The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. [1] It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi.
At 59.24 kilometres (36.81 mi), the Pink Line is the longest individual line in the Delhi Metro and in India, exceeding the length of the operational Blue Line (excluding its branch line). It is mostly elevated and covers Delhi in a Circle. The Pink Line is also known as the Ring Road Line, as the line passes alongside the Ring Road in Delhi.
The Pink Line has interchanges with most of the operational lines of the network, such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways / Namo Bharat) and the ISBTs at Anand Vihar and Sarai Kale Khan.
The Pink Line has the highest point of the Delhi Metro at Dhaula Kuan with a height of 23.6 metres (77 ft), passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line. [2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres (497 ft) against the usual 265 metres (869 ft). [3] : 93 The usual platform length for a six-coach train on this route is 140 metres (459 ft) but it has been reduced to 135 metres (443 ft) in the Ashram station.
Currently, main services run as circle . The further route towards Shiv Vihar acts as a feeder line with separate services, for which passengers have to change platforms. This is because the line has extended from Maujpur - Babarpur to Majlis Park via areas in North Delhi, effectively creating a circular metro which would be one of the world's longest circular railway lines. Once it happens, trains will run in anti-clockwise and clockwise directions in the main loop. The complete loop tis commenced in September 2025, although full service trials on the whole circular route were being done since August 2025. [4]
The line was initially put on table as a metro route that would run almost along the Delhi's busy Ring Road, on the lines of the existing Delhi Circular Railway. A route length of 59.24 kilometres (36.81 mi) [5] was proposed from Majlis Park to Shiv Vihar, that would cut through all the existing lines at various interchanges as part of Phase 3's expansion plans. There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.
The line was opened in stages from 2018 to 2021. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, it was then extended to Lajpat Nagar on 6 August 2018. A separate section between Shiv Vihar to Trilokpuri-Sanjay Lake was opened on 31 October 2018 and the initial section was extended to Mayur Vihar Pocket I on 31 December 2018.
The section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was not completed as construction of a 1.5 km (0.93 mi) viaduct began late due to land acquisition issues at Trilokpuri. [6] This had rendered the Pink Line into two independent lines and forced DMRC to convert the Mayur Vihar Pocket-1 station into a terminating station with reversal facilities so that trains from Majlis Park would terminate there. On the eastern section, trains would run in separate loops - Shiv Vihar to Maujpur-Babarpur, Maujpur-Babarpur to IP Extension/Trilokpuri-Sanjay Lake. Every third train from Maujpur-Babarpur would move beyond IP Extension to Trilokpuri-Sanjay Lake as the latter has no reversal facilities and single line movement take place in that section. Both disjoint sections were finally bridged on 6 August 2021. [7]
In December 2024, trial runs were initiated on the Phase 4 extension from Majlis Park to Jagatpur Village stations which were gradually done till Sonia Vihar and finally Maujpur-Babarpur by August 2025. As of September 2025, an initial section till Jagatpur Village is slated to be opened as rest of the stations are still pending finishing works.
The stations of the Pink Line are: [8]
Pink Line | |||||||||
---|---|---|---|---|---|---|---|---|---|
# | Station Name | Opening | Interchange Connection | Station Layout | Platform Layout | ||||
English | Hindi | ||||||||
1 | Maujpur - Babarpur | मौजपुर - बाबरपुर | 2025 | Pink Line | Elevated | Side | |||
2 | Yamuna Vihar | यमुना विहार | 2025 | None | Elevated | Side | |||
3 | Bhajanpura | भजनपुरा | 2026 | None | Elevated | Side | |||
4 | Khajuri Khas | खजूरी ख़ास | 2026 | None | Elevated | Side | |||
5 | Sonia Vihar | सोनिया विहार | 2026 | None | Elevated | Side | |||
6 | Soorghat | सूरघाट | 2026 | None | Elevated | Side | |||
7 | Jagatpur Village | जगतपुर गांव | 17 September 2025 | None | Elevated | Side | |||
8 | Jharoda Majra | झड़ौदा माजरा | 17 September 2025 | None | Elevated | Side | |||
9 | Burari | बुराड़ी | 17 September 2025 | None | Elevated | Side | |||
10 | Majlis Park | मजलिस पार्क | 14 March 2018 | Magenta Line (Under Construction) | Elevated | Side | |||
11 | Azadpur | आज़ादपुर | 14 March 2018 | Yellow Line Magenta Line (Under Construction) | Underground | Island | |||
12 | Shalimar Bagh | शालीमार बाग़ | 14 March 2018 | None | Underground | Island | |||
13 | Netaji Subhash Place | नेताजी सुभाष प्लेस | 14 March 2018 | Red Line | Underground | Side | |||
14 | Shakurpur | शकूरपुर | 14 March 2018 | None | Elevated | Island | |||
15 | Punjabi Bagh West | पंजाबी बाग़ पश्चिम | 14 March 2018 | Green Line | Elevated | Side | |||
16 | ESI - Basaidarapur | ईएसआई - बसईदारापुर | 14 March 2018 | None | Elevated | Side | |||
17 | Rajouri Garden | राजौरी गार्डन | 14 March 2018 | Blue Line | Elevated | Side | |||
18 | Mayapuri | मायापुरी | 14 March 2018 | None | Elevated | Side | |||
19 | Naraina Vihar | नारायणा विहार | 14 March 2018 | None | Underground | Island | |||
20 | Delhi Cantonment | दिल्ली छावनी | 14 March 2018 | None | Elevated | Side | |||
21 | Durgabai Deshmukh South Campus | दुर्गाबाई देशमुख साउथ कैम्पस | 14 March 2018 | Airport Express | Elevated | Side | |||
22 | Sir M. Vishweshwaraiah Moti Bagh | सर एम. विश्वेश्वरय्या मोती बाग़ | 6 August 2018 | None | Elevated | Side | |||
23 | Bhikaji Cama Place | भीकाजी कामा प्लेस | 6 August 2018 | None | Underground | Island | |||
24 | Sarojini Nagar | सरोजिनी नगर | 6 August 2018 | None | Underground | Island | |||
25 | Dilli Haat - INA | दिल्ली हाट - आईएनए | 6 August 2018 | Yellow Line | Underground | Island | |||
26 | South Extension | साउथ एक्सटेंशन | 6 August 2018 | None | Underground | Island | |||
27 | Lajpat Nagar | लाजपत नगर | 6 August 2018 | Violet Line Golden Line ((Under Construction) | Underground | Island | |||
28 | Vinobapuri | विनोबापुरी | 31 December 2018 | None | Underground | Island | |||
29 | Ashram | आश्रम | 31 December 2018 | None | Underground | Island | |||
30 | Sarai Kale Khan Nizamuddin | सराय काले ख़ान - निज़ामुद्दीन | 31 December 2018 | ![]() ![]() Sarai Kale Khan ISBT | Underground | Island | |||
31 | Mayur Vihar-I | मयूर विहार-१ | 31 December 2018 | Blue Line | Elevated | Side | |||
32 | Mayur Vihar Pocket I | मयूर विहार पॉकेट १ | 31 December 2018 | None | Elevated | Side | |||
33 | Trilokpuri Sanjay Lake | त्रिलोकपुरी संजय झील | 31 October 2018 | None | Elevated | Side | |||
34 | East Vinod Nagar - Mayur Vihar-II | पूर्व विनोद नगर - मयूर विहार-२ | 31 October 2018 | None | Elevated | Side | |||
35 | Mandawali - West Vinod Nagar | मंडावली - वेस्ट विनोद नगर | 31 October 2018 | None | Elevated | Side | |||
36 | IP Extension | आईपी एक्सटेंशन | 31 October 2018 | None | Elevated | Side | |||
37 | Anand Vihar | आनंद विहार | 31 October 2018 | Blue Line ![]() ![]() ![]() Anand Vihar ISBT | Elevated | Side | |||
38 | Karkarduma | कड़कड़डूमा | 31 October 2018 | Blue Line | Elevated | Side | |||
39 | Karkarduma Court | कड़कड़डूमा कोर्ट | 31 October 2018 | None | Elevated | Side | |||
40 | Krishna Nagar | कृष्णा नगर | 31 October 2018 | None | Elevated | Side | |||
41 | East Azad Nagar | आज़ाद नगर पूर्व | 31 October 2018 | None | Elevated | Side | |||
42 | Welcome | वेलकम | 31 October 2018 | Red Line | Elevated | Side | |||
43 | Jaffrabad | जाफ़राबाद | 31 October 2018 | None | Elevated | Side | |||
44 | Maujpur - Babarpur | मौजपुर - बाबरपुर | 31 October 2018 | Pink Line | Elevated | Side | |||
45 | Gokulpuri | गोकुलपुरी | 31 October 2018 | None | Elevated | Side | |||
46 | Johri Enclave | जौहरी एनक्लेव | 31 October 2018 | None | Elevated | Side | |||
47 | Shiv Vihar | शिव विहार | 31 October 2018 | None | Elevated | Side |
Pink Line | ||
---|---|---|
Rakes | Hyundai Rotem | Alstom Metropolis |
Train Gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | |
Electrification | 25 kV, 50 Hz AC through overhead catenary OHE | |
Train's Maximum Speed | 100 km/h | |
Train Operation | Delhi Metro |
Gokulpuri-Hindon Airport-Arthala Pink Line Extension: In September 2024, the DMRC proposed a branch of 13 km from Trans-Yamuna North-East Delhi (existing Gokulpuri metro station of pink line ) to the west Ghaziabad (existing Arthala metro station of Red Line) via Hindon Airport connecting 2 existing Red Line metro stations with 10 new Pink Line stations namely Gol Chakkar, DLF, Shalimar Garden, Hindon Airport, Bhopura, Tulsi Niketan, Rajendra Nagar, New Karhaira Colony, Karhaira, and Loni Road Industrial Area. [9]