Boston Landing | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Everett Street at Guest Street Brighton, Boston, Massachusetts | ||||||||||
Coordinates | 42°21′26″N71°08′21″W / 42.3572°N 71.1393°W | ||||||||||
Line(s) | Worcester Main Line | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 3 [1] [2] | ||||||||||
Connections | MBTA bus: 64 | ||||||||||
Construction | |||||||||||
Bicycle facilities | Bicycle racks; Blue Bikes bikeshare station | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | 1A | ||||||||||
History | |||||||||||
Opened | May 22, 2017 | ||||||||||
Closed | April 1959 (former stations) [3] | ||||||||||
Passengers | |||||||||||
2018 | 600 (weekday average boardings) [4] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Boston Landing station is an MBTA Commuter Rail station in Boston, Massachusetts, United States. It is served by the Framingham/Worcester Line. It is located in the Brighton neighborhood just west of the Everett Street bridge, next to the Massachusetts Turnpike. [5] It serves the Allston-Brighton area as well as the Boston Landing development including Warrior Ice Arena. The station is fully accessible, with a single full-length high-level island platform. Elevators and stairs lead to Arthur Street and to the Everett Street bridge.
The station, which was officially announced on June 7, 2012, is the result of discussions dating back to 1998. It was then projected to cost $16 million and to serve as many as 2400 daily riders by 2030. [1] [5] It is an infill station, since commuter rail trains passed frequently on existing tracks through the site. In November 2012, New Balance announced their intention to open the station in 2014. [6] However, in May 2014, the expected opening was pushed back to the fall of 2016. The new station is being financed by New Balance under a public-private partnership agreement. [2] Prior to a May 2013 renaming, the proposed station project was known as New Brighton Landing.
A groundbreaking ceremony for the $20 million station was held on May 12, 2015. [7] The station opened on May 22, 2017. [8] Boston Landing station is fully accessible, with elevators on the pedestrian bridge to Arthur Street and another elevator to the Everett Street bridge.
The Boston and Worcester Railroad (B&W) opened as far as West Newton in April 1834. [3] The first intermediate station was located at Brighton; it was alternately known at first as Winship Gardens after the adjacent gardens. [9] The small depot was located on the north side of the tracks near and probably just west of Market Street. [10] The first train to arrive at Brighton was reportedly greeted by a celebratory cannon shot. [11] Serving both tourists headed to the gardens and livestock dealers bound for the nearby cattle market, it quickly became one of the railroad's busiest stations. [12] By 1850, the station reported generated $5,000 in revenues some weeks, with round-trip tickets to Boston costing just 12.5 cents. [13]
Railroads frequently built stations in rural areas on their suburban lines, hoping to attract new development and thus prompt more commuters to use their lines. [14] : 15 A flag stop with limited service was later added at Cambridge Crossing, where what is now Cambridge Street crossed the line at grade. [9] The name confused travelers, as the station was not particularly close to Cambridge itself; by 1850 the name "East Brighton" was proposed instead. [13] The B&W merged with its extension/rival, the Western Railroad, in 1867 to become the Boston and Albany Railroad (B&A). That year, the B&A built a wood-frame depot off Cambridge Street near Harvard Street. Wishing to further distance itself from Cambridge, the village voted in 1868 to rename itself as Allston after the painter Washington Allston. The Post Office acknowledged the name change, as did the B&A; the station was officially renamed Allston on June 1, 1868. [14] : 16 By 1870, ridership was at double 1867 levels. [14] : 16
The railroad had originally been built on the northern fringes of Brighton to appease residents who did not want the noise and danger of a railroad in their village center. However, as its popularity grew, so did the local regret for that choice. In 1871, residents attempted to privately finance a branch line that would split from the mainline at Allston and run to Brighton Center. [14] : 16 From there, the branch would have either ran north to rejoin the mainline, or continued west through Oak Square and reached the main at Newton. [15] Two surveys were carried out - the latter of which proposed to extend the branch through Newton Lower Falls to Grantville - but the branch was not built. [16] [14] : 16
After years of deferred investment after the Panic of 1873, the B&A began a substantial improvement program to its suburban stations around 1879. This was likely to divert profits - capped at 10% under state law - into capital investment which would serve as an expanded base for larger profits later. [17] Famed architect H.H. Richardson would ultimately design nine stations for the railroad before his 1886 death; his successors Shepley, Rutan, and Coolidge designed an additional 23 stations by 1894. [17] A new Brighton station was commissioned in July 1884, and construction by the Norcross Brothers firm was completed in 1885. [17] The new station opened on July 6, 1885. [18] [19] [20]
The station agent was removed from Allston in May 1949, but the station building remained in use as shelter for passengers. [21] Allston and Brighton stations were closed in April 1959 (along with University, Faneuil, and Newton) when much of the main line was reduced from 4 to 2 tracks during the building of the Massachusetts Turnpike. [22] [5] [3] The station closures left the northern part of Brighton lacking rail service. The Brighton station was demolished during highway construction, while the Allston station remained intact. The Allston Depot Steakhouse opened in the building in 1972, followed by Sports Depot in 1988 and Regina Pizzeria in 2010. [23] [24] It was designated a Boston Landmark by the Boston Landmarks Commission in 1997. [14] Regina Pizzeria closed in July 2020; that August, Allston music venue Great Scott announced that they were in negotiations to lease the station to replace their former location. [25] [26] That plan fell through in 2022. [27]
In 1998, a new station in Allston-Brighton began to be considered as part of the Urban Ring planning process. In 2007, the City of Boston allocated $500,000 in funding for the Allston Multimodal Station Study. [28] The study analyzed both commuter rail and DMU local service along the corridor, with potential stops at Faneuil, Market Street, Everett Street, Cambridge Street, West (Ashford Street), and Commonwealth Avenue. [1] Allston was soon determined the most likely location for an initial commuter rail stop, using either the Everett Street or Cambridge Street location, with more stops and DMU service to follow later. Local opinion was skewed towards Cambridge Street, with residents citing better bus connections and access to Union Square, plus security risks at Everett Street. The station was estimated to serve 2,000 daily riders by 2030, cost $10 million, and take ten years to actually reach completion when the recommendations were made in 2009. [29]
In 2009 and 2010, the state negotiated a major agreement with CSX Transportation that involved the purchase of several rail lines, including purchasing the line between Framingham and Worcester. The agreement also included CSX moving its intermodal freight operations from the Beacon Park Yard in Allston to a new yard in Worcester. The abandonment of Beacon Park Yards allows for an increase in MBTA service on the Framingham/Worcester Line; additionally, the elimination of the single-track bottleneck through the yard opened the possibility for a station to be built in Allston while still allowing passing tracks. [30] However, with no funding source available, construction of a station was not pursued. [5]
In March 2012, New Balance submitted initial plans for a mixed-use development in Brighton, which included the possibility of a commuter rail station. [31] In May, they officially announced the $500 million development, which is to be one block away from the station site. A company spokesperson told the Boston Globe that "If designated by MassDOT, New Brighton Landing will design, permit and construct a commuter rail station in Allston-Brighton" and that New Balance was willing to contribute to funding the station. [32]
One June 7, 2012, Allston-Brighton officials announced that New Balance and the Massachusetts Department of Transportation had signed a letter of intent to build a station at Everett Street, to be named New Brighton Landing. The public-private partnership, in which New Balance will "fund all permitting, design, construction and annual maintenance costs" for the station - then projected to cost $16 million - was the first of its kind for the MBTA. [5] The associated New Brighton Landing development was approved by the Boston Redevelopment Authority on September 13, 2012, with construction to begin later that year. [33]
No timetable was initially laid out for station construction. On November 9, 2012, the company announced plans to open the station in 2014. Design and permitting were to be completed in 2013, with construction finished within a year. [6] In March 2013, the names of the station and the development were changed to Boston Landing. The proposed station was approved by a MassDOT finance board on May 14, 2013, and the agency's Board of Directors on May 22. [34] [35] By 2013 the expected completion date had slipped to mid-2015, and in May 2014 New Balance announced that the station would not open until the second half of 2016. The company cited the unanticipated complexity of the planning and construction for the delay. [2]
A groundbreaking ceremony for the $20 million station was held on May 12, 2015, still with an expected opening in the fall of 2016. [7] Construction began in October 2015 with the removal of the three yard tracks at the station site. The inner part of the Framingham/Worcester Line was closed for a weekend in December 2015 to allow construction of a temporary shoo-fly track, which allows the mainline track to be removed during construction. [36] The mainline tracks were put back in service during a similar weekend shutdown in April 2017, restoring double track through Allston for the first time since the 1950s. [37]
State legislators representing communities along the Worcester Line have expressed concern that Boston Landing and the planned West Station would slow down trips for suburban commuters. [38] It was originally proposed to limit service to the stop to two inbound trains in the morning rush hour and two outbounds in the afternoon (plus an unknown amount of off-peak service), but later schedules added additional stops. [34]
In April 2017, the MBTA announced that the station would be in Zone 1, which would have given suburban commuters inexpensive interzone fares but increased the cost of reaching downtown from Boston Landing. After criticism, the agency placed the station in Zone 1A. [39] The station opened on May 22, 2017. [8]
Allston is an officially recognized neighborhood in Boston, Massachusetts, United States. It was named after the American painter and poet Washington Allston. It comprises the land covered by the zip code 02134. For the most part, Allston is administered collectively with the adjacent neighborhood of Brighton. The two are often referred to together as Allston–Brighton. Boston Police Department District D-14 covers the Allston-Brighton area and a Boston Fire Department Allston station is located in Union Square which houses Engine 41 and Ladder 14. Engine 41 is nicknamed "The Bull" to commemorate the historic stockyards of Allston.
The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).
The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The mainline is currently used by CSX for freight as the Berkshire Subdivision and Boston Subdivision. Passenger service is provided on the line by Amtrak, as part of their Lake Shore Limited service, and by the MBTA Commuter Rail system, which owns the section east of Worcester and operates it as its Framingham/Worcester Line.
The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.
The Indigo Line was a proposed rapid transit service of the Massachusetts Bay Transportation Authority (MBTA) that would have incorporated parts of the former Grand Junction Railroad, the Seaport District's Track 61, a spur to Riverside station and segments of other MBTA Commuter Rail lines within the Greater Boston region of Massachusetts. As proposed, the Indigo Line was planned as hybrid rail and would have predominately shared existing infrastructure with the MBTA Commuter Rail.
The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts, to Worcester, Massachusetts, through the MetroWest region, serving 18 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.
Natick Center station is an MBTA Commuter Rail station in Natick, Massachusetts served by the Framingham/Worcester Line. The station, located below grade in a wide cut adjacent to North Main Street, has two side platforms serving the line's two tracks. The second-busiest non-accessible station on the system, it is undergoing a major accessibility renovation and modernization from 2020 to 2024.
Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.
Newtonville station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located between the Massachusetts Turnpike and Washington Street at Newtonville Square in the village of Newtonville in Newton, Massachusetts. Stairway entrances are located on the bridges over the Turnpike at Walnut Street and Harvard Street. Newtonville station is not accessible; renovations for accessibility are planned.
Auburndale station is an MBTA Commuter Rail station in Auburndale, Massachusetts. It serves the Framingham/Worcester Line. It is located next to the Massachusetts Turnpike near Lasell College. The modern station platform, built around 1961, replaced a highly acclaimed 1881 depot building designed by H. H. Richardson. A full renovation of the station for accessibility is planned.
Wellesley Hills station is an MBTA Commuter Rail station in Wellesley, Massachusetts, United States. It serves the Framingham/Worcester Line. It is located off Washington Street (MA-16) in Wellesley, Massachusetts. Wellesley Hills has two low platforms serving the line's two tracks; it is not accessible. Designed in 1885 and completed in 1886, the station was the last of nine stations that H.H. Richardson designed for the Boston and Albany Railroad. It replaced a previous station, built in 1834 with the completion of the Boston and Worcester Railroad.
Wellesley Square station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located just north of the MA 16-MA 135 intersection in downtown Wellesley, Massachusetts. It serves both walk-up and park-and-ride commuters, with a 224-space parking lot for the latter group. The station has low-level platforms and is not accessible.
Ashland station is an MBTA Commuter Rail station in Ashland, Massachusetts. It serves the Framingham/Worcester Line. It has a long driveway leading from the south parking lot to the intersection of West Union Street and Voyagers Lane. Like the other stations on the line west of Framingham, Ashland serves as a park-and-ride station with 678 parking spots.
Westborough station is an MBTA Commuter Rail station in Westborough, Massachusetts. It serves the Framingham/Worcester Line. It is located off Smith Parkway, west of the Westborough town center. The station consists of two side platforms serving the line's two tracks. Each side has a small mini-high platform for accessibility; an overhead ramp structure connects the two platforms.
Grafton station is an MBTA Commuter Rail station in the North Grafton village of Grafton, Massachusetts, served by the Framingham/Worcester Line. The station is fully accessible, with mini-high platforms serving both of the line's two tracks.
Framingham station is a historic Boston and Albany Railroad station located in downtown Framingham, Massachusetts. Designed by noted American architect H. H. Richardson, it was one of the last of the railroad stations he designed in the northeastern United States to be built. The station, built in 1884–85, served as a major stop on the B&A Main Line as well as a hub for branch lines to Milford, Mansfield, Fitchburg, and Lowell. After years of deterioration, the station was listed on the National Register of Historic Places in 1975 as the Framingham Railroad Station, and restored a decade later.
Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.
Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.
Beacon Park Yard was a CSX Transportation rail yard in Allston, Boston, now owned by Harvard University. The yard opened in 1890 on the site of a former trotting park, from which it took its name. It was closed in 2013 following the relocation of the yard's container operations to Worcester, Massachusetts and opening of a transload facility in Westborough, Massachusetts. Plans for the yard include relocation of the Massachusetts Turnpike Allston exit, construction of a new MBTA commuter rail station, a major real estate development, and possibly a rail layover yard.
West Station is a planned station on the MBTA Commuter Rail Framingham/Worcester Line, to be located in the former Beacon Park Yard in Allston, Massachusetts. It was initially proposed as part of a project to straighten the Massachusetts Turnpike through the yard, allowing much of the land to be redeveloped. As of 2024, plans for the station have not proceeded beyond conceptual studies.
Media related to Boston Landing station at Wikimedia Commons