Tri-Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | South Florida Regional Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Greater Miami | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 19 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | www | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Herzog Transit Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 15,400 (weekdays, Q3 2024) [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Ridership | 4,402,300 (2023) [2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | January 9, 1989 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 80.0 miles (128.7 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | At-grade | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 79 miles per hour (127 km/h) ~38 miles per hour (61 km/h) overall average | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Tri-Rail( reporting mark TRCX) is a commuter rail service linking Miami, Fort Lauderdale and West Palm Beach in Florida, United States. The Tri prefix in the name refers to the three counties served by the railroad: Palm Beach, Broward, and Miami-Dade. [3] Tri-Rail is managed by the South Florida Regional Transportation Authority (SFRTA) along CSX Transportation's former Miami Subdivision; [4] [5] the line is now wholly owned by the Florida DOT. The 80.0-mile-long (128.7 km) system has 19 stations along the Southeast Florida coast, and connects directly to Amtrak at numerous stations, to Metrorail at the Metrorail Transfer station, Miami Airport station, and MiamiCentral, and to Brightline at MiamiCentral.
In 2023, the line had a ridership of 4,402,300, or about 15,400 per weekday as of the third quarter of 2024.
A second Tri-Rail line on the Florida East Coast Railway corridor, dubbed the "Coastal Link", has been proposed. The line would operate between Toney Penna station in Jupiter and MiamiCentral in Downtown Miami, and add commuter rail service between the downtown areas of cities between West Palm Beach and Miami. Combined with the existing Tri-Rail line, this expanded Tri-Rail system is estimated to have a daily passenger ridership of almost 30,000; or approximately 9 million passengers per annum, doubling Tri-Rail's current ridership.
The line on which Tri-Rail operates was built by the Seaboard-All Florida Railway (a subsidiary of the Seaboard Air Line Railroad) for intercity passenger rail service in the early 1920s. The line was inaugurated on January 7, 1927. Intercity rail service by Seaboard operated the Orange Blossom Special service from New York City until 1953. Amtrak continues to offer passenger rail service with the Floridian train from Chicago and Silver Meteor train from New York City. [6] Today, the original 1920s Seaboard stations are used by Tri-Rail for service at West Palm Beach, Deerfield Beach, Fort Lauderdale, Hollywood. Though no longer in use, the Seaboard stations at Delray Beach, Opa-locka and Hialeah are still standing.
Planning for a new commuter rail line began in 1983, and building the organization began in 1986. The current system was formed by the Florida Department of Transportation and began operation January 9, 1989, to provide temporary commuter rail service while construction crews widened Interstate 95 and the parallel Florida's Turnpike. [7] [8] Tri-Rail was free from opening until June 1, 1989. [9]
Due to higher than expected ridership, FDOT made Tri-Rail a permanent service, adding more trains and stations in the process.[ citation needed ] The state's original plan was to use the more urban Florida East Coast Railway (FEC) line, but FEC declined the offer as it wanted freight to be their top priority. [10] In 1998, the initial 67-mile-long (108 km) route was extended north from the West Palm Beach station to the ‹See TfM› Mangonia Park, and south from ‹See TfM› Hialeah Market to Miami Airport (at an earlier station on the site of the current station). Construction of the extensions began in 1996; which added nearly 4 miles (6.4 km) to the system.
In the early 2000s, Tri-Rail received a budget of $84.8 million[ clarification needed ] for double tracking, building extensions, improving stations, establishing a headquarters, and linking to buses. [11]
In 2002, Tri-Rail began to upgrade its grade crossings to include raised medians and/or four quadrant gates to prevent cars from driving around them in an attempt to beat trains. This decreases accidents and allows the cities they run through to petition for them not to use their whistle between 10 p.m. and 6 a.m.[ citation needed ] They also decreased headways to 20 minutes during rush hours. [12]
In 2007, a project to upgrade the full length of the line from Mangonia Park to Miami Airport with double track was completed with the opening of a high-level fixed bridge over the New River near Fort Lauderdale. During the 2000s, most of the stations were completely rebuilt to accommodate for double-tracking and include dual platforms, elevators, pedestrian bridges over the tracks, large roofs over the platforms, and better facilities.
In March 2006, Tri-Rail went from 30 passenger trains a day to 40 trains; the completion of the New River rail bridge, the double-tracking project, and the addition of a second Colorado Railcar diesel multiple unit (DMU) ushered in sweeping changes to Tri-Rail's operational timetables. Tri-Rail added several more trains during peak weekday commuting hours in June 2007, increasing to the current 50 trains per day, as well as increasing weekend service. [13] During "rush-hour," trains ran every twenty to thirty minutes rather than the previous schedule of every hour. This change comes at quite a fortuitous time in Tri-Rail's operation history. With gasoline prices at record highs—particularly in South Florida's sprawling metropolis—Tri-Rail saw a double-digit percentage increase in ridership in mid-2007.[ citation needed ] By 2009, annual ridership had reached about 4.2 million passengers. [14] This was also the time during which work was being done on I-95 to add the express lanes from the Golden Glades Interchange to the Airport Expressway near Downtown Miami. [15] In 2007, Veolia Transport commenced operating the Tri-Rail service under a contract that ran until June 2017. [16]
In 2009, Tri-Rail service was nearly cut drastically, with the threat of being shut down altogether by 2011, [17] even as ridership was at a record high, as Palm Beach County withheld its funding of the system and looked to cut its funding from $4.1 million to $1.6 million per year. This would mean that Broward and Miami-Dade counties would also have had to cut their support to $1.6 million each to match. The state, which was also running a budget shortfall and did not pass a rental car tax increase to help fund Tri-Rail, would have had to cut its support as well. This would have caused an immediate cut from 50 to 30 daily trains and a complete cutting weekend service, followed by additional cuts and possible shut down two years later. [18] Schedules were decreased slightly, but service was never cut altogether, as dedicated federal funding was attained through the $2.5 million grant as part of the American Reinvestment and Recovery Act of 2009.
After a 25% fare increase in mid-2009, annual ridership dropped by 15% (about 600,000) in 2010. [19] However, in 2011, Tri-Rail again saw increasing ridership due to sustained high gas prices, averaging about 14,500 riders per weekday by the end of year. Throughout the year, ridership increased at a rate of about 11% per month, paired with a decline in automobile travel [20] and an increase in employment, with 285 companies and 2,829 individuals joining in the discount program. [21]
In 2011, the dilapidated Pompano Beach station received a $5.7 million federal grant, to be redone as a "green station," generating more than 100% of its energy demand through solar power, with the excess to be sent to the grid or stored for nighttime lighting. Construction started in spring 2012 with the station remaining open during construction. [22] The crossing of Race Track Road and the Tri-Rail line near the Pompano Beach station, rough for several years, was also repaired in 2012. [23]
In early 2012, it was announced that a second Tri-Rail station in Boca Raton was once again being considered at the busy intersection of Glades Road (S.R. 808) and Military Trail (S.R. 809), near Town Center Mall, Florida Atlantic University and large office parks. A station was proposed for this location in the early 2000s while many other stations were being renovated. Boca Raton station near Yamato Road (S.R. 794) is the busiest station in the system [24] as of 2014, with 1,600 riders a day, [25] surpassing the Tri-Rail and Metrorail transfer station in Miami-Dade County. For this reason, and the fact that Glades Road is considered the most congested road in the county, an infill station there has been long considered. [26] However, in 2019, plans for the station were ultimately canceled by the city and Tri-Rail. [27]
Total ridership on the system fully recovered to earlier high levels in fiscal year 2013, to 4.2 million. [19] Tri-Rail wanted to double ridership by 2021 to 30,000 daily riders by building the Coastal Link. [28]
In April 2015, Miami Airport station opened at the Miami Intermodal Center, once again connecting Tri-Rail directly with the Miami International Airport for the first time since the original Miami Airport station closed in 2011. This new station has connections to MIA Mover (providing a direct link to the airport), Metrorail, Metrobus and Greyhound. After extensive delays, Amtrak has yet to move its operations from its current station. [29] This new station was under construction since 2009, with a September 2011 closure of the original Miami Airport station to allow for construction of the new station. [30]
On January 27, 2017, the South Florida Regional Transportation Authority board voted to award Herzog Transit Services a $511 million, 10-year contract to operate Tri-Rail beginning in July 2017. [31] The board disqualified the other five bidders (Amtrak, Bombardier, First Transit, SNC-Lavalin Rail & Transit and incumbent operator Transdev), stating that they had all submitted "conditional" prices despite the request for proposals mandating that the bid price be final. [31] The other five losing bidders all protested the contract, with Transdev, Bombardier, and First Transit jointly requesting a court injunction to prevent it from being awarded. [31]
In the first quarter of 2023, the South Florida Regional Transportation Authority (SFRTA) reported a 25% increase in Tri-Rail ridership, surpassing 350,000 riders for the first time in three years. To meet the demand, the SFRTA began an overhaul process with their Brookville locomotives, which is anticipated to be completed by 2025, and received a federal grant that will allow the replacement of a third of the aging fleet of railcars with new ones, which are expected to start service in the coming years. [32] In addition, the SFRTA created a new livery design, which debuted in time for the Tri-Rail service into MiamiCentral. [33] [34]
Tri-Rail service to MiamiCentral (Tri-Rail Downtown Miami Link) began service on January 13, 2024. [35] The station, which is also a mixed-use complex, is located in Downtown Miami and includes direct access to Brightline as well as Miami-Dade Transit services. The initial service consists of a shuttle service between Metrorail Transfer station and MiamiCentral, but a MiamiCentral Express train has since been added, running from MiamiCentral to West Palm Beach station. [36] To continue traveling north or south, a transfer is required. [37] It marks the first time Tri-Rail trains use Florida East Coast's trackage for service. Tri-Rail trains switch to the FEC's Little River Branch on the Iris Connection south of Metrorail Transfer station and head east to the FEC mainline, where they turn south and head to Downtown Miami. Tri-Rail trains began testing the corridor on June 19, 2023. [38] The total cost of accommodating Tri-Rail trains in MiamiCentral was about $70 million. [39]
With the Brightline extension to Orlando, the company has indicated that their trains have reached capacity, especially during peak commute time along the Southeast Florida region. As a result of this, Brightline proposed for the SFRTA to facilitate a Tri-Rail express train between the West Palm Beach station and MiamiCentral, with few stops in between. This would be similar to the route Brightline currently services in Southeast Florida. [40] On May 31, 2024, the SFRTA announced that the new weekday rush hour express train, with stops at Boca Raton, Fort Lauderdale Airport, and Metrorail Transfer, which began service on July 1, 2024. [41] [42]
In the 2025 and 2030 long-range transportation plans, Tri-Rail has envisioned moving to or adding service on the Florida East Coast Railway (FEC) corridor, which runs parallel to U.S. 1 (Biscayne Boulevard/Brickell Avenue in Miami-Dade County, and Federal Highway in Broward and Palm Beach counties). This corridor will provide more opportunities for pedestrian travel from stations to end destinations than does the current South Florida Rail Corridor, which must rely almost exclusively on shuttle buses for passenger distribution. Tri-Rail officials project that the project would cost about $2.5 billion and that 59,000 people per day would ride it, [10] The FEC, which denied the state's request to use the line for commuter rail in the 1980s, is now under new ownership as of 2017, and has now stated that it is willing to allow the use of the 85-mile-long (137 km) segment of track between downtown Miami and Jupiter for passenger trains. [10]
Tri-Rail service on the FEC line would bring stations to Downtown Miami's transit hub, Government Center station via MiamiCentral, as well as service in Midtown Miami/Miami Design District, Upper East Side/Miami Shores, North Miami, North Miami Beach/Aventura, Downtown Hollywood, and Downtown Fort Lauderdale, putting it within walking distance of thousands of potential riders. Getting to and from the current stations has been a major detractor of Tri-Rail's convenience since opening. [43] Miami's Downtown Development Authority along with Miami-area politicians are[ when? ] actively lobbying to bring Tri-Rail to the city core. [44]
Track connections between the FEC tracks and the South Florida Rail Corridor are also currently under construction.[ when? ] These connections are mainly for freight connectivity between the two lines, but are planned for future Coastal Link use. The Northwood Connection just north of West Palm Beach will provide a new connection as well as rehabilitating an existing connection. The Iris Connection will connect the SFRC to the FEC's Little River Branch near Hialeah. FDOT has built both connections, which were funded by a federal TIGER grant. [45]
The Coastal Link is planned to begin in phases. The first phase is known as Tri-Rail Downtown Miami Link, which began service on January 13, 2024. [46]
A later phase would allow Tri-Rail to begin service to Jupiter by having trains switch to the FEC on the new Northwood connection north of West Palm Beach and head north to Jupiter with additional stops in Palm Beach Gardens, Lake Park and Riviera Beach. No official timeframe has been given for this phase. [47]
Miami-Dade County is also working to find funding for service on the FEC from Downtown Miami as far north as Aventura. [48] Construction of an additional track for commuter service would require the approval of Brightline, which owns trackage rights to operate passenger trains over the corridor. [49]
If the Coastal Link is fully implemented, Tri-Rail would operate in three separate services with a line on the FEC tracks from Jupiter to Downtown Fort Lauderdale, a line on the existing tracks from Mangonia Park to Pompano Beach, and then transition to the FEC tracks and continue to Downtown Miami. Another line would run on the existing tracks from Boca Raton to Miami Airport. [50]
Before full implementation of the Coastal Link service can begin, officials have acknowledged that a new crossing over (or under) the New River in Fort Lauderdale is necessary. The FEC's current low-level drawbridge is unable to handle Tri-Rail service along with Brightline and FEC freight service without negatively affecting vessel traffic on the river since the bridge would need to be lowered quite often. Proposals include a taller bridge or possibly a tunnel under the river. [48]
In 2020, Brightline solicited a proposal to operate a commuter rail service on the FEC, utilizing its exclusive trackage rights for passenger service, under a different system known as the Northeast Corridor Rapid Transit Project. [51] [52] Under these plans the city of Miami would support the service operated by Brightline, without direct involvement of Tri-Rail. [53]
There had been proposals in the past[ when? ] by Miami-Dade County and CSX Transportation to use the CSX Homestead Subdivision for Tri-Rail service, with the corridor being purchased by the county or the Florida Department of Transportation. [54] [55] However, one of the problems at the time[ when? ] was that the price of the corridor was exorbitant. Since then,[ when? ] CSX has had new leadership, and the company is now willing to make a deal with Miami-Dade County to potentially have passenger rail service initiated on the corridor. [56] Service could include the Lehigh spur from the Miami Intermodal Center to Doral, as well as the Homestead Subdivision from the Miami Intermodal Center to Homestead. [56] [57] [58] As of 2024 [update] , both lines only see sporadic freight service, and the southernmost 12 miles (19 km) of the Homestead Subdivision (south of the Gold Coast Railroad Museum) have been out of service since 2019 [update] . [59]
Tri-Rail is currently in the preliminary stages of adding a station near the VA Medical Center northwest of the Mangonia Park station. The tracks northwest of Mangonia Park are currently owned by CSX Transportation, which Tri-Rail would need to have an agreement with to operate at the potential new station. Palm Beach County is expected to cover the costs of the project. [60]
In November 2023, Swerdlow Group responded to a request for proposals from Miami-Dade County for a new affordable housing development in Little River, which also includes a Tri-Rail station. The project is located just east of I-95 and just north of the FEC's Little River Branch, which is part of the current route of the Tri-Rail Downtown Miami Link, which has no stations along the east-west route (with the north-south route eventually having stations as the result of the Northeast Corridor Rapid Transit Project). [61] Swerdlow Group had indicated that they would fund $20 million for the station. [62] [63] [64]
Tri-Rail shares the South Florida Rail Corridor trackage with Amtrak's Silver Meteor, Floridian, and CSX Transportation's Miami Subdivision. The Florida Department of Transportation purchased the track from CSX in 1989. Under the terms of the agreement, CSX would continue to provide dispatch services and physical plant maintenance for the track and would have exclusive freight trackage rights until certain conditions were met. At midnight on March 29, 2015, CSX handed over dispatching and maintenance to SFRTA (Tri-Rail). While this should have the advantage of giving passenger trains signal priority over freight trains, it was at first wracked with delays. [65]
Tri-Rail participates in the EASY Card regional smartcard-based fare collection system along with Miami-Dade Transit. Purely paper tickets are also available for same-day or weekend use. A paper ticket or an EASY Card with a paper-based transfer receipt (created after a confirmed trip is completed) can be used to obtain transfer discounts when transferring to Broward County Transit as well as Palm Tran. However, only EASY Cards may be used to obtain a transfer discount when transferring to Miami-Dade Transit. [66] [67] [68]
Due to the route's success, Amtrak's Silver Meteor and Floridian do not allow local travel between West Palm Beach and Miami. The two trains only stop to discharge passengers southbound and receive passengers northbound. This policy is in place to make seats on those two trains available for passengers making longer trips.
Tri-Rail fare is divided into six zones for 24-hour passes, ranging from $2.50 to $8.75, with fare calculated by the number of zones traveled through, and whether it is one-way or round trip. On weekends, a $5 all-day pass good for all zones is available, though trains run hourly headways. For frequent use, Tri-Rail offers a $110 monthly pass (good for Tri-Rail only) and a $155 regional monthly pass (good on Tri-Rail, Metrorail, and Metrobus). Discount fares are available for senior citizens, the disabled, students, and children under 12. [69] Certain businesses allow their employees to register for the Employer Discount Program, which reduces their fares by 25%. [13] Free parking is available at all Tri-Rail stations. [70] On weekdays, 50 train trips are made in all, with 25 in each direction, while on weekends only 30 trips, 15 north and 15 south, are made in all, with 1-hour headways between each train. While Tri-Rail peaks at speeds of 79 miles per hour (127 km/h), it can be extracted from the timetable and the distance of the line that its overall average speed is approximately 38 miles per hour (61 km/h).
For fiscal year 2010, train revenue was approximately $10.3 million. [71] Total operating expenses for fiscal year 2010, including depreciation expense, were approximately $86.9 million. Expenses increased by approximately $14.9 million or 20.7% when compared to fiscal year 2009. [71] 2010 was a low year for ridership after the economy crashed and there were service cuts. By 2015, ridership was about 25% higher. [72] By 2018, fare revenue was budgeted at $13.4 million, whereas operating expense was $119.8 million. [73]
The line has no turn around point so all trains will face one direction at all times. Locomotives will always face south. For this reason, Dual Operation Passenger Cabs are located on the opposite side of the train facing north. Trains will travel north in reverse and south forwards.
A typical station contains two tracks and two side platforms connected by an overpass. Most stations have large parking lots, however, some, like West Palm Beach and Hollywood have a limited number of spaces, most of which are reserved for Amtrak travelers.
Location | Zone | Station | Time to ‹See TfM› Pompano Beach | Year opened | Connections |
---|---|---|---|---|---|
Mangonia Park | 1 | ‹See TfM› Mangonia Park | 48 min | 1998 | Palm Tran: 21, 31, 33 |
West Palm Beach | ‹See TfM› West Palm Beach | 42 min | 1925 |
| |
Lake Worth Beach | ‹See TfM› Lake Worth Beach | 33 min | 1989 | Palm Tran: 61, 62 | |
Boynton Beach | 2 | ‹See TfM› Boynton Beach | 28 min | Palm Tran: 70, 71, 73 | |
Delray Beach | ‹See TfM› Delray Beach | 19 min | 1991 |
| |
Boca Raton | 3 | ‹See TfM› Boca Raton | 13 min | 1989 |
|
Deerfield Beach | ‹See TfM› Deerfield Beach | 6 min | 1926 |
| |
Pompano Beach | ‹See TfM› Pompano Beach | – | 1989 | BCT: 34 | |
Fort Lauderdale | 4 | ‹See TfM› Cypress Creek | 8 min | BCT: 14, 60, 62 | |
‹See TfM› Fort Lauderdale | 15 min | 1927 |
| ||
Dania Beach | 5 | ‹See TfM› Fort Lauderdale Airport | 22 min | 2000 |
|
Hollywood | ‹See TfM› Sheridan Street | 26 min | 1996 | ||
‹See TfM› Hollywood | 30 min | 1928 |
| ||
Miami-Dade | 6 | ‹See TfM› Golden Glades | 39 min | 1989 |
|
Opa-locka | ‹See TfM› Opa-locka | 45 min | 1927 |
| |
Hialeah | Metrorail Transfer | 52 min | 1989 | ||
‹See TfM› Hialeah Market | 58 min | Metrobus: 132 | |||
Miami | Miami Airport | 64 min | 2012 |
| |
MiamiCentral | 72 min (transfer at Metrorail Transfer) | 2018 |
|
Annual ridership averages
Date | Passengers [74] [75] Annual total | % Change | Passengers Weekday average |
---|---|---|---|
1995 | 2,481,200 | - | N/A |
1996 | 2,301,400 | -7.2% | 7,500 |
1997 | 2,377,700 | +3.3% | 8,000 |
1998 | 2,215,600 | -6.8% | 7,200 |
1999 | 2,180,000 | +1.6% | 7,300 |
2000 | 2,397,900 | +10.0% | 8,700 |
2001 | 2,543,604 | +6.1% | 8,500 |
2002 | 2,629,400 | +3.4% | 9,200 |
2003 | 2,755,300 | +4.8% | 9,200 |
2004 | 2,814,800 | +2.2% | 9,700 |
2005 | 2,619,900 | -6.9% | 8,500 |
2006 | 3,177,000 | +21.3% | 11,600 |
2007 | 3,502,500 | +10.2% | 12,600 |
2008 | 4,303,600 | +22.9% | 14,800 |
2009 | 3,789,700 | -11.9% | 12,400 |
2010 | 3,645,000 | -3.8% | 12,300 |
2011 | 3,947,900 | +8.3% | 13,300 |
2012 | 4,070,700 | +3.1% | 14,300 |
2013 | 4,350,782 | +6.9% | 14,800 |
2014 | 4,389,600 | +1.0% | 14,400 |
2015 | 4,292,705 | -1.0% | 13,900 |
2016 | 4,240,699 [76] | -1.0% | 13,900 |
2017 | 4,287,400 [77] | +1.1% | 13,900 |
2018 | 4,413,900 [78] | +2.9% | 13,900 |
2019 | 4,505,100 [79] | +2.0% | 13,900 |
2020 | 2,204,500 | -51.1% | 6,400 |
2021 | 2,029,609 | -8.3% | 6,350 |
2022 | 2,776,205 | +31.1% | 9,500 |
2023 | 3,735,897 | +29.5% | 13,000 |
Tri-Rail posted its highest-paid daily ridership in the commuter-rail system's 24-year history on June 24, 2013. It transported 19,060 people, many of whom attended a "victory parade" for the Miami Heat, which won the 2013 National Basketball Association championship. Most trains operated at or near capacity, SFTRA officials said in a press release. Special four-car sets were operated to accommodate the anticipated overflow crowd. [80]
Previous Miami Heat victory parades resulted in high ridership counts for Tri-Rail, as well. On June 23, 2006, Tri-Rail transported 18,613 riders; and on June 25, 2012, the agency carried 18,355 passengers. In 2019, TriRail reached its highest annual ridership with 4.5 million riders. [79]
This section needs additional citations for verification .(April 2019) |
The service began with five F40PHL-2 diesel locomotives. Tri-Rail later took delivery of three F40PH-2C locomotives and two ex-Amtrak EMD F40PHRs (Now upgraded to 3C specifications and electronics). In 2006, six EMD GP49 locomotives were acquired from Norfolk Southern and were rebuilt by Mid America Car Company to the designation GP49H-3. [81]
On October 29, 2008, the Tri-Rail switched to biodiesel fuel with a goal of a 99-percent blend, when available. [82]
On February 25, 2011, Tri-Rail announced an order for ten Brookville BL36PH locomotives, with options for 13 more, from the Brookville Equipment Corporation at a cost of $109 million. [83] The purchase was met with criticism by the Florida Chamber of Commerce and state lawmakers, who claimed the bidding process was flawed. Rival bidder MotivePower filed a lawsuit against Tri-Rail, claiming that the bidding process was skewed in Brookville's favour. [83] Tri-Rail later added two more BL36PH locomotives to the order for a total of 12. As of 2015, all locomotives have been delivered and are used in regular service, allowing the F40PHL-2, F40PH-2C, and F40PH locomotives to be retired. However, in July 2018, all the F40PHM-2C and F40PHR locomotives were sent up to Progress Rail in Patterson, Georgia to be rebuilt and returned to service for use on the Coastal Link. They were returned from August 2020 to January 2021, and have been put back in service on the RTA mainline.
Tri-Rail uses two types of passenger cars. Since the beginning of operations, the system has used 26 Bombardier BiLevel Coaches purchased new from Urban Transportation Development Corporation (even though they were delivered in GO Transit colors, the Tri-Rail cars were purchased new and never used or sold secondhand by GO, only leased by GO for a short period of time), a common model among Canadian and US commuter railroads, 11 with operating cabs and 15 without. Briefly, bi-level rolling stock from Colorado Railcar (4 DMU power coaches and 2 unpowered coaches) was used beginning in 2006.
In 2010, the South Florida Regional Transportation Authority agreed to purchase new rail cars from Hyundai Rotem for $95 million. [84] The first new car was put into service in March 2011. By late 2011, the 12 new locomotives and 24 new passenger cars had not yet been delivered, and the original cars, many over 30 years old, were falling into disrepair. This led to Tri-Rail often running two cars per train instead of three despite increasing ridership, leaving only standing room on many trains during rush hour. [85] By January 2013, all trains were again running with 3 cars, just as most of the Hyundai Rotem rail cars were delivered. In addition to decreased comfort but more reliability, the new cars provide additional safety with front and rear crumple zones designed to absorb energy in a crash. [84]
In 2015, three Bombardier coaches were renovated to include additional bicycle capacity. Cars 1002, 1006, and 1007 had one side of seating removed from the lower levels, which were in turn replaced by bike racks. These trains with special bike cars have the capacity to carry an additional 14 bicycles per train.
In 2003, after receiving a grant from the Florida Department of Transportation, Tri-Rail contracted to purchase two pieces of rolling stock from Colorado Railcar: a self-propelled diesel multiple unit (DMU) prototype control car and unpowered bi-level coach entered regular service with Tri-Rail in October 2006. The new purpose-built railcars are larger than the Bombardier BiLevel Coaches, holding up to 188 passengers, with room for bicycles and luggage. Tri-Rail possessed four DMU control cars and two unpowered trailer cars. One DMU train usually consists of two DMU power cars at each end of a trailer coach (making for two complete DMU+trailer+DMU sets on the system). Throughout their short careers, the cars suffered from many mechanical issues. Because of this all the cars were placed in permanent storage in 2012. As of 2024, all the DMUs and trailers have been retired with 704, 7001, and 7002 sold to the Indiana Railway Museum for excursion train service and are now off the property.
Year built | Make and model | Road Nos. | Number delivered | Number in service | Capacity | Notes |
---|---|---|---|---|---|---|
Locomotives | ||||||
1992 (Rebuilt 2020–21) | M-K F40PHM-3C | 807-809 | 3 | 3 | 3 crew | Units rebuilt between 2016-2019. Re-entered service in May 2021. |
1981 (Rebuilt 2020–21) | EMD F40PHR-3C | 810-811 | 2 | 2 | Ex-Amtrak units acquired in 1997. Units rebuilt between 2016-2019. Re-entered service in May 2021. | |
1980 (Rebuilt 2006) | EMD GP49H-3 | 812, 815, 816 | 6 | 3 | Ex-NS GP49s. Locomotives were rebuilt and reclassified as GP49H-3 in 2006. Originally part of a larger fleet of GP49H-3 locomotives, numbered 812-817.
| |
2013–15 | Brookville BL36PH | 818-829 | 12 | 12 | Delivered from 2013 to 2015. All are in service.
| |
Passenger coaches and cab cars | ||||||
1987 | UTDC Bi-Level Cab Car | 501-506 | 6 | 6 | 136 and 3 crew | Single-window half-width cab cars.
|
1987–1990 | UTDC Bi-Level Passenger Coach | 1001–1015 | 15 | 15 | 142 (trailer cars), 128 (bicycle cars) | All are now bicycle cars, with the exception of 1009 and 1015.
|
1996 | Bombardier Bi-Level Cab Car | 507-508 | 5 | 3 | 136 and 3 crew | Full-width cab cars with two front windows and washroom at B end of car. Originally part of a larger fleet of coaches, numbered 507-511.
|
2010–11 | Hyundai Rotem Cab Car | 512-521 | 10 | 9 | 140 and 3 crew | In service since 2013. Briefly banned from leading following the failure of an inspection in 2019.
|
Hyundai Rotem Passenger Coach | 1101–1114 | 14 | 14 | 146 | Entered service from 2011 to 2013, and all are currently active.
| |
Year built | Make and model | Road Nos. | Quantity | Capacity | Notes |
---|---|---|---|---|---|
1968 (Rebuilt 1988) | M-K F40PHL-2 | 801-805 | 5 | 3 crew | Rebuilt from CR GP40 locomotives using BN F45 parts in 1988. Retired in 2015.
|
1980 (Rebuilt 2006) | EMD GP49H-3 | 813-814, 817 | 3 | Ex-NS GP49s. Locomotives were rebuilt and reclassified as GP49H-3 in 2006, alongside the currently-active 812, 815, and 816.
| |
2002 | Colorado Railcar Single-Level DMU Demo | 702 | 1 | 73 and 3 crew | Formerly Colorado Railcar #2002; brought by Tri-Rail, repainted, and given a new number in 2004. It is now stored in Pueblo, Colorado. |
2005–09 | Colorado Railcar Bi-Level DMU | 703-706 | 4 | 165 and 3 crew | All were retired in 2012 due to reliability issues, left Tri-Rail in August 2023. 704 and 706 to Indiana Railway Museum and was delivered in March 2024. |
2005–07 | Colorado Railcar Bi-Level Trailer Coach | 7001-7002 | 2 | 182 | Large double-decker coaches that usually transited with two DMUs. Sold to Indiana Railway Museum and were delived in March 2024. |
On January 4, 2016, a passenger train collided with a garbage truck which had broken down on a grade crossing at Lake Worth Beach station and derailed. Twenty-two people were injured. [88] This marked the first derailment in almost 27 years of operation.
On January 28, 2016, Tri-Rail suffered their second derailment in Pompano Beach, after a train hit debris on the tracks between the Cypress Creek and Pompano Beach stations. This section of track is also where Tri-Rail is allowed to go its fastest speed, 79 MPH. One injury was reported and GP49H-3 locomotive #813 and a Bombardier BiLevel Coach directly behind it came off the rail. [89]
On October 25, 2019, a northbound Tri-Rail train led by Bombardier cabcar #509 hit a semitruck in Oakland Park. Several people were injured, and cabcar 509 was sidelined after the incident. [90]
On August 19, 2020 at Deerfield Beach, GP49H-3 locomotive 816 caught on fire and its passengers from the train were safely evacuated. No injuries were reported. [91]
On August 27, 2022, a northbound Tri-Rail train hit a vehicle left on the tracks in Fort Lauderdale. 6 people were taken to the hospital with minor injuries. The train partially derailed as a result of the impact. [92]
Miami-Dade Transit (MDT) is the primary public transit authority of Miami, Florida and the greater Miami-Dade County area. It is the largest transit system in Florida and the 15th-largest transit system in the United States. As of 2023, the system has 80,168,700 rides per year, or about 266,600 per weekday in the third quarter of 2024. MDT operates the Metrobus with their paratransit STS systems run by LSF. MDT also operates two rail transit systems: Metrorail and Metromover.
Metromover is a free to ride automated people mover system operated by Miami-Dade Transit in Miami, Florida, United States. Metromover serves the Downtown Miami, Brickell, Park West and Arts & Entertainment District neighborhoods. Metromover connects directly with Metrorail at Government Center and Brickell stations. It also connects to Metrobus with dedicated bus loops at Government Center and Adrienne Arsht Center station. It originally began service to the Downtown/Inner Loop on April 17, 1986, and was later expanded with the Omni and Brickell Loop extensions on May 26, 1994.
The Florida East Coast Railway is a Class II railroad operating in the U.S. state of Florida, currently owned by Grupo México.
Tri-Rail and Metrorail Transfer station is a Metrorail and Tri-Rail interchange station in Hialeah, Florida, northwest of the city of Miami proper.
Government Center station is an intermodal transit hub in the Government Center district of Downtown Miami, Florida. It is operated by Miami-Dade Transit and serves as a transfer station for the Metrorail and Metromover rapid transit systems and as a bus station for Metrobus, Paratransit, and Broward County Transit buses. MiamiCentral is directly connected via a pedestrian bridge over NW 3rd Street. The station is located near the intersection of Northwest First Street and First Avenue, a part of the Stephen P. Clark Government Center Building. It opened to service May 20, 1984, next to the site of a former FEC railway station which is now MiamiCentral.
The Silver Star is a temporarily discontinued long-distance passenger train operated by Amtrak on a 1,522-mile (2,449 km) route between New York City and Miami via Washington, D.C.; Richmond, Virginia; Raleigh, North Carolina; Columbia, South Carolina; Savannah, Georgia; Jacksonville, Florida; and Tampa, Florida.
Boca Raton is a Tri-Rail commuter rail station in Boca Raton, Florida. The station is located at Yamato Road, just east of Congress Avenue and west of I-95. Originally opened January 9, 1989, the station was moved and rebuilt following Hurricane Wilma, reopening to service November 4, 2005. The station is the southernmost Tri-Rail station in Palm Beach County, and offers parking. By 2014, it was considered the busiest station in the system with 1,600 riders a day, surpassing the Tri-Rail and Metrorail transfer station in Miami-Dade County. For this reason, a second Boca Raton Tri-Rail station at Glades Road has been long considered.
Miami Intermodal Center (MIC) is an intermodal rapid transit, commuter rail, intercity rail, local bus, and intercity bus transportation hub in Miami-Dade County, Florida, just outside the Miami city limits near the Grapeland Heights neighborhood. The facility was constructed by the Florida Department of Transportation and is owned by the Greater Miami Expressway Agency.
Metrorail is a rapid transit system in Miami and Miami-Dade County in the U.S. state of Florida. Metrorail is operated by Miami-Dade Transit (MDT), a departmental agency of Miami-Dade County. Opened in 1984, it is Florida's only rapid transit metro system, and is currently composed of two lines of 23 stations on 24.4 miles (39.3 km) of standard gauge track. Metrorail serves the urban core of Miami, connecting Miami International Airport, the Health District, Downtown Miami, and Brickell with the northern developed neighborhoods of Hialeah and Medley to the northwest, and to suburban The Roads, Coconut Grove, Coral Gables, and South Miami, ending at urban Dadeland in Kendall. Metrorail connects to the Metromover in Downtown, which provides metro service to the entirety of Downtown and Brickell. Additionally, it connects to South Florida's commuter rail system at Tri-Rail station, as well as Metrobus routes at all stations. In 2023, the system had 13,439,300 rides, and about 49,300 per day in the third quarter of 2024.
Transportation in Florida includes a variety of options, including Interstate Highways, U.S. Highways, and Florida State Roads; Amtrak and commuter rail services; airports, public transportation, and sea ports, in a number of the state's counties and regions.
SunRail is a commuter rail system in the Greater Orlando, Florida, area. Services began on May 1, 2014. The system comprises 17 stations along a former CSX Transportation line connecting Volusia County and Osceola County through Downtown Orlando. The SunRail system is financed by the state and federal governments and the counties it serves. SunRail is Florida's second commuter rail system after South Florida's Tri-Rail.
The Easy Card is a contactless smartcard system for public transit fares in the Miami metropolitan area. The Easy Card is valid on Metrobus and Metrorail services in Miami-Dade County, and on Tri-Rail services throughout the region. Easy Card payments were introduced in 2009 on Miami-Dade Transit services, and expanded to Tri-Rail in 2011. The card functions as a stored-value card, and can also be loaded with unlimited-ride passes. Reduced-fare and zero-fare versions of the Easy Card are available for eligible customers, including seniors and individuals with disabilities.
The Miami metropolitan area composed of the three counties of Miami-Dade, Broward, and Palm Beach, also known collectively as South Florida, is home to a wide variety of public and private transportation systems.
Brightline is an intercity rail route in the United States that runs between Miami and Orlando, Florida. Part of the route runs on track owned and shared by the Florida East Coast Railway.
The Seaboard–All Florida Railway was a subsidiary of the Seaboard Air Line Railroad that oversaw two major extensions of the system in the early 1920s to southern Florida on each coast during the land boom. One line extended the Seaboard's tracks on the east coast from West Palm Beach down to Fort Lauderdale and Miami, while the other extension on the west coast extended the tracks from Fort Ogden south to Fort Myers and Naples, with branches from Fort Myers to LaBelle and Punta Rassa. These two extensions were heavily championed by Seaboard president S. Davies Warfield, and were constructed by Foley Brothers railroad contractors. Both extensions also allowed the Seaboard to better compete with the Florida East Coast Railway and the Atlantic Coast Line Railroad, who already served the lower east and west coasts of Florida respectively.
MiamiCentral is a train station in Miami, Florida. Located in Downtown Miami, the station provides access to the Brightline inter-city rail service and the Tri-Rail commuter rail service. The station is part of a 9-acre (3.6 ha) mixed-use complex, which includes 3 million square feet (280,000 m2) of residential, office, commercial, and retail development.
West Palm Beach station is an inter-city rail station in West Palm Beach, Florida. It is served by Brightline, connecting West Palm Beach to Downtown Miami and Orlando International Airport. The station is located in downtown West Palm Beach, on Evernia Street between Rosemary Avenue and Quadrille Boulevard. This is about half a mile east of Amtrak and Tri-Rail's West Palm Beach station and half a mile south of the older Florida East Coast Railway station that operated on the same tracks in the first half of the 1900s, next to where Quadrille Boulevard turns south after crossing the Flagler Memorial Bridge.
Aventura station is a Brightline station in Ojus, Florida. It is located on West Dixie Highway, west of the Aventura Mall and the city of Aventura. The station is built on land purchased by Brightline and donated to Miami-Dade County, which funded a portion of the construction with $76 million. A groundbreaking ceremony was held September 3, 2020. Prior to Brightline's ongoing suspension of service due to the COVID-19 pandemic, the station had been expected to open in the fall of 2021. A ribbon-cutting ceremony was held on December 20, 2022. Despite a scheduled opening date of December 21, 2022, passenger service did not begin until a few days later, on December 24, 2022, due to some last-minute finishing touches to the station.
The Northeast Corridor Rapid Transit Project is a planned commuter rail service in Miami-Dade County, Florida. The line is planned to extend from MiamiCentral to the Aventura station along the existing Florida East Coast Railway (FEC) tracks. It will have seven stations for the service in Miami-Dade, with both of the terminal stations having access to Brightline. Service could begin as soon as 2032. Tri-Rail is a potential operator of the service. A future extension into Broward and Palm Beach County is under study.