Bellefonte and Snowshoe Railroad

Last updated
Bellefonte and Snow Shoe Railroad
Bellefonte and Snowshoe Railroad
Overview
Headquarters Bellefonte
Locale Centre County, Pennsylvania
Dates of operation18591881
Successor Bald Eagle Valley Railroad
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The Bellefonte and Snow Shoe Railroad was a coal-hauling railroad in Centre County, Pennsylvania. Begun in 1859, it came under the control of the Pennsylvania Railroad in 1881. Closing of mines in the 1930s resulted in the decline of traffic on the railroad, which was abandoned in 1959.

Contents

Origins and construction

The line was originally chartered as the Allegheny and Bald Eagle Railroad, Coal and Iron Company on June 12, 1839. [1] It was to extend from the western side of the Allegheny Mountains to Bald Eagle Creek. [2] For many years, however, it showed no organized activity, although the Pennsylvania General Assembly periodically renewed its charter. On May 2, 1855, a charter supplement allowed it to extend to Bellefonte, to connect with the Bald Eagle and Spring Creek Navigation canal. [2] In 1857, a survey of the line was finally completed. [3] Construction began in 1858, and it was completed in 1859, from the coal mines at Snow Shoe to Snow Shoe Intersection (now Wingate) in the Bald Eagle Valley. There it connected with the west end of the newly constructed Tyrone and Lock Haven Railroad, which ran up the valley to Milesburg and then south to Bellefonte, and over which it had trackage rights. [2]

The name of the company was changed to the Bellefonte and Snowshoe Railroad Company on March 24, 1859, shortly before a ceremonial opening on 21 June 1859, featuring a special train from Bellefonte to Clarks, then the terminus of the line. [4] It would be extended to Snow Shoe later in the year, and regular passenger service begun in December. [5]

Independent operation

Moshannon Railroad
Overview
Headquarters Bellefonte?
Locale Centre County, Pennsylvania
Dates of operation18611881
Successor Bald Eagle Valley Railroad
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge

The railroad's operations began at Bellefonte, site of coal-hungry iron furnaces and the head of navigation on the Bald Eagle & Spring Creek canal. Using the tracks of the Tyrone and Lock Haven, it passed north through the narrow valley of Spring Creek to reach the Bald Eagle Valley at Milesburg. The Tyrone and Lock Haven was intended to stretch north up the valley to Lock Haven and south to Tyrone, but only a little grading had been accomplished north of Milesburg or south of Wingate, where the Bellefonte & Snow Shoe turned onto its own tracks. It followed the valley of Wallace Run through Gum Stump, and, at the forks of Wallace Run, climbed the side of a mountain by a series of switchbacks. The line continued climbing through Rhoads following the edges of the Jonathan Run and South Fork Beech Creek gorges, crossing the latter and winding through Fountain to reach Snow Shoe. The total length of the line, from Wingate to Snow Shoe, was 20.26 miles (32.61 km) long. [6]

As new mines opened up in the region, extensions to the railroad began to be built. A line built in 1861 from Snow Shoe north, then west to Gillintown and Moshannon [6] (also known as Per Se) was incorporated on April 11, 1863 as the Moshannon Railroad, [1] and appears to have been operated as part of the Bellefonte and Snow Shoe, adding 2.00 miles (3.22 km) to that road.

In the meantime, the Pennsylvania Railroad had taken control of the Tyrone and Lock Haven, reorganized in 1861 as the Bald Eagle Valley Railroad, and begun to extend it up and down the valley. In 1863, it was completed south from Wingate to Vail, where it reached the PRR-controlled Tyrone and Clearfield Railroad, and in 1865, the line was finished from Milesburg to Lock Haven.

Stereoscopic view of the wreck at Miller's Spring Hollow. Great disaster near Bellefonte, Pa., June 11, 1878, by J. W. Moore 2.jpg
Stereoscopic view of the wreck at Miller's Spring Hollow.

The Bellefonte & Snow Shoe continued to improve its physical plant, stringing a telegraph line from Snow Shoe to Wingate in 1869. [7] In 1871, the directors resolved to construct a branch from Bellefonte to the vicinity of Oak Hall to connect with the Lewisburg, Centre and Spruce Creek Railroad when it reached that point. [8] However, the financial difficulties of the latter long delayed its construction, and while the link would be built (as the Bellefonte, Nittany and Lemont Railroad), it would not be the Bellefonte & Snow Shoe that would construct it.

A serious wreck occurred on the railroad on June 11, 1878, when the Miller's Spring Trestle collapsed under the southbound mixed train from Snow Shoe to Bellefonte and it fell 55 feet (17 m) into a ravine. One passenger was killed, and two passengers and four crewmen were injured. [9]

Snow-Shoe Branch

Map of the PRR Snow Shoe Branch and connecting railroads. Snow Shoe Branch map.svg
Map of the PRR Snow Shoe Branch and connecting railroads.

The Bellefonte & Snow Shoe ended its independent operation in January 1881, when it was sold to the Bald Eagle Valley Railroad, long a subsidiary of the PRR. [2] The Bellefonte & Snow Shoe and the Moshannon Railroads were merged into the Bald Eagle Valley on April 7, 1881 [1] to become the Snow-Shoe Branch.

Several new branches were built off the line under Bald Eagle Valley management to reach nearby coal mines. Two were constructed in 1890. The Sugar Camp Branch diverged 0.8 miles (1.3 km) north of Snow Shoe and ran north, then turned west and rounded a horseshoe curve to cross the Beech Creek Railroad and descend to Clarence, along the North Fork Beech Creek, ending near Lehigh Valley Coal Co. #9 Mine with a length of 4.75 miles (7.64 km). The Grauer Branch left the Sugar Camp Branch just north of the Beech Creek crossing and ran 2.04 miles (3.28 km) north up Cherry Run, reaching Sugar Camp and the Clarence Colliery #1. [6] [10] The Fountain Branch was built in 1903, 1.32 miles (2.12 km) in length, [6] crossing the Beech Creek Railroad to serve Lehigh Valley Coal Co. #14 Mine. [11]

On March 31, 1908, the Bald Eagle Valley Railroad was at last merged into the PRR, including the Snow-Shoe and other branches. [1] The PRR would construct a few more mine branches, extending the Sugar Camp Branch 3.87 miles (6.23 km) in 1914 and 1915. [6] The extension continued east out of Clarence, then climbed steeply north to Poorman Side, then descended along Contrary Run and (Big) Sandy Run to Cherry Run #4 Mine of the Big Sandy Coal Company near Shettleston. The Big Sandy Branch, built in 1915, left the Sugar Camp Branch along Big Sandy Run and climbed out of its valley and along that of an unnamed tributary, extending 2.41 miles (3.88 km) to Lehigh Valley Coal Co. #25 Mine. [10]

However, the railroad was soon to pass into a decline. The Fountain branch had already been removed by 1923. [10] The Great Depression caused the closure of most of the coal mines in the area, [2] and the Big Sandy Branch was abandoned in 1935. A fire brick manufacturer near Clarence and the remaining coal mines still provided some business to the line, [12] but the mine branches continued to be pruned back. On March 6, 1959, the entire line from Wingate north was abandoned.

Related Research Articles

<span class="mw-page-title-main">Centre County, Pennsylvania</span> County in Pennsylvania, United States

Centre County is a county in the U.S. state of Pennsylvania. As of the 2020 census, the population was 158,172. Its county seat is Bellefonte. Centre County comprises the State College, PA Metropolitan Statistical Area.

Bald Eagle Creek is a 9.4-mile-long (15.1 km) tributary of the Little Juniata River in Blair County, Pennsylvania, in the United States. It runs southwest through the Bald Eagle Valley at the foot of the Bald Eagle Mountain ridge to Tyrone.

Nittany and Bald Eagle Railroad

The Nittany and Bald Eagle Railroad is a short line railroad that operates 73 miles (117 km) of track in Blair, Centre, and Clinton counties in Pennsylvania in the United States. It is part of the North Shore Railroad System.

The Bellefonte Central Railroad was a shortline connecting Bellefonte and State College, Pennsylvania. Constructed in the late 19th century to haul local iron ore to furnaces in the Bellefonte region, it later hauled freight traffic to Penn State and lime for steelmaking from local quarries. The line to State College was abandoned in 1974, and most of the remaining railroad in 1984, but a small portion is still used by the Nittany and Bald Eagle Railroad.

The Central Railroad of Pennsylvania was a short railroad of 27.3 miles (43.9 km) built to connect Bellefonte, Pennsylvania with the Beech Creek Railroad at Mill Hall, Pennsylvania. Sustained by shipments from the Bellefonte iron industry, the abandonment of the iron furnaces there led to its demise in 1918.

Pennsylvania Route 150 State highway in Pennsylvania, US

Pennsylvania Route 150 is a 41.1-mile-long (66.1 km) highway in Central Pennsylvania. Its southern terminus is at PA 26 in Dale Summit, Pennsylvania near State College, at the location of the Nittany Mall. Its northern terminus is at U.S. Route 220 in Avis.

Bald Eagle Valley

The Bald Eagle Valley of central Pennsylvania, United States, is the low-lying area draining into Bald Eagle Creek between the Allegheny Front and Bald Eagle Mountain, south of the West Branch Susquehanna River, in the Ridge-and-valley Appalachians. It is southwest of the West Branch Susquehanna Valley that includes Williamsport and northwest of the Nittany Valley that includes State College.

<span class="mw-page-title-main">Nittany Valley</span> Region in Pennsylvania, United States

The Nittany Valley is an eroded anticlinal valley in the central portion of Centre County, Pennsylvania in the United States. It is separated from the Bald Eagle Valley by Bald Eagle Mountain and from Penns Valley by Mount Nittany. The valley is closed to the north by a high plateau that joins these two mountain ridges, but is open to the south at the southern terminus of Mount Nittany. The valley drains to Bald Eagle Creek through water gaps in Bald Eagle Mountain formed by Spring Creek and Fishing Creek, along with smaller streams running through Curtain Gap and Howard Gap. The northwest side of the valley between the Bald Eagle Mountain ridge and the lower Sand Ridge is also known as the "Little Nittany Valley".

Pennsylvania Canal

The Pennsylvania Canal was a complex system of transportation infrastructure improvements including canals, dams, locks, tow paths, aqueducts, and viaducts. The Canal and Works were constructed and assembled over several decades beginning in 1824, the year of the first enabling act and budget items. It should be understood the first use of any railway in North America was the year 1826, so the newspapers and the Pennsylvania Assembly of 1824 applied the term then to the proposed rights of way mainly for the canals of the Main Line of Public Works to be built across the southern part of Pennsylvania.

Bald Eagle Creek (West Branch Susquehanna River tributary)

Bald Eagle Creek is a 55.2-mile-long (88.8 km) tributary of the West Branch Susquehanna River mostly in Centre County, Pennsylvania, in the United States.

John Wesley Gephart was a Bellefonte, Pennsylvania lawyer and industrialist. Educated in Bellefonte and at Princeton University, Gephart's diligence and intelligence were already marked when he was admitted to the bar at the end of 1876 and joined the Bellefonte law practice of James A. Beaver in 1877. He took a prominent part in the civic and moral life of the town, and enjoyed a reputation as a skillful lawyer and charismatic orator. In 1891, he became president of the newly organized Valentine Iron Company, and thereafter became increasingly devoted to furthering industry and commerce in his home town. He laid aside his legal practice in 1893, after becoming the superintendent of the new Central Railroad of Pennsylvania, to become a full-time industrialist.

Pennsylvania Route 144 State highway in Pennsylvania, US

Pennsylvania Route 144 is a state highway located in the U.S. state of Pennsylvania, covering a distance of about 109 miles (175 km). The southern terminus is located near an interchange with U.S. Route 322 (US 322) at State Route 2015 in Potter Township while the northern terminus is located at US 6 in Galeton. Between Snow Shoe and Renovo, PA 144 is known as the High Plateau Scenic Byway, a Pennsylvania Scenic Byway.

The Bald Eagle Valley Railroad was a subsidiary of the Pennsylvania Railroad which owned several rail lines in central Pennsylvania. It had its genesis in the Tyrone and Lock Haven Railroad, a financially troubled railroad chartered in 1857, which was unable to complete more than a small portion of its line before it was reorganized as the Bald Eagle Valley and funded by the PRR in 1861. Completed from Tyrone to Lock Haven in 1865, it was completely controlled by the PRR and did not operate independently. However, it retained its corporate existence for some time, acquiring branch lines into the Snowshoe coal region and an extension from Bellefonte to Lemont before being merged into the PRR in 1908.

Bald Eagle and Spring Creek Navigation Canal company in central Pennsylvania

The Bald Eagle and Spring Creek Navigation Company was a canal company in central Pennsylvania intended to link the iron industry of Bellefonte, Pennsylvania, with the Pennsylvania canal system. Opened for half its length in 1837, the remainder of the canal was not completed until 1848. Destroyed by flooding in 1865, it was not rebuilt; a paralleling railroad completed that year replaced it.

The Lewisburg and Tyrone Railroad, previously the Lewisburg, Centre and Spruce Creek Railroad, was a subsidiary of the Pennsylvania Railroad (PRR) in central Pennsylvania. Originally intended to connect the Susquehanna Valley with Tyrone and the ore lands to its northeast, it was built in two discontinuous and never-connected pieces, one from Tyrone to Fairbrook and one from Lewisburg to Lemont. These served as lightly trafficked branches of the PRR into the early 20th Century. The line from Tyrone to Fairbrook passed into the hands of the short line Bellefonte Central Railroad in 1927, but the PRR's manipulations ensured its abandonment in 1941. The line between Lewisburg and Lemont was severed in 1970 and was gradually cut further back towards Montandon. Regular service ended on the last remaining part of the line in 1997, and it was abandoned in 2008.

U.S. Route 220 in Pennsylvania Section of U.S. Highway in Pennsylvania

U.S. Route 220 is a U.S. Highway that is a spur route of US 20. It runs from Rockingham, North Carolina north to South Waverly, Pennsylvania. In the state of Pennsylvania, the route runs 248 miles (399 km) from the Maryland border in Cumberland Valley Township, Bedford County northeast to an interchange with Interstate 86 (I-86)/New York State Route 17 in South Waverly, Bradford County a short distance south of the New York border. Through the state, US 220 passes through the cities and towns of Bedford, Altoona, State College, Lock Haven, Williamsport, and Towanda. US 220 is concurrent with the entire completed Pennsylvania segment of I-99 between I-70/I-76 in Bedford and I-80 near Bellefonte. US 220 is also a freeway around Bedford, along the I-80 concurrency between Bellefonte and Mill Hall, between Mill Hall and Jersey Shore, from the western end of Williamsport to near Halls, and near the New York border. The remainder of US 220 in Pennsylvania is mostly a two-lane surface road.

Edmund Blanchard was a lawyer and prominent businessman in Centre County, Pennsylvania. He was an early promoter of rail transportation in the area.

Bellefonte Furnace Hot blast iron furnace located in Bellefonte, Pennsylvania

Bellefonte Furnace was a hot blast iron furnace located in Bellefonte, Pennsylvania. Founded in 1888, it was the first hot blast, coke-fueled iron furnace to be built in Centre County, Pennsylvania. While its founders hoped to transform Centre County's iron industry with modern technology, the furnace struggled to operate at a profit and was out of operation from 1893 until 1899. Thereafter, it operated more or less continuously until 1910, and was demolished four years later. It should not be confused with the charcoal-fueled Bellefonte Furnace and Forge on Logan Branch, which was replaced by Valentine Furnace.

Bald Eagle Creek Path

The Bald Eagle Creek Path was a major Native American trail in the U.S. State of Pennsylvania that ran from the Great Island on the West Branch Susquehanna River southwest to what is now the village of Frankstown on the Frankstown Branch Juniata River. The path ran from Clinton County southwest through Centre County and a small part of Blair County to its southern end in Blair County. It was part of a "Warriors Path", an important connector between paths leading to New York and the Six Nations of the Iroquois and the Ohio River country in the north and west, and paths leading to what are now Maryland, Virginia, and the Carolinas in the south.

The Beech Creek Railroad is a defunct railroad which operated in central Pennsylvania between Jersey Shore and Mahaffey. Originally chartered in 1882, it was leased by the New York Central and Hudson River Railroad in 1890 and was directly operated by that company afterwards. Much of the line was abandoned in the second half of the 20th century, though sections at both ends are still active.

References

  1. 1 2 3 4 "Corporate Succession of The Pennsylvania Railroad: Corporate History". Archived from the original on 2007-02-10. Retrieved 2007-06-01.
  2. 1 2 3 4 5 Taber, Thomas T. III (1987). Railroads of Pennsylvania Encyclopedia and Atlas. Thomas T. Taber III. ISBN   0-9603398-5-X.
  3. Linn, John B (1883). History of Centre and Clinton Counties. Archived from the original on 2005-04-02. Retrieved 2007-06-01.
  4. "The Iron Horse". Democratic Watchman. 1859-06-23. p. 3. Archived from the original on 2011-09-29. Retrieved 2007-06-01.
  5. "Passenger Car". Democratic Watchman. 1859-12-15. p. 3.
  6. 1 2 3 4 5 "Corporate Succession of The Pennsylvania Railroad: Development of Fixed Physical Property". Archived from the original on 2007-12-29. Retrieved 2007-06-01.
  7. "Odds and Ends 1869". Democratic Watchman. 1869-10-22. p. 8. Archived from the original on 2005-02-12. Retrieved 2007-06-01.
  8. "Odds and Ends 1871". Democratic Watchman. 1871-06-16. p. 8. Archived from the original on 2011-07-20. Retrieved 2007-06-01.
  9. Annual Report of the Pennsylvania Department of Internal Affairs Part IV. Pennsylvania Department of Internal Affairs. 1878. pp. 38–39.
  10. 1 2 3 C. T. 1000 E Pennsylvania Railroad System List of Stations and Sidings and Instructions for Making Reports to the Superintendent Car Services (1923)
  11. Bezilla, Michael (2001). "The Reading's Nittany Valley Branch: A Railroad That Never Was". The Bee Line. Reading Company Technical and Historical Society. 23 (2): 20.
  12. C. T. 1000 E Pennsylvania Railroad System List of Stations and Sidings and Instructions for Making Reports to the Superintendent Car Services (1945)