Rail Vikas Nigam

Last updated

Rail Vikas Nigam Limited
Company type Public Sector Undertaking
BSE:  542649
NSE:  RVNL
Industry Railway infrastructure
Founded24 January 2003;21 years ago (2003-01-24) in New Delhi, India
HeadquartersAugust Kranti Bhawan, Bhikaji Cama Place, R. K. Puram,
New Delhi
,
India [1]
Area served
India
Key people
Revenue₹ 19,381.71 Cr (2022)
₹ 1476.14 Cr (2022)
Total assets ₹ 19,121.42 Cr (2022)
Total equity ₹ 5,631.41 Cr (2022)
Owner Government of India (78.20%) [3]
Number of employees
515 (March 2022)
Subsidiaries
Website rvnl.org/home

Rail Vikas Nigam Limited (RVNL) is an Indian public sector enterprise (PSU) which works as the construction arm of the Ministry of Railways for project implementation and transportation infrastructure development. It was incorporated in 2003 to meet the country's surging infrastructural requirements and to implement projects on a fast-track basis as well as for creating a Railway equipment construction company. RVNL is a Navratna PSU in India under the administrative control of the Ministry of Railways, Government of India.

Contents

The organization undertakes project execution from concept to commissioning and creates project-specific SPVs. RVNL’s mandate includes the mobilization of extra-budgetary resources (EBRs) through a mix of equity and debts via these SPVs.

History

Rail Vikas Nigam Limited (RVNL) was established to implement the National Rail Vikas Yojana (NRVY), a project to develop railway infrastructure in India. The NRVY was announced by Prime Minister Atal Bihari Vajpayee from the ramparts of the Red Fort during the Independence Day speech on 15 August 2002. The NRVY was formally launched by Vajpayee on 26 December 2002, and RVNL was incorporated under the Companies Act, 1956 on 24 January 2003. RVNL's two main objectives are to augment the capacity of rail infrastructure and raise extra budgetary resources for special purpose vehicle projects. [4]

RVNL opened its initial public offering (IPO) on 29 March 2019. It was the third railways-related PSU to initiate an IPO, after RITES and IRCON. The company offered a 12% stake at a price range of 17-19 per share. [5] [6] The IPO was subscribed 1.78 times by close on 3 April earning 481 crore (US$60 million). [7] RVNL was listed on the Bombay Stock Exchange and the National Stock Exchange on 19 April 2019. [8]

List of Manufacturing Units

ProjectTypeLocationStatusNotes
Rail Coach Naveenikaran Karkhana (RCNK) - RVNL Rail factory Sonipat CompletedRail Vikas Nigam Limited successfully commissioned the Rail Coach Naveenikaran Karkhana at Sonipat, Haryana in October 2021. The Rolling Stock Complex is designed for sustainable development with Industry 4.0 compliant assembly line.Vande Bharat Express production to start in the factory in near future.
Marathwada Rail Coach Factory (MRCF), Latur - RVNL Rail factory Latur, Maharashtra CompletedThe Marathwada Rail Coach Factory, a project of RVNL in Latur, Maharashtra produced its first coach shell on Good Governance Day i.e. 25.12.2020. This state-of-the-art factory was set up and commissioned in just two years by RVNL to manufacture self-propelled trains for Indian Railways. [9] Vande Bharat Express production to start in the factory in near future.
Railway Manufacturing Unit (RMU) Wagon Factory Kazipet,Telangana Under constructionIndian Railways is going to set up a railway wagon manufacturing unit in Telangana. The unit will be constructed on 160 acres of land in Kazipet at an estimated cost of `521 crore and is expected to be completed by February 2025. The Rail Vikas Nigam Limited (RVNL) was entrusted with this project.

Subsidiaries

High Speed Rail Corporation of India Limited

The High Speed Rail Corporation of India Limited (HSRC) is an SPV which was incorporated in 2012 as a subsidiary of RVNL to implement high-speed rail projects in India. [10]

Kinet Railway Solutions Ltd

RVNL has incorporated a private company Kinet Railway Solutions Ltd which will act as the SPV that will sign the manufacturing-cum-maintenance agreement with the Ministry of Railways. [11]

Kyrgyzindustry-RVNL

RVNL established a 50:50 joint venture company, named Kyrgyzindustry-RVNL, with Kyrgyz company Kyrgyzindustry. [12] The company will develop rail, road, and other infrastructure in Kyrgyzstan. [13] RVNL informed the Securities and Exchange Board of India (SEBI) of the establishment of the joint venture on 10 December 2022. [14]

Special Purpose Vehicles

Kutch Railway Company Ltd [15]

RVNL owns 50% equity in this project. The project length is 301 km and is for gauge conversion of Palanpur-Gandhidham section. Currently RVNL is doubling Samakhiali-Palanpur (248 km) anticipating increased traffic flow from Mundra and Deendayal Ports.

Bharuch Dahej Railway Co Ltd [16]

RVNL is the largest stakeholder in this SPV with 35.46% equity. The project length is 63 km and is for gauge conversion.

Krishnapatnam Railway Co Ltd [17]

RVNL is the largest stakeholder in this SPV with 49.76% equity. The project length is 113.2 km and is for construction of new line from Obulaparivalli to Krishnapatnam port. Complete connectivity was provided in June 2019.

Haridaspur Paradip Railway Co Ltd

RVNL is the largest equity shareholder with 30%. This SPV is for a new 82 km line from Haridaspur to Paradip Port. This commercial route became operational on 30.07.2020

Angul Sukinda Railway Ltd [18]

RVNL is the largest stakeholder in this SPV with 32.16% equity. This is for a new 102.42 km railway line from Angul-Sukinda. 80% of the project has already been completed and the commercial operation will begin shortly.

New SPVs under formation

Indian Port Rail Corporation Limited (IRPCL)

RVNL is participating in the formation of IRPCL. This is a SPV under the Ministry of Shipping, with the stakeholders being RVNL and 12 major ports. The initial authorised capital of the SPV is Rs 500 crore with RVNL's equity participation being Rs 10 crore only or 10% of the initial subscribed share capital.

The mandate of the SPV is to enhance rail connectivity to the various Ports in the country. This includes maintenance of Port Railways along with up-gradation, modernisation and capacity augmentation as and when required.

Rail connectivity to Rewas Port in Maharashtara

RVNL began as an organisation for executing various projects of railway engineering, to meet the shortfall of rail infrastructure that the existing system of that time could not fulfil. It was important to think out of the box and find a solution as eventually the price would be heavy with respect to the curtailment of opportunities and options available to a developing nation.

From beginning with railway capacity augmentation through track doubling, new railway lines, gauge conversion, railway electrification, RVNL has moved onto working on metro railways, multimodal transport system, port connectivity, turnkey projects i.e. workshops, training institutes, green buildings, high speed rail projects, cable stayed bridges, river and road bridges, vertical lift bridge, mountain Railways and tunnels.

Corporate Social Responsibility

Corporate Social Responsibility is a part of the ethos of Rail Vikas Nigam Limited. Aligning its goals to CSR objectives’, RVNL has implemented projects in the thematic areas of Health and Education. The geographic focus of RVNL CSR has been West Bengal, Chhattisgarh, Jharkhand, Uttar Pradesh, Madhya Pradesh, Uttarakhand and Odisha. About 60 per cent of CSR funds are spent in the education & health care sector for the underprivileged, marginalized communities and tribal belts.

Department of Public Enterprises Ratings

Rail Vikas Nigam Limited has been rated as "Excellent" by the Department of Public Enterprises (DPE) for 11 consecutive years.  The Company has ranked 1st amongst the Railway PSEs and 3rd amongst PSUs in the country in the latest DPE ratings 2020-2021 with a MoU Score of 99.

Assessment YearRatingRVNL’s rank among Railway CPSEs
2007-08Good8th
2008-09Very Good10th
2009-10Very Good7th
2010-11Excellent5th
2011-12Excellent2nd
2012-13Excellent1st
2013-14Excellent2nd
2014-15Excellent1st
2015-16Excellent1st
2016-17Excellent1st
2017-18Excellent1st
2018-19Excellent2nd
2019-20Excellent1st
2020-21Excellent1st

Recent Accolades

Rail Vikas Nigam Limited team bagged two awards for excellence by Skoch group viz. Gold award for Public-Private Partnership and Silver award for response to Covid in 2022. [19]

Rail Vikas Nigam Limited was conferred the Roll of Honour as the fastest-growing Mini-Ratna of the year by Dalal Street Investment Journal.

Completed projects

The list of 18 projects completed in 2021-22 is as under: [20]

S.

No.

RailwayName of ProjectPlan HeadLength (km)
1.        East Coast RailwaySambalpur-Titlagarh (182 km)Doubling182.00
2.        Northern RailwayUtraitia-Raebareli (65.6 km)Doubling68.04
3.        Northern RailwayRaebareli-Amethi (60.1 km)Doubling59.00
4.        South Central RailwayVijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-Machlipatnam and Bhimavaram-Nidadavolu (221 km) - Doubling with electrificationDoubling221.00
5.        South Central RailwaySecunderabad (Falaknuma)-Mehbubnagar doublingDoubling85.70
6.        West Central RailwayBina-Kota (282.66 km) with REDoubling282.66
7.        Western RailwayAhmedabad-Botad (170.48 km)GC166.09
8.        Western RailwayDhasa-Jetalsar (104.44 km)GC106.69
9.        Railway ElectrificationRaninagar Jalpaigudi-New Bongaigaon - Guwahati (Incl) RE (382 km) (Part of Barauni - Katihar - Guwahati Incl. Katihar - Barsoi (836 km) RERE374.98
10.    Railway ElectrificationChikjajur-Bellary RE (184 km)RE183.15
11.    Railway ElectrificationBengaluru-Omalur Via Hosur RE (196 km)RE196.00
12.    Railway ElectrificationUtratia-Raebareli-Amethi 2nd line RE (126 km)RE126.00
13.    DepositRE of NTPC siding at Hotgi Station (37 km)RE34.41
14.    East Central RailwayGaya -Setting up New MEMU car shed for maintaining 30 rakes of 16 coachesWKSP-
15.    Northern RailwaySonipat-Setting up of coach periodical overhauling and refurbishment workshopWKSP-
16.    North Eastern RailwaySaidpur Bhitri- Setting up of Electric Loco Shed to home 200 LocosWKSP-
17.    Western RailwayDhasa-Jetalsar-Subways in lieu of Level Crossing-35 Nos.RSW-
18.    South Central RailwayLallaguda (Carriage Workshop)- Replacement of 100-Year-Old Administrative BuildingOSW-

The list of 102 projects fully completed since inception and up to March 2021 is as under: [20]

S. No.RailwayProject NameType of ProjectLength (km)
1.                  Central RailwayDiva - Kalyan 5th & 6th LineDoubling11
2.        Central RailwayPakni - Mohol DoublingDoubling17
3.        Central RailwayPanvel - Jasai JNPT DoublingDoubling28.5
4.        Central RailwayPakni - Solapur DoublingDoubling16.28
5.        Eastern RailwayGurup - Saktigarh Extn of 3rd LineDoubling26
6.        East Central RailwayBarauni - Tilrath Bypass DoublingDoubling8.3
7.        East Coast RailwayTalcher-Cuttack-Paradeep Doubling with 2nd Bridge on Rivers Birupa & MahanadiDoubling3
8.        East Coast RailwayJakhapura- Haridaspur 3rd LineDoubling23.3
9.        East Coast RailwayCuttack - Barang DoublingDoubling14.3
10.    East Coast RailwayRajatgarh-Barang DoublingDoubling31.3
11.    East Coast RailwayKhurda-Barang - 3rd line (35 km)Doubling32.32
12.    Northern RailwayNew Delhi-Tilak Bridge- 5th & 6th line (2.65 km)Doubling2.65
13.    North Central RailwayPalwal - Bhuteswar 3rd LineDoubling81
14.    North Central RailwayAligarh - Ghaziabad 3rd LineDoubling106.1
15.    North Western RailwayBhagat Ki Kothi - Luni DoublingDoubling30.3
16.    North Western RailwayKarjoda - Palanpur DoublingDoubling5.4
17.    North Western RailwayRewari- Manheru DoublingDoubling69.02
18.    North Western RailwayRani-Keshav Ganj DoublingDoubling59.5
19.    North Western RailwayAbu Road-Sarotra Road- Patch doubling (23.12 km)Doubling23.12
20.    North Western RailwaySwaruganj-Abu Road - Patch doubling (25.36 km)Doubling25.36
21.    North Western RailwaySarotra Road-Karjoda - Patch doubling (23.59 km)Doubling23.59
22.    Southern RailwayAttipattu - Korukkupet 3rd LineDoubling18
23.    Southern RailwayPattabiram - Tiruvallur 4th Line & Tiruvallur - Arakkonam 3rd LineDoubling41.89
24.    Southern RailwayTiruvallur - Arakkonam 4th LineDoubling28
25.    Southern RailwayVillipuram-Dindigul DoublingDoubling273
26.    Southern RailwayThanjavur-Ponmalai - DoublingDoubling46.96
27.    South Central RailwayPullampet - Balapalle Ph I of Gooty - Renigunta DoublingDoubling41
28.    South Central RailwayKrishnapatnam - Venkatachalam Doubling with REDoubling16.5
29.    South Central RailwayGooty - Renigunta Patch DoublingDoubling151
30.    South Central RailwayRaichur - Guntakal DoublingDoubling81.0
31.    South Central RailwayGuntur-Tenali - Doubling with electrification (24.38 km)Doubling25
32.    South Eastern RailwayTikiapara - Santragachi DoublingDoubling5.6
33.    South Eastern RailwayPanskura - Kharagpur 3rd LineDoubling45
34.    South Eastern RailwayPanskura - Haldia Ph 1 DoublingDoubling14
35.    South Eastern RailwayRajgoda - Tamluk (Jn. Cabin) DoublingDoubling13.5
36.    South Eastern RailwayTamluk Jn. Cabin – Basulya Sutahata DoublingDoubling24.23
37.    South Eastern RailwayGoelkera-Monoharpur 3rd line (40 km)Doubling27.5
38.    South East Central RailwayBilaspur - Urkura 3rd Line DoublingDoubling105
39.    South East Central RailwaySalka Road- Khongsara Patch DoublingDoubling26
40.    South East Central RailwayKhodri-Anuppur, with Flyover at Bilaspur (61.6 km)Doubling61.6
41.    South Western RailwayHospet - Guntakal DoublingDoubling115
42.    West Central RailwayBhopal-Bina - 3rd line (143 km)Doubling144.3
43.    West Central RailwayItarsi-Budni - 3rd line (25.090 km)Doubling25.09
44.    West Central RailwayBarkhera-Habibganj - 3rd line (41.420 km)Doubling41.2
45.    North Western RailwayDelhi - Rewari Gauge ConversionGC94.2
46.    North Western RailwayAjmer - Phulera - Ringus - Rewari Gauge ConversionGC295
47.    North Western RailwayBhildi - Samdari Gauge ConversionGC223
48.    Southern RailwayThanjavur - Villupuram Gauge ConversionGC192
49.    Southern RailwayCuddalore - Salem Gauge ConversionGC193
50.    South Western RailwayArasikere-Hassan-Mangalore Gauge ConversionGC230
51.    Western RailwayBharuch - Samni - Dahej Gauge ConversionGC62
52.    Western RailwayGandhidham - Palanpur Gauge ConversionGC301
53.    East Coast RailwayDaitari - Banspani New LineNL155
54.    East Coast RailwayHaridaspur-Paradeep (82 km)New Line82
55.    Southern RailwayVallarpadam - Idapally New LineNL9
56.    South Central RailwayObulavaripalle- Krishnapattnam (113 km)New Line121
57.    Railway ElectrificationTomka -Banspani – RERE144
58.    Railway ElectrificationKharagpur (Nimpura) - Bhubaneswar Including Branch Line of Talcher - Cuttack - ParadeepRE581
59.    Railway ElectrificationBhubaneswar - KottavalasaRE417
60.    Railway ElectrificationDaund-Manmad Incl. Puntamba- Shirdi - RERE255
61.    Railway ElectrificationReningunta - Guntakal RERE308
62.    Railway ElectrificationYelahanka - Dharmavaram - Gooty RERE306
63.    Railway ElectrificationBharuch - Samni - Dahej RERE64
64.    Railway ElectrificationManheru- Hissar RERE74
65.    Railway ElectrificationJakhal - Hisar (79 km)RE80.0
66.    Railway ElectrificationChhapra-Ballia-Ghazipur-Varanasi-Allahabad RE (330 km)RE330
67.    Railway ElectrificationGuntakal-Kalluru RE (40 km)RE40
68.    Railway ElectrificationUtretia - Rae Bareli - Amethi - Janghai RE (214 km)RE214
69.    Railway ElectrificationDaund-Baramati (44 km)RE44
70.    Railway ElectrificationAmla-Chhindwara-KalumnaRE257
71.    Railway ElectrificationRaipur-Titlagarh (203 km) {Part of Vizianagaram - Rayagada - Titlagarh - Raipur (465 km)}RE203
72.    Railway ElectrificationRajpura - Dhuri - Lehra Mohabat (151 km)RE151
73.    Railway ElectrificationGuntakal - Bellary - Hospet incl. Tornagallu - Ranjitpura Branch Line (138 km)RE138
74.    Railway ElectrificationWani- Pimpalkutti RE (66 km)RE66
75.    Railway ElectrificationManoharabad- Medchal (14 km)RE14
76.    Railway ElectrificationYalahanka-Penukonda (120.55 km)-DoublingRE-
77.    Railway ElectrificationJakhal - Dhuri - Ludhiana (123 km)RE123
78.    Railway ElectrificationGuna-Gwalior (227 km)RE227
79.    Railway ElectrificationRani-Palanpur 166 kmRE166
80.    Railway ElectrificationVillupuram-Cuddalore Port-Mayiladuturai-Thanjavur & Mayiladuturai-Thiruvarur (228 km)RE228
81.    Railway ElectrificationRaebareli-Unchahar incl. Dalmau-Daryapur (63 km)RE63
82.    Central RailwayLatur- Setting up of coach manufacturing factoryWKSP-
83.    Eastern RailwayCivil Engineering Works in Connection with Diesel Loco Component Factory, DankuniWKSP-
84.    Eastern RailwayDankuni - Setting Up of Electric Loco Assembly and Ancillary Unit of CLWWKSP-
85.    East Central RailwayBarauni - 250 High Horse Power Loco ShedWKSP-
86.    East Coast RailwayVadlapudi- Wagon PoH Workshop of 200 Nos Capacity Near Duvvada StationWKSP-
87.    North Central RailwayKanpur - Construction of MEMU Car shedWKSP-
88.    South Eastern RailwaySetting Up of Diesel Multiple Unit (DMU) Manufacturing Factory at Sankrail/ HaldiaWKSP-
89.    DLWVaranasi - Augmentation of Production Capacity from 200 To 250 High HP Locos Per YearWKSP-
90.    North Eastern RailwayAunrihar - DEMU ShedWKSP-
91.    South Central RailwayWorkshop for Manufacture of Flat Bogies for LHB Design Coaches, YadgirWKSP-
92.    METKOLMM of Existing Corridor Noparanagar-Baranagar- DaksineshwarMTP4.14
93.    Eastern RailwayBarddhaman Yard - 4-lane road over bridge in lieu of 2-lane road over bridge No. 213ROB-
94.    Southern RailwaySrirangam-Tiruchchirapalli Town - 4-lane road over bridge in lieu of 2- lane bridge No.380-AROB-
95.    North Western RailwayIOC Siding at Salawas (Deposit Work)Others2.82
96.    South Central RailwaySecunderabad- Upgradation of facilities at Centralised Training Academy for Railway AccountsTRG-
97.    South Central RailwayMoula Ali - Setting Up of Indian Railway Institute of Finance ManagementTRG-
98.    North Western RailwayMadar - Palanpur - Removing of PSR (Kms 589/1 to 590/1)Track Renewal-
99.    North Central RailwayJhansi-Garhmau, Orai-Ata, Ata-Kalpi &Pokhrayan-Lalpur - Splitting of longer block sectionsTF-
100.          North Central RailwayPaman-Bhimsen - New B-class stationTF-
101.          Western RailwaySabarmati-Botad-subways in lieu of level crossing-23 Nos.RSW-
102.          Western RailwaySabarmati-Botad-Subways in lieu of LCs-14 Nos.RSW-

Projects Under Implementation

There are 72 projects under various stages of implementation by RVNL.

The details of 66 projects assigned to RVNL till March 2021 and which are under implementation are as under:

S. No.RailwayName of ProjectPlan Head
1CR & SCRDaund-Gulbarga - Doubling (224.9 km) and Pune-Guntakal -Electrification (641.37 km)Doubling
2ERNabadwipghat-Nabadwipdham upto BB loop (9.58 km) {Part of Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur Nabadwipghat- GC, Krishnanagar-Chartala, MM for Krishnanagar Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop (9.58 km), Ranaghat-Lalgola strengthening (bridge No.2)}Doubling
3ERDankuni-Furfura Sharif NL {Part of Liluah-Dankuni - 3rd line (10.13 km) with extension to Furfura Sharif}Doubling
4ECRDhanbad-Sonnagar (Patratu-Sonnagar) - 3rd line (291 km)Doubling
5ECoRRaipur-Titlagarh (203 km), incl new line Mandir Hasaud-Naya Raipur (20 km) and new MM for conversion of Raipur (Kendri)-Dhamtari & Abhanpur-Rajim branch (67.20 km)Doubling
6ECoRBanspani-Daitari-Tomka-Jakhapura (180 km)Doubling
7ECoRVizianagaram-Sambhalpur (Titlagarh) 3rd lineDoubling
8.      NRRajpura-Bhatinda Doubling with Electrification (172.64 km)Doubling
9.      NRJanghai-Phaphamau DL with RE (46.79 km)Doubling
10.  NCRBhimsen-Jhansi (206 km) with REDoubling
11.  NCRMathura-Jhansi 3rd lineDoubling
12.  NERVaranasi-Madhosingh-AllahabadDoubling
13.  NERBhatni - Aunrihar with electrification (125 km) (excl Indara - Mau (116.95 km))Doubling
14.  NERPhephna-Indara, Mau-Shahganj (excl. Indara-Mau) (150.28 km) DLDoubling
15SRMadurai-Maniyachi-Tuticorin Doubling with RE (159 km)Doubling
16SRManiyachi - Nagarcoil Doubling with RE (102 km)Doubling
17SCRVijayawada-Gudur 3rd lineDoubling
18SERKharagpur (Nimpura)-Adityapur 3rd line (132 km)Doubling
19SWRHospet-Hubli-Londa-Tinaighat-Vasco da Gama (352.28 km)Doubling
20WRPalanpur-Samakhiali (247.73 km)Doubling
21WCRBudni-Barkhera - 3rd line (33 km)Doubling
22NERLucknow-Pilibhit via Sitapur, Lakhimpur (262.76 km)Gauge Conversion
23CRDighi Port-Roha (33.76 km)New Line
24CRYevatmal- Nanded (206 km) NLNew Line
25ECRFatuah-Islampur incl. material modification for extension of new line from Neora to Daniawan; Daniawan to Biharsharif; Biharsharif to Barbigha; Barbigha to SheikhpuraNew Line
26ECoRAngul-Sukinda Road (98.7 km)New Line
27NRRishikesh-Karnaprayag (125.09 km)New Line
28NRBhanupalli-Bilaspur-Beri (63.1 km)New Line
29NERMau-Ghazipur-Tarighat New LineNew Line
30SECRDallirajhara-Rowghat (90 km) {Part of Dallirajhara-Jagdalpur (235 km)}New Line
31WCRIndore-Jabalpur (342 km) NL sanctioned as Budhni-Indore (205 km)New Line
32COREHospet - Hubli - Vasco da Gama (346 km)RE
33COREKasganj-Bareilly-Bhojipura-Daliganj RE (401 km)RE
34CORERE of Sambalpur-Titlagarh Doubling project (96.596 km)RE
35COREPalanpur-Samakhiali (247.73 km) RERE
36DepositElectrification of IOCL Siding at Pakni (4 km)RE
37DepositElectrification of Ultra Tech Cement Siding at Hotgi (8 km)RE
38DepositElectrification of Chettinad Cement  Siding at Tilati (7.1 km)RE
39ERRanaghat (EMU Car Shed)-Inspection bay for 15 coach maintenance facilitiesWKSP
40ERJheel Siding Coaching Depot- Infrastructure developmentWKSP
41ECoRKhurda Road - Construction of main line electrical multiple unit car shed (Phase-2)WSKP
42NCRJhansi-Setting up of coach periodic overhauling and refurbishment workshopWKSP
43NERDullahapur Yard - Provision of tower wagon periodic overhauling shedWKSP
44SCRKazipet - Workshop for Wagon Periodical OverhaulingWKSP
45WRVadodara - Setting up of New PoH Shop for Electrical LocosWKSP
46SRRepair of S&T Workshop at Podanur, Tamil NaduWKSP
47ERSamudragarh-Nabadwipdham - Road over bridge in lieu of level crossing No.14RSW
48SCRNew Crossing Station Between Umdanagar-Timmarpur Stations of Secunderabad-Mahabubnagar SectionTFC
49SRManamadurai-Rameswaram - Repl of Full Scherzer Lift Span (Bridge No. 346) (Pamban Viaduct)BRGW
50SRManamadurai-Rameshwaram - Reconstruction of bridge (Pamban Viaduct) with navigational lift spanBRGW
51NERDaraganj - Rebuilding (Bridge No.111 On Ganga)BRGW
52NERSetting Up of Centralised Training Institute for IRSME & IRSS Officers at LucknowTRG
53WRNational Rail & Transportation Institute at Vadodara (NAIR)TRG
54WRConstruction of hostels in centralised training institutes (Umbrella Work 2019-20)TRG
55SECRDirect Power Supply from Central Generating AgenciesOEW
56WCRProvision of Addl. Traction Substation at BudhniOEW
57SWRNew Station Building at BelguamOSW
58SWRSecond Entry Station Building at BelguamOSW
59SWRProposed Coaching Depot at BelgaumOSW
60SWRYard Remodelling Works at BelgaumOSW
61SCRMulti-Modal Transport System (MMTS) - Phase-II in HyderabadMTP
62SCRGhatkesar-Raigir (Yadadri)-Extension of multi modal transportation system Phase-IIMTP
63METBaranagar-Barrackpore & Dakshineswar - Construction of Metro Railway (14.5 km)MTP
64METDum Dum Airport-New Garia via Rajerhat - Construction of Metro Railway (32 km) including Naupara (Ex.)-Baranagar (2.6 km) {Part of Dumdum-Baranagar Metro Railway sanctioned as MM to Dumdum-New Garia Metro Railway vide letter No. 96/Proj/C/5/1/Pt. Dated 30.10.09}MTP
65METJoka-Binoy Badal Dinesh Bagh via Majerhat - Construction of Metro railway (16.72 km) incl material modification for extension from Joka Diamond Park (Phase-I)MTP
66NRFinal Location Survey for New Line Connectivity to Char Dham (327 km)FLS

The list of Railway project assigned to RVNL in 2021-22 and under execution is as under:

S. No.RailwayName of ProjectPlan Head
1.        WRInfrastructure up-gradation of Training Institutes at NAIR CampusTRG

The list of projects awarded to RVNL through Competitive Bidding in 2021-22 and under execution is as under:

S. No.Agency /ClientName of ProjectPlan Head
1.MP MetroDesign and Construction of Elevated 10 km Viaduct and 09 Elevated Metro Stations including all Civil, Structural, Roof structure, MEP works, Architectural finishes, Façade, etc for Indore Metro Rail Project.Metro Works
2.MP MetroDesign and Construction of 07 Elevated Metro Stations including Structures, Architectural Finishes, E&M Works etc. of Indore Metro Rail Project.Metro Works
3.NHIDCLDPR Preparation for Highways in North-East Region in state of Nagaland for length of 200 KM.DDC
4.NHIDCLDPR Preparation for Highways in North-East Region in state of Nagaland for length of 280 KM.DDC
5.NHIDCLDPR Preparation for Highways in North-East Region in state of Mizoram for length of 740 KM.DDC

See also

Related Research Articles

Kalinganagar is a planned industrial town in Jajpur district of coastal Odisha, India. Kalinganagar is emerging to be major global hub in steel, power and ancillary products. A large number of steel plants including projects by Jindal Steel and Tata Steel are in various stages of implementation.

<span class="mw-page-title-main">Ircon International</span> Indian railway infrastructure company

Ircon International, or Indian Railway Construction International Limited (IRCON), is an Indian engineering & construction corporation, specialized in transport infrastructure. The public sector undertaking was established in 1976, by the Indian Railways under the Indian Companies Act 1956. IRCON was registered as the Indian Railway Construction International Limited, a wholly owned entity of the Indian Railways. Its primary charter was the construction of railway projects in India and abroad. Ircon has since diversified into other transport and infrastructure segments and with its expanded scope of operations around the world, the name was changed to Indian Railway International Ltd. in October 1995.

<span class="mw-page-title-main">GAIL</span> Central Public Sector Undertaking

GAIL (India) Limited is an Indian state-owned energy corporation with primary interests in the trade, transmission and production distribution of natural gas. GAIL also has interests in the exploration and production solar and wind power, telecom and telemetry services (GAILTEL) and electricity generation. GAIL was founded as the Gas Authority of India Ltd. in August 1984 under the Ministry of Petroleum and Natural Gas to build, operate and maintain the HVJ Gas Pipeline. On 1 February 2013, the Indian government conferred GAIL with Maharatna status along with 11 other Public Sector Undertakings (PSUs).

<span class="mw-page-title-main">Braithwaite, Burn & Jessop Construction Company</span> PSU of the Government of India

The Braithwaite Burn & Jessop Construction Company Limited is a Public Sector Undertaking (PSU) of the Government of India under Department of Heavy Industries. Established on 26 January 1935, BBJ Construction Company has been involved in the construction & repairing of Rail Bridges & Rail-cum-Road Bridges, Industrial structural works, Large building foundation, Civil engineering works, Refinery piping works, Railway gauge conversion etc. The company is registered and headquartered in Kolkata.

<span class="mw-page-title-main">Power Finance Corporation</span> Central Public Sector Undertaking

Power Finance Corporation Ltd. is an Indian central public sector undertaking under the ownership of the Ministry of Power, Government of India. Established in 1986, it is the financial backbone of Indian power sector. PFC's net worth as on 30 June 2023 is INR 1,184 billion. PFC is the 8th highest profit making Central Public Sector Undertaking (CPSU) as per the Department of Public Enterprises Survey for FY 2017–18. PFC is India's largest NBFC and also India's largest infrastructure finance psu. Government has raised status of PFC from ' Navratna' to 'Maharatna' psu on 12 October 2021.  No comment with respect to IP address(es)

<span class="mw-page-title-main">Latur railway station</span> Railway station in Maharashtra, India

Latur railway station is a railway station in Central Railway zone which serves the city of Latur, Maharashtra. It is the start of the Latur–Miraj section of the Solapur (SUR) Division of Central Railway (CR). Latur is well connected to Latur Road Junction, Parli Vaijnath, Purna, Hingoli, Washim, Akola, Amravati, Wardha, Nagpur, Nanded, Nizamabad, Osmanabad, Pune, Lonavla, Karjat, Panvel, Thane, Kalyan, Mumbai, Pandharpur, Miraj, Kolhapur, Udgir, Bidar, Vikarabad, Secunderabad, Hyderabad, Yeshwantpur, Bangalore.

<span class="mw-page-title-main">GMR Group</span> Indian conglomerate based in New Delhi

GMR Group is an Indian multinational conglomerate headquartered in New Delhi. The group was founded in 1978 by Grandhi Mallikarjuna Rao and comprises several companies including GMR Infrastructure, GMR Energy, GMR Airports, GMR Enterprises. Employing the public-private partnership model, the Group has implemented several infrastructure projects in India. The Group also has a global presence with infrastructure operating assets and projects in several countries including Philippines and Greece.

<span class="mw-page-title-main">Emerging Kerala</span> Economy of Kerala

Emerging Kerala is the name given to a biennial investors summit held by the Government of Kerala in Kerala, India. The event is aimed at bringing together business leaders, investors, corporations, thought leaders, policy, and opinion makers.

<span class="mw-page-title-main">Jharsuguda–Vizianagaram line</span> Railway line in India

The Jharsuguda–Vizianagaram line is a railway line in eastern India. It connects Jharsuguda,516 km (321 mi) from Howrah on the Howrah–Nagpur–Mumbai line, and Titlagarh, which in turn is connected with Vizianagaram, 820 km (510 mi) from Howrah on the Howrah–Chennai main line, and Raipur Junction, 830 km (516 mi) from Howrah on the Howrah–Nagpur–Mumbai line. There are several branch lines, like the 176 km (109 mi) line connecting Rayagada with Koraput on the Kothavalasa–Kirandul line. The line traverses Western Odisha and connects the Howrah–Nagpur–Mumbai line with the Howrah–Chennai main line. It covers small portions of Chhattisgarh and Andhra Pradesh.

<span class="mw-page-title-main">Indian Railway Finance Corporation</span> Indian public sector undertaking

Indian Railway Finance Corporation (IRFC) is an Indian public sector undertaking engaged in raising financial resources for expansion and running through capital markets and other borrowings. The Government of India owns a majority stake in the company, while the Ministry of Railways has the administrative control.

The High Speed Rail Corporation of India Limited (HSRCIL) is a Special Purpose Vehicle (SPV) which has been incorporated in 2012 as a subsidiary of Rail Vikas Nigam Limited (RVNL), a public sector enterprise of the Government of India. The HSRCIL has been formed under the Ministry of Railways, Government of India, for the development and implementation of the high speed rail projects in India.

<span class="mw-page-title-main">Ariyalur railway station</span> Railway station in Tamil Nadu, India

Ariyalur railway station is an NSG–5 category Indian railway station in Tiruchirappalli railway division of Southern Railway zone. It is the main railway station in Ariyalur, headquarters of the Ariyalur district in Tamil Nadu, India. It is located on the chord line between Viluppuram and Tiruchirappalli.

Public Sector Undertakings (PSU) or Public Sector Enterprises (PSE) in India are government-owned enterprises in which 51 percent or more share capital is held by the Government of India or state governments or joint ventures between multiple Public Sector Enterprises. Depending on the level of government ownership, they can be broadly categorised as Central PSUs or State PSUs. These entities include government companies, statutory corporations, banking institutions, and departmentally run companies. PSUs are officially classified into three categories, which are Central Public Sector Enterprises (CPSE) and Public Sector Banks (PSB) owned by the central government or other CPSEs/PSBs, and State Level Public Enterprises (SLPE) owned by state governments or other SLPEs. CPSE is further classified into Strategic Sector and Non-Strategic Sector. Depending on their financial performance and progress, CPSEs are granted the status of Maharatna, Navaratna, and Miniratna.

<span class="mw-page-title-main">Sagar Mala project</span> Indian shipping infrastructure project

The Sagarmala Programme is an initiative by the Government of India to enhance the performance of the country's logistics sector. The programme envisages unlocking the potential of waterways and the coastline to minimize infrastructural investments required to meet these targets.

<span class="mw-page-title-main">Kolkata Metro Line 3</span> Transit line in Kolkata, India

Kolkata Metro Line 3 or the Purple Line is a line of the Kolkata Metro. The 6.5 kilometres (4.0 mi) stretch from Joka to Taratala of the 15.08 kilometres (9.37 mi) line was inaugurated on 30 December 2022 before being extended to Majerhat on 6 March 2024. The route will span 15.08 kilometres (9.37 mi) from Joka in the south, to Esplanade in the north with a future extension of 3.39 kilometres (2.11 mi) to Diamond Park from Joka. It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

<span class="mw-page-title-main">Kolkata Metro Line 6</span> Transit line in Kolkata, India

Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro, in the Indian state of West Bengal, is a rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. It currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This stretch will be one of the most important stretches of the metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. The total distance of this route will be 29.87 km (18.56 mi).

<span class="mw-page-title-main">Mominpur metro station</span> Metro station in Kolkata, India

Mominpur Metro Station is a under construction station of the Kolkata Metro in Mominpur, Kolkata, India. The elevated station is located near Mominpur bus stop. It will be a station of Kolkata Metro Line 3. This station will be built in the second phase of the construction of the Kolkata Metro Line 3. There will be two platforms at this station.

<span class="mw-page-title-main">Majerhat metro station</span> Metro station in Kolkata, India

Majerhat metro station is an operational metro station on Line 3 of Kolkata Metro. It is the terminal station of the first phase 1 of this line and the first and only station built over an existing railway network, from Joka to Majerhat. The line was sanctioned in India's railway budget of 2010–11, but due to various hurdles, construction was delayed and missed multiple deadlines. The most notable reason for delays was the Majerhat Bridge collapse in 2018.

Kerala Rail Development Corporation d/b/a Kerala-Rail is a public sector joint venture company under the ownership of the Government of Kerala for the railway infrastructure development in Kerala. The company was incorporated on 3 January 2017.

Dholera Special Investment Region (DSIR) is a greenfield industrial planned city near Dholera in Gujarat's Ahmedabad district, around 100 kilometers to the south-west. spread over more than 920 km2 it is a new industrial city being jointly developed by the Government of India and Gujarat. Dholera is strategically located, well connected with trade gateways and falls in the influence zone of proposed Delhi – Mumbai Industrial Corridor project (DMIC), a joint initiative by the Government of India and Japan.

References

  1. "RVNL". rvnl.org. Retrieved 20 May 2023.
  2. "RVNL". rvnl.org. Retrieved 20 May 2023.
  3. "RVNL climbs on bagging orders". Business Standard India. 18 January 2023. Retrieved 9 February 2023.
  4. "RVNL". rvnl.org. Retrieved 20 May 2023.
  5. "Rail Vikas Nigam's IPO to start today, price band set at Rs 17-19 per equity share". The Indian Express. 29 March 2019. Retrieved 20 May 2023.
  6. "RVNL public float opens on Friday". www.thehindubusinessline.com. 26 March 2019. Retrieved 20 May 2023.
  7. Staff Writer (29 March 2019). "Rail Vikas Nigam IPO fully subscribed". mint. Retrieved 20 May 2023.
  8. "Hot stock! Whopping 544.81 pc returns since IPO listing - Share price of this Navratna status company hits all-time high intraday!". TimesNow. 3 May 2023. Retrieved 20 May 2023.
  9. "Latur rail coach factory to make 100 Vande Bharat trains". The Times of India. 4 October 2022. ISSN   0971-8257 . Retrieved 31 July 2023.
  10. "About HSRC". hsrc.in. Retrieved 20 May 2023.
  11. "Russia to hold majority stake in Vande Bharat joint venture". The New Indian Express. Retrieved 31 July 2023.
  12. Dharma, RanjithKumar (12 December 2022). "RVNL forms new JV in Kyrgyz Republic". Railway Technology. Retrieved 20 May 2023.
  13. "Rail Vikas Nigam shares locked in upper circuit after joint venture in Kyrgyz Republic". cnbctv18.com. 12 December 2022. Retrieved 20 May 2023.
  14. "Rail Vikas Nigam Limited (RVNL) has formed a Joint Venture Company with Kyrgyzindustry- OJSC" (PDF). Bombay Stock Exchange. Archived from the original (PDF) on 11 December 2022.
  15. "Kutch Railway Company Ltd". www.kutchrail.org. Retrieved 1 December 2022.
  16. "Bharuch Dahej Railway Company Limited". www.bdrail.in. Retrieved 1 December 2022.
  17. "Krishnapatnam Railway Company Limited (KRCL)". KRCL. Retrieved 1 December 2022.
  18. "Angul Sukinda Railway Limited | Angul Sukinda Railway Limited". asrl.in. Retrieved 1 December 2022.
  19. "Rail Vikas Nigam Limited' SPV Kutch Railway Company Limited - Rail Vikas Nigam Limited". SKOCH Award. 14 April 2022. Retrieved 1 December 2022.
  20. 1 2 "RVNL's 19th Annual Report (2021-22)" (PDF). rvnl.org.