High Speed Rail Corporation of India Limited

Last updated
High Speed Rail Corporation of India Limited
Type Public Sector Undertaking
SPV
Industry Public transport
Founded2012
Headquarters New Delhi, India
ServicesHigh Speed Rail
Owner Government of India
Parent Rail Vikas Nigam Limited
Website hsrc.in

The High Speed Rail Corporation of India Limited (HSRCIL) is a Special Purpose Vehicle (SPV) which has been incorporated in 2012 as a subsidiary of Rail Vikas Nigam Limited (RVNL), a public sector enterprise of the Government of India. The HSRCIL has been formed under the Ministry of Railways, Government of India, for the development and implementation of the high speed rail projects in India.

Contents

Projects

Mumbai–Ahmedabad high-speed rail corridor

The corridor is being implemented by the National High Speed Rail Corporation Limited and the construction is expected to begin by April 2020 and the project is expected to be completed by December 2023. The corridor will use Japan Railways Shinkansen E5 Series electric multiple unit for its rolling stock.

Diamond Quadrilateral

As of 2020, contracts have been awarded for the feasibility studies for the Diamond Quadrilateral network. There will be 3 phases: [1]

Delhi–Chandigarh–Amritsar high-speed rail corridor

The pre-feasibility study of this high speed rail corridor is in progress. The interim report was submitted by Systra in 2015. [2]

Delhi–Chennai

This route will have 2 phases. The first phase, Delhi-Nagpur section is under feasibility study. [3]

See also

Related Research Articles

<span class="mw-page-title-main">Mumbai Metro</span> Rapid transit system serving the city of Mumbai, Maharashtra, India

The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.Mumbai Metropolitan Region Development Authority is responsible authority for maintaining the metro system.Maha Metro is responsible for all the metro rail projects undergoing in Maharashtra except the Mumbai Metropolitan Area. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai Suburban Railway network. It is being built in three phases over a 15-year period, with overall completion expected in October 2026. When completed, the core system will comprise fourteen high-capacity metro railway lines and one metrolite line, spanning a total of 356.972 kilometres (221.812 mi), and serviced by 286 stations.

<span class="mw-page-title-main">National Highway 8 (India, old numbering)</span> Highway in India

National Highway 8 is a 4-lane National Highway in India. According to estimates, it is the busiest highway in the subcontinent, as it connects the national capital Delhi to the financial capital Mumbai, as well as important cities Gurgaon, Jaipur, Ajmer, Udaipur, Ahmedabad, Vadodara, Surat, Nadiad, Anand and Kheda. The total length is 1428km. Under the new numbering it has become part of the NH48.

<span class="mw-page-title-main">Bengaluru Commuter Rail</span> Planned suburban rail network in Bengaluru, India

Bengaluru Suburban Railway is an under construction suburban rail network for the city of Bengaluru. A Suburban Rail system for the city was first proposed in 1983. Since then, several different route proposals were made but no Suburban Rail project took shape. It was finally approved in the 2019 Railway Budget. On 1 February 2020, finance minister, Nirmala Sitharaman mentioned in her budget that the project would be implemented at cost of Rs 18,600 crores. The central government would provide 20% of the equity and facilitate external assistance up to 60 percent of the project cost. It will be first of its kind and unique in India as it will have metro like facilities and rolling stock. It has slowest design speed among all the new suburban rail projects currently being implemented in India as Nagpur broad-gauge Metro and National Capital Region Transport Corporation are building rail tracks for design speed of 200 km/h with operating speed of 160 km/h.

<span class="mw-page-title-main">Dedicated Freight Corridor Corporation of India</span> Subsidiary of Indian Railways

The Dedicated Freight Corridor Corporation of India Limited (DFCCIL) is a Public Sector Undertaking under the Ministry of Railways, Government of India with the responsibility to undertake planning, development, and mobilisation of financial resources and construction, maintenance and operation of the "Dedicated Freight Corridors" (DFC). The DFCCIL was registered as a company under the Companies Act 1956 in 2006. First 2 DFCs, Western Dedicated Freight Corridor (WDFC), from Dadri in Uttar Pradesh to JNPT in Mumbai and Eastern Dedicated Freight Corridor (EDFC), Ludhiana in Punjab to Dankuni in West Bengal, which will decongest railway network by moving 70% of India's goods train to these two corridors, are both on track for completion by June 2022. 99% required land for these two have been acquired, and 56% of WDFC and 60% of EDFC is complete as of July 2020. There are new DFC approved/proposed in the national budget by Government of India such as East-West Dedicated Freight Corridor, North-South Dedicated Freight Corridor, East Coast Dedicated Freight Corridor and Southern Dedicated Freight Corridor.

<span class="mw-page-title-main">High-speed rail in India</span> Overview of current and planned HSR lines in India

Indian Railways is currently improving their existing conventional lines to handle speeds of up to 180 km/h (110 mph), and with certain improved corridors seeing speeds of more than 200 km/h (120 mph). Also, a total of twelve corridors are planned and one of the corridors which links Mumbai and Ahmedabad is under construction. As of 2022, the fastest train of India is Vande Bharat Express with a top speed of 180 km/h (110 mph), while the fastest operating train is the Gatimaan Express with a top operating speed of 160 km/h (99 mph).

Chennai Monorail was a proposal for a number of lines as part of mass transit system for the Indian city of Chennai. Originally the city planned to use monorail on all lines but many were subsequently changed to railways as part of the Chennai Metro.

<span class="mw-page-title-main">Urban rail transit in India</span> Overview of the urban rail transit system in India

Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail and tram systems. According to a report published in 2021, a total of 2.63 billion people travelled annually in metro systems across India's fifteen major cities, placing the country as one of the busiest urban rapid transit hubs in the world in terms of ridership. The combined length of 810 kilometres of metro systems in India makes it the fourth longest in operation in the world.

Mumbai–Ahmedabad High Speed Rail Corridor (MAHSR) or Mumbai–Ahmedabad HSR is an under-construction high-speed rail line connecting India's economic hub Mumbai with the city of Ahmedabad. When completed, it will be India's first high-speed rail line.

<span class="mw-page-title-main">Silver Line (K-Rail)</span> Semi-high speed rail corridor

The Silver Line is a proposed higher-speed rail line in India that would connect Thiruvananthapuram, the capital city, and Kasaragod of Kerala state. It will have an operating speed of 200 kilometres per hour (120 mph), [Maximum Design Speed: 220 kmph, ] allowing trains to cover the 532-kilometre (331 mi) distance in less than four hours, compared to the present 10 to 12 hours it takes to traverse this distance. Thiruvananthapuram, Kollam, Chengannur, Kottayam, Ernakulam, Thrissur, Tirur, Kozhikode, Kannur and Kasaragod will be the stations in this corridor. The project is temporarily halted by the state government till the Central government approval.

<span class="mw-page-title-main">Delhi–Kolkata high-speed rail corridor</span> High speed rail corridor

The Delhi–Kolkata high-speed rail corridor is one of the route of the proposed high-speed rail in India. The line is part of the Diamond Quadrilateral Program, which seeks to unite the cities of New Delhi, Kolkata, Mumbai and Chennai via high speed rail. This travels along the Delhi–Howrah main line from Tundla to Howrah. The train expects to cut the journey time for the 1,500 km (930 mi) between the national capital of India, New Delhi, and the capital of the Indian state of West Bengal, the city of Kolkata, to just 5 hours 30 minutes.

<span class="mw-page-title-main">National Capital Region Transport Corporation</span> Indian rail transport company

The National Capital Region Transport Corporation (NCRTC) is a joint venture company of the Government of India and the states of Haryana, Rajasthan, Uttar Pradesh, and Delhi. The NCRTC is mandated with implementing the Regional Rapid Transit System (RRTS) project across the National Capital Region (NCR), ensuring a balanced and sustainable urban development through better connectivity and access.

The Diamond Quadrilateral is a project of the Indian Railways to establish a high-speed rail network in India. The Diamond Quadrilateral will connect the four mega cities of India, viz. Delhi, Mumbai, Kolkata and Chennai, similar to the Golden Quadrilateral highway system.

<span class="mw-page-title-main">Future of rail transport in India</span> Overview of Indian programme to upgrade railways

The Indian Government is undertaking several initiatives to upgrade its aging railway infrastructure and enhance its quality of service. The Railway Ministry has announced plans to invest 5,400,000 crore (US$680 billion) to upgrade the railways by 2030. Upgrades include 100% electrification of railways, upgrading existing lines with more facilities and higher speeds, expansion of new lines, upgrading railway stations, introducing and eventually developing a large high-speed train network interconnecting major cities in different parts of India and development of various dedicated freight corridors to cut down cargo costs within the country.

Coimbatore Metro, also known as Kovai Metro, is a proposed rapid transit system for Coimbatore, Tamil Nadu.

<span class="mw-page-title-main">Delhi–Alwar Regional Rapid Transit System</span> Higher-speed rail corridor in India

Delhi–Alwar Regional Rapid Transit System is a 164 km long under-construction semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three rapid-rail corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h, the distance between Delhi and Alwar will be covered in 104 minutes. The project is expected to cost 37,000 crores.

<span class="mw-page-title-main">National High Speed Rail Corporation Limited</span> Indian government organisation

The National High Speed Rail Corporation Limited (NHSRCL) has been incorporated since 2016 to manage the High Speed Rail Corridor in India. It is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India.

Kerala Rail Development Corporation d/b/a Kerala-Rail is a public sector joint venture company under the ownership of the Government of Kerala for the railway infrastructure development in Kerala. The company was incorporated on 3 January 2017.

Delhi–Varanasi High Speed Rail Corridor is India's second bullet train project after the Mumbai-Ahmedabad High Speed Rail Corridor. The 958-kilometre (595 mi) HSR corridor will connect Varanasi to Delhi through 13 stations along with a 123 km long spur connecting Lucknow and Ayodhya.

The Chennai-Mysuru high speed rail corridor is India's third high-speed rail project after the Mumbai Ahmedabad High Speed Rail Corridor and Delhi Varanasi High Speed Rail Corridor. The 435 km HSR corridor will connect Chennai to Mysuru through 9 stations.

References

  1. "Welcome to HSRC". hsrc.in. Retrieved 2020-02-14.
  2. "Welcome to HSRC". hsrc.in. Retrieved 2020-02-14.
  3. "Welcome to HSRC". hsrc.in. Retrieved 2020-02-14.