original on January 1, 2012. Retrieved June 6, 2020.
  36. "High-speed Quebec City-Windsor rail link could cost $21.3B | CTV News". Ctv.ca. 2011-11-15. Archived from the original on 2012-07-30. Retrieved 2015-04-07.
  37. "Windsor politicians disagree with rail study". CBCNews. 18 October 2012. Retrieved 17 November 2012.
  38. Hall, Dave (17 November 2011). "Chamber urges rail rethink" (PDF). Windsor Star. Retrieved 17 November 2012.
  39. "Liberals promise high speed rail in Kitchener within 10 years". CBCNews. 15 April 2014. Retrieved 15 April 2014.
  40. "Liberals to study 71-minute Toronto, Kitchener, London rail trip". CNCNews. 30 April 2014. Retrieved 7 June 2014.
  41. "2014 Glenn Murray HighSpeed Presentation.pdf – Google Drive" . Retrieved 2015-04-07.
  42. "Ontario Government Backs Toronto-London HSL". Railjournal.com. Retrieved 2015-04-07.
  43. Langan, Paul (2014-10-30). "Train à grande vitesse au Canada : High Speed Rail Canada to Release Toronto – Kitchener – London High Speed Rail Preliminary Business Plan by FCPWorld". High Speed Rail Canada. Retrieved 2015-04-07.
  44. "Newsroom : Ontario Moving Forward With High-Speed Rail". 2014-12-05. Retrieved 2015-04-07.
  45. "Special Advisor, High Speed Rail". 2014-12-05. Retrieved 2015-11-01.
  46. "High Speed Rail in Ontario: Transforming mobility, connecting communities, integrating centres of innovation and fostering regional economic growth and development". 2016-12-02. Archived from the original on January 7, 2020. Retrieved June 6, 2020.
  47. "High-speed rail between Toronto and London by 2025, premier says". 2017-05-19. Retrieved 2017-05-19.
  48. "Are the Tories going to take a second look at high-speed rail?". TVO. 2018-08-31. Retrieved 2018-09-30.
  49. "High-speed rail may be a long shot for cost-cutting Ford government". The London Free Press. 2018-07-04. Retrieved 2018-09-30.
  50. "Ontario considers alternative options for high-speed rail | CBC News". CBC. Retrieved 2018-11-28.
  51. "Ford government pauses high-speed rail funding, looking to enhance current services | Globalnews.ca". globalnews.ca. 2019-04-15. Retrieved 2019-05-14.
  52. Westoll, Nick (July 6, 2021). "Feds set to begin procurement process for Toronto-Quebec City high-frequency rail corridor | Globalnews.ca". Global News. Retrieved 2021-08-16.
  53. Boisvert, Nick (July 5, 2021). "Liberals announce plans for new 'high frequency' rail lines from Toronto to Quebec City". CBC News. Retrieved October 22, 2021.
  54. Bellavance, Joël-Denis (2022-12-10). "Train à grande fréquence | Le projet est bien « réel », dit le ministre des Transports". La Presse (in French). Retrieved 2023-01-01.
  55. Canada, Transport (2021-07-06). "The Government of Canada is taking the first steps in preparing for the procurement process to build a new train service in the Toronto to Quebec City Corridor". www.canada.ca. Retrieved 2021-10-22.
  56. railways, UIC-International union of (2021-10-22). "Intercity and High-Speed". UIC - International union of railways. Retrieved 2021-10-22.
  57. "High-speed rail from Chilliwack to Whistler pitched as part of COVID-19 recovery". vancouver.citynews.ca. Retrieved 2023-02-02.
  58. "Ultra-high speed rail study | WSDOT". wsdot.wa.gov. Retrieved 2023-02-02.
  59. "Pierre Bourque intéressé par le projet d'un TGV entre Montréal et New York". Lcn.canoe.com. Archived from the original on 2012-07-14. Retrieved 2015-04-07.
  60. "High Speed Rail Study". New York State Department of Transportation. February 2004. Archived from the original on June 6, 2020. Retrieved June 6, 2020.
  61. "Projet de train à haute vitesse Montréal-New York". Transports Québec. Archived from the original on September 28, 2011. Retrieved June 6, 2020.
  62. "Étude de préfaisabilité pour l'implantation d'un train à haute vitesse Montreal-New York" [High Speed Rail Pre-Feasibility Study: New York City to Montreal](PDF) (in French). Archived (PDF) from the original on June 6, 2020. Retrieved June 6, 2020.
  63. "Évaluation préliminaire des tracés, des technologies et des coûts d'implantation inhérents à un train haute vitesse entre Montréal et la frontière américaine (direction New York)" (PDF) (in French). December 2003. Archived (PDF) from the original on June 6, 2020. Retrieved June 6, 2020.

Further reading