General information | |||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | 2900 North Broad Street (PA-611) Philadelphia, Pennsylvania United States | ||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 39°59′51″N75°9′16″W / 39.99750°N 75.15444°W | ||||||||||||||||||||||||||||||||||||||||||||||
Owned by | Amtrak | ||||||||||||||||||||||||||||||||||||||||||||||
Line(s) |
| ||||||||||||||||||||||||||||||||||||||||||||||
Platforms |
| ||||||||||||||||||||||||||||||||||||||||||||||
Tracks |
| ||||||||||||||||||||||||||||||||||||||||||||||
Connections |
| ||||||||||||||||||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||||||||||||||||||
Parking | 333 spaces | ||||||||||||||||||||||||||||||||||||||||||||||
Accessible | No | ||||||||||||||||||||||||||||||||||||||||||||||
Architect | Theophilus P. Chandler Jr. Roydhouse Arey & Co. | ||||||||||||||||||||||||||||||||||||||||||||||
Architectural style | Renaissance | ||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||
Station code | Amtrak: PHN | ||||||||||||||||||||||||||||||||||||||||||||||
IATA code | ZHC | ||||||||||||||||||||||||||||||||||||||||||||||
Fare zone | C (SEPTA) | ||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1870s (original station) | ||||||||||||||||||||||||||||||||||||||||||||||
Rebuilt |
| ||||||||||||||||||||||||||||||||||||||||||||||
Previous names |
| ||||||||||||||||||||||||||||||||||||||||||||||
Passengers | |||||||||||||||||||||||||||||||||||||||||||||||
2013 | 184 daily boardings [2] (SEPTA) | ||||||||||||||||||||||||||||||||||||||||||||||
FY 2023 | 1,684 annually [3] (Amtrak) | ||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||
Germantown Junction Station | |||||||||||||||||||||||||||||||||||||||||||||||
NRHP reference No. | 92000940 [4] | ||||||||||||||||||||||||||||||||||||||||||||||
Added to NRHP | July 8, 1999 |
North Philadelphia station is an intercity rail and regional rail station on the Northeast Corridor, located on North Broad Street in the North Philadelphia neighborhood of Philadelphia, Pennsylvania, United States. SEPTA Regional Rail's Trenton Line and Chestnut Hill West Line account for most of the station's service. Three Amtrak trains, two southbound and one northbound, stop on weekdays only.
The station opened in the 1870s and was known as New York Junction and Germantown Junction. A new station, which ushered in the Beaux-Arts style for large train stations, was built from 1896 to 1901. After a 1912–1915 enlargement, it was renamed as North Philadelphia. Despite several other renovations, its use declined in the mid and late 20th century; in 1991, Amtrak constructed a smaller replacement station across the tracks. The building was renovated once more in 1999 and is now used as commercial space. It was added to the National Register of Historic Places the same year.
Two high-level island platforms serve three of the four Northeast Corridor passenger tracks; there is a center passing track, as well as a fifth track on the south side that is only used by CSX and Norfolk Southern freights. Most SEPTA Trenton Line trains and four daily weekday-only Amtrak trains (one northbound and three southbound) stop at these platforms. [5] [6] Two low-level platforms, a short distance to the west, serve the diverging SEPTA-owned Chestnut Hill West Line. North Philadelphia has been a flag stop on the line since 1993. [7] The station has relatively low inbound boardings; however, it is used by riders from the Chestnut Hill West Line transferring to SEPTA and Amtrak trains to reach jobs in New Jersey and New York. [8]
The station is within a few blocks of the North Broad station on SEPTA's Main Line (formerly belonging to the Reading Company), and the North Philadelphia subway station on SEPTA's Broad Street Line. [9] [10]
The Pennsylvania Railroad (PRR) built the Connecting Railway in 1867 to connect its main line to the Philadelphia and Trenton Railroad. By the early 1870s, New York Junction station was established where the Connecting Railway crossed over the Philadelphia and Reading Railroad mainline in North Philadelphia. [11] A signal tower, still extant, was constructed around this time. [1]
By the early 1880s, the PRR station was known as Germantown Junction, while the Reading had its 16th Street station a block to the northwest (and after 1890, Huntingdon Street station to the southeast). [12] Germantown Junction station was a two-story Queen Anne style building located between the diverging lines; its large gables acted as shelters for passengers. [5] [13]
By the mid 1890s, the station was frequently overcrowded and North Philadelphia and the northern suburbs grew in population. The completion of the Delair Bridge in 1896 allowed passengers to ride trains directly to the summer resorts of southern New Jersey (rather than taking a ferry to Camden) further increased traffic on the line. [5] George B. Roberts, president of the railroad, used his social connections to hire Theophilus Parsons Chandler Jr. to construct a new station. [1] The new station was constructed on a former freight yard on the south side of the tracks (across from the previous station), where there was more space for the station. The site also provided better connections for passengers using newly electrified streetcars on Glenwood Avenue and North Broad Street to reach the station. [5]
Foundation construction began in May 1896. However, work was stopped when Roberts took ill in August; he died the next January. [1] The Panic of 1896 led Roberts' successor, Frank Thomson, not to continue work. [5] When Thomson died in 1899, Alexander Cassatt was recalled to the PRR to serve as president. Cassatt immediately began a major capital improvement program, which included both adding capacity to mainlines and constructing large stations including Washington Union Station and New York Penn Station. Work resumed in 1900 with an enlarged floor plan, and the new station was complete in April 1901. [1] [5]
Previous PRR stations were generally in the picturesque eclectic style common among 19th-century railroads stations, like the Victorian eclectic Overbrook station and the Furness-style Broad Street Station. Germantown Junction was the first station along the Northeast Corridor to be constructed in the Châteauesque style, and it ushered in the Beaux Arts style used by the Pennsylvania and other railroads during the early 20th century. [1] [5]
As constructed, the main facade of the station faced Glenwood Avenue. The two-story entrance loggia consisted of seven arched bays, with a three-bay wing to the northeast and a two-bay wing to the southwest, and acted as a transition point between the street and the station interior. The first floor (at track level) featured a large waiting room occupying the entire center block, with vault lights providing natural illumination and a fountain set into the western wall. Restrooms, a kitchen, and a cafe occupied the wings. [1] [5]
The basement housed the boiler room, a smaller waiting room, kitchen storerooms, and baggage rooms. The station appears to have had two side platforms serving four tracks, accessed through a basement-level tunnel that was reached from the main waiting room by a staircase. [1] The steep roof over the center block had several dormers, some of which were later removed. A covered ramp from the west wing, which had direct access from the south platform, led to a small trolley station on Glenwood Avenue. [1] [5]
After construction, the station served as the PRR's sole Philadelphia stop for most long-distance east-west Main Line traffic to avoid a reverse move into Broad Street Station (and later 30th Street Station). [5] It also served local trains from Fort Washington, Chestnut Hill, Bustleton, and Trenton, as well as a variety of services from the PRR-owned West Jersey and Seashore Railroad system. Within a decade of completion, the station was already overcrowded. [5] On June 22, 1912, the PRR signed a million-dollar contract for massive renovations to the station. Designed by PRR architect William H. Cookman, the modifications reflected the latest in passenger station design. [1]
The ground was lowered by a full story on the south and east sides of the station, exposing what had formerly been the basement to improve access for taxis and private automobiles. A marquee to shelter arriving and departing passengers spanned the seven central bays of the lower level, with a more ornate version on the north end of the pedestrian tunnel. The lower waiting room was expanded, a ticket office constructed, and a larger staircase to the main waiting room was built. The floor was covered with terrazzo and green marble, with white marble wainscoting on the walls. [1] Three bays were added to the west wing for additional functional space, removing direct track access from the ramp. Cast iron streetlights with the PRR Keystone motif in their base were located around the driveway and grounds. [1] [5]
The original side platforms were replaced with high-level island platforms, long enough to permit level boarding for twelve-car trains. The platforms and platform supports were constructed of cast-in-place concrete. The line was widened to eight tracks through the station, with the platforms between the 2nd and 3rd tracks and the 6th and 7th tracks. The center non-platform tracks were reserved for through freights, with the outside non-platform tracks used by local freights. [1] Each platform had a 10-foot (3.0 m)-wide waiting room, 60 feet (18 m) long on the eastbound (south) platform and 80 feet (24 m) long on the westbound platform. The waiting rooms were covered in copper sheathing and had large skylights. The railroad constructed full-length steel platform canopies in their own shops. A separate baggage tunnel, west of the main passenger tunnel, connected with freight elevators to the platforms. [1] When the renovations were complete in 1915, the station was renamed as North Philadelphia. [5]
North Philadelphia continued to grow during the early 20th century as a popular residential area for the nouveau riche rejected by old money society. Two ballparks (the Baker Bowl and Shibe Park) were located nearby, as were new cultural institutions and automotive industry buildings. In 1928, the Broad Street Subway was opened with a station at North Philadelphia, offering more frequent service to Center City. Its northern entrances were located at the intersection of Glenwood Avenue and North Broad Street, with an underground passage offering an easy connection to the PRR station. [14] The Reading Company replaced Huntingdon Avenue station with North Broad Street station, a massive Classical Revival structure rivaling the PRR station in grandeur. 30th Street Station opened in 1933, reducing North Philadelphia's importance for north-south services. However, North Philadelphia continued to serve heavy commuter traffic and east-west long-distance trains. [15]
An interior rearrangement was completed around 1942. The women's room for the main waiting room was moved from the east side to the west side, with one bay added to the west wing. A new dining area was constructed, occupying one-third of the waiting room, with its kitchen occupying the former bathroom space. The lunch cafe and staircases were also modified. [1]
After World War II, North Philadelphia suffered from the failure of its industries, and the PRR reduced both local and long-distance service due to competition from private autos, further reducing the importance of the station. [5] Escalators and a new drop ceiling were added around 1955, the former due to the insistence of the city council. The surrounding parking lots and ground were rearranged in 1968. [1]
In 1977, after a fire in March 1976, Amtrak undertook a $314,000 rehabilitation of the station. The roof and portico were rebuilt, two of the three dormers removed, new restrooms added, and the platform and waiting room repaired. The loggia, windows, and other openings were covered with cinderblocks and brick. [1] [16]
In the 1980s, the city and Amtrak attempted to fund a second renovation with a private partner, but plans fell through. [5] In 1991, Amtrak constructed a rectangular concrete and glass station building on the north side of the tracks, in front of the passenger tunnel. Access from the south was blocked off. [1] In 1999, the original station building was renovated at a cost of $7 million for use as commercial space. The front parking lot was expanded on a slope to the west; it covered much of the ground level (similar to the station before 1915). The mechanical building and the covered ramp to the trolley station were removed. A strip mall was built just to the east, with balustrades and archways referencing the historic station. [5] The passageway from the subway station, long closed, was likely buried at this time. [14] The 1901-built station building was listed on the National Register of Historic Places on July 8, 1999. [4]
The Amtrak ticket office was closed in April 2001 as part of austerity measures. Vandalism also forced the closure of elevators. [17] The same year, SEPTA proposed closing the station because it served few inbound commuters. [18] However, advocacy from the Delaware Valley Association of Rail Passengers, which showed that the station was more heavily used by commuters from the Chestnut Hill West Line changing to SEPTA Trenton Line trains and Amtrak Clockers to Trenton and New York, succeeded in persuading SEPTA to keep the station open for the time being. [19] By 2005, no official decision had been made to permanently keep the station, but SEPTA planned repairs to the deteriorated platforms. [20]
In 2010, a renovation of North Philadelphia subway station was completed. This included restoring the Glenwood Avenue headhouses, closed for decades before, which improved connections to the mainline station. [14] [21]
The Northeast Corridor Line is a commuter rail service operated by NJ Transit between the Trenton Transit Center and New York Penn Station on Amtrak's Northeast Corridor in the United States. The service is the successor to Pennsylvania Railroad commuter trains between Trenton and New York, and is NJ Transit's busiest commuter rail service. After arrival at New York Penn Station, some trains load passengers and return to New Jersey, while others continue east to Sunnyside Yard for storage. Most servicing is done at the Morrisville Yard, at the west end of the line.
Newark Penn Station is an intermodal passenger station in Newark, New Jersey. One of the New York metropolitan area's major transportation hubs, Newark Penn Station is served by multiple rail and bus carriers, making it the seventh busiest rail station in the United States, and the fourth busiest in the New York City metropolitan area.
The SEPTA Regional Rail system is a commuter rail network owned by SEPTA and serving the Philadelphia metropolitan area. The system has 13 branches and more than 150 active stations in Philadelphia, Pennsylvania, its suburbs and satellite towns and cities. It is the sixth-busiest commuter railroad in the United States. In 2016, the Regional Rail system had an average of 132,000 daily riders and 118,800 daily riders as of 2019.
Suburban Station is an art deco office building and underground commuter rail station in Penn Center in Philadelphia. Its official SEPTA address is 16th Street and JFK Boulevard. The station is owned and operated by SEPTA and is one of the three core Center City stations on the SEPTA Regional Rail and one of the busiest stations in the Regional Rail System.
Wilmington station, also known as the Joseph R. Biden, Jr., Railroad Station, is a passenger rail station in Wilmington, Delaware. It serves nine Amtrak train routes and is part of the Northeast Corridor. It also serves SEPTA Regional Rail commuter trains on the Wilmington/Newark Line as well as DART First State local buses and Greyhound Lines intercity buses.
The Chester Transportation Center is a SEPTA bus and train station in Chester, Pennsylvania. The outside portion of the ground level serves SEPTA City Transit Division Route 37, and Suburban Transit Division Routes 109, 113, 114, 117, 118, and 119.
Trenton Transit Center is the main passenger train station in Trenton, New Jersey. It is the southernmost stop in New Jersey on the Northeast Corridor. It is the terminus for NJ Transit trains to and from New York City and SEPTA Trenton Line Regional Rail trains to and from Philadelphia, Pennsylvania, and an intermediate station for Amtrak trains traveling between the two cities along the Northeast Corridor.
The Keystone Corridor is a 349-mile (562 km) railroad corridor between Philadelphia and Pittsburgh, Pennsylvania, that consists of two rail lines: Amtrak and SEPTA's Philadelphia-to-Harrisburg main line, which hosts SEPTA's Paoli/Thorndale Line commuter rail service, and Amtrak's Keystone Service and Pennsylvanian inter-city trains; and the Norfolk Southern Pittsburgh Line. The corridor was originally the Main Line of the Pennsylvania Railroad.
The Wilmington/Newark Line is a route of the SEPTA Regional Rail commuter rail system in the Philadelphia area. The line serves southeastern Pennsylvania and northern Delaware, with stations in Marcus Hook, Pennsylvania, Wilmington, Delaware, and Newark, Delaware. It is the longest of the 13 SEPTA Regional Rail lines.
Schuylkill River Passenger Rail is a proposed passenger train service along the Schuylkill River between Philadelphia and Reading, Pennsylvania, with intermediate stops in Norristown, King of Prussia, Phoenixville, and Pottstown.
Merion station is a SEPTA Regional Rail station on the Paoli/Thorndale Line, located in Merion, Pennsylvania just outside of Philadelphia. Merion has two low-level side platforms with pathways connecting the platforms to the inner tracks.
Paoli station is a passenger rail station located in the western suburbs of Philadelphia at 13 Lancaster Avenue, Paoli, Pennsylvania. It is served by Amtrak's Keystone Service and Pennsylvanian trains, and most SEPTA Paoli/Thorndale Line trains.
Broad Street Station at Broad & Market streets was the primary passenger terminal for the Pennsylvania Railroad (PRR) in Philadelphia from early December 1881 to the 1950s. Located directly west of Philadelphia City Hall, the site is now occupied by the northwest section of Dilworth Park and the office towers of Penn Center.
North Broad station, known as North Broad Street until 1992, is a SEPTA Regional Rail station in Philadelphia, Pennsylvania. It is located at 2601 North Broad Street in the Cecil B. Moore section of Lower North Philadelphia, and serves the Lansdale/Doylestown Line and the Manayunk/Norristown Line. The station has low-level platforms on the outside tracks, with "mini-high" platforms for wheelchair and accessible accessibility.
Newark station, also known as Thomas R. Carper Station, is a train station in Newark, Delaware, on Amtrak's Northeast Corridor, serving a limited number of Amtrak Northeast Regional trains and SEPTA's Wilmington/Newark Line regional rail trains.
The Connecting Railway was a subsidiary of the Pennsylvania Railroad, incorporated to build a connection between the Philadelphia and Trenton Railroad and the PRR in the city of Philadelphia.
52nd Street is a closed train station that was located at the intersection of North 52nd Street & Merion Avenue in the West Philadelphia section of Philadelphia, Pennsylvania, United States. It was built by the Pennsylvania Railroad (PRR) at the junction of its Main Line and its Schuylkill Branch. Today, these lines are the SEPTA Regional Rail Paoli/Thorndale Line and Cynwyd Line, respectively.
Frankford Junction is a railroad junction, and former junction station, located on the border between the Harrowgate neighborhood of Philadelphia and Frankford, Philadelphia. At the junction, the 4-track Northeast Corridor line from Trenton connects with the 2-track Atlantic City Line from Atlantic City in the northeastern portion of Philadelphia about 2.9 miles (4.7 km) northeast of North Philadelphia station. It lies near the intersection of Frankford Avenue and Butler Street, to the west of the interchange between Interstate 95 and the approach to the Betsy Ross Bridge. It has been used for rail transportation since 1832 but has not served as a station since October 4, 1992.
North Philadelphia station is a rapid transit station on SEPTA's Broad Street Line. It serves both local trains and Broad-Ridge Spur trains. It is located in Philadelphia under North Broad Street with headhouses at Glenwood Avenue and Lehigh Avenue.
The Paoli/Thorndale Line, commonly known as the Main Line, is a SEPTA Regional Rail service running from Center City Philadelphia through Montgomery County and Delaware County to Thorndale in Chester County. It operates along the far eastern leg of Amtrak's Philadelphia to Harrisburg Main Line, which in turn was once the Main Line of the Pennsylvania Railroad and is now part of the Keystone Corridor, a federally-designated high-speed rail corridor.