PortMiami

Last updated
PortMiami
Port of Miami Florida.jpg
A January 2008 aerial view of PortMiami in Miami, the world's largest passenger port and one of its busiest
PortMiami
Click on the map for a fullscreen view
Location
Country United States
Location Miami, Florida, U.S.
Coordinates 25°46′27″N80°10′16″W / 25.77417°N 80.17111°W / 25.77417; -80.17111
UN/LOCODE USMIA [1]
Details
Type of harbour Natural/Artificial
Draft depth 43 ft. [2]
Employees176,000 [3]
Port DirectorHydi Webb
Statistics
Vessel arrivals2,489
Annual cargo tonnage 7.42 million
Passenger traffic4.33 million
Annual revenue $94.70 million
FormerlyPort of Miami
Website
PortMiami

The Port of Miami, styled as PortMiami and formally known as the Dante B. Fascell Port of Miami, is a major seaport located in Biscayne Bay at the mouth of the Miami River in Miami, Florida. It is the largest passenger port in the world and one of the largest cargo ports in the United States.

Contents

The port is located on Dodge, Lummus and Sam's Islands, which is the combination of three historic islands (Dodge, Lummus and Sam's Islands) that have since been combined into one. It is connected to Downtown Miami by Port Boulevard—a causeway over the Intracoastal Waterway—and to the neighboring Watson Island via the PortMiami Tunnel. [4] It is named in honor of 19-term Florida Congressman Dante Fascell. [5] [6]

As of 2023, PortMiami accounts for approximately 334,500 jobs and has an annual economic revenue of $43 billion to the state of Florida. [7] [8]

History

In the early 1900s, Government Cut was dredged along with a new channel to what now is known as Bicentennial Park in downtown Miami. [9] This new access to the mainland created the Main Channel which greatly improved the shipping access to the new port. From these original dredging spoils which were disposed on the south side of the new Main Channel, new islands were inadvertently created which later became Dodge, Lummus and Sam's Island along with several other smaller islands. [10]

PortMiami's improved shipping access and growth of the South Florida community led to an expansion of the port. On April 5, 1960, Resolution No. 4830, "Joint Resolution Providing for Construction of Modern Seaport Facilities at Dodge Island Site" was approved by the Dade County Board of Commissioners. On April 6, 1960, the City of Miami approved City Resolution No. 31837 to construct the new port. The new port on Dodge Island required expansion of the island by joining it together with the surrounding islands. [11] After the seawalls, administrative buildings, and a vehicle and railroad bridge were completed, Port of Miami operations were moved to the new Dodge Island port. Additional fill material enlarged the connected Lummus and Sam's islands as well as the North, South and NOAO slips, creating a completely artificial island for PortMiami. [12]

The port is officially named after Florida House of Representatives member Dante Fascell, who served for four decades from 1955 to 1993, and died in 1998.

In 1993, the first dredge of PortMiami occurred, deepening it to 42 feet (13 m). [13] In 2006, a $40 million project to expand the South Harbor finished. [13] In 2011, a project to reconnect PortMiami to the mainland via railroad began. [14] In 2013, a dredging project began to deepen the harbors around PortMiami from 44 to 52 feet (13 to 16 m). [15] In April 2019, the Miami-Dade Tourism and Ports Committee approved a deal for Royal Caribbean Cruises to build a new office and parking garage on Dodge Island. [16]

Today

Cruise ship operations

Royal caribbean Terminal A at PortMiami in March 2024. Royal caribbean Terminal A at PortMiami (March 11, 2024).jpg
Royal caribbean Terminal A at PortMiami in March 2024.
Virgin Voyages at Terminal V. Virgin Voyages Terminal V at PortMiami (March 11, 2024).jpg
Virgin Voyages at Terminal V.

PortMiami is the busiest cruise/passenger port in the world. [17] [18] [19] It accommodates major cruise lines such as Carnival, Royal Caribbean, Norwegian, and MSC, among others, and also serves as the homeport of the largest cruise ship in the world by gross tonnage, Icon of the Seas. Over 7.2 million cruise passengers pass through the port each year (FY2023/2024). [20]

As of July 2024, there are nine operating passenger terminal facilities at PortMiami: A, B, C, D, E, F, G, J, and V. Of the nine, there are three facilities that are purpose-built for a specific company, while other companies share the other terminals. Other company-specific facilities are in their planning or construction stages.[ citation needed ]

Current passenger terminals

TerminalAllocation
AThis facility exclusively serves cruise lines that are part of Royal Caribbean Group, and handles the world's largest class of cruise ships, the Icon-class ships. [21] [22]
BThis facility exclusively serves cruise lines that are part of Norwegian Cruise Line Holdings. [23] [24]
CThis facility primarily serves cruise lines that are part of MSC Cruises. [23] [24]
DThis facility primarily serves cruise lines that are part of Carnival Corporation & plc. [23] [24]
EThis facility primarily serves cruise lines that are part of Carnival Corporation & plc. [23] [24]
FThis facility primarily serves Carnival Cruise Line. [23] [24]
GThis facility primarily serves cruise lines that are part of Royal Caribbean Group. [24]
JAs PortMiami's boutique cruise terminal, it primarily serves smaller vessels and luxury cruise lines, such as Oceania Cruises and Regent Seven Seas Cruises. [23]
VThis facility exclusively serves Virgin Voyages. [25]

Terminals and projects

Norwegian Cruise Line (NCL) Terminal B at PortMiami in March 2024. Norwegian Cruise Line (NCL) Terminal B at PortMiami (March 11, 2024) 01.jpg
Norwegian Cruise Line (NCL) Terminal B at PortMiami in March 2024.
MSC shared Terminal AA/AAA under construction in March 2024. MSC shared terminal under construction at PortMiami (March 11, 2024).jpg
MSC shared Terminal AA/AAA under construction in March 2024.

On June 28, 2016, Royal Caribbean Group announced plans for a new 200,000-square-foot (19,000 m2) facility that would redevelop "Terminal A" at PortMiami. It would be Royal Caribbean's homeport and be fully capable of serving larger Oasis-class ships. [26] The terminal, dubbed the "Crown of Miami," was completed in November 2018. [23]

On March 7, 2018, Norwegian Cruise Line Holdings announced plans for a new 166,000-square-foot (15,400 m2) facility that would redevelop "Terminal B" at PortMiami. It would be fully capable of serving Norwegian's largest ships, the Breakaway Plus-class ships. Norwegian originally intended to open the terminal, dubbed the "Pearl of Miami," by fall 2019, but budgeting issues and the COVID-19 pandemic postponed its opening date until August 2021, when Terminal B officially serviced its first cruise ship. [27] [28] [29] [23] [30]

On November 28, 2018, Virgin Voyages announced plans to build a new 100,000-square-foot (9,300 m2) terminal located on the northwest side of PortMiami. [23] On September 19, 2019, Virgin Voyages finalized the $150 million contract with Miami-Dade County to begin redeveloping the area currently occupied by "Terminal H", which would be renamed "Terminal V" upon completion. [31] This facility effectively replaced "Terminal H". [32] [31] Prior to August 2019, "Terminal H" was primarily occupied by FRS Caribbean, which operated a ferry service between Miami and Bimini in the Bahamas. [33] [32] [ needs update ] The new terminal is designed to be the homeport for Virgin Voyages' first two vessels, the Scarlet Lady and the Valiant Lady. [34] "Terminal V" was completed in February 2022. [23]

On September 19, 2019, Carnival Cruise Line announced that it had received approval from Miami-Dade County for an expansion of its company's facilities at PortMiami by renovating and expanding "Terminal F", making it the company's third passenger facility at the port and the company's largest terminal in North America, at 471,500 square feet (43,800 m2). [35] The terminal was completed on February 14, 2023 to coincide with the debut of Carnival's second Excellence-class vessel, Carnival Celebration, which is currently homeported in Miami. [36] The terminal will be operated by Carnival under a 20-year lease. [31] [35] [8]

In July 2018, MSC Cruises announced plans to build "Terminal AA/AAA" for its upcoming World-class cruise ships, a forthcoming class of cruise ship with an approximate gross tonnage of 215,800 tons. On September 19, 2019, MSC and Miami-Dade County finalized the contract to construct the new facility. [37] The new $300 million building will span 16.7 acres (6.8 ha) and include two berths capable of operating simultaneously, separately named as "AA" and "AAA," and be operated by MSC under a 62-year lease. [37] In September 2018, it was announced that Disney Cruise Line had entered into an agreement with Miami-Dade County to plan for a brand-new terminal, "Terminal K", on the south side of PortMiami and east of Terminal J. The inauguration of the terminal was expected to coincide with Disney's expansion into Miami with two vessels homeported at the port in the mid-2020s. [38] The construction of the terminal would have been dependent on improvements made to the port's infrastructure that could have enabled Disney's vessels to operate on the south side of the port. Dates for groundbreaking and completion were not announced at the time of announcement. [38] [23] However, in July 2020, in light of the COVID-19 pandemic and its economic repercussions, PortMiami issued a new proposal that accommodates MSC's difficulties in receiving financing for the project by amending the ground lease, while also granting the port additional time to prepare the site for the project prior to turning over the premises to MSC. [39] Additionally, in an effort to reduce costs for its expansion projects, the port issued an accompanying resolution requiring the new MSC complex to share facilities with Disney Cruise Line, and will require Miami-Dade County to establish a new berthing rights agreement with Disney Cruise Line based on the proposal. [39] Construction of "Terminal AA/AAA" began in March 2022, [40] and is expected to be completed in 2024. [41] [23] In the future, a third birth will added to operate up to three cruise ships simultaneously. [42]

Royal Caribbean Group also announced plans to redevelop "Terminal G" at PortMiami. A larger terminal would be constructed, and would be able to accommodate larger Oasis-class and Icon-class ships. The new terminal is expected to be completed in winter of 2027. [42]

Container ship operations

PortMiami, the world's largest passenger port and one of its busiest container ports Port of Miami container ship.jpg
PortMiami, the world's largest passenger port and one of its busiest container ports

As the "Cargo Gateway of the Americas," the port primarily handles containerized cargo with small amounts of breakbulk, vehicles and industrial equipment. It is the largest container port in the state of Florida and ninth in the United States.

Over 9.6 million tons of cargo and over 1 million  twenty-foot equivalent units  (TEU) (FY 2018/2019) of intermodal container traffic move through the seaport per year. The economic impact from cargo operations at PortMiami to Florida amounts to $35 billion. [7]

As of 2021, nearly 1,000 cargo ships docked at the port. [43] In terms of TEU, China is PortMiami's largest trade partner, while Honduras is ranked first in terms of trade value. [44] Computers represent the port's most valuable export, while insulated wire and cable are considered the most valuable import. [45]

Design and infrastructure

The port currently operates eight passenger terminals, six gantry crane wharves, seven Ro-Ro (Roll-on-Roll-off) docks, four refrigerated yards for containers, break bulk cargo warehouses and nine gantry container handling cranes. In addition, the port tenants operate the cruise and cargo terminals which includes their cargo handling and support equipment.

To retain the port's competitive rank as a world-class port, in 1997 the port undertook a redevelopment program of over $250 million which is well underway to accommodate the changing demands of cruise vessel operators, passengers, shippers and carriers. To further resolve accessibility, the PortMiami Tunnel was constructed in 2010 and completed in 2014, providing direct vehicle access from the port to the interstate highway system via State Road 836, thereby bypassing congestion in downtown Miami. [4]

As part of the massive PortMiami redevelopment program, new ultramodern cruise terminals, roadways and parking garages have been constructed. Additionally, a new gantry crane dock and container storage yards have been constructed along with the electrification of the gantry crane docks to include the conversion of several cranes has been completed. In addition, the Port acquired two state-of-the-art super post-panamax gantry cranes which are amongst the largest in the world; able to load and unload 22 container (8 foot wide each), or nearly 200 foot, wide mega container ships. This, along with the planned Deep Dredge Project, would make it possible for PortMiami to facilitate even the future largest containerships in the world, the Maersk Triple E Class. The new and restructured roadway system with new lighting, landscaping and signage greets visitors to the 'Cruise Capital of the World and Cargo Gateway of the Americas'. The roadways will change again with the completion of the PortMiami Tunnel. And to enhance cargo port accessibility, the newly constructed Security Gates opened at the end of 2006 to increase the processing rate for container trucks and help eliminate the daily traffic backups.

Tunnel and Deep Dredge

Four major projects directly and indirectly related to PortMiami are expected to increase both the capacity and efficiency of the port: the expansion of the Panama Canal, the PortMiami Deep Dredge Project, the PortMiami Tunnel, and the restoration and upgrade of the bridge and rail line connecting PortMiami to the mainland.

On May 24, 2010, construction began on the Miami Port Tunnel, a $1 billion project providing a much-needed direct connection from the port to I-395. Prior to the tunnel's completion, the only way to enter and exit the port was via surface streets through downtown Miami. Construction on the tunnel finished in 2014.

Another major development for the PortMiami was the PortMiami Deep Dredge project, enabling Super Post Panamax Megaships to enter the United States after the completion of the Panama Canal expansion in 2014. The ports of Norfolk, New York and Baltimore have also deepened their ports to the required 50 feet. It is estimated that this project could double Miami's cargo business in the next 10 years as well as creating over 30,000 permanent jobs for Miami, which currently has a very high unemployment rate.

There were plans to build a soccer-specific stadium at PortMiami. The plans were proposed by a group, led by David Beckham, seeking to bring a Major League Soccer team to Miami. [46] The group has stated that they would fund such a stadium privately, but there has been opposition on multiple grounds, including the added traffic to downtown Miami and the impact on wildlife.[ citation needed ] The stadium has now been relocated to a new site.

Port of Miami 20071208.jpg
PortMiami is the world's busiest cruise ship port, and is headquarters to many of the world's largest cruise companies. From left to right: Hapag-Lloyd Europa, Norwegian Sky , Oceania Nautica, Carnival Valor , Carnival Imagination , Carnival Liberty , Liberty of the Seas , and MV Explorer

Railroad access

The rail line being renovated, November 2011 FEC line track repair to Port of Miami.jpg
The rail line being renovated, November 2011

In 2011, PortMiami was awarded a federal grant, as part of the Transportation Investment Generating Economic Recovery (TIGER) program, to restore a connection between the Florida East Coast Railway's yard in Hialeah and PortMiami, directly connecting the port to rail networks across the United States, [47] as well as re-establishing the port's on-dock rail capability (loading and unloading directly between ships and trains). [48] The railroad bridge connecting the port to the mainland was damaged by Hurricane Wilma in 2005, at which time service was suspended. [49] The project was scheduled to be finished in time for the completion of the other projects in 2014. [50] The rail project is related to another scheme to increase PortMiami's capacity; an inland intermodal center, known as Flagler Logistics Hub, to be built near the airport on 300 acres of land in Hialeah. [51]

There was some opposition to the railroad line being returned to service, with claims that it would be as much of a problem to downtown traffic as container trucks, and that the noise would be a disturbance to nearby residents. However, trains are occasional and will be reserved for specialty freight, such as oversized loads and hazardous materials, which will be banned from the tunnel.[ citation needed ] As well, trains will be able to travel at up to 30 mph (50 km/h) on the newly renovated line, in contrast to the old limit of 5 mph (8 km/h), [52] and so will be able to cross Biscayne Boulevard in 90 seconds. [53] The current plan is for the line to be strictly for intermodal services, with the project including a rail yard and station at the port. However, a passenger station may be added in the future. [54]

The cost of restoring the rail link between the port and the Hialeah Railyard was estimated at $46.9 million, $28 million of which was applied for through a federal grant in 2010. [50] Later that year, a grant of $22 million was awarded for this project, [55] as well as to build an on site intermodal rail yard at the port. During the 2000s the percent of Florida East Coast Railway's business has increased from around 60% to around 80% intermodal freight. [56] However, this was partially due to a decrease in other freight traffic caused by the 2008 recession, which reduced the number of trains, many carrying rock aggregate used in construction, from about 20 to 14 per day. [57]

There was a plan to start a passenger service connecting Jacksonville to Miami using the FECR mainline, with stops at popular tourist attractions. The State of Florida had provided $116 million of the $268 million needed to fund that project. [58] The remaining funding for the passenger line is expected to come from a federal grant, and the remaining funding to fix the local freight line from the Port to Hialeah is supposed to come from the Florida East Coast Railroad (FEC) at $10.9 million, the Florida Department of Transportation (FDOT) at $10.9 million, with the PortMiami itself [50] providing $4.8 million. [53] (The passenger service never began; however, the plan was effectively replaced by Brightline.) In April 2011, Atlas Railroad Construction was chosen to rebuild the line, which was to be completed by 2012 and was estimated to remove 5% of the road traffic from the port. [59] On July 15, 2011, a ground-breaking ceremony marking the beginning of the rail link project, which is expected to create over 800 jobs and generate $33.38 million in wages, was performed by US Senator Bill Nelson, Secretary of Transportation Ray LaHood, Miami-Dade Mayor Carlos Giménez, and Miami city mayor Tomás Regalado. [53] The project has been named the PortMiami Intermodal and Rail Reconnection Project. [47]

See also

Related Research Articles

<span class="mw-page-title-main">Port</span> Maritime facility where ships may dock to load and discharge passengers and cargo

A port is a maritime facility comprising one or more wharves or loading areas, where ships load and discharge cargo and passengers. Although usually situated on a sea coast or estuary, ports can also be found far inland, such as Hamburg, Manchester and Duluth; these access the sea via rivers or canals. Because of their roles as ports of entry for immigrants as well as soldiers in wartime, many port cities have experienced dramatic multi-ethnic and multicultural changes throughout their histories.

<span class="mw-page-title-main">Port Everglades</span> Seaport in Broward County, Florida

Port Everglades is a seaport in Fort Lauderdale, Florida, located in Broward County. Port Everglades is one of South Florida's foremost economic engines, as it is the gateway for both international trade and cruise vacations. In 2022, Port Everglades was ranked the third-busiest cruise homeport, accommodating more than 1.72 million passengers. Port Everglades' cargo sector has been climbed up the rankings based on its operational performance among 348 seaports in the world.

<span class="mw-page-title-main">Oakland Seaport</span> Container ship facility in Oakland, California

The Oakland Seaport is a major container ship facility located in Oakland, California, in the San Francisco Bay. It is operated by the Port of Oakland port authority along with the San Francisco Bay Oakland International Airport. It was the first major port on the Pacific Coast of the United States to build terminals for container ships. As of 2022, it was the eighth busiest container port in the United States, behind the ports of Los Angeles, New York/New Jersey, Long Beach, Savannah, Houston, Virginia, and Seattle/Tacoma. Development of an intermodal container handling system in 2002 after over a decade of planning and construction positions the Oakland Seaport for further expansion of the West Coast freight market share. In 2019 it ranked 8th in the United States in the category of containers.

<span class="mw-page-title-main">Port of Liverpool</span> Series of docks on the River Mersey, Liverpool, England

The Port of Liverpool is the enclosed 7.5-mile (12.1 km) dock system that runs from Brunswick Dock in Liverpool to Seaforth Dock, Seaforth, on the east side of the River Mersey and the Birkenhead Docks between Birkenhead and Wallasey on the west side of the river.

<span class="mw-page-title-main">Port of Boston</span> Seaport district in Boston, Massachusetts

The Port of Boston is a major seaport located in Boston Harbor and adjacent to the City of Boston. It is the largest port in Massachusetts and one of the principal ports on the East Coast of the United States.

<span class="mw-page-title-main">Port of New Orleans</span> Port in United States

The Port of New Orleans is a significant transport hub located in Louisiana, United States. It serves as an embarkation point for cruise passengers and Louisiana’s sole international container port.

<span class="mw-page-title-main">Port Canaveral</span> Port in Florida, United States

Port Canaveral is a cruise, cargo, and naval port in Brevard County, Florida, United States. The port has the busiest cruise terminals in the world. In 2022, the port had over 4 million passengers passing through it during the fiscal year. Additionally, over 5.4 million tonnes of bulk cargo moves through each year.

The Port of Palm Beach is located in Riviera Beach, Florida, United States, in Palm Beach County. The port is an independent taxing district, with a five-member board of commissioners elected at large by voters within the district. The port district covers a land area of 971 square miles (2,510 km2) or approximately fifty percent of the Palm Beach County area. The port is administered by an Executive Director and professional staff of 59 full-time employees.

<span class="mw-page-title-main">Port of New York and New Jersey</span> Port in New York and New Jersey, United States

The Port of New York and New Jersey is the port district of the New York-Newark metropolitan area, encompassing the region within approximately a 25-mile (40 km) radius of the Statue of Liberty National Monument.

<span class="mw-page-title-main">Miami Intermodal Center</span> Ground transportation hub for Miami International Airport

Miami Intermodal Center (MIC) is an intermodal rapid transit, commuter rail, intercity rail, local bus, and intercity bus transportation hub in Miami-Dade County, Florida, just outside the Miami city limits near the Grapeland Heights neighborhood. The facility was constructed by the Florida Department of Transportation and is owned by the Greater Miami Expressway Agency.

<span class="mw-page-title-main">Port of Bridgetown</span> Port in Barbados

The Port of Bridgetown, is a seaport in Bridgetown on the southwest coast of Barbados. Situated at the North-Western end of Carlisle Bay, the harbour handles all of the country's international bulk ship-based trade and commerce. In addition to international-shipping the Deep Water Harbour is the port of entry for southern-Caribbean cruise ships. The port is one of three designated ports of entry in Barbados, along with the privately owned Port Saint Charles marina and the Sir Grantley Adams International Airport. The port's time zone is GMT −4, and it handles roughly 700,000 cruise passengers and 900,000 tonnes of containerised cargo per year.

<span class="mw-page-title-main">Port of Jacksonville</span> Port in United States

The Port of Jacksonville (JAXPORT) is an international trade port on the St. Johns River in Jacksonville, Florida. JAXPORT is the largest port by volume in Florida, and the 14th largest container port in the United States. It carries about 18 million short tons of cargo each year and has an annual economic impact of over $31 billion, including 138,500 jobs across the state of Florida related to cargo moving through the port. It handled 1,338,000 containers, and is the second largest handler of vehicles in the United States with 696,500 in 2019.

<span class="mw-page-title-main">Port of Galveston</span> Port of the city of Galveston, Texas, United States

The Port of Galveston is the port of the city of Galveston, Texas, United States. It was established by a proclamation issued by the Congress of Mexico on October 17, 1825, while the land known today as Texas was still part of Mexico. The Port of Galveston is the oldest port in the Gulf of Mexico west of New Orleans.

<span class="mw-page-title-main">Port of Southampton</span> Passenger and cargo port in Southampton, England

The Port of Southampton is a passenger and cargo port in the central part of the south coast of England. The modern era in the history of the Port of Southampton began when the first dock was inaugurated in 1843. After the Port of Felixstowe, Southampton is the second largest container terminal in UK, with a handled traffic of 1.5 million twenty-foot equivalent units (TEU). It also handles cruise ships, roll-on roll-off, dry bulk, and liquid bulk.

<span class="mw-page-title-main">Port Miami Tunnel</span> Tunnel in Miami, Florida

The Port of Miami Tunnel is a 4,200-foot (1,300 m) bored, undersea tunnel in Miami, Florida. It consists of two parallel tunnels that travel beneath Biscayne Bay, connecting the MacArthur Causeway on Watson Island with PortMiami on Dodge Island. It was built in a public–private partnership between three government entities—the Florida Department of Transportation, Miami-Dade County, and the City of Miami—and the private entity MAT Concessionaire LLC, which was in charge of designing, building, and financing the project and holds a 30-year concession to operate the tunnel.

The Virginia Port Authority (VPA) is an autonomous agency of the Commonwealth of Virginia that owns The Port of Virginia, a group of facilities with their activity centered on the harbor of Hampton Roads, Virginia.

<span class="mw-page-title-main">PortMiami Deep Dredge Project</span>

The PortMiami Deep Dredge Project was a project that expanded PortMiami by dredging the bay to allow new, larger cargo ships to enter the port. The project was related to the "New Panamax" project that was completed in 2016 that involved a major expansion of the Panama Canal. The port, which was 42 feet deep, was dredged to 50 feet in depth to allow the new Super Post Panamax megaships to enter. This project also coincided with the Port Miami Tunnel project, which was completed in 2014, that allows trucks to bypass Downtown Miami, resulting in twice the traffic capacity to the port. The ports of New York, Norfolk, and Baltimore have already undergone these projects. The Deep Dredge, along with port facility improvements such as the addition of two new large gantry cranes, made PortMiami capable of berthing even the next largest container vessels in the world, the Maersk Triple E Class, which has a draught of 48 feet (15 m) and is nearly 200 feet (61 m) wide, and was completed in 2015.

<span class="mw-page-title-main">Rail freight transportation in New York City and Long Island</span>

From the start of railroading in America through the first half of the 20th century, New York City and Long Island were major areas for rail freight transportation. However, their relative isolation from the mainland United States has always posed problems for rail traffic. Numerous factors over the late 20th century have caused further declines in freight rail traffic. Efforts to reverse this trend are ongoing, but have been met with limited success.

<span class="mw-page-title-main">Liverpool2</span> Container terminal on the River Mersey, England

Liverpool2 is a container terminal extension adjoining the River Mersey in Seaforth, Merseyside. The extension, built by Peel Ports, officially opened on 4 November 2016 and is an expansion of the Seaforth Dock container terminal.

<span class="mw-page-title-main">ExpressRail</span> Intermodal rail facilities at New York Harbor

ExpressRail is a network of on- or near-dock rail yards supporting intermodal freight transport at the major container terminals of the Port of New York and New Jersey. The development of dockside trackage and rail yards for transloading has been overseen by the Port Authority of New York and New Jersey, which works in partnership with other public and private stakeholders. As of 2019, four ExpressRail facilities were in operation, with a total built capacity of 1.5 million lifts.

References

  1. "UNLOCODE (US) - UNITED STATES". service.unece.org. Retrieved 23 September 2020.
  2. "Port of Miami, U.S.A." www.findaport.com. Shipping Guides Ltd. Retrieved 23 September 2020.
  3. "Coronavirus Impact: Cargo Side of PortMiami Still Chugging Despite 15-20% Drop - CBS Miami". CBS News . 16 April 2020.
  4. 1 2 Chardy, Alfonso (May 17, 2014). "Decades after conception, Miami has a port tunnel". Miami Herald. Retrieved June 6, 2014.
  5. "PortMiami makes history - Historic Marker Unveiled". Port of Miami. September 14, 2014. Retrieved November 15, 2014.
  6. "Contact PortMiami". PortMiami. Miami-Dade County. Retrieved 16 June 2017.
  7. 1 2 "PortMiami Port Guide 2018-2019" (PDF). PortMiami.
  8. 1 2 Sreeharsha, Vinod. "How the cruise capital of the world came back from COVID. What it means for Miami port". Miami Herald.
  9. "PortMiami Government Cut Bicentennial". Archived from the original on 2006-02-13.
  10. "PortMiami Cruise Terminal: Miami, Florida" (PDF).
  11. "2023 Master Plan" (PDF). MiamiDade.gov. p. 1.
  12. Scott Mall (April 27, 2021). "FreightWaves Classics: PortMiami handles cargo and cruises". Freight Waves.
  13. 1 2 Herrera, Chabeli (8 July 2018). "Despite recent dredge, PortMiami still can't fit some large ships. New project in the works". Miami Herald.
  14. "Groundbreaking For $50M Port Of Miami Rail Project". 2011-07-15. Retrieved 2019-08-14.
  15. "Dredging Underway At PortMiami". 2013-11-24. Retrieved 2019-08-14.
  16. Dolven, Taylor (15 April 2019). "Royal Caribbean unveils new $300M office plan for PortMiami that will look like a ship". Miami Herald.
  17. "PortMiami 2017 Cruise Guide" (PDF). miamidade.gov. PortMiami. Retrieved 16 June 2017.
  18. "See which Florida cruise ports are among the largest in the world". bizjournals.com. Orlando Business Journal.
  19. "The World's Busiest Cruise Ports". The Telegraph. Retrieved 16 June 2017.
  20. "2023-2024 Seaport Mission Plan" (PDF).
  21. "Royal Caribbean Signs Agreement With Miami-Dade County to Build World-Class Cruise Terminal". Royal Caribbean Cruises Ltd. June 28, 2016. Retrieved September 11, 2019.
  22. Diaz, Johnny (November 5, 2018). "Royal Caribbean opened a new terminal at PortMiami. Here's a look inside". Sun-Sentinel . Retrieved September 11, 2019.
  23. 1 2 3 4 5 6 7 8 9 10 11 12 "PortMiami - Cruise Terminals - Miami-Dade County". www.miamidade.gov. Retrieved 2019-09-11.
  24. 1 2 3 4 5 6 "Miami Cruise Port Address, Parking & Information - Cruise Critic". www.cruisecritic.com. Retrieved 2019-09-11.
  25. Staff, C. I. N. (2022-02-14). "Virgin Voyages Opens New Terminal V in Miami". www.cruiseindustrynews.com. Retrieved 2022-02-18.
  26. "ROYAL CARIBBEAN SIGNS AGREEMENT WITH MIAMI-DADE COUNTY TO BUILD WORLD-CLASS CRUISE TERMINAL". www.royalcaribbeanpresscenter.com. 2016-06-28. Retrieved 2024-08-05.
  27. Scheckner, Jesse (2019-08-13). "As PortMiami rides high, more development deals on horizon". Miami Today. Retrieved 2019-10-07.
  28. Tribou, Richard (7 March 2018). "Norwegian Cruise Line to build new Miami terminal". orlandosentinel.com. Retrieved 2019-09-11.
  29. "Norwegian Cruise Line needs more time, bigger budget for PortMiami terminal". www.bizjournals.com. Retrieved 2019-09-11.
  30. Staff, CIN (2018-03-07). "Norwegian Cruise Line Holdings Announces New Terminal at PortMiami" . Retrieved 2018-03-09.
  31. 1 2 3 Hanks, Douglas; Dolven, Taylor (September 19, 2019). "PortMiami creating 'Terminal V' for Virgin Voyages cruise ships". Miami Herald .
  32. 1 2 Stieghorst, Tom (November 28, 2018). "Virgin Voyages building Miami terminal: Travel Weekly". Travel Weekly. Retrieved September 11, 2019.
  33. "FRS Caribbean | Ferry Services From Miami to Bimini, Bahamas". FRS Caribbean. Retrieved 2019-09-11.
  34. Diaz, Johnny (28 November 2018). "Virgin Voyages debuts plans for new cruise ship terminal in Miami". sun-sentinel.com. Retrieved 2019-09-11.
  35. 1 2 Staff, C. I. N. (2019-09-19). "Carnival to Expand Terminal F at PortMiami to Accommodate 2022 Newbuild". www.cruiseindustrynews.com. Retrieved 2019-09-20.
  36. "Lemartec Completes PortMiami Cruise Terminal F Expansion Project On Time and On Budget – Lemartec". 2023-02-14. Retrieved 2024-08-02.
  37. 1 2 "MSC Cruises gets green light for $300M terminal project at PortMiami". The Real Deal Miami. 2019-09-19. Retrieved 2019-09-20.
  38. 1 2 "Disney plans to build Miami terminal for year-round cruises: Travel Weekly". www.travelweekly.com. Retrieved 2019-09-11.
  39. 1 2 Kalosh, Anne (14 July 2020). "PortMiami proposes MSC Cruises' mega terminal provide joint facilities for Disney". Seatrade Cruise News. Retrieved 14 July 2020.
  40. "Construction Begins at PortMiami on U.S.'s Largest Cruise Terminal". The Maritime Executive. 2022-03-11. Retrieved 2024-08-01.
  41. Chrusciel, Brittany (July 11, 2018). "MSC Cruises to Build Second Cruise Terminal in Miami". Cruise Critic. Retrieved July 12, 2018.
  42. 1 2 "World's largest cruise terminal nears PortMiami opening". Miami Today. 2024-07-30. Retrieved 2024-08-05.
  43. "PortMiami - Statistics at a Glance - Miami-Dade County". www.miamidade.gov. Retrieved 2024-03-20.
  44. "PortMiami - Statistics at a Glance - Miami-Dade County". www.miamidade.gov. Retrieved 2024-03-20.
  45. "Port Miami". US TradeNumbers. Retrieved 2024-03-20.
  46. Report: David Beckham, MLS Commissioner Don Garber to address Miami expansion plans next week | MLSsoccer.com
  47. 1 2 Jeanette Sheppard, Hank Tester (July 15, 2011). "Port of Miami Rail Project Groundbreaking". NBC Miami . Retrieved 2011-07-16.
  48. "Miami port rail link construction set". Railway Age. July 13, 2011. Archived from the original on September 27, 2011. Retrieved 2011-07-16.
  49. "Back to the Future: Port of Miami & Florida East Coast Railway?". MiamiDade.gov. 2010. Retrieved 2011-03-30.
  50. 1 2 3 Alfonso Chardy (August 21, 2010). "Port of Miami puts rail project on fast track". Miami Herald . Retrieved 2011-03-30.[ dead link ]
  51. Zachary S. Fagenson (March 10, 2011). "Million-square-foot Flagler logistics hub key piece of Miami's international trade puzzle". Miami Today News . Retrieved 2011-03-30.
  52. "Port of Miami rail connection breaks ground". WSVN-TV. July 15, 2011. Retrieved 2011-07-16.
  53. 1 2 3 Ashley D. Torres (July 15, 2011). "FEC rail project starts – 800 jobs expected". South Florida Business Journal. Retrieved 2011-07-17.
  54. "TIGER II Grant". Miami-Dade.gov. 2010. Retrieved 2011-04-11.
  55. "Port of Miami Cargo". Edward Redlich. October 14, 2010. Retrieved 2011-04-06.
  56. James R. Hertwig (April 4, 2011). "Historic Florida railroad has eyes on business from wider Panama Canal". Sun-Sentinel. Archived from the original on August 20, 2012. Retrieved 2011-04-13.
  57. Kevin Gale (April 1, 2011). "Florida East Coast Railway pulls the throttle on intermodal business". South Florida Business Journal. Retrieved 2011-04-14.
  58. William Lind (April 13, 2011). "A Test for Florida's Governor". The Conservative American. Retrieved 2011-04-14.
  59. Zachary Fagenson (June 2, 2011). "Florida East Coast Rail line to haul 5% of cargo trucks from Port of Miami". Miami Today. Retrieved 2011-06-02.