घाटकोपर Ghatkopar | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mumbai Metro One terminus | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Ghatkopar Station (West), Mumbai | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 19°5′11.98″N72°54′28.76″E / 19.0866611°N 72.9079889°E | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Mumbai Metro One Pvt Ltd (MMOPL) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | Line 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 (1 island platform) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Connections |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platform levels | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Parking | No | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bicycle facilities | No | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accessible | Yes [1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station code | GHK | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 8 June 2014 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Passengers | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2023 | 115,441 [2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rank | 1 out of 12 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Ghatkopar is the elevated eastern terminal metro station on the East-West Corridor of the Blue Line 1 of Mumbai Metro serving the Ghatkopar suburb of Mumbai, India. It was opened to the public on 8 June 2014. Ghatkopar is the busiest station on Line 1, with a daily passenger traffic of 115,441 in December 2023.
The Mumbai Metropolitan Region Development Authority (MMRDA) acquired a 1,400 square metre plot near the Ghatkopar railway station for construction of the Ghatkopar metro station. The MMRDA initially believed that the land belonged to the Brihanmumbai Municipal Corporation (BMC). While the metro was being constructed, the Central Railway Zone (CR) wrote letters to the MMRDA informing them that the land actually belonged to CR. After CR submitted documents proving the same, the MMRDA agreed to compensate them for the plot. At a meeting between MMRDA and CR officials in April 2014, it was agreed that the former would pay ₹18 crore (US$2.2 million) for acquiring the land as part of an inter-governmental agency deal. However, some CR officials were reportedly upset as the amount was far lower than the market value of the land. As per market trends at the time, the land was estimated to be worth ₹180 crore (US$22 million). [3]
In March 2017, MMOPL completed the installation of LED lights at the station. The replacement of the station's 1,718 lamps with LED lights halved its energy consumption. Only lamps were replaced; fixtures were not. The total reduction in the station's electricity consumption amounts to 120,000 units per year providing the MMOPL with an annual saving of ₹12 lakh (US$14,000). [4]
There are 7 sets of automated fare collection (AFC) gates at Ghatkopar station. Three more will be installed by the end of June 2014. [5] The station has textured tiles intended to provide grip to commuters who use wheelchairs. The station also has an elevator wide enough to accommodate a wheelchair, and a ramp from road level up to the elevator, enabling access for the disabled. [6]
L1 Platforms | ||
Platform 1 | ← Line 1 toward Versova (Jagruti Nagar) | |
Island platform, doors will open on the right | ||
Platform 2 | ← Line 1 toward Versova (Jagruti Nagar) | |
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
The Ghatkopar station is connected with the western side of the Ghatkopar railway station through a 12-meter-wide foot overbridge (FOB). [7] [8] [9] Commuters who want to exit the metro station from the main gate must purchase a platform ticket to cross the FOB and reach the road. [10]
Although the Central Railway (CR) had initially permitted metro commuters to use the FOB as a goodwill gesture around two weeks after the metro's opening, they announced that commuters found using the FOB without a platform ticket or a railway pass would be fined. A CR official told Mid-Day , "We have seen the flow of passengers and we think that our local train passengers are facing a problem because of the sudden rush of Metro passengers. Therefore we are now insisting that Metro passengers buy tickets to use the railway-owned overbridge." Railway Pravasi Sangh President Subhash Gupta told the paper, "I am aware of this issue and also took it up in the meeting with railway officials. The railway FOB here can't take the burden of thousands of additional Metro passengers. The rush has increased manifold after Metro services started." [10]
The Mumbai Rail Vikas Corporation (MRVC) completed improvement works at the Ghatkopar railway station on 25 December 2023. The project aims to ease congestion caused by the spillover of commuters from the Versova-Andheri-Ghatkopar Metro-1 into the rail premises. A new 12-metre-wide and 75-metre-long foot over bridge (FOB) was constructed to connect the east and west sides of the station, along with platforms 1/2/3/4. The FOB features a three-metre-wide staircase and escalators on platforms 2/3/4. [11]
In addition, an elevated deck was built to connect the new middle FOB and the existing bridge of Metro 1, aiming to provide respite to metro rail commuters. The upgraded station also features more ticket counters, food stalls, and shops. The first phase of these infrastructure additions, including Automated Ticket Vending Machines on the elevated deck, was carried out at a cost of ₹28 to 30 crore. The overall cost, including the second phase, was estimated to be ₹60-70 crore. The improvements are expected to alleviate the then stampede-like situation during peak hours and facilitate a smoother commute for both local train and metro passengers. [11]
Ghatkopar metro station exits [1] | |||||
---|---|---|---|---|---|
Gate No-1A 🛗 ♿ | Gate No-1B | Gate No-2A | Gate No-2B | Gate No-3 🛗 ♿ | Gate No-4 |
Toward L.B.S. Marg/Sarvodaya Hospital | Near Bata Showroom | Near Bhau Vadapav | Near Ghatkopar railway station | Near Ghatkopar railway station | Near Khot Gali Market |
Thane is a metropolitan city located on the northwestern side of the state of Maharashtra in India and on the northeastern side of Mumbai. It is an immediate neighbour of Mumbai city proper, and a part of the Mumbai Metropolitan Region. It is situated in the north-eastern portion of the Salsette Island.
Transport in Mumbai is achieved by both public and private transport. As of 2016, 52% of commuters use public transport. Mumbai has the largest organized bus transport network among major Indian cities.
Ghatkopar is a suburb in eastern Mumbai, close to which, the City's International Airport is located. The area is located on the Western corner of the Western Ghats and marks the beginning of the Ghats from Mumbai side. It is served by the railway station on the Central Line of the Mumbai Suburban Railway and the metro station on Line 1 of the Mumbai Metro. The eastern part has a large Gujarati population.
The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.
Andheri ([ən̪d̪ʱeɾiː]) is a suburb situated in Western Mumbai, Maharashtra, India.
The MMRDA Mumbai Monorail is a monorail line in the city of Mumbai, Maharashtra, India, built as part of a major expansion of public transport in the city. The project is operated by the Mumbai Metropolitan Region Development Authority (MMRDA).
The Western Railway Elevated Corridor, also known as the Oval Maidan-Virar elevated corridor, was a proposed rapid transit corridor that would have run along the same alignment as the Western Line of the Mumbai Suburban Railway, and link Oval Maidan with Virar.
Line 1 (Blue Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The 11.40 km (7.08 mi) line is fully elevated and consists of 12 stations from Versova to Ghatkopar. The line connects the eastern and western suburbs of Mumbai. It was built at an estimated cost of ₹4,321 crore (US$520 million) and is operated by the Metro One Operation Pvt Ltd (MOOPL) on a 5-year contract. This special purpose vehicle, namely, Mumbai Metro One Private Limited (Mumbai Metro 1) was incorporated for the implementation of the project. Reliance Infrastructure holds 69% of the equity share capital of MMOPL, 26% is with Mumbai Metropolitan Region Development Authority (MMRDA).and the remaining 5% stake with Veolia Transport
The Western line of the Mumbai Suburban Railway is a public transit system serving Mumbai Metropolitan Region, Maharashtra. It consists of 37 stations from Dahanu Road to Churchgate railway station. It is operated by Western Railways (WR). The entire line is at grade.
Andheri is a passenger rail station located at Andheri suburb of Mumbai. It serves the Western line and Harbour lines of the Mumbai Suburban Railway. It is also a stop for some express trains and August Kranti Rajdhani Express. The station also inter-connects the Line 1 of the Andheri metro station. Andheri station first came under prominence after the development of Salsette–Trombay Railway services in 1928 by the British Empire of India during the pre-independence period.
Goregaon is a railway station on the Western line and Harbour line of the Mumbai Suburban Railway network. It serves the suburb of Goregaon. As a general rule, Virar-bound fast trains skip Goregaon, while Borivali-bound fast trains halt here but being in middle between Andheri and Borivali ; it hosts as an important halt for termination and origination of Churchgate and Mumbai CSMT/ Panvel bound services with access to various areas of Dindoshi, Oshiwara, Film City and outlining areas from Malad and Jogeshwari.
Mira Road is a passenger railway station located at Mira Road, a suburb in the Western Suburbs of Mumbai. It is situated between Borivali and Bhayandar stations on the Western line, of Mumbai Suburban Railway. The route of the station is located between the salt pan towards the western zone of the suburb leading towards Bhayandar.
Versova is the elevated western terminal metro station on the East-West Corridor of the Blue Line 1 of Mumbai Metro serving the Seven Bungalows, Yari Road and Versova neighbourhoods of Andheri in Mumbai, India. It opened to the public on 8 June 2014 and consists of two side platforms. The station is located at Seven Bungalows.
Andheri is an elevated metro station on the East-West Corridor of the Blue Line 1 of Mumbai Metro serving the Andheri suburb of Mumbai, India. It was opened to the public on 8 June 2014. After Ghatkopar, Andheri is the busiest station on Line 1, with a daily passenger traffic of 72,125 in February 2017.
Western Express Highway is an elevated metro station on the Blue Line 1 of Mumbai Metro serving the Andheri suburb of Mumbai, India. It is the flagship station of the line and was opened to the public on 8 June 2014.
Line 2 (Yellow Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.
Line 7 (Red Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. When completed, the 30.08 km (18.69 mi) line will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations. The line is mostly elevated except for the 2.49 km (1.55 mi) underground twin tunnels at its southern terminus.
Red Line 9 (extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. Metro Line 9 is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road. This line will be unique from the other metro lines because it will run on a double-decker bridge. There will be a flyover on the first deck and the metro will run on the second deck. The flyover will start near the proposed Shivaji Chowk metro station and will end in Bhayander (West) via Mira Bhayander Road. It shall provide interconnectivity among the Western Express Highway, the Western Line, and the Mumbai Metro.
Line 6 (Pink Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. The 14.477 km (8.996 mi) elevated line will connect Lokhandwala Complex with Vikhroli and will have 13 stations.