Northlander

Last updated
Northlander
Northlander at Englehart 2008 12 21.jpg
The Northlander at Englehart station.
Overview
StatusDiscontinued
Locale Ontario, Canada
Termini
Stations14
Service
Type Inter-city rail
System Ontario Northland Railway
Operator(s) Ontario Northland Railway
History
Opened1976;49 years ago (1976)
ClosedSeptember 28, 2012
Reopened2026 (planned) [1]
Technical
Track length776 km (482 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Route map

Contents

BSicon CONTg azure.svg
BSicon KBHFa.svg
BSicon KBHFe azure.svg
10:45
Cochrane
BSicon HST.svg
9:50
Matheson
BSicon HST.svg
9:05
Swastika
BSicon HST.svg
8:25
Englehart
BSicon HST.svg
7:55
New Liskeard
BSicon HST.svg
7:40
Cobalt
BSicon HST.svg
6:55
Temagami
BSicon HST.svg
5:10
North Bay
BSicon HST.svg
3:55
South River
BSicon HST.svg
3:00
Huntsville
BSicon HST.svg
2:25
Bracebridge
BSicon HST.svg
2:10
Gravenhurst
BSicon HST.svg
1:45
Washago VIA Rail Canada simplified.svg
BSicon KINTe.svg
0:00
Toronto GO Transit logo.svg VIA Rail Canada simplified.svg BSicon LOGO Amtrak2.svg

The Northlander was a passenger train operated by the provincially-owned Ontario Northland Railway in southern and northeastern Ontario, Canada. In 2012, rail service was discontinued and replaced with express bus service. Rail service will be reinstated in the mid-2020s with an expanded route, greater frequency, new Siemens Venture trainsets manufactured by Siemens Mobility, and various track and station upgrades. [1] [2] The new bi-directional route will run up to seven days a week from Toronto Union Station to Timmins, with an additional new rail connection from Timmins to Cochrane (where passengers can then connect directly to the Polar Bear Express at Cochrane Station) and express bus service from Matheson to Cochrane Station. [3]

Prior to 2012, the Northlander operated six days per week year-round in both directions and connected Cochrane with Toronto. The train typically consisted of one engine, an auxiliary power unit, two coaches and a cafeteria lounge car. It ran on ONR tracks from Cochrane to North Bay and on CN tracks south of North Bay to Toronto.

Plans to resume rail service

Northlander (future)
BSicon CONTg azure.svg
BSicon KBHFe azure.svg
BSicon exKHSTa purple.svg
BSicon BLaq.svg
BSicon BL+r.svg
Cochrane
BSicon extKHSTaq purple.svg
BSicon eKBHFaq.svg
BSicon exSTRr purple.svg
BSicon STR+r.svg
BSicon extSTRr purple.svg
BSicon STR black.svg
BSicon BL.svg
Timmins
(Porcupine)
BSicon eHST.svg
BSicon lHST black.svg
BSicon BLe.svg
Matheson
BSicon eHST.svg
Kirkland Lake
(Swastika)
BSicon HST.svg
Englehart
BSicon eHST.svg
Temiskaming Shores
(New Liskeard)
BSicon eHST.svg
Temagami
BSicon BHF.svg
North Bay
BSicon eHST.svg
South River
BSicon eHST.svg
Huntsville
BSicon eHST.svg
Bracebridge
BSicon eHST.svg
Gravenhurst
BSicon eINT.svg
Washago VIA Rail Canada simplified.svg
BSicon INT.svg
Gormley GO Transit logo.svg
BSicon INT.svg
Langstaff GO Transit logo.svg
BSicon KINTe.svg
Toronto GO Transit logo.svg VIA Rail Canada simplified.svg UP Express icon white on black.jpg BSicon LOGO Amtrak2.svg
Key
BSicon STRq.svg
Proposed Northlander
BSicon eBHFq.svg
Stations to be rebuilt
BSicon exSTRq purple.svg
Rail Connection
(Timmins-Cochrane)
BSicon BLq.svg
BSicon STRq black.svg
Freight service only
BSicon STRq azure.svg
Source [4] [5]

Prior to the 2018 Ontario general election, Doug Ford promised to restore the service. [6] Ontario Northland prepared a business plan and submitted it to the Ministry of Transportation of Ontario in late 2019, and the resumption of the service was mentioned in the province's Draft Transportation Plan for Northern Ontario published in December 2020, [7] although no timeline was provided.

In May 2021, the provincial government announced plans for Ontario Northland and Metrolinx to resume rail operations between Toronto and northeastern Ontario with a 13-stop route to begin service by the mid-2020s. The route would provide service from Toronto to Timmins or Cochrane and would be available between four and seven days a week, based on seasonal travel demands. [8] Two of the proposed stations, Gormley and Langstaff, are not ONR stations from the original Northlander route but they are serving GO Transit Richmond Hill line. Stations south of North Bay to Washago and south of Cochrane would need to be restored as they have either become inactive or adapted for other uses.

In April 2022, Ontario's Progressive Conservative government announced it has earmarked $75 million to restore the Northlander passenger rail service to northeastern Ontario. President and CEO of Ontario Northland Corina Moore said the money will be split over the next three years. She said it will look after passenger coaches, infrastructure and stations. The province said it continues to eye an in-service date of 2025. They said that the service will be offered on seasonal travel demands and will range from four and seven days a week between northern Ontario and Toronto. [9]

On December 15, 2022, the Government of Ontario announced that it had purchased three trainsets from Siemens Mobility for use on the Northlander, each comprising a Charger locomotive, two Venture coaches, and a cab car operating in a push-pull configuration on trains between Toronto and Timmins. [10]

By December 2023, further details became known. The trip from Toronto to Cochrane on the restored Northlander is expected take 10 hours and 40 minutes. Trains would leave Cochrane in the evening, and return in the evening or overnight. Station along the route would be slightly different from the pre-2012 service; the 16 stops would be Union Station, Langstaff, Gormley, Washago, Gravenhurst, Bracebridge, Huntsville, South River, North Bay, Temagami, Temiskaming Shores, Englehart, Kirkland Lake/Swastika, Matheson, Timmins, and Cochrane. Cobalt was the only station from the original Northlander route that was not included as a new stop for the resumed service. [11] Northbound trains would have a layover in Timmins before proceeding to Cochrane, but an optional express bus service would be available. Instead of a dining car, the new Northlander would have seat service for food and beverages. Ridership by 2041 is expected to be 60,000 per year. [12]

Stations

The Northlander made scheduled stops at the following stations:

↓↓↓↓CITY / TOWN↑↑↑↑NOTES
08:40DP Toronto (Union Station)AR19:15Connections to Via Rail, GO Transit & Amtrak
10:25 Washago 16:30Connections to Via Rail's The Canadian
10:50 Gravenhurst 16:10
11:05 Bracebridge 15:55
11:40 Huntsville 15:30
12:35 South River 14:40
13:50AR North Bay DP13:35Connections to Ontario Northland, Greyhound Canada and other intercity bus operators.
14:05DP North Bay AR13:25
15:35 Temagami 11:50
16:20 Cobalt 11:05
16:35 New Liskeard 10:50 Ontario Northland bus stop until 2016
17:05 Englehart 10:20ONR storage facility and repair shops
17:45 Swastika 09:40 Ontario Northland bus stop
18:30 Matheson 08:55Transfer point for bus service to Timmins and South Porcupine, Ontario
18:55 Porquis Junction 08:20
19:25AR Cochrane DP08:00Connections to Polar Bear Express to Moosonee, Ontario (as southern terminus)
Temagami railway station Temagami station.jpg
Temagami railway station
Cochrane railway station Cochrane Ontario.jpg
Cochrane railway station

Former stations

Service to Barrie and Orillia ended in 1992 when the Northlander was rerouted to the Bala subdivision. Before the former TEE trainsets were retired, Barrie and Orillia were typically served in one direction only to avoid turning the train in Toronto; routing a giant loop around Lake Simcoe. Newer ex-GO Transit cars were bi-directional. That corresponding section of the Newmarket subdivision was abandoned, then tracks removed by the Canadian National Railway in 1996. The old line is now Oro-Medonte Rail Trail, Barrie North Shore Trail and Barrie Waterfront Heritage Trail.

StationLocationNotes
old Barrie StationLocated just north of Allandale Waterfront GO Station Station has been restored for non transportation reuse
Orillia station150 Front Street SouthRe-purposed for commercial space. [13]

Dream Catcher Express

The Dream Catcher Express was a seasonal passenger rail service that ran annually over a period of six days from the end of September to the beginning of October. It operated between North Bay and Temagami along the same route as the Northlander.

Train sets consisted of several single deck cars, a dining car, and a dome car.

The service was by reservation only and provided one run per day. Trains departed in the morning and returned in the early evening. The Dream Catcher Express allowed passengers to view the fall colours in Northern Ontario.

This service, along with the Northlander, ended in 2012.

References

  1. 1 2 "Trains will soon be running again between Toronto and Northern Ontario. But first, they're going in the freezer". thestar.com. 2023-01-09. Archived from the original on 9 January 2023. Retrieved 9 January 2023.
  2. "Northlander Passenger Rail Updates | Ontario Northland". www.ontarionorthland.ca. Retrieved 2023-01-09.
  3. "Ontario Advances Northlander Service Revival". Railway Age. 2022-12-15. Retrieved 2023-01-09.
  4. "Northlander Passenger Train". www.ontarionorthland.ca. Ontario Northland Transportation Commission. 6 June 2023.
  5. "Northlander Shelter Design and Contract Award Announcement". Ontario Northland. Ontario Northland Transportation Commission. 28 June 2024. Retrieved 5 July 2024.
  6. "Ford promises new Northlander to Nipissing voters". Metroland Media Group. May 4, 2018. Retrieved February 5, 2021.
  7. "Draft Transportation Plan for Northern Ontario" (PDF). Ministry of Transportation. December 10, 2020. Retrieved February 5, 2021.
  8. "Passenger rail service in northeastern Ontario to return by mid-2020s". CBC News. May 5, 2021. Retrieved May 5, 2021.
  9. Sam Juric (11 April 2022). "Return of Northlander train service could include new connection to Cochrane, Ont". CBC News.
  10. "Ontario Newsroom". news.ontario.ca. Retrieved 2022-12-15.
  11. Wroe, Darlene (February 24, 2023). "Cobalt urged to lobby for Northlander passenger train stop". Bay Today. Retrieved July 7, 2024.
  12. "Northlander trains are poised to make a return — and will offer travel to cottage country and beyond. Here's what you need to know". Toronto Star . December 28, 2023.
  13. "Former Orillia train station will become venue to showcase locomotive history". 20 March 2021.